KitLog pro

Powered By Kitlog Pro v2.0

Vans RV6
Work Logs Found: 364
Category Work Time: 1187 Hours
 Date
Hours
Work Log Summary

Details

 03-05-2012
3.00
W&B - Whats She Weigh
Details
     

 03-03-2012
2.00
Wingtips On
     

 02-27-2012
1.00
Nice day to pop outside.
Details
       

 02-27-2012
10.00
Final Wing Installation
       

 02-20-2012
3.00
Off To The Airport
Details
       

 02-07-2012
15.00
Prepare For Painting
Details
       

 02-06-2012
3.00
Fit of RAM Air Induction
     

 02-01-2012
6.00
Prop Installation Preparation
       

 02-01-2012
6.00
Finishing Air Ramps
Details
       

 12-28-2011
10.00
Tail Section Installed
       

 12-23-2011
10.00
Fuselage Primed
       

 12-23-2011
10.00
Fuselage Painted
       

 12-23-2011
10.00
Fuselage Painted
       

 12-15-2011
10.00
Fuselage Paint Preparation
       

 12-12-2011
5.00
Tail Section Painting
       

 12-07-2011
10.00
Wing Last Coat
       

 12-07-2011
5.00
Painted Wing Control Surfaces
       

 12-06-2011
2.00
Wings First Coat
       

 12-05-2011
5.00
Prep Wing For Painting
       

 11-30-2011
15.00
Preparation For Painting
       

 11-30-2011
2.00
Paint Planning
     

 11-28-2011
15.00
More Cowls & WIndscreen
       

 11-26-2011
5.00
Final Fuel Tank Checks
Details
       

 11-04-2011
5.00
Wing Tip[ Completion
       

 11-01-2011
1.00
Cut Hole For Flap Actuator
     

 10-23-2011
4.00
Aileron Rigging
       

 10-16-2011
6.00
Panel & Centre Console Fit
       

 10-16-2011
5.00
Control Stick Wiring
       

 10-05-2011
4.00
Panel Lighting
       

 10-02-2011
10.00
Panel Fit
       

 10-01-2011
4.00
Wing Wire Termination
       

 09-28-2011
4.00
Temporary Fit Of Wings
       

 09-26-2011
6.00
Right Wing Wiring
       

 09-25-2011
8.00
Wiring Left Wing
Details
       

 09-25-2011
2.00
Altimeter Mismatch
Details
       

 09-18-2011
8.00
Installed Wing Lighting
       

 09-11-2011
6.00
Cleaned Wings With Scotchbrite & Soapy Water
       

 09-01-2011
1.00
Wing Fillet Temp Fit
     

 08-21-2011
2.00
Moving my wings to the factory
       

 08-21-2011
6.00
Firewall Insulation
     

 08-20-2011
6.00
More Canopy & WIndscreen Fitting
       

 08-19-2011
1.00
Plenum Test Fit
       

 08-18-2011
4.00
James Plenum Fitting
Details
       

 08-17-2011
2.00
Run EGT/CHT Wires
     

 08-15-2011
1.00
Moved my RV from my shed to a factory for finalisa
Details
       

 08-15-2011
1.00
In the factory
       

 08-04-2011
8.00
Windscreen & Canopy Fitting
       

 08-04-2011
2.00
Throttle Body RAM Induction Plate
       

 08-04-2011
4.00
Sucsess - No Cracks
       

 08-01-2011
12.00
The Cowling
       

 08-01-2011
3.00
More Cowling Shots
       

 07-03-2011
8.00
THE BIG CUT
Details
       

 07-01-2011
3.00
Final preparation forward deck after wiring.
     

 06-29-2011
150.00
Wiring & Avionics
Details
       

 06-29-2011
2.00
Wiring
       

 06-29-2011
2.00
Panel Mounts & Instruments
       

 06-28-2011
0.50
SABRE 2.5" Prop Extension
     

 06-28-2011
1.50
Baffles & James Plenum
       

 06-06-2011
1.00
Firewall modification for cable bulkhead fitting.
Details
     

 05-29-2011
1.00
Fuel Pump Fitting
Details
       

 05-28-2011
4.00
G3 Ignition System
Details
     

 05-23-2011
2.00
Cable Routing
     

 05-20-2011
4.00
Pitch & Roll Servo Installation
       

 03-02-2011
2.00
Panel Cutout 2
       

 02-19-2011
6.00
Mockup Panel
Details
       

 02-13-2011
2.00
Panel - Final Cut
Details
       

 02-12-2011
4.00
The Ponies Are In
Details
       

 02-12-2011
4.00
Engine Fitted
Details
       

 02-07-2011
1.50
Templated Cowling Attatch Points
Details
     

 02-06-2011
1.00
Fitted Trutrak EDM & Pressure Sensors
       

 02-06-2011
6.00
Fitted FWF Components
Details
       

 02-01-2011
0.20
Purge Valve Arrived
     

 01-14-2011
1.00
The Babys On Her Legs.
       

 01-13-2011
4.00
Landing Gear
       

 01-12-2011
0.10
January 2011 - It looks like a plane.
       

 01-12-2011
8.00
Forward Fuselage
       

 01-12-2011
1.00
Engine Mount Is On.
       

 01-11-2011
6.00
Rollover Bar
Details
       

 01-11-2011
1.00
Fuel Vent
Details
       

 01-07-2011
5.00
Brake Lines
       

 01-05-2011
6.00
Cabin Interiour Structure 2
       

 01-04-2011
6.00
Cabin Interiour Structure
       

 12-30-2010
1.00
Look What Santa Brought
Details
       

 12-28-2010
3.00
Control Rods
Details
       

 12-17-2010
1.00
Drilled Seat Ribs
     

 12-14-2010
1.00
Rear Cabin Seat Belt Guides
       

 12-14-2010
1.00
Fitted Master Cylinders For Duel Brake
     

 12-13-2010
1.00
Temp Fitting Of Tail Wheel Springs
     

 12-13-2010
1.50
Rudder Stop
       

 12-13-2010
3.00
Mounted Empannage & Bolted
       

 12-12-2010
1.00
Rudder Pedal Fitting
       

 12-11-2010
4.00
Empennage Fitting & Alignment
       

 12-05-2010
1.50
Brake Pedal Fitting
       

 11-01-2010
4.00
Wing ALignment Continued
       

 11-01-2010
0.50
Rudder Cable Fitting
       

 11-01-2010
6.00
Fitted Wings For Alignment
       

 10-19-2010
1.00
Installed Rudder Cable
       

 10-18-2010
1.00
Some Fun In The Shop
Details
       

 10-18-2010
2.00
Rear Turtle Deck
       

 10-18-2010
1.00
Rear Top Skins Cleckoed
       

 10-18-2010
2.00
Rear Top Skins
       

 10-18-2010
1.00
Rear Canopy Skin Structure
       

 10-18-2010
0.50
Interiour ready for painting,
       

 10-18-2010
2.50
Installed Static Kit - Hose
       

 10-18-2010
1.00
Installed Static Kit
       

 10-18-2010
3.00
Installation Turtle Deck
       

 10-18-2010
1.00
Finish Bottom Skins
       

 10-18-2010
1.00
Empennage Stiffners
       

 10-13-2010
3.00
Empennage Attatch Section
       

 10-11-2010
1.00
Seat Rear Brace
     

 10-11-2010
2.00
Empennage Attach Area
       

 10-10-2010
2.00
Level Stand
Details
       

 10-10-2010
1.20
Installed Aft Cockpit Section
       

 10-10-2010
1.00
Fitted Control Assembly For Movement Test
     

 10-09-2010
2.00
Engine Stand
Details
       

 10-02-2010
0.50
General Tidy Up Of Rivets
       

 10-01-2010
1.00
Preparation Reat Turtle Deck
       

 10-01-2010
1.00
Further Tidy Up Fuse Rear End
       

 09-04-2010
0.50
MILESTONE. The fuse says goodbuy to the Jig.

 09-04-2010
0.50
Manufactured the elevator bel crank.
     

 09-02-2010
1.50
Seat Bottoms.
Details
       

 09-02-2010
2.50
Rear Baggage Cabbin Fitted
       

 09-02-2010
0.20
Look from right side up.
Details
       

 09-02-2010
1.50
External Air
Details

 09-02-2010
3.00
Bottom Skins Rivetred On.
Details

 09-02-2010
3.00
656 Gussets bent, primed & fitted.
       

 08-30-2010
2.00
Engine Stand
Details
       

 08-17-2010
1.00
Riveting On Right Side Skin
       

 08-08-2010
1.20
Wingtip Lights
       

 08-08-2010
1.50
RHS Side Skin Finishing
Details
       

 08-07-2010
3.00
RHS Side Skin Preparation
       

 07-31-2010
0.50
Bolted In Seat Belt Brackets
     

 07-30-2010
1.00
Assembled Seat Parts
       

 07-09-2010
0.50
Filed Groove Out For Bottom Hinge
     

 07-03-2010
0.50
Side Skin Preparation
     

 06-26-2010
1.00
Bottom Skin Prepared
       

 06-26-2010
1.00
Bottom Skin Fitted
       

 06-26-2010
0.50
Bolts Fitted To Forward Fuse
     

 06-24-2010
1.00
Seat Backs Started
       

 06-24-2010
2.00
Seat Back Stiffners
       

 06-24-2010
3.00
Floor Skin Assembly
       

 06-24-2010
0.50
Fiited Floor Skin For Alignment
       

 06-23-2010
1.00
Floor Skin
       

 06-22-2010
4.00
Floor Skin Stiffners
       

 05-30-2010
1.50
Brake & Rudder Pedal Assembly
       

 05-25-2010
1.00
Rudder Pedal Assembly
       

 05-24-2010
2.00
Brake Pedal Assembly
       

 05-05-2010
1.50
Rear Inspection Holes
       

 05-01-2010
3.00
Family Affair
Details
       

 05-01-2010
2.00
Assembled Forward Fuselage
       

 04-30-2010
3.00
Rear Tail Cone Preparation
       

 04-30-2010
3.00
Rear Skinning
       

 04-30-2010
1.00
Cleaned & Primed Forward Fuselage Parts
     

 04-30-2010
2.00
Bottom Rear Skin Preparation
       

 04-26-2010
3.00
Manufactured forward fuselage braces & gussets
       

 04-26-2010
1.00
Drilled holes for control stick mounts & put in pl
       

 04-10-2010
2.00
Fusellage Assembly
       

 04-09-2010
0.50
Tailwheel Assembly Attatched.
     

 04-08-2010
3.00
Seat & Floor Rib Assembly
       

 04-08-2010
2.00
Initial Assembly & Alignment - Bulkheads
     

 04-08-2010
1.00
Baggage Compartment Cont.
     

 04-08-2010
1.00
Adjustments - Middle Floor Ribs
       

 04-07-2010
0.50
Longerons riveted to firewall.
     

 04-07-2010
1.00
Further Work F605
       

 04-07-2010
2.00
Floor Ribs
       

 04-07-2010
1.00
F604 Bulkhead Assembly
       

 04-07-2010
1.00
F-605 Bulkhead Primed & Assembled
     

 04-06-2010
4.00
Tail Section Bulkheads Primed & Put Together
       

 04-05-2010
3.00
Longerons Bent To Shape
     

 04-05-2010
0.50
Fuselage Jig Leveled
     

 04-03-2010
3.00
Stringers Attached
       

 04-02-2010
0.10
Scuff Scuff Cleaner
Details
     

 04-02-2010
0.50
Other Bulkkheads More
       

 04-02-2010
0.50
Other Bulkkheads More
       

 04-02-2010
4.00
Other Bulkheads
       

 04-01-2010
4.00
F605 Bulkhead
       

 03-22-2010
3.00
F606, 607 & 608
Details
       

 03-08-2010
2.00
Firewall Clecoed & Riveted Together
       

 03-08-2010
0.50
Firewall Assembled
     

 03-08-2010
1.00
Firewall Aluminium Parts Primed.
       

 03-07-2010
1.00
Firewall Various Parts Formed
Details
       

 03-07-2010
1.00
Firewall Stiffners Put In Place
       

 03-06-2010
0.50
Wing Jig Taken Down
       

 03-06-2010
0.60
Fuselage Jig Assembled
Details
     

 03-01-2010
1.50
Firewall Pats Put Together
       

 02-28-2010
1.20
The wing was rotated in the Jig & aileron angles m
       

 02-28-2010
0.50
Fuselage Started - Plans Open
     

 02-28-2010
2.80
Flaps
Details
       

 02-28-2010
1.00
Flap Brace Fitted & Pop Riveted
     

 02-27-2010
0.10
Wings Finished Apart From Tips
       

 02-26-2010
0.10
Wing Pictures In Jig
       

 02-26-2010
1.00
Pushrod Hole In Rear Spar
       

 02-26-2010
1.20
Aileron Trim
Details
       

 02-26-2010
0.25
Aileron Pushrod
Details
       

 02-26-2010
1.50
Aileron Brackets Riveted On
       

 02-26-2010
4.00
Aileron Bracket Fitting
Details
       

 02-25-2010
1.50
Fuel Tank Final Assemby & Fit
       

 02-24-2010
4.50
Riveted Bottom Rear Skins On
       

 02-24-2010
1.00
Fitted gusset & inbourd aileron mounting bracket.
       

 02-23-2010
0.40
604 Bulkhead - 5/8 Holes Drilled For Rudder Cable
     

 02-23-2010
2.00
604 Bulkhead
       

 02-23-2010
2.00
604 Bulkhead
       

 02-22-2010
2.50
Pitot Alignemnt & Bottom Skinning
       

 02-20-2010
0.70
Primed Left Wing Skins
       

 02-15-2010
0.80
Fitted Aileron Belcrank
       

 02-09-2010
0.80
Run Pitot Line & Pop Rivited Down. Run guides for
       

 02-09-2010
1.50
Rear Tank Baffle Fitted & Sealed. Nutplates On Spa
Details
       

 02-08-2010
1.30
Capacitave Fuel Senders
     

 02-07-2010
3.00
Fuel Tank Assembly
Details
       

 02-02-2010
2.00
Prosealing end baffle on fuel tank.
     

 01-26-2010
1.20
Organising Fitting Of Pitot
       

 01-23-2010
1.50
Prosealed end rib
Details

 01-17-2010
2.50
Prosealing Left Fuel Tank Ribs
       

 01-17-2010
2.10
Left Fuel Tank Pickup
       

 10-28-2009
4.00
Left Fuel Tank
       

 10-27-2009
1.60
Left Fuel Tank - Fuel Trap Door
       

 10-26-2009
5.00
Left Wing Bottom Skins Fitted
     

 10-22-2009
6.00
Left Leading Edge Fitted
       

 10-21-2009
6.00
Left Wing Leading Edge
       

 10-20-2009
5.00
Left wing ribs fitted
Details
       

 10-05-2009
2.00
Left Main Wing Assembley
Details
       

 10-04-2009
1.00
Right Wing - Completed For Inspection
Details
       

 10-03-2009
2.20
Left Fuel Tank Started.
Details
       

 10-01-2009
3.50
Left Rear Spar Constructed.
Details
       

 10-01-2009
6.00
Left Main Spar Constructed.
Details
       

 10-01-2009
1.00
Fluting Not Required
Details
       

 09-30-2009
0.75
Wing Ribs Prepared
Details
       

 09-30-2009
1.00
Wing Ribs Alodined
       

 09-29-2009
1.40
Right Aileron Connected.
       

 09-29-2009
0.60
Flaps Fitted for alignment.
       

 09-29-2009
0.75
Flap Brace
Details
       

 09-28-2009
1.30
Aileron Tidyup & Fitting.
Details
       

 09-28-2009
1.20
Aileron Pushrod Assembly
Details
       

 09-27-2009
4.00
LH Rear Spar Cleaned & Assembled.
       

 09-26-2009
0.50
Ribs Alodined
       

 09-26-2009
0.20
LH Ribs Preparation.
Details
       

 09-22-2009
1.00
Further Assembly - LH Spar
       

 09-22-2009
3.00
Assembled LH Spar
       

 09-21-2009
4.00
Alodined LH Spar Components
       

 09-13-2009
4.00
Bottom Skins Riveted On - RH Wing
     

 09-13-2009
1.20
Ailerons Mounted - Right Wing
       

 09-08-2009
3.00
Final Assembly Flaps
Details
       

 09-08-2009
5.00
Drilled, Deburred & Clecoed Bottom Sikins On.
       

 09-07-2009
1.00
Primed Bottom & Flap Skins
       

 09-07-2009
1.00
Drilled & Clecoed piano hinge to the flap spar.
Details
       

 09-06-2009
4.00
Manufacture - Flap
Details
       

 09-05-2009
3.00
Flap Parts
Details
       

 09-05-2009
4.00
Flap Assembly
Details
       

 08-30-2009
1.00
Flaps
       

 08-23-2009
2.50
Rear Baffle Prosealed & Riveted.
     

 08-22-2009
4.00
Plate Nuts Installed For Fuelk Tank Fitting
       

 08-16-2009
1.50
Wiring Tube Brackets
Details
     

 08-16-2009
2.50
Wing Wiring Brackets
Details
       

 08-16-2009
1.00
Internal Tank Work.
Details
       

 08-16-2009
0.50
Cork Casket Fitted
Details
     

 08-02-2009
1.00
Prosealed anywhere where fuel can get out.
Details
       

 08-02-2009
3.00
Prosealed & Riveted End Ribs
Details

 08-02-2009
0.50
Fuel Tank Elbow Prosealed
Details
       

 08-01-2009
3.00
Fuel Pickup
Details
       

 07-26-2009
4.60
Ribs Proselaed & Riveted
Details
       

 07-26-2009
3.00
Fuel Tank Access Plate
Details
       

 07-26-2009
1.00
Fuel Drain Fitted
Details
     

 07-25-2009
5.00
Capacitave Fuel Sensor Plates
Details
       

 07-19-2009
0.90
Fuek Cap
Details
       

 07-19-2009
3.00
Baffles Cut, Fitted & Sealed
Details
       

 07-18-2009
3.50
Skin fitted, drilled & clekoed
Details
       

 07-18-2009
0.80
End Baffles
Details
       

 07-12-2009
1.00
Fluted Ribs & Cut Cell Holes
Details
     

 07-12-2009
3.00
Alignement
Details
       

 07-11-2009
1.50
Prepared Baffles & Spar
Details
       

 07-04-2009
1.00
Fuel Tank Construction
Details
       

 06-17-2009
0.20
Wow Whats in the box.
Details
       

 06-17-2009
0.50
Fuse & Finish Kit
Details
       

 06-16-2009
1.00
Finished Riveting The Leading Edge.
Details
     

 06-11-2009
0.10
Fuselage & Finish Kit Arrive
Details
       

 06-06-2009
3.00
Placed Outboard Skin On Ribs
Details
       

 05-25-2009
1.00
Threaded Rod Through Top Ribs
Details
       

 05-25-2009
0.50
Threaded rod aligned to Jig
Details
       

 05-25-2009
0.10
Rivet On Belcrank Assembly Over Driven
Details
     

 05-25-2009
0.10
Rivet Driven At Top Of Belcrank.
Details
     

 05-25-2009
2.00
Mounting Leading Edge On Spar.
       

 05-25-2009
2.00
Leading Edge Complete
Details
       

 05-25-2009
0.10
Check Extra Hiles In Main Spar Above Bell Crank.
     

 05-24-2009
0.20
Wing Taking Shape
Details
       

 05-24-2009
0.75
W623 Strap Riveted To Rib
Details
       

 05-24-2009
2.00
Belcrank assembly assembbled.
Details
       

 05-24-2009
0.75
Balcrank Assembly
Details
       

 05-24-2009
2.00
Assembly of leading edge.
Details
       

 05-23-2009
1.50
Wing Ribs Primed & Riveted To Spar
Details
       

 05-23-2009
0.50
Belcrank Frame Assembly Primed
Details
       

 05-23-2009
0.10
Aileron Hole
Details
     

 05-18-2009
0.20
Further parts prepared for priming.
Details
     

 05-03-2009
2.00
Rear Spar Primed & Assembled.
Details
       

 05-03-2009
0.50
Rear spar mounted into jig
Details
       

 05-03-2009
1.00
Rear Spar Assembly
Details
       

 04-28-2009
0.50
Spacers & Tiedown riveted & bolted into place.
Details
       

 04-27-2009
4.00
Main Spar Riveted & Assembled In Jig
Details
       

 04-24-2009
1.20
Gussets pre assembled to Belcrank Assembly.
Details
       

 04-21-2009
0.75
Belcrank assembly started.
Details
       

 04-16-2009
2.00
Top & Bottom Ribs aligned, drilled & deburred.
Details
     

 04-14-2009
3.00
Angle spacers cut, scotchbrite & pre assembly.
Details
       

 04-13-2009
0.50
Spar rechecked again for stations.
Details
     

 04-12-2009
2.00
Set Spar Bolt/Rivet Configuration
Details
       

 04-12-2009
1.00
Prepared Ribs For Priming
Details
     

 04-11-2009
2.00
Rivet Flush Head Rivest Into Spar Root.
     

 04-09-2009
2.50
Main Bulkhead Preparation
Details

 04-07-2009
2.00
Prepared Main WIng Spar For Priming.
Details

 04-07-2009
1.00
Cleaned & Prepared Rudder For Priming
Details

 04-05-2009
1.00
Primed Aileron
Details

 03-25-2009
3.00
Aileron Trim Tab
Details
       

 03-22-2009
2.50
Electric Aileron Trim.
Details
       

 03-19-2009
2.00
Cleckod Skeleton To Skin
Details
       

 03-15-2009
2.50
Riveted A-610 Stiffners Inside Right Aileron
Details
       

 03-15-2009
4.00
Alodined Spar & Skins
Details

 03-15-2009
3.00
A610 stiffners and aileron skins primed.
Details

 03-11-2009
2.50
Lighning Holes Cut Into Aileron Spar
Details
       

 03-07-2009
1.00
Right Aileron Dimpled and Deburred
Details
       

 03-07-2009
4.00
Clean, alumniprep & alodine aileron parts.
Details

 02-28-2009
6.00
Aileron Pre Construction
Details
       

 02-18-2009
0.20
Aileron Mounting Brackets Sent To Powdercoat
Details
       

 02-05-2009
2.00
Aileron Skeleton
Details

 02-04-2009
1.00
Aileron Counterbalance
Details

 02-03-2009
4.00
A408 Aileron Re-enforcement Bracket
Details

 12-24-2008
6.00
Right Wing Spar With Zinc Chromate Removed
Details
       

 12-22-2008
0.20
Disaster strikes.
Details
       

 12-13-2008
2.00
Polished various Aileron Parts
Details
       

 12-12-2008
0.50
Scotchbrite wheel arrived for my grinder.
Details
     

 12-11-2008
3.00
Removing Zinc Chromate from Spars.
Details
       

 12-04-2008
1.00
Inventory Aileron Parts
Details
       

 11-27-2008
0.50
Spar Strap
Details

 11-25-2008
2.20
Removed Plastic From LH Wing Spar
Details
       

 11-22-2008
14.00
RV Workshop - Sam Richards
Details

 11-16-2008
3.50
Constructing the Wing Jig
Details
       

 09-28-2008
3.00
Workbench
Details
       

 09-26-2008
0.50
Concrete Down
Details
       

 09-22-2008
0.50
Concrete Preparation
Details
       

 09-21-2008
0.20
Before The Project - Somwhere to work from.
Details
       

 09-20-2008
0.60
Clenaed & Lubrictated tools.
Details
     

 09-15-2008
1.00
Purchase
Details

 09-09-2008
0.50
Contact Other 8 Cylinder Jabiru Owners
Details

 08-11-2008
0.20
Tool Ideas & Vendors
Details

 08-07-2008
0.10
RV Builders Training Course
Details

 08-07-2008
0.20
Freight Costs For Empennage
Details

 08-04-2008
0.50
Australian Distributer - Aerosport Power
Details

 08-03-2008
0.10
What Engine ??
Details

 08-01-2008
1.00
What Model
Details

 08-01-2008
0.10
Ordered RV Info Pack & Parts Catalogue

 07-01-2008
0.50
Background
Details
       

 01-01-2000
0.10
https://fairings-etc.com/Home_.html

 01-01-2000
0.10
http://www.vansaircraft.com/

 01-01-2000
0.10
http://www.trutrakflightsystems.com/

 01-01-2000
0.10
http://www.averytools.com/

 01-01-2000
0.10
http://www.alphasystemsaoa.com/

 01-01-2000
0.10
http://www.aircraftspruce.com/

 01-01-2000
0.10
http://pilotlights.net/

 01-01-2000
0.10
http://approachfaststack.com/

 08-02-1997
20.00
Further Construction Pictures From Cons Build Log.
       

 08-01-1997
20.00
Further Construction Pictures From Cons Build Log.
       

 07-15-1997
10.00
Further Construction Pictures From Cons Build Log.
       

 07-15-1997
20.00
Further Construction Pictures From Cons Build Log.
       

 07-01-1997
50.00
Further Construction Pictures From Cons Build Log.
       

 06-01-1997
56.00
Exctract From Cons Build Log. Horiz. Stab
Details
       

 03-01-1997
0.50
Extract From Cons Build Log.
Details

 01-01-1997
0.10
Con Maheras - Sale of the RV6 WInk & Emponnage Kit
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.