Powered By Kitlog Pro v2.0
DOUG'S WEB SITE
CH 650
All
Work Logs Found:
38
Category Work Time:
107 Hours
Date
Hours
Work Log Summary
Details
07-12-2010
3.00
Left flap trim and fit hinge
Details
07-05-2010
7.00
Left Flap
Details
06-23-2010
2.00
Riveted right flap
Details
11-27-2009
3.00
Finish flap rib pilot holes
Details
11-25-2009
2.00
Drill Flap skin pilot holes
Details
11-11-2009
2.00
Right flap
Details
11-06-2009
1.00
Right flap
Details
10-09-2009
2.00
Rivet Elevator
Details
10-08-2009
2.00
Riveted Elevator
Details
10-06-2009
2.00
Setup for riveting
Details
10-04-2009
2.00
Prime trim tab, solder servo wires
Details
09-12-2009
4.00
Deburr, clean, prime
Details
08-28-2009
3.00
Drill out final hole size
Details
08-25-2009
2.00
Drill out holes in elevator
Details
08-13-2009
2.50
Fit servo control arm and horn
Details
08-12-2009
2.00
Trim Servo work
Details
08-08-2009
2.00
Trim tab hinge and final position
Details
08-04-2009
2.00
Elevator trim tab cutout
Details
03-27-2009
3.00
Plugs for elevator cutout
Details
03-01-2009
1.00
Lower elevator horn
Details
02-10-2009
3.00
Work on elevator horns
Details
02-01-2009
2.00
Elevator cutout
Details
01-31-2009
4.00
Work on elevator
Details
12-27-2008
6.00
Elevator initial fit
Details
12-13-2008
4.00
Elevator hinge and skeleton
Details
11-29-2008
2.00
Fit hinge to rear
Details
11-28-2008
4.00
Debur, prime, rivet top skin
Details
11-07-2008
3.00
Fit top skin
Details
10-17-2008
4.00
Attach skin to bottom of skeleton
Details
10-15-2008
2.00
Fitted HS Skins
Details
10-14-2008
1.50
Begin fitting skin
Details
10-10-2008
2.00
Rivet Horizontal Stabilizer Skeleton
Details
09-28-2008
9.00
HS Skelton
Details
09-21-2008
2.00
Make L brackets
Details
09-18-2008
2.50
HS ribs
Details
09-17-2008
2.00
Rear spar attach bracket
Details
09-14-2008
3.00
Front spar attach brackets
Details
09-13-2008
1.50
Front spar doublers
Details
SITE NAVIGATION
Contact Builder
CH 650 Home
Category
# Logs
# Hours
All
38
107
Horiz Stabilizer
31
87
Wings
7
20
Copyright © 2001-2024 Matronics. All Rights Reserved.