Davids Web Site
C2Standard
All
Work Logs Found:
99
Category Work Time:
406 Hours
Date
Hours
Work Log Summary
Details
08-21-2007
0.50
Taxie test
08-21-2007
2.00
1 hour engine break-in
08-18-2007
5.00
Windshield
08-17-2007
5.00
Windshield install
08-15-2007
4.00
Gap cover fit and install
08-13-2007
5.00
Gap cover fit and install
08-12-2007
2.00
Jury struts final
08-11-2007
3.00
Aleron and hinge rivet
08-10-2007
2.00
Final assembly wings and struts
08-09-2007
4.00
Reinstalling Engine
08-07-2007
3.00
3rd coat UV
07-12-2007
1.00
Watching paint dry
07-06-2007
3.00
2nd coat of UV
07-05-2007
4.00
1st coat of UV protection Polyspray
07-03-2007
4.00
Spraying Polybrush coat
07-02-2007
5.00
06-28-2007
4.00
Spraying epoxy primer on fiberglass and metal
06-27-2007
6.00
Hanging plane parts to paint
06-23-2007
7.00
Still covering the fuse
06-22-2007
6.00
Covering Fuse
06-20-2007
6.00
Building the paint booth and fan filters
06-19-2007
7.00
Covering
06-18-2007
4.00
Adding bolt through mod to fin.
Details
06-13-2007
4.00
05-12-2007
2.00
Fishing fabric work on wings
04-28-2007
4.00
Taping wings cont.
Details
04-21-2007
6.00
Riveting and Taping wings
04-07-2007
2.00
Painting first coat of PolyBrush on wings
02-24-2007
4.00
Covered alerons with fabric
01-02-2007
2.00
Final ironing of wings at 350'
12-03-2006
4.00
12-02-2006
6.00
Finishing the wing ends
11-25-2006
4.00
Covering top side and ends
11-24-2006
5.00
Covering top side of wings
11-23-2006
6.50
Getting ready to put down glue
11-23-2006
4.00
Covering bottom of wings
11-22-2006
6.00
Covering wings
10-05-2006
2.00
Took wings off to cover plane
07-30-2006
5.50
Removed completed engine
Details
07-29-2006
2.00
Inspection by EAA Tech Advisor Ron
07-24-2006
9.00
Carb and choke and oil pump cables attached to e
07-10-2006
10.00
Ran cables for throttle and choke.
06-28-2006
2.00
Nose cone transition plates in place.
Details
06-13-2006
8.00
Wired electrical from engine to fire wall.
Details
06-08-2006
9.00
Installed oil tank to fit under cover
Details
05-07-2006
5.00
Made quick disconnect plug for strobes near wing r
05-06-2006
4.00
Deck plate below engine
Details
04-22-2006
4.00
Boxed wing tips
Details
04-15-2006
3.00
Installed oil pump and starter
04-08-2006
6.00
Jury Struts
03-11-2006
2.00
Bending jury strut barcketts.
Details
03-09-2006
3.00
Cutting holes in streamlined strut fariing covers
Details
03-07-2006
3.00
Jury strut constuction
Details
03-05-2006
5.00
Strut fairings
Details
03-01-2006
2.50
Install streamlined strut farings
Details
02-25-2006
5.00
Fixing wings to fuselage
Details
12-11-2005
8.00
Doors
Details
12-04-2005
6.00
Doors
Details
11-06-2005
1.00
Unpacked engine
Details
09-10-2005
4.00
Doors
Details
08-09-2005
2.50
Mounted panel
Details
08-03-2005
2.00
Made plate for radio transformer.
Details
08-02-2005
5.00
Wired inter com and radio
Details
07-23-2005
6.00
Installed ELT
Details
07-15-2005
6.00
Wiring Batt cables, regulator, selinoid, fuel pump
Details
07-09-2005
2.00
Installed sending unit for gas tank.
Details
07-02-2005
5.00
Wiring instrument panel.
Details
06-14-2005
5.00
Wiring cables to front disconnects.
Details
06-13-2005
4.00
Install rear seat batt. mod
Details
06-11-2005
1.00
Soldering rear quick disconnects
Details
05-25-2005
2.00
Inventory and unpacked strut package
Details
05-24-2005
6.00
Stabilizer struts connect.
Details
05-19-2005
1.00
Cleaned up shop
Details
05-12-2005
3.00
Trim control
Details
05-07-2005
5.50
Landing gear
Details
05-05-2005
5.00
Nose cone
Details
03-01-2005
3.00
Moved out of house into hanger.
Details
10-23-2004
3.00
Installed wing fiberglass wing tips.
Details
10-17-2004
3.00
Wing tips
Details
09-11-2004
3.00
Installed wing hinges
Details
09-10-2004
4.00
Wing hinges
Details
08-27-2004
5.00
Installed wing ribs
Details
08-14-2004
6.00
Installed wing ribs
Details
07-31-2004
6.00
In-board and out-board wing panels
Details
07-24-2004
8.00
In-board and out-board wing panels
Details
07-10-2004
6.00
In-board and out-board wing panels
Details
06-10-2004
2.50
In-board and out-board wing panels
Details
06-09-2004
2.00
unpacked and stored fuselage outside
03-04-2004
3.00
Fabric heat and shrink
Details
02-25-2004
3.50
Covered fuse fin
Details
02-19-2004
3.00
Recovering tail section
Details
02-11-2004
2.50
Still covering tail section
Details
02-05-2004
3.00
Covering tail
Details
01-31-2004
3.00
Covering tail
Details
01-28-2004
3.00
Covering tail with fabric
Details
01-08-2004
3.00
Hinges cont.
Details
12-11-2003
2.00
Hinges
Details
12-04-2003
3.00
Pre-drilling elevator hinges
Details
10-17-2003
4.00
Getting started. Tail section.
Details
SITE NAVIGATION
Contact Builder
C2Standard Home
Category
# Logs
# Hours
All
99
407
Avionics
4
16
Electrical
6
26
Empennage
15
54
Engine
10
52
Fuselage
20
86
Miscellaneous
10
38
None
2
3
Wings
32
132