Work Logs Found: 378
Category Work Time: 1387 Hours
 Date
Hours
Work Log Summary

Details

 03-27-2014
3.00
Final checks - then FIRST FLIGHT!
Details
       

 03-21-2014
3.50
More final prep work.
Details
       

 03-21-2014
3.00
Final WOT static engine test.
Details
       

 02-25-2014
4.50
More fuel calibrations and general work.
Details
       

 02-22-2014
5.00
Calibrating fuel tanks - stage 1
Details
       

 02-21-2014
5.00
Getting fuel level senders to co-operate ...
Details
       

 02-15-2014
3.00
More avionics debugging ....
Details
       

 02-02-2014
4.00
Getting the Voltmeter & Fuel Flow Meter working
Details
       

 01-29-2014
6.00
Fuel line re-routing and testing.
Details
       

 01-29-2014
5.00
Chasing sparks ...
Details
       

 01-27-2014
4.50
More de-bugging....
Details
       

 01-24-2014
3.00
Hunting low fuel pressure fault.
Details
       

 01-24-2014
1.00
Elevator stop-block
Details
       

 01-23-2014
1.00
Tidying engine bay
Details
       

 01-20-2014
2.00
More work on the engine miss - with success.
Details
       

 01-19-2014
2.00
More finishing touches & checking mag gap
Details
       

 01-18-2014
3.00
Hunting for the engine miss ...
Details
       

 01-04-2014
3.00
2nd taxi tests
Details
     

 01-01-2014
6.00
Engine run & first taxi tests
Details

 12-30-2013
4.00
Carbi exploring & Dynon EMS Mapping
Details
       

 12-28-2013
6.00
Engineer's inspection & engine start-up
Details
       

 12-27-2013
7.00
Reweighing & more flap work
Details
     

 12-26-2013
8.50
Wing root tape and wiring
Details
       

 12-21-2013
5.00
Weight and balance
Details
       

 12-20-2013
4.00
Preparing for weight and balance
Details
       

 11-08-2013
2.00
Replacing the ram air duct rubber baffles
Details
       

 11-08-2013
1.00
Removing & mailing off the Eflap controller.
Details
       

 10-28-2013
4.00
More general finishing work
Details
       

 10-22-2013
2.00
Filling and priming the oil system.
Details
       

 10-21-2013
3.00
Fuel flow sender leak - panel remove
Details
       

 10-19-2013
4.00
More finishing touches
Details
       

 10-18-2013
3.00
Flushing fuel tanks & battery charger
Details
       

 10-01-2013
4.00
Pre-inspection for certification
Details

 09-28-2013
5.00
Seat belts and electrics
Details
       

 09-27-2013
2.00
More finishing work ...
Details
       

 08-17-2013
5.50
Avionics bay completion ....
Details
       

 07-28-2013
5.00
Finishing tasks
Details
       

 07-27-2013
2.00
Tapping out and fitting wing tank drains.
Details
       

 07-26-2013
3.00
Finishing tasks
Details
       

 06-23-2013
3.00

Details
       

 06-22-2013
2.00
Finishing fitting prop
Details
       

 06-21-2013
2.00
Fitting ground adjustable prop & spinner step 1
Details
       

 06-17-2013
7.00
Getting the radio working ...
Details
       

 06-03-2013
6.00
Re-installing the panel after tidying the wiring
Details
       

 06-01-2013
8.00
Continued tidying of the electrics
Details
       

 05-26-2013
4.50
Tidying cabling behind panel
Details
       

 05-20-2013
2.00
Rewiring the 9 pin plug for the skyview ....
Details
       

 05-19-2013
1.50
Cutting the seatbelt slots in the cockpit side lin
Details
       

 05-08-2013
4.00
A start to cable tidying ...
Details
       

 05-03-2013
7.00
Rigging day ...
Details
       

 04-27-2013
9.00
Firing up the panel!
Details
       

 04-25-2013
9.00
Panel prep.
Details

 04-22-2013
2.50
More panel wiring
Details

 04-02-2013
8.00
General work & wiring work
Details
       

 03-04-2013
6.00
Fitting the stick mixer and aileron tubes
Details
       

 03-03-2013
2.00
Wiring progress
Details
       

 12-26-2012
4.50
Flap fitting and rigging.
Details
       

 12-22-2012
3.00
Wings back on and bolts in
Details
       

 12-15-2012
1.00
Finishing wing skin repair
Details
       

 12-06-2012
3.00
Removing & repairing the left wing.
Details
       

 11-18-2012
2.00
Replacing the gear leg retaining bolts.
Details
       

 11-17-2012
4.00
Fitting the pitot.
Details
       

 11-11-2012
2.50
Refitting the flaps.
Details
       

 11-10-2012
0.50
Changing the linkage points on the elevator tube.
Details
       

 10-28-2012
3.00
Installing the steps.
Details
       

 10-27-2012
4.00
Moving from the shared hangar.
Details
       

 10-14-2012
2.00
Making extra bolt spacers for the spar box.
Details
       

 10-13-2012
7.00
Control stick relay and fuel level wiring
Details
       

 09-30-2012
7.00
Control sticks & evevator trim electrics.
Details
     

 09-29-2012
5.00
Wing AOA bolts & electrics
Details
       

 09-15-2012
4.00
Removing the master relay - general elec work
Details

 09-01-2012
6.00
Final prep and wing install!
Details
       

 08-26-2012
0.50
Tapping and cleaning the fuel tanks insert threads
Details
     

 08-25-2012
6.50
Fitting Ailerons
Details
       

 08-17-2012
6.00
Preparing the wings for final fitting
Details
       

 08-10-2012
2.00
Moving the wings etc over the fuselage hangar.
Details
       

 07-21-2012
2.00
Moving the wings etc to Ed's hangar

 07-07-2012
5.00
The big move to the hangar....
Details
       

 07-06-2012
2.00
Last night in the garage ...!!
Details
       

 06-24-2012
4.00
Final electric work at home
Details
       

 06-17-2012
4.00
More EMS wiring work.
Details
       

 06-16-2012
2.00
Shunt fuses and tacho pickup.
Details
       

 06-09-2012
7.00
General wiring work.
Details
       

 06-02-2012
8.00
More avionics ......
Details
       

 05-26-2012
5.00
Avionics cabling .......
Details
     

 05-19-2012
6.00
Making and installing a new ADAHRS module mounting
Details
       

 05-13-2012
3.00
Making and installing the flap position indicator.
Details
       

 05-12-2012
7.00
Finishing sensor cables & fitting flap position in
Details
       

 05-10-2012
3.50
Locating cables & holding cables at actuating arms
Details
       

 05-09-2012
1.50
Mounting bars to hold cables in position
Details
     

 04-18-2012
2.50
Centre console & flap position indicator
Details
       

 04-14-2012
8.00
Completed panel basic wiring.
Details
       

 04-13-2012
2.50
And more panel work ....
Details
     

 04-12-2012
2.50
More panel work.
Details
     

 04-11-2012
3.00
More Panel Work
Details
       

 04-10-2012
2.00
More Panel Wiring
Details
       

 04-07-2012
5.00
Preparation of the final panel.
Details
       

 04-06-2012
8.00
Wiring engine & passing cables through firewall.
Details
       

 03-31-2012
4.00
Fitting cable glands to pass cables through the fi
Details
       

 03-30-2012
4.00
Connecting Dynon sensor cables.
Details
       

 03-24-2012
1.50
Making mounting nuts for cable glands through the
Details
       

 03-17-2012
3.50
Wiring the CHT and EGT cables for the Dynon.
Details
       

 03-10-2012
2.00
Painting the face plates for the dash and consoles
Details
     

 03-05-2012
3.00
Fuel valve & cutting holes through firewall.
Details
       

 03-04-2012
2.50
Labeling CHT & EGT sensors.
Details
       

 03-03-2012
5.00
Making up the planel cover plate/sheet.
Details
       

 03-02-2012
4.00
Making up cover plates for throttle quadrant & fue
Details
       

 02-26-2012
4.00
Oil cooler hoses - completion.
Details
       

 02-25-2012
2.50
Making up oil cooler oil hoses.
Details
       

 02-19-2012
2.50
Re-bleeding brake lines.
Details
       

 02-18-2012
1.50
Made "P" clamp to hold the fuel pressure sender.
Details
       

 02-17-2012
3.00
Wiring & fitting headset sockets.
Details
       

 02-11-2012
2.00
Priming the brake system.
Details
       

 02-08-2012
1.00
Recutting the thread on the fuel pressure sender.
Details
       

 02-05-2012
2.50
Fitting the fuel flow meter.
Details
       

 02-04-2012
2.00
Cables & brake lines
Details
       

 02-03-2012
4.00
Cutting and fitting scat tubing
Details
       

 01-28-2012
1.50
Making cardboard templates for the console cover p
Details
       

 01-27-2012
5.00
More work on panel.
Details
       

 01-26-2012
2.00
Fitting accessory socket.
Details
       

 01-25-2012
3.00
Fitting nut-plates to secure the panel.
Details
       

 01-24-2012
1.50
Changing to longer screws
Details
       

 01-11-2012
1.00
Panel work
Details
       

 01-08-2012
4.00
Fitting canopy lock.
Details
       

 12-18-2011
5.00
Making bus bars.
Details
       

 12-17-2011
3.00
Making up bus bars.
Details
       

 12-16-2011
5.00
Throttle quadrant and cable holder
Details
       

 12-15-2011
3.00
Cable glands
Details
       

 11-12-2011
3.00
Fitting cables and routing wiring.
Details
       

 11-11-2011
4.00
Connecting bowden cables.
Details
       

 10-29-2011
3.00
Rear of fuselage finished and wings moved to hanga
Details
       

 10-23-2011
3.50
Making mounting frames for the dynon remote units.
Details
       

 10-22-2011
2.50
Fitting the radio antenna and fixing all cables in
Details
       

 10-21-2011
3.00
Locating sensors and antenna.
Details
       

 10-16-2011
3.00
Locating antenna locations & prep
Details
       

 10-15-2011
3.00
Control cables and brake lines.
Details
       

 10-09-2011
6.00
Fitting scat tube and CHT sensors and ram aid duct
Details
       

 10-08-2011
3.00
General & Fitting Dynon EGT Sensors
Details
       

 10-07-2011
1.50
Fuel valve sealing
Details
     

 10-01-2011
3.00
Modifying and fitting the exhaust heat exchange mu
Details
       

 09-24-2011
5.00
Canopy & Panel V2
Details
       

 09-17-2011
3.00
Ram Air Ducts
Details
       

 09-10-2011
4.00
Exhaust & Brake Lines
Details
       

 09-04-2011
6.00
More cable and firewall work.
Details
       

 09-03-2011
4.00
Fitting cables.....
Details
       

 09-02-2011
3.00
Panel Design
Details
       

 08-13-2011
6.00
Elevator trim completed and trial panel fitted.
Details
       

 08-12-2011
3.00
More panel work.
Details
       

 08-05-2011
4.50
Design & construction of trial panel.
Details
       

 07-31-2011
1.50
Replacing the longer temp engine bolts with the co
Details
       

 07-30-2011
1.00
Refitting engine.
Details
       

 07-29-2011
5.00
Final fit of firewall and engine mount.
Details
       

 07-28-2011
2.00
Preparing firewall for install.
Details
       

 07-04-2011
1.00
Making up metal connector tubes for the fuel valve
Details
       

 07-03-2011
2.00
Final prep of firewall
Details
       

 07-02-2011
3.00
Flap tube and motor
Details
       

 06-27-2011
4.50
Rudder cable final fit.
Details
       

 06-25-2011
6.00
Elevator & rudder final fit
Details
       

 06-24-2011
1.00
Fitting the elevator trim cable
Details
       

 06-22-2011
3.00
Replacing with large area washers
Details
       

 06-12-2011
2.00
Making & fitting elevator torque tube
Details
       

 06-11-2011
6.00
Refitting elevators.
Details
       

 06-05-2011
5.00
Getting ready to refit the elevators and controls.
Details
       

 06-04-2011
2.00
Treating rust on elevator hinges.
Details
       

 05-27-2011
2.00
Getting the plane back - and back to work!
Details
       

 04-30-2011
1.00
Fitting the elevator trim motor and inspection cov
Details
       

 04-29-2011
1.00
Attaching the elevator trim tab
Details
       

 03-19-2011
2.00
Centre console - final prep for upholsterer.
Details
       

 03-15-2011
2.50
Wings & flaps to the paint shop.
Details
       

 03-09-2011
0.50
Finalising the paint design.
Details
       

 03-02-2011
1.00
Fuse to the paint shop at last!
Details
       

 03-01-2011
10.00
Sanding back undercoat.
Details
       

 01-22-2011
2.00
Last pre-painting works ..........
Details
       

 01-20-2011
1.50
Console frame completion.
Details
       

 01-19-2011
3.00
Centre & Fuel console
Details
       

 12-24-2010
4.00
General stuff
Details
       

 12-23-2010
2.50
Brake line mod - keeping the plastic tube away fro
Details
       

 12-22-2010
3.00
Centre console & fuel console
Details
       

 12-15-2010
5.00
Oil dipstick access cover - top cowl
Details
       

 12-12-2010
13.00
Building up firewall with attached components.
Details
       

 12-10-2010
2.00
Wings off to the paint shop.
Details
       

 12-09-2010
1.50
Oil dipstick access cover - start on firewall layo
Details
       

 12-06-2010
1.50
Oil dipstick cover - top cowling
Details
       

 12-05-2010
2.00
Flipping the plane back upright - more sanding and
Details
       

 12-04-2010
2.00
Preparing the underside of the fuselage.
Details
       

 12-03-2010
3.00
Filling and sanding all around.
Details
       

 12-02-2010
2.00
Opera windows & general fuse prep
Details
       

 11-28-2010
3.00
Oil access cover and opera window
Details
       

 11-27-2010
4.50
Fitting the two opera windows
Details
       

 11-26-2010
2.50
Finishing the baggage area
Details
       

 11-23-2010
3.00
Making the baggage shelf
Details
       

 11-22-2010
2.00
Baggage area floor supports
Details
       

 11-21-2010
4.00
Removing engine & general work
Details
       

 11-20-2010
3.00
Stage one of baggage area shelf
Details
       

 11-19-2010
4.00
Coil cooling ducts
Details
       

 11-18-2010
2.50
Ram Air Ducts - first trim & fit
Details
       

 11-13-2010
9.50
Lots of general work - oil cooler, glare shield &
Details
       

 11-12-2010
4.00
Making up the alloy oil pan cooling duct.
Details
       

 11-06-2010
8.00
Making the optional oil pan fin cooler.
Details
       

 11-05-2010
4.00
Using expanding foam to fill under the alloy top o
Details
       

 10-24-2010
1.50
Glare shield work
Details
       

 10-23-2010
4.00
Glare shield work and general stuff .....
Details
       

 10-22-2010
1.00
Started forming the glare shield on the English Wh
Details
       

 10-20-2010
1.50
Cutting the alloy for the glare shield frame
Details
       

 10-17-2010
2.00
Fitting the extension flange for the prop.
Details
       

 10-16-2010
6.00
General work plus template making
Details
       

 10-15-2010
2.00
Console mock-ups
Details
       

 10-14-2010
1.00
Glare Shield - bending glass sheet, or not .......
Details
     

 10-13-2010
2.00
More glare shield work
Details
       

 10-09-2010
7.00
Making a glare shield extension for the dash.
Details
       

 10-08-2010
2.00
Sanding & Filling .....
Details
       

 10-07-2010
1.00
Top cowling camlok receivers
Details
       

 10-05-2010
1.00
Fitting nutplates to main gear wheel pants.
Details
     

 10-04-2010
1.50
Fitting nut plates to wheel pants
Details
     

 10-02-2010
8.00
Main gear fairings and pants.
Details
       

 10-01-2010
2.00
Air intake duct work.
Details
       

 09-30-2010
2.00
Fitting air inlet ducts.
Details
       

 09-28-2010
1.50
First fit of the oil cooler and ducting.
Details
       

 09-27-2010
7.00
Fitting main gear leg fairings.
Details
       

 09-26-2010
2.00
Making a start on the main gear leg fairings.
Details
       

 09-25-2010
6.00
More filling & sanding - oil cooler prep work.
Details
       

 09-04-2010
6.00
More work front wheel fairing + making up hinges f
Details
       

 08-16-2010
2.00
Taping bushes and bearings - assembling parts fpr
Details
       

 08-15-2010
3.00
Fitting nose leg fairing.
Details
       

 08-14-2010
6.00
Final trim and fit of main gear wheel pants.
Details
       

 08-13-2010
4.00
Getting the wings and control surfaces ready for p
Details
       

 08-08-2010
2.00
Elevator trim motor access cover.
Details
       

 08-07-2010
2.00
Final fit of elevators
Details
     

 08-01-2010
3.00
Fitting the rear elevator bell crank,
Details
       

 07-31-2010
9.00
More wing prep
Details
       

 07-30-2010
2.00
Control surface prep.
Details
     

 07-28-2010
4.00
More sanding & fitting AOI nut plates in the wings
Details
       

 07-17-2010
7.50
Fitting main gear wheel pants
Details
       

 07-16-2010
6.00
More fuselage sanding - main gear pant prep.
Details
     

 07-10-2010
8.00
General work and lots more sanding!
Details
       

 07-09-2010
3.00
Cowl fitting and general sanding.
Details
       

 07-05-2010
4.00
Fitting cowl nutplates - general filling and sandi
Details
       

 07-03-2010
6.00
Final fit of the engine cowls.
Details
       

 06-27-2010
3.00
Reinforcing the back edge of t top & bottom cowls
Details
       

 06-26-2010
8.00
General canopy and fuselage sanding.
Details
       

 06-24-2010
3.00
Centre & Fuel consoles
Details
       

 06-20-2010
7.00
Canopy and general work
Details
       

 06-19-2010
6.00
Manufacture & fit of front wheel pant.
Details
       

 06-12-2010
7.00
First fit of the engine cowls.
Details
       

 06-11-2010
2.00
Changing the prop flange to the 2" extended flange
Details
       

 06-09-2010
2.00
Making clamp to compress rubber mounts to get engi
Details
       

 06-07-2010
5.00
Main gear alignment & bolting.
Details
       

 06-05-2010
6.00
Prep & mounting of engine.
Details
       

 06-01-2010
1.00
Lock-wiring main gear assemblies
Details
       

 05-31-2010
4.50
Nose gear prep.
Details
       

 05-28-2010
3.00
Prep for fitting gear.
Details
       

 05-26-2010
4.00
Engine arrives!
Details
       

 05-17-2010
1.00
More sanding and filling underneath ....
Details
       

 05-15-2010
2.00
Fitting the tail tie-down eyebolt - and filling ..
Details
       

 05-11-2010
2.00
Making the covers for the hor stab AOA bolt inspec
Details
       

 05-10-2010
2.00
Flipping the plane and fitting the main gear.
Details
       

 05-08-2010
7.00
Centre console work, seat back brace and canopy dr
Details
       

 05-06-2010
2.00
More work on the centre console
Details
       

 05-02-2010
1.00
Centre console brackets and side seat rails.
Details
       

 05-01-2010
8.00
Fitting centre console & seats.
Details
       

 04-30-2010
2.00
Lowering braces
Details
       

 04-27-2010
4.00
Lowering the spar box rear braces.
Details
       

 04-25-2010
4.00
More sanding and filling of control surfaces.
Details
       

 04-24-2010
3.00
More sanding and filling ......
Details
       

 04-23-2010
4.00
Control surfaces - filling and sanding.
Details
       

 04-22-2010
6.00
Centre console & wings
Details
       

 04-21-2010
6.00
Making inspection covers - and sanding .....
Details
       

 04-20-2010
8.00
Extending centre console - and more sanding ....
Details
       

 04-19-2010
12.00
The start of work on the seat & console ..........
Details
       

 04-18-2010
3.50
Installing the fuel sender units - and more sandin
Details
       

 04-17-2010
6.00
Fitting fuel senders - and more wing tip work
Details
       

 04-16-2010
6.00
Fitting fuel filler collars
Details
       

 04-15-2010
5.00
Attaching wing tips
Details
       

 04-14-2010
1.00
Stand for new tool chest
Details
       

 04-12-2010
7.00
Wing tip work
Details
       

 04-09-2010
6.00
Fitting ailerons
Details
       

 04-08-2010
0.10
Peter T's first flight!
Details
       

 04-06-2010
3.00
Fitting aileron - part I
Details
       

 04-05-2010
1.00
Fitting bearings to aileron hinges
Details
       

 04-04-2010
5.00
Preparing for flap and aileron installation.
Details
       

 04-03-2010
5.00
Repairing, filling and sanding wings
Details
       

 01-04-2010
6.00
Wing AOI setting and initial flap fitting
Details
       

 01-02-2010
0.50
Drilling plates & preloading bushes
Details
       

 01-01-2010
3.00
Cutting and glassing in the landing light mount
Details
       

 12-31-2009
2.00
Preparing the landing light and mount
Details
       

 12-30-2009
3.00
Making landing light mounting bracket and fitting
Details
       

 12-29-2009
4.00
Filling and trueing the wing leading edges
Details
       

 12-28-2009
1.30
Moving wings from livingroom to garage (hanger)
Details
       

 08-15-2009
2.00
More work on elevator horn mod - and BIG BREAK!
Details
       

 08-09-2009
3.00
More work on the elevator horn modification.
Details
       

 08-01-2009
8.00
Elevator preparation continued
Details
       

 07-18-2009
5.00
Elevators, axles & canopy
Details
       

 07-14-2009
1.00
Removing toe brake bars from right side.
Details
       

 07-12-2009
4.00
Elevator bell crank
Details
       

 05-31-2009
2.00
Finishing rudder assemblies and cables
Details
       

 05-30-2009
4.00
Fitting rudder cables
Details
       

 05-23-2009
5.00
Finished rudder pulleys - cutting out for rudder c
Details
       

 05-16-2009
2.00
Fabricating and assembling the rudder cable pulley
Details
       

 05-15-2009
5.00
Fabricating and installing rudder assemblies
Details
       

 05-14-2009
2.00
More work on the pedal bar assembly.
Details
       

 05-09-2009
4.40
Rudder pedal assembly, brakes and mounts
Details
       

 05-08-2009
1.00
Making spacers and fitting the last spar box bolt.
Details
       

 05-07-2009
3.00
More spar box work
Details
       

 05-06-2009
2.00
Finishing work on the spar box instal & engine mou
Details
       

 04-20-2009
3.00
More work on the canopy - then canopy removal.
Details
     

 04-13-2009
9.00
Second wing fit attempt - with success!
Details
       

 04-12-2009
3.00
Riveting the elevator hinges to the elevators
Details
       

 04-11-2009
10.00
First attempt to fit wing spars into the spar box.
Details
       

 04-10-2009
4.00
Canopy trim work
Details
       

 04-09-2009
5.00
Finishing and fitting of the canopy latch
Details
       

 03-29-2009
2.50
Removal & refit of canopy with panel and edge seal
Details
       

 03-28-2009
7.00
Bonding of the skins to the canopy.
Details
       

 03-27-2009
6.00
Prep for attaching canopy skins
Details
       

 03-14-2009
12.00
Canopy skin trimming & engine mount positioning
Details
       

 03-07-2009
12.00
Making pedal supports and more canopy skin work.
Details
       

 03-02-2009
7.00
Made the rudder pedal flute tubes and the the rudd
Details
       

 03-01-2009
2.00
Making the upper canopy catch striker plate.
Details
       

 02-28-2009
6.00
Continued canopy skin work
Details
       

 02-27-2009
1.00
Extending canopy skins
Details
       

 02-24-2009
2.50
First fit of canopy skins
Details
       

 02-22-2009
1.00
Finishing the inside canopy to frame joint
Details
       

 02-21-2009
1.00
Fitting canopy part 1
       

 02-21-2009
0.00
Building a new storage rack for wings etc
Details
       

 02-20-2009
3.00
Preparing to affix canopy to frame
Details
       

 02-19-2009
5.00
Preparing the frame & canopy
Details
       

 02-18-2009
5.00
Finishing up trim tab servo access hole.
Details
       

 02-17-2009
2.00
Fitting trim tab control horn
Details
       

 02-07-2009
6.00
General work on canopy frame and elevator trim tab
Details
       

 02-06-2009
5.00
Firewall & rudder work
Details
       

 01-24-2009
4.00
Firewall part 1
Details
       

 01-23-2009
4.00
Fitting the rudder brackets & rudder
Details
       

 01-22-2009
0.50
First peel of the protective coat from the canopy
Details
       

 01-21-2009
1.50
Trim tab part 2
Details
       

 01-21-2009
1.00
Finishing the inside canopy to frame joint
       

 01-20-2009
2.50
Trim tab part 1
Details
       

 01-19-2009
2.00
Attaching hinges to elevators - part 1
Details
       

 01-17-2009
5.00
Fitting elevators
Details
       

 01-15-2009
2.00
Fitting rudder bracket bearings
Details
       

 01-14-2009
1.00
Trueing the HS trailing edge
Details
       

 01-02-2009
0.50
Drilling plates and pre-loading bushes.
Details
       

 12-20-2008
2.00
More canopy frame and fuse finishing
Details
     

 12-19-2008
4.00
Trimmed canopy!
Details
       

 12-17-2008
10.00
Canopy Frame Fitting
Details
       

 12-07-2008
5.00
General filling & cutting through panel for canopy
Details
       

 12-06-2008
4.00
Moving toward canopy mounting
Details
       

 11-29-2008
5.00
Finished and fitted gas strut brackets to top of p
Details
       

 11-28-2008
1.50
Making the brackets to hold the canopy gas struts
Details
       

 11-26-2008
3.50
Trial fitted panel and located side brackets
Details
     

 11-20-2008
1.50
Fitted steps
Details
       

 11-15-2008
10.00
More sanding .. sanding .. sanding
Details
       

 11-07-2008
7.00
Glassing HS to VS fairing
Details
       

 11-06-2008
0.50
Rolling aircraft - first aerobatic manouver!
Details
       

 11-05-2008
2.00
Glassing cut-off elevator horn to horizontal stabi
Details
       

 11-01-2008
4.00
Fitted HS up to marking AOI bolt holes.
Details
       

 10-31-2008
3.00
Preparing to instal horozontal stabiliser
Details
       

 10-28-2008
1.00
Elevator horn modification
Details
       

 10-26-2008
1.00
Started tail feather work
Details
       

 10-25-2008
1.00
Making elevator hinges
Details
       

 10-22-2008
1.00
Fitting canopy locating tangs
Details
       

 10-15-2008
2.00
Making up canopy locating tangs
Details
       

 10-05-2008
2.00
Trial fitted the canopy hinge to frame
Details
       

 10-04-2008
2.00
Further work on canopy hinge brackets
Details
       

 09-20-2008
2.00
Peter T & canopy hinges
Details
       

 09-19-2008
6.00
Fitting new design canopy frame brackets
Details
       

 09-18-2008
5.00
Canopy frame fitting day 3
Details
       

 09-17-2008
1.50
Fixing canopy hinge brackets to bulkhead
Details
       

 09-16-2008
2.50
Made up forward canopy hinge brackets
Details
       

 09-07-2008
2.00
Canopy frame fitting day 2
Details
       

 09-06-2008
2.50
Canopy frame fitting day 1
Details
       

 09-03-2008
3.00
Preparing canopy frame
Details
       

 09-01-2008
0.50
Mounted rudder cable guides in spar box
Details
     

 08-30-2008
4.00
Prepare to mount spar boxes
Details
       

 08-23-2008
3.00
Cut opera window openings
Details
       

 08-19-2008
1.00
Sanding fuselage
Details
       

 08-14-2008
5.00
Inventory
Details

 08-13-2008
1.00
Sorting & storing fastenings
Details
       

 08-12-2008
0.50
Loading into garage
Details
       

 08-11-2008
3.00
Kit arrival & receiving
Details
       