Powered By Kitlog Pro v2.0
TERRY'S WEB SITE
RV 7A
All
Work Logs Found:
130
Category Work Time:
468 Hours
Date
Hours
Work Log Summary
Details
06-27-2007
4.00
Canopy Anchor Blocks and Latch
Details
06-26-2007
6.00
New right side canopy front cap strip
Details
06-25-2007
7.00
Windscreen fit, more cap strips and canopy fit
Details
06-24-2007
4.00
Began fitting windscreen
Details
06-23-2007
4.00
Canopy fron cap strips Cont.
Details
06-22-2007
4.00
Canopy cap strips
Details
06-21-2007
6.00
Drilled Plexi to Canopy Frame
Details
06-20-2007
6.00
Canopy rear hoop fit
Details
06-19-2007
4.00
Test fit of Canopy
Details
06-19-2007
2.50
More fitting of canopy after big cut - Recommendat
Details
06-18-2007
5.00
Initial cut of plexi
Details
06-17-2007
5.00
Canopy brackets cont.
Details
06-16-2007
4.50
Install JRW Tipper brackets
Details
06-15-2007
3.00
Design glove box / fuse holder
Details
06-14-2007
4.50
Adjusted canopy frame width and contour
Details
06-13-2007
4.50
Canopy Rear Track
Details
06-12-2007
2.00
Completed riveting of right side aft upper skin
Details
06-12-2007
4.00
Begin Slider Fitment
Details
06-11-2007
3.00
Installed Roll Bar
Details
05-25-2007
2.00
Bending Roll Bar Cont.
Details
05-24-2007
2.00
Bent Roll Bar to fit fus per plans
Details
06-04-2006
3.50
Finished left seat back parts
Details
06-03-2006
3.00
Build left seat back parts
Details
06-02-2006
4.50
Control Tunnel Support and Cover
Details
06-01-2006
2.00
More nutplates in baggage floor
Details
05-30-2006
4.00
More nutplates in baggage floor
Details
05-29-2006
4.00
More nutplates in baggage floor
Details
05-28-2006
2.00
Refit bagage floors with nutplates
Details
05-27-2006
3.50
Fit tail cone forward top skin
Details
05-26-2006
3.00
Fabricate and fit the F-635 Bellcrank assy.
Details
05-25-2006
4.00
Side rails and gussets
Details
05-24-2006
3.50
Mounted the brake pedels in the footwell
Details
05-23-2006
3.50
Brake pedal assembly
Details
05-22-2006
4.00
Brake pedal construction complete
Details
05-21-2006
4.00
Brake pedal construction
Details
05-20-2006
2.50
Build rudder and brake pedals
Details
05-10-2006
2.00
Finished front fuel tank mounts
Details
05-09-2006
4.50
Fit right step and starded fuel tank mounts
Details
05-08-2006
5.50
Fit Left Step
Details
05-07-2006
4.50
Fit Flap Bearing Blocks and Started Step Installat
Details
05-06-2006
3.00
Finished riveting F-705 bulkhead
Details
05-04-2006
4.00
Finished and installed seat adjustment supports
Details
05-03-2006
5.50
finished control fit and started seat adjustment s
Details
05-02-2006
3.50
Rolled right elevator skin leading edge.
Details
05-01-2006
4.50
Rolled left elevator leading edge
Details
04-30-2006
4.50
Final assembly of trim tab with mini-ribs
Details
04-29-2006
3.00
Fit trim tab hinge
Details
04-28-2006
4.00
Riveted left elevator skin
Details
04-26-2006
3.00
Trim control column mounts per plans, trial fit
Details
04-24-2006
8.00
Checked all QB Fuselage work
Details
04-23-2006
3.50
Riveted skin to right elevator
Details
04-22-2006
3.00
Riveted L & R Elevator Skeltons
Details
04-21-2006
4.00
Prime Skeleton parts
Details
04-20-2006
4.50
Prepare Left Elevator Skeleton
Details
04-19-2006
5.00
Prepared Right Elevator Skeleton
Details
04-18-2006
4.50
Bent Left Elevator TE and made Mini Ribs
Details
04-15-2006
2.00
Bend Trailing edge for Right Elevator
Details
04-12-2006
2.00
riveted right elevator stiffeners
Details
04-11-2006
4.00
Back Riveted Stiffeners to Left Elevator
Details
04-09-2006
3.00
Conversion Coat and Akzo primer Elevator Skeleton
Details
04-03-2006
2.00
Conversion Coat and Seal Elevator Skeleton
Details
04-02-2006
3.00
Conversion Coat Elevator Skeleton
Details
03-29-2006
5.50
Prep Left Elevator Stiffeners and both skins
Details
03-27-2006
2.00
Prep Left Elevator Parts
Details
03-26-2006
3.00
Prep Right Elevator Skin and Ribs
Details
03-24-2006
2.00
Roll Rudder Leading Edge
Details
03-11-2006
4.50
Rivet Rudder Trailing Edge
Details
03-10-2006
3.00
Trim Tab with Mini-Ribs
Details
03-09-2006
4.00
Trim Tab Mini Ribs Continued
Details
03-07-2006
4.00
Trim Tab Construction - w/ mini ribs
Details
03-06-2006
3.00
Assemble rudder trailing edge w/ tank sealant
Details
03-05-2006
4.50
Riveted Rudder Skins
Details
03-04-2006
3.50
Prime inside edges of skins Rivet skins to skeleto
Details
03-03-2006
4.00
Primed Rudder Skeleton w/ AKZO & started assy.
Details
03-02-2006
3.00
Prepped rudder skeleton w/ Sanchem
Details
02-12-2006
2.00
Riveted Side and Bottom Firewall to Skins
Details
02-10-2006
4.50
Fit aft bulkhead F712 and Rivet in place
Details
02-07-2006
1.00
Drill Counterweight and Dimple Spars and Skins
Details
02-06-2006
2.00
Finish dimpling the rudder parts
Details
02-05-2006
2.00
Deburr and Dimple Rudder Parts
Details
01-10-2006
1.00
Delivery of QB kit
Details
01-05-2006
5.00
Prepared Rudder skeleton parts. Test assemble rud
Details
01-04-2006
4.00
Primed Rudder Stiffeners and Riveted to Left Skin
Details
01-04-2006
2.00
Begin Rudder Skeleton
Details
01-03-2006
4.00
Conversion Coated Rudder Skin Stiffeners
Details
01-02-2006
4.00
Prep Rudder Skins
Details
12-31-2005
3.00
Cut and prepared Rudder stiffiners
Details
12-30-2005
10.00
Construct Wing Stand for QB Wings
Details
12-29-2005
10.00
Built Fuselage Jig
Details
12-10-2005
2.00
VS Rear Spar Rivets
Details
12-09-2005
3.00
Finished VS skin riveting except for rear spar
Details
12-07-2005
4.00
Rivet VS Left side Front Spar to Skin
Details
12-06-2005
4.00
Riveted VS Substructure
Details
12-05-2005
1.50
Primed VS parts with AKZO
Details
12-04-2005
3.50
Prime Vertical Satilizer parts
Details
12-03-2005
3.00
Conversion coatings on VS Substructure
Details
11-30-2005
2.50
Debur and countersink Rudder parts
Details
11-29-2005
3.00
Match drilled Rudder Skin, and align substructure
Details
11-28-2005
2.50
Drill Rudder Substructure
Details
11-24-2005
3.00
Preped VS substructure ribs. Cleco'd together
Details
11-23-2005
1.50
drilled VS rear spar hinge brackets.
Details
11-22-2005
2.50
Finished VS Rear Spar Prep.
Details
11-21-2005
2.50
Hung HS on Garage Ceiling. Started Rudder
Details
11-19-2005
3.50
Completed Horizontal Stabilizer!!
Details
11-17-2005
3.00
Squeezed HS Skin Rivets
Details
11-16-2005
4.00
Finish Right HS Riveting Start Rear Spar
Details
11-15-2005
4.50
Finish Left HS riveting and start Right HS rivetin
Details
11-14-2005
5.00
Prep Left Horizontal Stabilizer for Assembly
Details
11-12-2005
3.50
Riveted Rear Spar Assy.
Details
11-11-2005
4.50
Prime Right Horizontal Stabilizer Skin and Rear Sp
Details
11-10-2005
3.50
Prime Right HS parts
Details
11-09-2005
4.50
Prep Right Horizontal Stabiliser for Assembly
Details
11-06-2005
5.00
Conversion coating on left substructure parts
Details
11-04-2005
2.00
Dimples Left HS Skin
Details
11-03-2005
0.50
HS Parts Prep.
Details
11-01-2005
4.50
Match drilling HS Skin
Details
10-31-2005
5.00
Right and Left HS inner nose and inner rib drilli
Details
10-30-2005
3.00
Improve fit of center nose rib Right HS
Details
10-29-2005
3.20
Right HS center rib and spar drilling
Details
10-28-2005
4.50
Right side HS skin drilling
Details
10-27-2005
3.00
Left HS Drilling
Details
10-26-2005
0.50
Left HS locating and drilling
Details
10-25-2005
6.00
HS Left Skeleton
Details
10-24-2005
1.50
Notching front inner HS ribs.
Details
10-23-2005
3.50
Triming Front Spar
Details
10-22-2005
0.50
Triming HS Front Spar
Details
10-21-2005
4.50
Front Spar Initial
Details
10-18-2005
4.00
Rear Spar Cont.
Details
10-17-2005
3.50
First Steps
Details
10-16-2005
0.00
Workshop Setup
Details
SITE NAVIGATION
Contact Builder
Tool Box Kit Home
RV 7A Home
Category
# Logs
# Hours
All
130
468
Avionics
1
3
Canopy
19
82
Empennage
79
262
Fuselage
28
110
Miscellaneous
2
1
Wings
1
10
Copyright © 2001-2025 Matronics. All Rights Reserved.