KitLog pro

Powered By Kitlog Pro v2.0

My Web Site
Work Logs Found: 365
Category Work Time: 904 Hours
 Date
Hours
Work Log Summary

Details

 08-31-2010
1.00
Weight and Balance
Details
       

 08-30-2010
1.50
Weight and Balance
Details

 08-29-2010
4.00
Tailcone Fairing Installation
Details

 08-29-2010
4.00
Stabilator Cables
Details

 08-18-2010
1.00
Tailcone Fairing Installation
Details

 08-17-2010
0.50
Tailcone Fairing Installation
Details

 08-15-2010
3.00
Tailcone Fairing Installation
Details
       

 08-13-2010
4.00
Airplane Moved to the Airport
Details
       

 08-11-2010
0.50
Interior Lighting Completed
Details

 08-10-2010
0.50
Tailcone Fairing
Details

 08-09-2010
1.50
Aft Window, ELT Antenna
Details

 08-08-2010
2.00
Interior Access Panels and Carpet
Details
       

 08-05-2010
1.50
Interior Access Panels, Brake Line Revision
Details

 08-04-2010
2.00
Interior Access Panels, Seat Belts
Details

 07-24-2010
9.00
PAP and First Engine Run
Details
       

 07-22-2010
0.50
Tailcone Fairing
Details

 07-21-2010
2.00
Tailcone Fairing
Details

 07-20-2010
2.00
Tailcone Fairing
Details
       

 07-18-2010
1.50
Tailcone Fairing
Details

 07-12-2010
2.50
Carb Comp Preparation and Prop Blade Pitch
Details

 07-11-2010
0.50
Fuel Tank Sender
Details

 07-11-2010
2.50
Completed Lighting Kit Installation
Details

 07-10-2010
1.50
Installation of Left Nav Light Extension
Details

 07-09-2010
1.50
Prime of Left Wing Nav Extension
Details

 07-07-2010
2.00
Prep of Left Wing Nav Extension.
Details

 07-06-2010
2.00
Left Wing Nav Extension
Details

 06-26-2010
4.00
Right Wing Lighting
Details
       

 06-26-2010
0.50
Fuel Neck
Details

 06-25-2010
2.00
Prep and Prime of Right Wing Nav Extension.
Details

 06-23-2010
1.00
Right Wing Nav Extension
Details

 06-22-2010
2.00
Wire Fabrication, Installation
Details

 06-21-2010
2.00
Right Nav Light Extension
Details
       

 06-20-2010
3.00
Right Wing Lighting
Details
     

 06-10-2010
1.00
Bleeding of Brake System
Details

 06-09-2010
1.50
Bleeding of Brake System
Details

 06-08-2010
2.00
Brake Lines
Details

 06-07-2010
1.50
Placards
Details

 06-06-2010
4.00
Engine Controls
Details

 05-31-2010
9.00
Fuel, Lighting, Interior
Details
       

 05-29-2010
3.50
Painted Fuel Tank
Details
       

 05-29-2010
3.50
EGT, Oil Hoses, Wiring
Details

 05-28-2010
2.00
Cowl Heat Shield
Details
     

 05-26-2010
0.50
Cowl Duct Seal
Details

 05-25-2010
2.50
Fuel Tank, Cowl Duct Seal
Details
       

 05-24-2010
2.00
Exhaust System Installation
Details
     

 05-23-2010
2.00
Exhaust System Installation
Details

 05-22-2010
3.50
Cooling, Exhaust System Installation
Details

 05-21-2010
1.00
Fuel Tank
Details

 05-21-2010
1.00
Cooling System
Details

 05-20-2010
2.50
Cooling System
Details
       

 05-18-2010
2.00
Cooling System
Details

 05-17-2010
1.50
Cooling System
Details

 05-16-2010
5.50
Cooling System
Details

 05-15-2010
3.00
Cooling System
Details

 05-14-2010
3.00
Cooling System
Details

 05-12-2010
1.50
Cooling System
Details

 05-11-2010
2.00
Cooling System Installation
Details

 05-09-2010
5.00
Cowl Installation Completed, Cooling System
Details

 05-08-2010
3.00
Cowl Installation
Details

 05-01-2010
6.00
Cowl Installation
Details
       

 04-30-2010
4.50
Cowl Installation
Details
       

 04-29-2010
1.50
Cowl Preparation
Details

 04-27-2010
2.00
Cowl Preparation
Details
       

 04-25-2010
6.00
Spinner Installation
Details
       

 04-24-2010
2.00
Spinner Preparation
Details

 04-22-2010
1.00
Propeller Installation
Details
       

 04-20-2010
0.50
Spinner Parts Preparation
Details

 04-18-2010
5.50
Engine Wiring, Spinner Prep
Details

 04-13-2010
2.00
Regulator Cooling Shroud
Details

 04-12-2010
2.00
Engine Installation
Details

 04-11-2010
2.00
Engine Installation
Details
       

 04-10-2010
3.50
Engine Preparation
Details

 04-09-2010
1.00
Engine Preparation
Details

 04-08-2010
2.50
Interior Lighting Wiring, Engine
Details

 04-07-2010
1.50
Engine Preparation
Details
       

 04-06-2010
1.00
Fuel Tank Assembly
Details

 04-06-2010
1.00
Engine Preparation
Details

 04-05-2010
2.50
Engine Preparation
Details
       

 04-04-2010
1.50
Engine Preparation
Details
     

 04-03-2010
3.00
Control Board, Engine Preparation
Details
       

 04-02-2010
1.50
Adjustment of Control Board
Details

 04-01-2010
2.00
Adjustment of Control Board
Details

 03-31-2010
3.00
FF Wiring
Details

 03-19-2010
1.00
FF Wiring
Details
     

 03-17-2010
1.50
Canopy Fiberglass Finishing
Details
       

 03-16-2010
2.00
Canopy Fiberglass Finishing
Details

 03-15-2010
1.50
Canopy Fiberglass Finishing
Details
       

 03-14-2010
2.00
Canopy Fiberglass Finishing
Details
       

 03-13-2010
1.50
Powerplant Inventory
Details

 03-13-2010
2.00
FF Wiring
Details

 03-13-2010
1.00
Canopy Fiberglass Finishing
Details

 03-12-2010
3.00
Powerplant Uncrating/Inventory
Details
       

 03-12-2010
1.50
Canopy Fiberglass Finishing
Details
     

 03-11-2010
1.50
Canopy Fiberglass Finishing
Details

 03-10-2010
0.50
Canopy Fiberglass Finishing
Details

 03-09-2010
1.50
Sanding of Fiberglass
Details
       

 03-08-2010
1.00
Sanding Fiberglass
Details

 03-07-2010
3.50
Canopy Fiberglass Continued
Details
       

 03-06-2010
6.75
Canopy Fiberglass Started
Details
       

 03-05-2010
1.50
Canopy Foam Installation
Details

 03-04-2010
2.50
Canopy Prep for Fiberglass
Details

 03-03-2010
1.50
Cut Fiberglass Templates and Cloth Pieces
Details

 02-28-2010
2.50
Canopy Guide Blocks
Details

 02-27-2010
4.00
Canopy Installation
Details
       

 02-26-2010
2.50
Canopy Installation
Details

 02-20-2010
4.50
Primed and Painted Canopy Frame
Details
       

 02-19-2010
1.50
Prep of Canopy Frame for Paint
Details
     

 02-14-2010
2.50
Canopy Handle
Details
       

 02-13-2010
8.00
Canopy Fitting Continued
Details

 02-12-2010
7.00
Canopy Fitting
Details
       

 02-06-2010
3.50
Fuel Tank and Canopy Prep
Details

 02-05-2010
0.50
Fuel Tank Filler Neck
Details

 01-31-2010
2.00
Fuel Tank Filler Neck
Details
       

 01-30-2010
2.00
ELT Installation
Details

 01-29-2010
0.50
ELT Antenna Bracket
Details

 01-23-2010
0.50
Pitch Servo
Details

 01-23-2010
1.00
Fuel Tank Sealing
Details

 01-19-2010
1.00
Transponder Antenna and Magnetometer
Details

 01-17-2010
6.00
Avionics continued
Details
       

 01-16-2010
3.50
AV control board, D-180 Install, Transponder
Details
       

 01-15-2010
1.00
APDC Install
Details

 01-10-2010
8.00
Avionics Panel Preparation
Details

 01-09-2010
2.50
EFIS Mounting Tray
Details

 01-04-2010
9.00
Canopy Frame
Details
       

 01-03-2010
1.50
Stabilator Cables
Details

 12-24-2009
1.00
Rudder Cables Completed
Details
       

 12-23-2009
3.00
Rudder Cables
Details

 12-22-2009
3.00
Rudder Cables
Details

 12-21-2009
1.00
Rudder Pedal Rigging Stop
Details

 12-20-2009
1.50
Roll Servo Installation
Details
       

 12-20-2009
1.50
Reinstallation of Torque Tubes
Details

 12-19-2009
0.75
Final Drilling of Torque Tubes
Details

 12-18-2009
3.50
Flaperon Install, Torque Tube Drilling
Details
       

 12-13-2009
4.00
Brake Lines
Details

 12-13-2009
0.50
Autopilot
Details

 12-12-2009
3.00
Mapbox Assembly
Details

 12-09-2009
1.00
Instrument Panel
Details

 12-06-2009
2.50
Flight Controls, Brakes, Engine Mount
Details

 11-28-2009
2.50
Nose Gear
Details
       

 11-27-2009
4.00
Main Landing Gear
Details

 11-26-2009
3.00
Wheel/Tire Assemblies
Details
       

 11-25-2009
1.50
Autopilot Bracket Installation
Details

 11-24-2009
1.00
Autopilot Pushrod Tubes
Details

 11-22-2009
1.50
Flight Controls
Details

 11-22-2009
0.50
Autopilot Bracket Installation
Details

 11-21-2009
5.00
Nose Fork, Priming, Painting
Details
       

 11-21-2009
1.50
Autopilot
Details

 11-19-2009
1.50
Flight Controls
Details

 11-14-2009
6.50
Fuselage Wiring
Details
       

 11-12-2009
1.00
Fuselage Wiring
Details

 11-09-2009
2.00
Fuselage Wiring
Details

 11-08-2009
4.00
Fuselage Wiring
Details
       

 11-07-2009
2.00
Fuselage Wiring
Details

 11-03-2009
1.00
Fuselage Wiring
Details

 11-02-2009
2.00
Fuselage Wiring
Details

 11-01-2009
4.00
Fuselage Wiring
Details
       

 10-31-2009
3.00
Forward Firewall Upper
Details
       

 10-30-2009
2.50
Forward Upper Fuselage
Details
       

 10-29-2009
3.00
Forward Upper Fuselage
Details

 10-28-2009
2.50
Forward Upper Fuselage
Details

 10-26-2009
7.00
Primed and Painted Interior
Details
       

 10-21-2009
13.00
Primed and Painted Interior Parts
Details

 10-19-2009
2.00
Fuel Tank Assembly
Details
       

 10-18-2009
1.50
Fuel Tank Assembly
Details

 10-17-2009
4.00
Fuel Tank Assembly
Details
       

 10-11-2009
1.00
Prep of Interior for Paint
Details
       

 10-11-2009
2.00
Fuel Tank Assembly
Details
       

 10-10-2009
2.50
Prep of Interior for Paint
Details

 10-04-2009
1.50
Prep of Interior for Paint
Details

 09-26-2009
2.00
Fuel Tank Parts Prep
Details

 09-25-2009
6.00
Parts prep- cover panels and fuel tank
Details
     

 09-20-2009
7.00
Flight Controls
Details
       

 09-19-2009
3.00
Fwd Upper Fuse
Details

 09-07-2009
3.50
Fwd Upper Fuse and Roll Bar
Details

 08-29-2009
1.00
Wing Installation
Details
       

 08-28-2009
0.50
Fuselage Pin Completion
Details

 08-23-2009
2.50
Fuel System
Details

 08-17-2009
3.00
Preparation of Interior for Paint
Details

 08-16-2009
2.00
Painting Parts
Details

 08-15-2009
1.50
Priming Parts
Details

 08-02-2009
3.00
Miscellaneous
Details

 07-21-2009
2.50
Fwd Upper Fuselage
Details

 07-20-2009
1.50
Fwd Upper Fuselage
Details

 07-19-2009
1.00
Fwd Upper Fuselage
Details

 07-18-2009
1.50
Fwd Upper Fuselage
Details

 07-17-2009
0.50
Fuselage Pins
Details

 07-16-2009
0.50
Empennage Fairings
Details

 07-15-2009
2.50
Empennage Fairings
Details

 07-14-2009
1.00
Empennage Fairings
Details

 07-13-2009
0.50
Empennage Fairings
Details

 07-12-2009
0.50
Aft Window Prep
Details

 07-11-2009
2.50
Aft Window Installation
Details
       

 07-10-2009
2.00
Turtle Deck Skins
Details

 07-09-2009
2.50
Riveting of tailcone to Fuselage
Details
       

 07-08-2009
1.50
Tailcone Attachment
Details

 07-05-2009
1.50
Tailcone Attachment
Details
       

 06-30-2009
1.00
Fuselage Pin Assembly
Details

 06-23-2009
1.50
Tailcone Attach Prep
Details

 06-21-2009
1.00
Baggage Bulkhead Completion
Details
       

 06-19-2009
2.50
Baggage Bulkhead Assembly
Details

 06-18-2009
2.00
Baggage Bulkhead
Details

 06-16-2009
1.00
Finish Kit Inventory
Details

 06-15-2009
1.00
Finish Kit Inventory
Details

 06-14-2009
0.50
Finish Kit Inventory
Details

 06-06-2009
1.00
Baggage Bulkheads
Details

 06-04-2009
1.50
Finish Kit Inventory
Details

 06-03-2009
1.00
Finish Kit Inventory
Details

 06-03-2009
2.50
AST Installation
Details

 06-01-2009
2.00
Finish Kit Inventory
Details

 05-29-2009
1.00
Took Delivery of Finish Kit
Details
       

 05-25-2009
2.50
Empennage Attachment
Details
       

 05-22-2009
1.50
AST Servo Tray
Details

 05-20-2009
1.50
AST Servo Tray
Details

 05-19-2009
1.50
AST Servo Tray
Details

 05-17-2009
2.50
Tailcone Completion
Details
       

 05-16-2009
3.50
Tailcone Skins
Details

 05-15-2009
6.50
Tailcone Skins
Details
       

 05-12-2009
1.50
Tailcone Skins, AST Tray
Details

 05-11-2009
1.00
Tailcone Skins
Details

 05-10-2009
2.00
Tailcone Skins
Details
       

 05-09-2009
8.50
Tailcone Skins
Details
       

 05-03-2009
5.50
Tailcone Aft Bulkhead
Details
       

 05-02-2009
2.50
Tailcone Skeleton Parts Preparation
Details

 04-28-2009
1.00
Tail Skid Bracket
Details

 04-27-2009
1.50
Tailcone Skeleton Parts Preparation
Details

 04-26-2009
5.00
Tailcone Skeleton Parts Preparation
Details

 04-25-2009
1.00
Stabilator Counterbalance
Details

 04-22-2009
1.00
Stabilator Control Horns
Details

 04-20-2009
2.50
Stabilator Skin Completion
Details

 04-19-2009
3.50
Stabilator Skins
Details
       

 04-14-2009
1.50
Stabilator Skin Preparation
Details

 04-12-2009
2.00
Stabilator Trim Tab Hinges
Details
     

 04-11-2009
6.50
Stabilator Spar Box Assembly
Details
       

 04-09-2009
1.50
Stabilator Spar Box Assembly
Details

 04-08-2009
2.00
Stabilator Spar Box Assembly
Details

 04-07-2009
2.00
Stabilator Spar Box Assembly
Details

 04-05-2009
7.00
Stabilator Parts Preparation
Details

 04-04-2009
4.00
AST Parts Prep and Assembly
Details
       

 04-03-2009
4.50
Rudder Assembly, Started AST Parts Prep
Details
       

 03-25-2009
1.00
Fuel System
Details

 03-24-2009
1.50
Fuel System
Details

 03-22-2009
0.50
Rudder Skeleton Assembly
Details

 03-22-2009
1.50
Fuel System
Details

 03-21-2009
6.50
Rudder Parts Preparation
Details
       

 03-20-2009
10.00
Vertical Stabilizer Assembly
Details
       

 03-18-2009
2.50
Vertical Stabilizer Parts Preparation
Details

 03-17-2009
2.00
Vertical Stabilizer Hinges
Details

 03-16-2009
1.00
Vertical Stabilizer Parts Prep
Details

 03-15-2009
2.00
Fuel System
Details
     

 03-14-2009
1.00
Tailcone/Empennage Inventory
Details

 03-14-2009
2.50
Fuel System
Details
     

 03-11-2009
2.00
Fuel System
Details
     

 03-09-2009
1.00
Fuel System
Details

 03-08-2009
3.50
Seatbacks
Details
       

 03-07-2009
3.00
Seatbacks
Details

 03-07-2009
4.00
Rudder Pedals/Brakes
Details
       

 03-06-2009
1.00
Tailcone/Empennage Inventory
Details
       

 03-06-2009
1.00
Rudder Pedals/Brakes
Details

 03-04-2009
2.00
Rudder Pedals/Brakes
Details
     

 03-01-2009
3.00
Roll Bar Assembly
Details
       

 02-28-2009
7.00
Roll Bar
Details
       

 02-23-2009
2.00
Roll Bar Parts Preparation
Details

 02-22-2009
5.25
Skin Stiffeners, Vent Doors, Cowl Hinges
Details
       

 02-21-2009
3.75
Fuselage Side Skins
Details
       

 02-19-2009
1.50
Fuselage Side Skins
Details

 02-16-2009
1.50
Fuselage Side Skins
Details

 02-15-2009
2.00
Fuselage Side Skins
Details

 02-07-2009
7.00
Fueslage Side Skins
Details
       

 02-06-2009
7.00
Longerons and roll bar attach plates
Details
       

 02-05-2009
2.00
Longeron Shaping, Drilling
Details
       

 02-04-2009
1.50
Longeron Shaping
Details

 01-28-2009
1.50
Left Longeron Shaping
Details

 01-27-2009
1.50
Longeron Fabrication
Details

 01-25-2009
2.50
Tunnel Assembly Completion
Details
       

 01-24-2009
4.50
Tunnel Assembly
Details
       

 01-20-2009
1.00
Tunnel Assembly
Details

 01-18-2009
4.50
Tunnel Assembly
Details

 01-17-2009
5.75
Completion of Section 21, Start Section 22
Details
       

 01-15-2009
1.00
Step Floor Preparation
Details

 01-11-2009
3.00
Step Attachment
Details
       

 01-10-2009
5.00
Fuselage Bottom Skin and Step Attach
Details
       

 01-09-2009
2.50
Fuselage Bottom Skin
Details

 01-06-2009
2.00
Fuselage Corner Skins
Details
       

 01-04-2009
6.50
Seat Ramp Floors, Control Columns, Prep
Details
       

 01-03-2009
2.50
F-1203A Bulkhead, Seat Ramp Floors
Details

 12-24-2008
1.50
F-1203A Bulkhead
Details
       

 12-23-2008
4.75
Seat Floors, Center Section, Bulkhead
Details
       

 12-22-2008
2.00
F-1203A Bulkhead Components
Details

 12-21-2008
1.00
Control column mount preparation
Details

 12-20-2008
9.00
Seat Floors
Details
       

 12-19-2008
2.00
Seat Floor Prep
Details

 12-17-2008
2.50
Riveted Baggage Ribs and Bulkhead
Details
       

 12-16-2008
1.00
Priming
Details
     

 12-15-2008
1.75
Riveting of Baggage Floors
Details
       

 12-14-2008
7.00
Bulkhead Assebly and Seat Rib Assemblies
Details
       

 12-13-2008
4.50
Pulley Bracket, Flaperon Mixer Arm, Parts Preparat
Details

 12-10-2008
2.00
Pulley Bracket Preparation
Details

 12-09-2008
2.75
Baggage Rib Preparation
Details

 12-07-2008
6.50
Fuselage Center Section Assembly
Details
       

 12-05-2008
1.00
Center Section Preparation
Details
     

 12-02-2008
2.00
Center Section Preparation
Details

 11-30-2008
2.00
Fuselage Kit Inventory
Details
       

 11-27-2008
2.00
Fuselage Kit Inventory
Details

 11-26-2008
1.00
Fuselage Kit Arrives, Inventory Started
Details
       

 11-15-2008
3.25
Right Flaperon Skins
Details
       

 11-11-2008
2.25
Right Flaperon Skins
Details
     

 11-09-2008
2.00
Left Flaperon Skins
Details
       

 11-08-2008
5.50
Flaperon Assembly
Details
       

 11-04-2008
0.50
Flaperon Internal Structure Assembly
Details
     

 11-02-2008
5.00
Deburring Ribs and Priming
Details
       

 11-01-2008
0.50
Deburring of Main Flaperon Ribs
Details

 10-31-2008
3.25
Flaperon Bracket Attachments and Right Counterbala
Details

 10-30-2008
2.00
Flaperon Parts Preparation and Left Counterbalance
Details

 10-27-2008
1.50
Flaperon Parts Preparation
Details

 10-26-2008
1.25
Flaperon Parts Preparation
Details

 10-19-2008
2.00
Flaperon Parts Preparation
Details

 10-18-2008
6.00
Right Wing Tip
Details
       

 10-15-2008
0.50
Left Wing Tip
Details
       

 10-14-2008
1.00
Right Wing Tip
Details

 10-12-2008
3.00
Left Wing Tip, Right Wing Tip
Details
       

 10-11-2008
2.00
Left Wing Tip
Details
       

 10-09-2008
1.50
Wing Tips
Details

 10-08-2008
1.50
Wing Tips
Details

 10-07-2008
1.25
Right Wing Skins, Wing Tips
Details
       

 10-06-2008
1.50
Bending Tool Fabrication, Flaperon Pivot Brackets
Details
       

 10-05-2008
5.25
Right Wing Skins
Details
       

 10-02-2008
1.50
Wing Tip Parts Prep, Flaperon Pivot Brackets
Details

 10-01-2008
0.50
Flaperon Pivot Brackets
Details

 09-30-2008
1.75
Right Wing Skins, Misc.
Details
     

 09-29-2008
1.75
Right Wing Skins, Misc.
Details

 09-28-2008
1.75
Right Wing Skins
Details
       

 09-23-2008
2.75
Right Wing Skins
Details
       

 09-21-2008
2.00
Right Wing Skins
Details
       

 09-20-2008
3.25
Left Wing Skins, Right Wing Skins
Details
       

 09-19-2008
1.25
Left Wing Skins
Details
       

 09-18-2008
1.75
Left Wing Skins
Details
       

 09-13-2008
6.25
Left Wing Skins
Details
       

 09-12-2008
1.50
Left Wing Skins
Details
       

 09-10-2008
0.75
Left Wing Skins
Details

 09-07-2008
2.50
Left Wing Skins
Details
       

 09-06-2008
2.50
Nose Rib and Right Stub Spar Attachment
Details
       

 09-05-2008
2.50
Right Wing Main Rib Attachment
Details
       

 08-27-2008
0.75
Finished Flaperon Actuation Brackets
Details
     

 08-24-2008
3.00
Stall Warning and Terminal Brackets
Details
       

 08-24-2008
1.00
Flaperon Actuation Brackets
Details

 08-23-2008
1.50
Stall Warning Subassembly
Details
     

 08-23-2008
1.25
Nose Rib and Left Stub Spar Attachment
Details
       

 08-22-2008
0.75
Left Wing Nose Rib Attachment
Details

 08-19-2008
1.00
Left Wing Rear Spar and Nose Rib Attachment
Details
     

 08-17-2008
5.00
Wing Rib Prep and Left Main Rib Attachment
Details
       

 08-17-2008
1.50
Rear Spar Prep and Assembly
Details
     

 08-16-2008
4.00
Wing Rib Prep
Details
     

 08-13-2008
0.50
Main Rib Prep
Details

 08-11-2008
0.25
Hinge Rib Prep
Details

 08-10-2008
3.00
Nose Rib Prep
Details

 08-07-2008
0.50
Nose Rib Prep
Details
     

 08-03-2008
1.00
Flaperon Hinge Assemblies
Details
     

 08-01-2008
1.00
Stub Spar and Flaperon Hinges
Details
       

 07-30-2008
2.00
Spar Doubler Prep
Details

 07-27-2008
3.00
Spar Assembly
Details
       

 07-26-2008
1.50
Spar Assembly
Details

 07-26-2008
0.50
Inventory
Details

 07-25-2008
1.00
Inventory
Details

 07-23-2008
0.50
Inventory
Details

 07-22-2008
0.00
Wing Kit Arrives
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.