Date
|
Hours
|
Work Log Summary
|
Details
|
05-15-2010
|
2.60
|
Main Fairings
|
Details
|
|
|
05-14-2010
|
6.30
|
Main gear leg fairings
|
Details
|
|
|
05-13-2010
|
5.20
|
Main gear legs
|
Details
|
|
|
05-12-2010
|
4.70
|
Main wheel fairings
|
Details
|
|
|
05-11-2010
|
3.70
|
Nose gear
|
Details
|
|
|
05-08-2010
|
2.90
|
Flaps
|
Details
|
|
|
05-07-2010
|
5.20
|
Nose fairing
|
Details
|
|
|
05-06-2010
|
3.80
|
Wheel fairing fitting
|
Details
|
|
|
05-05-2010
|
3.30
|
Muffler alterations
|
Details
|
|
|
05-04-2010
|
2.90
|
Muffler alterations
|
Details
|
|
|
04-28-2010
|
5.10
|
Nose Fairing
|
Details
|
|
|
04-27-2010
|
5.50
|
Wheel Pants
|
Details
|
|
|
04-25-2010
|
3.90
|
Main Fairings
|
Details
|
|
|
04-24-2010
|
1.90
|
|
Details
|
|
|
04-23-2010
|
3.50
|
Main Fairings
|
Details
|
|
|
04-22-2010
|
1.90
|
Flight testing
|
Details
|
|
|
04-20-2010
|
3.80
|
Flight testing
|
Details
|
|
|
04-19-2010
|
2.40
|
Flight testing
|
Details
|
|
|
04-15-2010
|
2.10
|
Flight testing
|
Details
|
|
|
04-14-2010
|
4.60
|
Flaps, ailerons, prop
|
Details
|
|
|
04-13-2010
|
2.30
|
Prop, empennage
|
Details
|
|
|
04-09-2010
|
4.40
|
Brackets, prop install
|
Details
|
|
|
04-08-2010
|
2.20
|
Bracket layouts
|
Details
|
|
|
04-07-2010
|
3.20
|
Prop
|
Details
|
|
|
04-06-2010
|
3.20
|
Installing Gen 3
|
Details
|
|
|
04-05-2010
|
1.60
|
Removed Gen 1
|
Details
|
|
|
03-31-2010
|
1.70
|
First Flight
|
Details
|
|
|
03-28-2010
|
0.80
|
Fuel
|
Details
|
|
|
03-28-2010
|
0.01
|
First Flight
|
Details
|
|
|
03-24-2010
|
2.20
|
Main wheel fairings
|
Details
|
|
|
03-23-2010
|
1.20
|
More documentation for aircraft pouch
|
Details
|
|
|
03-22-2010
|
2.10
|
Paperwork
|
Details
|
|
|
03-21-2010
|
2.10
|
Hi-speed testing
|
Details
|
|
|
03-20-2010
|
1.10
|
Fuel & Taxi Testing
|
Details
|
|
|
03-18-2010
|
5.10
|
Taxi Testing
|
Details
|
|
|
03-17-2010
|
6.10
|
Low speed taxi testing
|
Details
|
|
|
03-16-2010
|
3.80
|
Low speed taxi testing
|
Details
|
|
|
03-16-2010
|
0.10
|
Headset
|
Details
|
|
|
03-15-2010
|
2.20
|
Batteries, misc
|
Details
|
|
|
03-13-2010
|
2.80
|
Cleaning
|
Details
|
|
|
03-12-2010
|
2.30
|
Insurance
|
Details
|
|
|
03-11-2010
|
4.70
|
Canopy, seals
|
Details
|
|
|
03-10-2010
|
5.20
|
Inspection Panels
|
Details
|
|
|
03-08-2010
|
5.20
|
Seating and belts
|
Details
|
|
|
03-07-2010
|
3.90
|
Carpeting
|
Details
|
|
|
03-06-2010
|
2.60
|
Trim Panels
|
Details
|
|
|
03-06-2010
|
2.10
|
More trim finishing
|
Details
|
|
|
03-05-2010
|
2.50
|
Panels and trim
|
Details
|
|
|
03-05-2010
|
3.60
|
Interior
|
Details
|
|
|
03-04-2010
|
0.10
|
IT'S HERE.. FINALLY !!!!!
|
Details
|
|
|
03-04-2010
|
2.10
|
Interior
|
Details
|
|
|
03-03-2010
|
2.90
|
Seals and misc.
|
Details
|
|
|
03-03-2010
|
2.70
|
Panel installation
|
Details
|
|
|
03-02-2010
|
1.40
|
Labelling and tire pressures.
|
Details
|
|
|
03-02-2010
|
1.20
|
Label replacements.
|
Details
|
|
|
03-02-2010
|
2.10
|
Cover installations
|
Details
|
|
|
03-01-2010
|
3.60
|
Panels & Wheel Torque
|
Details
|
|
|
03-01-2010
|
3.10
|
Panel Installs
|
Details
|
|
|
02-22-2010
|
5.00
|
Floor panels
|
Details
|
|
|
02-21-2010
|
3.10
|
Wing roots
|
Details
|
|
|
02-12-2010
|
3.20
|
Fairings
|
Details
|
|
|
02-11-2010
|
4.80
|
Fairings
|
Details
|
|
|
02-10-2010
|
2.10
|
Touchups
|
Details
|
|
|
02-09-2010
|
2.40
|
Paperwork for Inspection
|
Details
|
|
|
02-09-2010
|
6.10
|
Inspection
|
Details
|
|
|
02-08-2010
|
3.80
|
Readying for inspection
|
Details
|
|
|
02-07-2010
|
2.30
|
Washing
|
Details
|
|
|
02-06-2010
|
3.60
|
Engine Testing
|
Details
|
|
|
02-04-2010
|
2.10
|
Checking
|
Details
|
|
|
01-29-2010
|
1.10
|
Batteries
|
Details
|
|
|
01-25-2010
|
2.20
|
Testing systems
|
Details
|
|
|
01-23-2010
|
4.70
|
Forward cowl, engine cowl
|
Details
|
|
|
01-22-2010
|
2.20
|
Forward cowl
|
Details
|
|
|
01-21-2010
|
2.40
|
Wire tie ups
|
Details
|
|
|
01-19-2010
|
5.70
|
EIS, CofG, Start
|
Details
|
|
|
01-16-2010
|
3.10
|
Electrical system
|
Details
|
|
|
01-15-2010
|
2.80
|
Fuel, MAP
|
Details
|
|
|
01-14-2010
|
2.70
|
EIS Fuel Guages
|
Details
|
|
|
01-12-2010
|
1.60
|
ELT
|
Details
|
|
|
01-07-2010
|
2.20
|
EIS
|
Details
|
|
|
01-06-2010
|
2.10
|
EIS programming
|
Details
|
|
|
01-02-2010
|
0.70
|
Canopy
|
Details
|
|
|
12-30-2009
|
2.10
|
Checking ranges
|
Details
|
|
|
12-23-2009
|
4.20
|
EIS Programming
|
Details
|
|
|
12-22-2009
|
3.10
|
Wiring and installing panel
|
Details
|
|
|
12-19-2009
|
2.30
|
Finished wiring
|
Details
|
|
|
12-17-2009
|
9.20
|
Wiring and tweaking
|
Details
|
|
|
12-05-2009
|
3.20
|
More wiring
|
Details
|
|
|
11-30-2009
|
46.00
|
Wiring tweaking
|
Details
|
|
|
10-19-2009
|
4.40
|
Forward Cowl
|
Details
|
|
|
10-13-2009
|
73.00
|
Miscellaneous wiring
|
Details
|
|
|
10-06-2009
|
2.30
|
Forward Cowl
|
Details
|
|
|
10-05-2009
|
3.10
|
Forward Cowl
|
Details
|
|
|
10-04-2009
|
2.70
|
Engine run & Fuel Calibration
|
Details
|
|
|
10-03-2009
|
2.10
|
EIS Wiring
|
Details
|
|
|
10-02-2009
|
2.30
|
Forward Cowling Improvement
|
Details
|
|
|
10-01-2009
|
3.10
|
Finishing
|
Details
|
|
|
09-30-2009
|
4.40
|
Finishing
|
Details
|
|
|
09-29-2009
|
6.20
|
Miscellaneous
|
Details
|
|
|
09-28-2009
|
3.20
|
Muffler & Heater
|
Details
|
|
|
09-25-2009
|
2.20
|
Heating Ducts
|
Details
|
|
|
09-24-2009
|
2.30
|
Muffler & Heat Ducts
|
Details
|
|
|
09-23-2009
|
5.10
|
Wiring cleanup
|
Details
|
|
|
09-22-2009
|
3.10
|
Brakes
|
Details
|
|
|
09-21-2009
|
3.50
|
Locking Handle
|
Details
|
|
|
09-19-2009
|
3.10
|
Misc W#iring
|
Details
|
|
|
09-18-2009
|
3.30
|
Wiring & W&B
|
Details
|
|
|
09-17-2009
|
3.30
|
Weight & Balance
|
Details
|
|
|
09-12-2009
|
2.80
|
Wire tie ups.
|
Details
|
|
|
09-11-2009
|
3.30
|
Timing
|
Details
|
|
|
09-10-2009
|
3.10
|
Tying off
|
Details
|
|
|
09-09-2009
|
5.10
|
Wiring cleanup, etc
|
Details
|
|
|
09-08-2009
|
5.50
|
Engine tuning, muffler work
|
Details
|
|
|
09-07-2009
|
4.60
|
Cockpit area and engine area
|
Details
|
|
|
09-05-2009
|
3.50
|
Engine
|
Details
|
|
|
09-04-2009
|
3.30
|
Engine testing and timing
|
Details
|
|
|
09-03-2009
|
3.60
|
Sensors and trim
|
Details
|
|
|
09-03-2009
|
2.10
|
FWF Finishing
|
Details
|
|
|
09-02-2009
|
5.70
|
Little stuff
|
Details
|
|
|
09-01-2009
|
4.30
|
Water temp sensor SDS & Misc
|
Details
|
|
|
09-01-2009
|
0.10
|
test
|
Details
|
|
|
09-01-2009
|
2.40
|
ECM, drain hole
|
Details
|
|
|
08-31-2009
|
3.30
|
Pitot, static, AOA lines
|
Details
|
|
|
08-31-2009
|
1.70
|
Labelling
|
Details
|
|
|
08-31-2009
|
0.50
|
Engine start
|
Details
|
|
|
08-29-2009
|
2.10
|
Trim
|
Details
|
|
|
08-29-2009
|
1.10
|
Finishing
|
Details
|
|
|
08-29-2009
|
2.30
|
EFI
|
Details
|
|
|
08-28-2009
|
1.50
|
Static & Pitot
|
Details
|
|
|
08-28-2009
|
5.40
|
SDS EFI
|
Details
|
|
|
08-27-2009
|
5.30
|
SDS EFI
|
Details
|
|
|
08-26-2009
|
2.70
|
A/F Guage, plug wires.
|
Details
|
|
|
08-22-2009
|
2.60
|
Trim wiring
|
Details
|
|
|
08-22-2009
|
4.20
|
SDS EFI
|
Details
|
|
|
08-21-2009
|
7.20
|
Sensors and wiring.
|
Details
|
|
|
08-21-2009
|
5.10
|
Connecting the trimwiring
|
Details
|
|
|
08-20-2009
|
6.20
|
Muffler and Injectors
|
Details
|
|
|
08-19-2009
|
5.90
|
SDS EFI system Install
|
Details
|
|
|
08-18-2009
|
5.70
|
New SDS EFI system
|
Details
|
|
|
08-17-2009
|
1.70
|
SDS system
|
Details
|
|
|
08-15-2009
|
0.90
|
Autopilot troubleshooting
|
Details
|
|
|
08-14-2009
|
4.60
|
Flaps, bezels, autopilot
|
Details
|
|
|
08-13-2009
|
4.30
|
Trims systems and flaps
|
Details
|
|
|
08-12-2009
|
5.70
|
Control sticks
|
Details
|
|
|
08-11-2009
|
2.70
|
Control sticks and Ignition system
|
Details
|
|
|
08-10-2009
|
3.90
|
Engine diagnostics
|
Details
|
|
|
08-08-2009
|
1.50
|
Engine miss
|
Details
|
|
|
08-07-2009
|
5.50
|
Engine miss
|
Details
|
|
|
08-06-2009
|
5.30
|
Engine miss and Prop
|
Details
|
|
|
08-05-2009
|
5.20
|
Engine tuning
|
Details
|
|
|
08-04-2009
|
5.20
|
Misfiring
|
Details
|
|
|
07-31-2009
|
6.20
|
First Start of Engine
|
Details
|
|
|
07-30-2009
|
10.10
|
Wire cleanup.
|
Details
|
|
|
07-30-2009
|
4.30
|
Securing and finishing
|
Details
|
|
|
07-29-2009
|
4.10
|
Wire routing and cleanup.
|
Details
|
|
|
07-29-2009
|
9.70
|
Wire cleanup
|
Details
|
|
|
07-28-2009
|
9.20
|
Wire tie-ins and testing
|
Details
|
|
|
07-28-2009
|
4.70
|
More tie-ins and EXP Bus rework
|
Details
|
|
|
07-27-2009
|
9.10
|
Wiring tie-ins
|
Details
|
|
|
07-27-2009
|
4.70
|
Wiring
|
Details
|
|
|
07-25-2009
|
2.00
|
Panel finishing
|
Details
|
|
|
07-24-2009
|
7.10
|
Routing and anti-chafing
|
Details
|
|
|
07-24-2009
|
4.10
|
Panel windup
|
Details
|
|
|
07-23-2009
|
7.70
|
Wiring, and fuel system.
|
Details
|
|
|
07-23-2009
|
5.50
|
More panel work
|
Details
|
|
|
07-22-2009
|
6.50
|
Fuel flows, etc
|
Details
|
|
|
07-21-2009
|
6.10
|
Tested both tanks
|
Details
|
|
|
07-20-2009
|
4.00
|
Panel wiring and routing
|
Details
|
|
|
07-20-2009
|
5.00
|
Brake bleed
|
Details
|
|
|
07-19-2009
|
3.10
|
Fuel drains
|
Details
|
|
|
07-17-2009
|
6.10
|
Rudder lite and headset brackets.
|
Details
|
|
|
07-16-2009
|
8.10
|
Routing wires and lines
|
Details
|
|
|
07-15-2009
|
7.50
|
More panel wiring.
|
Details
|
|
|
07-14-2009
|
3.80
|
Routing of wiring and pitot lines.
|
Details
|
|
|
07-14-2009
|
4.10
|
Panel wiring and wingtip wiring.
|
Details
|
|
|
07-13-2009
|
7.10
|
Testing and routing
|
Details
|
|
|
07-10-2009
|
7.00
|
Light and prop controller
|
Details
|
|
|
07-09-2009
|
5.10
|
Testing lighting system
|
Details
|
|
|
07-08-2009
|
5.90
|
Breakers and switches
|
Details
|
|
|
07-07-2009
|
2.30
|
VOR Testing
|
Details
|
|
|
07-07-2009
|
3.70
|
Layout and drilling
|
Details
|
|
|
07-06-2009
|
5.30
|
Strobe unit
|
Details
|
|
|
07-04-2009
|
5.10
|
Checking
|
Details
|
|
|
06-30-2009
|
2.70
|
Dynon
|
Details
|
|
|
06-29-2009
|
3.90
|
Dynon
|
Details
|
|
|
06-26-2009
|
9.50
|
Harnesses for Avionics
|
Details
|
|
|
06-24-2009
|
5.60
|
Engine wiring
|
Details
|
|
|
06-23-2009
|
7.10
|
Engine wiring
|
Details
|
|
|
06-22-2009
|
6.60
|
Engine compartment & prop
|
Details
|
|
|
06-20-2009
|
1.30
|
Reading of wiring avionics.
|
Details
|
|
|
06-20-2009
|
1.80
|
OAT
|
Details
|
|
|
06-19-2009
|
2.20
|
Cooling
|
Details
|
|
|
06-19-2009
|
3.40
|
Cleaning & Organizing
|
Details
|
|
|
06-18-2009
|
5.70
|
Instrument panel
|
Details
|
|
|
06-17-2009
|
4.50
|
Olieker clamps, plugs
|
Details
|
|
|
06-17-2009
|
2.60
|
Firewall
|
Details
|
|
|
06-16-2009
|
3.20
|
Fuel rail
|
Details
|
|
|
06-16-2009
|
1.20
|
Firewall seal
|
Details
|
|
|
06-15-2009
|
5.80
|
Aileron trim & panel
|
Details
|
|
|
06-12-2009
|
3.20
|
Control stick wiring
|
Details
|
|
|
06-11-2009
|
1.20
|
Fuel line
|
Details
|
|
|
06-11-2009
|
2.90
|
Control stick
|
Details
|
|
|
06-10-2009
|
5.70
|
Fuel system
|
Details
|
|
|
06-09-2009
|
5.20
|
Aileron servo & prop
|
Details
|
|
|
06-08-2009
|
3.90
|
Installed prop
|
Details
|
|
|
06-08-2009
|
2.30
|
Aileron trim wiring
|
Details
|
|
|
06-06-2009
|
1.10
|
Electric trim
|
Details
|
|
|
06-05-2009
|
1.70
|
Strobes
|
Details
|
|
|
06-05-2009
|
2.00
|
Electric roll trim
|
Details
|
|
|
06-04-2009
|
5.30
|
Right Wingtip
|
Details
|
|
|
06-03-2009
|
6.30
|
More wiring
|
Details
|
|
|
06-02-2009
|
4.50
|
Miscellaneous wiring
|
Details
|
|
|
06-01-2009
|
5.10
|
EIS Wiring
|
Details
|
|
|
05-29-2009
|
1.20
|
Routing
|
Details
|
|
|
05-29-2009
|
2.10
|
Gascolator
|
Details
|
|
|
05-28-2009
|
2.60
|
ECU and EIS harness routing.
|
Details
|
|
|
05-28-2009
|
2.10
|
Coolant lines
|
Details
|
|
|
05-27-2009
|
4.70
|
More figuring
|
Details
|
|
|
05-26-2009
|
2.70
|
Sensors
|
Details
|
|
|
05-26-2009
|
1.30
|
Exhaust clearance
|
Details
|
|
|
05-25-2009
|
4.70
|
Thinking and reading
|
Details
|
|
|
05-24-2009
|
1.10
|
Removed Instrument Panel
|
Details
|
|
|
05-23-2009
|
4.30
|
Tracing engine harness
|
Details
|
|
|
05-22-2009
|
2.10
|
Wiring
|
Details
|
|
|
05-22-2009
|
3.20
|
Installed Dynon
|
Details
|
|
|
05-21-2009
|
6.10
|
Installed instruments
|
Details
|
|
|
05-21-2009
|
1.10
|
Engine mount Bolts
|
Details
|
|
|
05-20-2009
|
5.20
|
Ailerons and flaps
|
Details
|
|
|
05-19-2009
|
5.70
|
Ailerons and flaps
|
Details
|
|
|
05-18-2009
|
3.20
|
Flaps and ailerons
|
Details
|
|
|
05-17-2009
|
1.40
|
The thought process
|
Details
|
|
|
05-17-2009
|
5.60
|
Ailerons
|
Details
|
|
|
05-16-2009
|
5.50
|
Flaps & ailerons
|
Details
|
|
|
05-15-2009
|
4.60
|
Flaps and ailerons
|
Details
|
|
|
05-14-2009
|
6.20
|
Wings bolts, ete
|
Details
|
|
|
05-13-2009
|
8.10
|
Installation of wings.
|
Details
|
|
|
05-12-2009
|
5.70
|
Elevator and misc
|
Details
|
|
|
05-11-2009
|
6.10
|
Brakes, alt hold, rudder
|
Details
|
|
|
05-09-2009
|
2.80
|
Elevator installation
|
Details
|
|
|
05-08-2009
|
5.90
|
Empennage assembly.
|
Details
|
|
|
05-07-2009
|
3.20
|
Planning for assembly.
|
Details
|
|
|
05-06-2009
|
2.10
|
More parts to hangar
|
Details
|
|
|
05-06-2009
|
3.90
|
Finish painting
|
Details
|
|
|
05-06-2009
|
2.40
|
Elevator paint
|
Details
|
|
|
05-05-2009
|
4.70
|
Upper engine cowl
|
Details
|
|
|
05-04-2009
|
1.40
|
More items to hangar
|
Details
|
|
|
05-03-2009
|
1.50
|
Tool box
|
Details
|
|
|
04-27-2009
|
2.10
|
Wings to hangar
|
Details
|
|
|
04-25-2009
|
0.00
|
Turned 57 today...day off
|
Details
|
|
|
04-23-2009
|
4.20
|
Moved fuselage for hangar
|
Details
|
|
|
04-22-2009
|
2.80
|
Reinstalled the engine
|
Details
|
|
|
04-21-2009
|
3.40
|
Firewall insulation
|
Details
|
|
|
04-20-2009
|
4.70
|
Finished painting upper fuselage
|
Details
|
|
|
04-19-2009
|
2.30
|
Naca fitting
|
Details
|
|
|
04-19-2009
|
2.10
|
Masking fuselage
|
Details
|
|
|
04-19-2009
|
1.50
|
Loaded up the Jeep for the airport
|
Details
|
|
|
04-18-2009
|
3.70
|
Rear window
|
Details
|
|
|
04-17-2009
|
2.90
|
Rear window install
|
Details
|
|
|
04-17-2009
|
1.80
|
Prepping fuselage.
|
Details
|
|
|
04-17-2009
|
1.70
|
ELT Shelf
|
Details
|
|
|
04-16-2009
|
4.10
|
Upper fuselage prep.
|
Details
|
|
|
04-16-2009
|
2.10
|
Pulled more wire.
|
Details
|
|
|
04-15-2009
|
3.60
|
Tail cone wiring.
|
Details
|
|
|
04-14-2009
|
0.00
|
Day Off
|
Details
|
|
|
04-13-2009
|
1.80
|
Repainted instrument panel
|
Details
|
|
|
04-13-2009
|
2.20
|
Loom for tail
|
Details
|
|
|
04-12-2009
|
2.00
|
Painted instrument panel
|
Details
|
|
|
04-12-2009
|
2.10
|
Paint spinner
|
Details
|
|
|
04-11-2009
|
2.70
|
Riveting trays
|
Details
|
|
|
04-11-2009
|
1.40
|
Reading on fairings.
|
Details
|
|
|
04-11-2009
|
2.90
|
Prepping panel and spinner
|
Details
|
|
|
04-10-2009
|
4.90
|
Fitting Instruments
|
Details
|
|
|
04-08-2009
|
3.10
|
Interior paint
|
Details
|
|
|
04-07-2009
|
4.90
|
Finish painting the interior.
|
Details
|
|
|
04-06-2009
|
3.90
|
Prepping interior for paint
|
Details
|
|
|
04-05-2009
|
0.70
|
Rolled the fuselage over.
|
Details
|
|
|
04-05-2009
|
2.60
|
Firewall pentrations and ECU
|
Details
|
|
|
04-04-2009
|
2.10
|
Cleaned up the masking tape and paper
|
Details
|
|
|
04-03-2009
|
2.60
|
Prime bottom of fuse and cowlings
|
Details
|
|
|
04-03-2009
|
5.40
|
Finish paint Fuselage Bottom
|
Details
|
|
|
04-03-2009
|
0.10
|
Before, during and after colour change.
|
|
|
|
04-02-2009
|
3.20
|
Masking and prepping
|
Details
|
|
|
04-02-2009
|
2.60
|
Finish prep and wash
|
Details
|
|
|
04-01-2009
|
2.70
|
Repaint prep
|
Details
|
|
|
04-01-2009
|
1.90
|
Nose gear change.
|
Details
|
|
|
03-31-2009
|
4.80
|
Stripping of primer.
|
Details
|
|
|
03-31-2009
|
3.30
|
Stripping
|
Details
|
|
|
03-30-2009
|
4.50
|
Started stripping old colour
|
Details
|
|
|
03-30-2009
|
3.30
|
Engine removal.
|
Details
|
|
|
03-29-2009
|
5.20
|
Sealing pinholes
|
Details
|
|
|
03-28-2009
|
0.10
|
Back from the In-Laws
|
Details
|
|
|
03-23-2009
|
2.60
|
Spot Putty
|
Details
|
|
|
03-22-2009
|
3.20
|
Block Sanding
|
Details
|
|
|
03-21-2009
|
3.10
|
Prep for prime
|
Details
|
|
|
03-20-2009
|
1.50
|
Instrument Panel Mockup
|
Details
|
|
|
03-20-2009
|
5.00
|
Finishing Cowling
|
Details
|
|
|
03-19-2009
|
6.70
|
Cowl hinges
|
Details
|
|
|
03-18-2009
|
5.30
|
Fitting Cowling
|
Details
|
|
|
03-18-2009
|
2.10
|
Fitting cowl
|
Details
|
|
|
03-17-2009
|
3.10
|
Lower cowl finishing
|
Details
|
|
|
03-16-2009
|
3.70
|
More filling and sanding
|
Details
|
|
|
03-16-2009
|
4.90
|
Fitting and toggles
|
Details
|
|
|
03-15-2009
|
4.50
|
Slurry fill in vent areas.
|
Details
|
|
|
03-14-2009
|
3.80
|
Lower vent finishing
|
Details
|
|
|
03-14-2009
|
1.10
|
Lower cowl vents
|
Details
|
|
|
03-14-2009
|
2.70
|
Dynon tray fitting in Instrument Panel
|
Details
|
|
|
03-13-2009
|
2.20
|
Layups on lower outlet vents
|
Details
|
|
|
03-13-2009
|
3.40
|
Cutting and lay out.
|
Details
|
|
|
03-12-2009
|
1.80
|
Radiator intake blanks.
|
Details
|
|
|
03-12-2009
|
2.30
|
Lower exit vents
|
Details
|
|
|
03-12-2009
|
3.10
|
Lower cowl flaps
|
Details
|
|
|
03-12-2009
|
1.00
|
Inlet work
|
Details
|
|
|
03-11-2009
|
2.90
|
Lower cowl exit vents
|
Details
|
|
|
03-11-2009
|
3.80
|
Honeycomb removal and cleanup.
|
Details
|
|
|
03-11-2009
|
1.80
|
Cowl opening shaping
|
Details
|
|
|
03-10-2009
|
7.10
|
More cowling work
|
Details
|
|
|
03-09-2009
|
0.50
|
Gen 1,2,3,4 oil cowl vent
|
Details
|
|
|
03-09-2009
|
8.10
|
Designed new oil cowl vent
|
Details
|
|
|
03-08-2009
|
0.80
|
Oil vent
|
Details
|
|
|
03-08-2009
|
2.10
|
Horizontal hinge fasteners
|
Details
|
|
|
03-08-2009
|
2.20
|
Coolant inlets
|
Details
|
|
|
03-08-2009
|
4.10
|
Botton exit vents
|
Details
|
|
|
03-07-2009
|
2.30
|
Oil & Rad Vents
|
Details
|
|
|
03-06-2009
|
4.40
|
Rework coolant openings
|
|
|
|
03-06-2009
|
2.70
|
New Oil vent
|
Details
|
|
|
03-06-2009
|
0.60
|
Cowl rework
|
Details
|
|
|
03-05-2009
|
3.30
|
Repairs
|
Details
|
|
|
03-04-2009
|
4.50
|
Cooler core
|
Details
|
|
|
03-03-2009
|
0.20
|
Repairs
|
Details
|
|
|
03-03-2009
|
6.30
|
Oil cooler vent
|
Details
|
|
|
03-02-2009
|
3.40
|
Oil door
|
Details
|
|
|
03-02-2009
|
1.10
|
Fibreglass repair
|
Details
|
|
|
03-02-2009
|
2.30
|
Exit air
|
Details
|
|
|
03-01-2009
|
1.10
|
Lower Cowl Fitting
|
Details
|
|
|
03-01-2009
|
5.20
|
Exit Air Cowl Bracket
|
Details
|
|
|
02-28-2009
|
6.20
|
Hinge fasteners
|
Details
|
|
|
02-27-2009
|
5.80
|
Fitting upper cowl
|
Details
|
|
|
02-26-2009
|
7.70
|
More fitting
|
Details
|
|
|
02-25-2009
|
5.80
|
Upper cowl
|
Details
|
|
|
02-24-2009
|
4.70
|
Cowling fitting
|
Details
|
|
|
02-23-2009
|
1.70
|
Upper cowling
|
Details
|
|
|
02-23-2009
|
2.70
|
Clear-coated wing
|
Details
|
|
|
02-22-2009
|
3.40
|
Repainted basecoat
|
Details
|
|
|
02-21-2009
|
3.50
|
BASE TOUCHUP
|
Details
|
|
|
02-20-2009
|
4.00
|
Colour sanding
|
Details
|
|
|
02-19-2009
|
5.80
|
Wet sanding
|
Details
|
|
|
02-18-2009
|
5.60
|
Repaint
|
Details
|
|
|
02-17-2009
|
3.20
|
Repaint
|
Details
|
|
|
02-12-2009
|
3.20
|
Prepped left wing
|
Details
|
|
|
02-12-2009
|
5.40
|
Painted left wing.
|
Details
|
|
|
02-11-2009
|
5.30
|
Painted left wing bottom
|
Details
|
|
|
02-10-2009
|
3.20
|
Prepped left wing
|
Details
|
|
|
02-09-2009
|
6.20
|
Rt Wing
|
Details
|
|
|
02-05-2009
|
4.60
|
Buffing
|
Details
|
|
|
01-28-2009
|
5.20
|
More fitting
|
Details
|
|
|
01-27-2009
|
4.70
|
More fitting
|
Details
|
|
|
01-26-2009
|
6.70
|
Cutting & Fitting
|
Details
|
|
|
12-31-2008
|
3.20
|
Wing tip
|
Details
|
|
|
12-30-2008
|
4.60
|
Bottom skin
|
Details
|
|
|
12-29-2008
|
2.30
|
Wingtip lighting
|
Details
|
|
|
12-23-2008
|
3.30
|
Left wing tip lighting
|
Details
|
|
|
12-22-2008
|
3.60
|
Left wing tip - Painted
|
Details
|
|
|
12-21-2008
|
4.90
|
Left wing tip
|
Details
|
|
|
12-20-2008
|
3.90
|
Autopilot
|
Details
|
|
|
12-19-2008
|
3.80
|
Auto pilot
|
Details
|
|
|
12-18-2008
|
5.70
|
Fuel sender & plate
|
Details
|
|
|
12-18-2008
|
3.90
|
Autopilot
|
Details
|
|
|
11-21-2008
|
7.50
|
Left wing top.
|
Details
|
|
|
11-20-2008
|
5.70
|
Under left wing.
|
Details
|
|
|
11-19-2008
|
3.80
|
Masking
|
Details
|
|
|
11-18-2008
|
4.20
|
Fuel plate.
|
Details
|
|
|
11-17-2008
|
5.20
|
Bottom wing skin
|
Details
|
|
|
11-05-2008
|
2.50
|
Wingtips.
|
Details
|
|
|
11-05-2008
|
3.10
|
Pitot
|
Details
|
|
|
11-04-2008
|
2.30
|
Heated pitot.
|
Details
|
|
|
10-29-2008
|
3.50
|
Pitot
|
Details
|
|
|
10-28-2008
|
4.20
|
Left wing
|
Details
|
|
|
10-27-2008
|
3.00
|
Left wing
|
Details
|
|
|
10-26-2008
|
3.80
|
Pitot
|
Details
|
|
|
10-25-2008
|
1.00
|
Cleaned shop.
|
Details
|
|
|
10-24-2008
|
2.50
|
Wing tip
|
Details
|
|
|
10-23-2008
|
3.20
|
Aileron & Vert Stab
|
Details
|
|
|
10-18-2008
|
5.00
|
Wing tip & rudder
|
Details
|
|
|
10-17-2008
|
4.00
|
Rudder
|
Details
|
|
|
10-16-2008
|
4.80
|
Painted ailerons
|
Details
|
|
|
10-14-2008
|
4.60
|
Repaint Flaps
|
Details
|
|
|
10-13-2008
|
4.00
|
Elevators
|
Details
|
|
|
10-11-2008
|
6.70
|
Painted elevators
|
Details
|
|
|
10-10-2008
|
6.50
|
Horizontal stabilizer
|
Details
|
|
|
10-09-2008
|
6.80
|
Sand & Paint Vetical Stabilizer.
|
Details
|
|
|
10-08-2008
|
3.70
|
Wet sanding.
|
Details
|
|
|
10-07-2008
|
4.50
|
Sanding
|
Details
|
|
|
10-06-2008
|
4.20
|
Priming
|
Details
|
|
|
10-05-2008
|
7.90
|
Priming
|
Details
|
|
|
10-04-2008
|
2.00
|
Scuffing
|
Details
|
|
|
10-03-2008
|
2.50
|
Wing tips
|
Details
|
|
|
09-29-2008
|
3.80
|
Wingtip
|
Details
|
|
|
09-28-2008
|
6.80
|
Wingroot fairings
|
Details
|
|
|
09-27-2008
|
5.00
|
Wing tips
|
Details
|
|
|
09-26-2008
|
6.70
|
Wing angles
|
Details
|
|
|
09-26-2008
|
6.70
|
Wing angles
|
Details
|
|
|
09-25-2008
|
5.50
|
Wing settings
|
Details
|
|
|
09-24-2008
|
6.20
|
More wing work
|
Details
|
|
|
09-23-2008
|
7.00
|
Setup
|
Details
|
|
|
09-22-2008
|
4.50
|
Installation
|
Details
|
|
|
09-16-2008
|
4.50
|
Lower Cowling
|
Details
|
|
|
09-15-2008
|
5.00
|
Fitting
|
Details
|
|
|
09-14-2008
|
3.50
|
Removed Prop
|
Details
|
|
|
09-14-2008
|
3.30
|
Fitting
|
Details
|
|
|
09-13-2008
|
3.20
|
Wing tips
|
Details
|
|
|
09-12-2008
|
2.70
|
Wing tips
|
Details
|
|
|
09-11-2008
|
5.80
|
Wing tips
|
Details
|
|
|
09-10-2008
|
5.40
|
Wing tips
|
Details
|
|
|
09-09-2008
|
4.00
|
Wing tips
|
Details
|
|
|
09-08-2008
|
3.50
|
Wings
|
Details
|
|
|
09-07-2008
|
3.00
|
Wing skin
|
Details
|
|
|
09-05-2008
|
6.00
|
R/S Wiing
|
Details
|
|
|
09-04-2008
|
3.80
|
Bottom wing panel.
|
Details
|
|
|
09-03-2008
|
3.20
|
Wiring
|
Details
|
|
|
09-02-2008
|
5.50
|
Aileron
|
Details
|
|
|
09-01-2008
|
3.50
|
Ailerons
|
Details
|
|
|
08-31-2008
|
2.70
|
Fuel senders
|
Details
|
|
|
08-30-2008
|
6.50
|
Fairings
|
Details
|
|
|
08-29-2008
|
5.50
|
Wiring
|
Details
|
|
|
08-28-2008
|
1.40
|
Bottom skin.
|
Details
|
|
|
08-28-2008
|
5.50
|
Bottom skin.
|
Details
|
|
|
08-27-2008
|
4.50
|
Skins
|
Details
|
|
|
08-27-2008
|
4.00
|
Bottom skin.
|
Details
|
|
|
08-26-2008
|
5.00
|
Paint prep
|
Details
|
|
|
08-25-2008
|
4.00
|
Paint prep
|
Details
|
|
|
08-24-2008
|
4.00
|
Prepping for paint.
|
Details
|
|
|
08-23-2008
|
7.00
|
Prepped hor stab
|
Details
|
|
|
08-22-2008
|
6.50
|
Aileron fitting
|
Details
|
|
|
08-21-2008
|
5.60
|
Ailerons
|
Details
|
|
|
08-20-2008
|
6.50
|
Ailerons
|
Details
|
|
|
08-19-2008
|
0.50
|
Took wing out of box.
|
Details
|
|
|
08-19-2008
|
6.50
|
Flaps
|
Details
|
|
|
08-18-2008
|
5.50
|
Wing tip Lights
|
Details
|
|
|
08-17-2008
|
6.00
|
Wing tips
|
Details
|
|
|
08-16-2008
|
3.00
|
Wing tips
|
Details
|
|
|
08-15-2008
|
4.60
|
Lights
|
Details
|
|
|
08-14-2008
|
3.50
|
Push pull tubes
|
Details
|
|
|
08-14-2008
|
1.00
|
Landing Light Lenses
|
Details
|
|
|
08-10-2008
|
3.50
|
Paint prep
|
Details
|
|
|
08-09-2008
|
1.00
|
Prop adjustment
|
Details
|
|
|
08-06-2008
|
2.80
|
Installed Quinti/Warp
|
Details
|
|
|
08-05-2008
|
11.00
|
Trip to my other house.
|
Details
|
|
|
08-04-2008
|
4.00
|
more glass work on emp
|
|
|
|
08-03-2008
|
3.00
|
more sanding on emp
|
|
|
|
08-02-2008
|
4.00
|
primed some repairs on emp
|
|
|
|
08-01-2008
|
3.00
|
epoxy work on hor stab
|
|
|
|
07-31-2008
|
2.00
|
glass work on emp
|
|
|
|
07-30-2008
|
3.50
|
re-attached horizontal stabilizer
|
|
|
|
07-28-2008
|
3.00
|
Reading
|
|
|
|
07-26-2008
|
1.60
|
Cleanup
|
|
|
|
07-25-2008
|
2.50
|
seating ass'y
|
|
|
|
07-24-2008
|
4.20
|
seat assembly
|
|
|
|
03-13-2008
|
0.50
|
Engine start
|
Details
|
|
|
02-08-2008
|
2.50
|
Fired Egg Subaru up
|
Details
|
|
|
05-27-2007
|
6.70
|
Seating area
|
Details
|
|
|
05-26-2007
|
4.80
|
Baggage
|
Details
|
|
|
05-25-2007
|
1.60
|
Baggage area
|
Details
|
|
|
05-24-2007
|
3.70
|
Baggage area
|
Details
|
|
|
05-23-2007
|
4.80
|
Baggage
|
Details
|
|
|
05-22-2007
|
4.20
|
Baggage
|
Details
|
|
|
05-21-2007
|
9.50
|
Baggage area
|
Details
|
|
|
05-19-2007
|
6.00
|
Baggage
|
Details
|
|
|
05-18-2007
|
5.00
|
Baggage
|
Details
|
|
|
05-16-2007
|
3.50
|
Tuning
|
Details
|
|
|
05-14-2007
|
4.00
|
Figuring out panel
|
Details
|
|
|
05-10-2007
|
2.70
|
Routing
|
Details
|
|
|
05-06-2007
|
4.50
|
Engine start
|
Details
|
|
|
05-06-2007
|
2.50
|
Brake Bleed
|
Details
|
|
|
02-06-2007
|
2.40
|
Canopy screws
|
Details
|
|
|
02-06-2007
|
3.50
|
Brakes
|
Details
|
|
|
02-05-2007
|
4.70
|
Main gear
|
Details
|
|
|
02-05-2007
|
5.60
|
Engine orientation
|
Details
|
|
|
02-04-2007
|
6.50
|
Rear window
|
Details
|
|
|
02-02-2007
|
6.00
|
Rear window
|
Details
|
|
|
02-01-2007
|
4.00
|
Rear Window
|
Details
|
|
|
01-31-2007
|
3.50
|
Canopy finishing
|
Details
|
|
|
01-30-2007
|
6.00
|
Canopy Work
|
Details
|
|
|
01-29-2007
|
6.50
|
Drilling
|
Details
|
|
|
01-28-2007
|
8.00
|
Canopy drilling
|
Details
|
|
|
01-27-2007
|
1.50
|
Cleanup
|
Details
|
|
|
01-19-2007
|
4.80
|
Canopy painting and layout
|
|
|
|
01-18-2007
|
5.80
|
Drilled C-603
|
Details
|
|
|
01-17-2007
|
6.70
|
Riveting C-702 to WD-725
|
Details
|
|
|
01-16-2007
|
3.10
|
Notch mod to C-702
|
Details
|
|
|
01-15-2007
|
6.60
|
Canopy Prime & Paint
|
Details
|
|
|
01-14-2007
|
6.30
|
Latch system
|
Details
|
|
|
01-13-2007
|
4.70
|
Latch system
|
Details
|
|
|
01-12-2007
|
5.30
|
Canopy gas struts
|
Details
|
|
|
01-11-2007
|
4.90
|
Canopy gas struts
|
Details
|
|
|
01-10-2007
|
6.10
|
Canopy fitting
|
Details
|
|
|
01-09-2007
|
5.20
|
Riveting canopy frame
|
Details
|
|
|
01-08-2007
|
4.70
|
Canopy fitting
|
Details
|
|
|
01-04-2007
|
7.00
|
Canopy fitting
|
Details
|
|
|
01-03-2007
|
5.50
|
Fitting
|
Details
|
|
|
12-16-2006
|
5.00
|
Canopy fitting
|
Details
|
|
|
12-15-2006
|
5.50
|
Fit side rails.
|
|
|
|
12-13-2006
|
5.20
|
Filling C631
|
Details
|
|
|
12-12-2006
|
7.10
|
Paint prep 631
|
Details
|
|
|
12-11-2006
|
6.30
|
Spacers
|
Details
|
|
|
12-10-2006
|
4.40
|
Clearance issues.
|
Details
|
|
|
12-09-2006
|
6.80
|
Brakes
|
Details
|
|
|
12-08-2006
|
3.40
|
Nose wheel
|
Details
|
|
|
12-07-2006
|
2.60
|
Painted nose gear leg.
|
Details
|
|
|
10-08-2004
|
3.50
|
F904Bulkhead
|
Details
|
|
|
09-23-2004
|
4.10
|
Centre section
|
Details
|
|
|
09-22-2004
|
7.80
|
Floor & seats
|
Details
|
|
|
09-21-2004
|
8.80
|
Riveting floor skin
|
Details
|
|
|
09-20-2004
|
9.00
|
Seat & Baggage
|
Details
|
|
|
09-19-2004
|
6.00
|
Centre section floor
|
Details
|
|
|
09-18-2004
|
5.70
|
Centre section
|
Details
|
|
|
09-17-2004
|
2.00
|
Reading about & starting centre fuselage.
|
Details
|
|
|
09-17-2004
|
6.20
|
Re-riveting, cleanup shop
|
Details
|
|
|
09-16-2004
|
8.60
|
Floors and side skins
|
Details
|
|
|
09-15-2004
|
1.20
|
Aft floor
|
Details
|
|
|
09-14-2004
|
5.00
|
Riveting
|
Details
|
|
|
09-07-2004
|
6.10
|
Fuselage work
|
Details
|
|
|
09-06-2004
|
6.50
|
Fuselage
|
Details
|
|
|
09-05-2004
|
6.10
|
Longerons & 707 & 708 bulkheads
|
Details
|
|
|
09-04-2004
|
5.50
|
Longerons
|
Details
|
|
|
09-03-2004
|
2.20
|
F718 Template
|
Details
|
|
|
09-02-2004
|
3.50
|
Work area.
|
Details
|
|
|
09-01-2004
|
8.00
|
705,712,F916
|
Details
|
|
|
08-31-2004
|
5.00
|
705 & 712
|
Details
|
|
|
08-25-2004
|
2.50
|
705 & 712
|
Details
|
|
|
08-24-2004
|
3.50
|
Priming
|
Details
|
|
|
08-23-2004
|
2.80
|
Alodining
|
Details
|
|
|
08-18-2004
|
6.50
|
F705a
|
Details
|
|
|
08-17-2004
|
9.50
|
F904 & F705
|
Details
|
|
|
08-11-2004
|
9.00
|
F904 Bulkhead
|
Details
|
|
|
08-10-2004
|
5.50
|
Inspection Day
|
Details
|
|
|
08-09-2004
|
2.50
|
Pre-inspection
|
Details
|
|
|
08-08-2004
|
1.50
|
Firewall
|
Details
|
|
|
08-07-2004
|
6.50
|
Firewall
|
Details
|
|
|
08-02-2004
|
4.70
|
Firewall
|
Details
|
|
|
07-26-2004
|
3.50
|
Firewall
|
Details
|
|
|
07-22-2004
|
12.00
|
Firewall
|
Details
|
|
|
07-21-2004
|
12.00
|
Firewall
|
Details
|
|
|
07-20-2004
|
4.50
|
Inventory
|
Details
|
|
|
07-18-2004
|
9.00
|
Shop
|
Details
|
|
|
07-17-2004
|
9.50
|
Moved kit to Peterborough.
|
Details
|
|
|
07-15-2004
|
2.50
|
PICKED UP FUSELAGE KIT.
|
Details
|
|
|
05-24-2004
|
2.70
|
Elevators
|
Details
|
|
|
05-23-2004
|
4.00
|
Wedges, trailing edge
|
Details
|
|
|
05-22-2004
|
2.20
|
Trim tab.
|
Details
|
|
|
05-21-2004
|
5.00
|
Riveting
|
Details
|
|
|
05-19-2004
|
4.00
|
Rudder
|
Details
|
|
|
05-18-2004
|
2.00
|
Rudder
|
Details
|
|
|
05-17-2004
|
3.00
|
Rudder
|
Details
|
|
|
05-16-2004
|
0.50
|
Priming
|
Details
|
|
|
05-15-2004
|
3.00
|
Servo
|
Details
|
|
|
05-13-2004
|
3.50
|
LS elev
|
Details
|
|
|
05-08-2004
|
6.00
|
ls elev
|
Details
|
|
|
05-07-2004
|
2.00
|
Riveting
|
Details
|
|
|
05-04-2004
|
2.00
|
Rivetting
|
Details
|
|
|
04-24-2004
|
2.00
|
Back-rivetting
|
Details
|
|
|
04-21-2004
|
3.40
|
Riveting
|
Details
|
|
|
04-20-2004
|
2.30
|
Elevators
|
Details
|
|
|
04-19-2004
|
2.20
|
Left Elevator
|
Details
|
|
|
04-18-2004
|
7.50
|
Elevators
|
Details
|
|
|
04-17-2004
|
7.00
|
VS, Rudder and rt elevator.
|
Details
|
|
|
04-10-2004
|
3.50
|
Rivet
|
Details
|
|
|
04-09-2004
|
3.50
|
Rivet
|
Details
|
|
|
04-07-2004
|
2.50
|
Rivet
|
Details
|
|
|
04-06-2004
|
2.80
|
Dimple & c/s
|
Details
|
|
|
04-04-2004
|
5.00
|
VS
|
Details
|
|
|
04-01-2004
|
1.50
|
Cleanup
|
Details
|
|
|
03-31-2004
|
6.70
|
Riveting
|
Details
|
|
|
03-26-2004
|
6.50
|
Riveting
|
Details
|
|
|
03-25-2004
|
1.50
|
Priming
|
Details
|
|
|
03-21-2004
|
7.00
|
HS VS Rudder
|
Details
|
|
|
03-10-2004
|
2.50
|
VS
|
Details
|
|
|
03-09-2004
|
3.10
|
HS
|
Details
|
|
|
03-07-2004
|
4.90
|
rt skin
|
Details
|
|
|
03-05-2004
|
1.90
|
drill debur
|
Details
|
|
|
03-04-2004
|
6.50
|
HS
|
Details
|
|
|
03-03-2004
|
1.00
|
Fabrication
|
Details
|
|
|
03-02-2004
|
2.00
|
HS
|
Details
|
|
|
03-01-2004
|
1.00
|
H/S Parts
|
Details
|
|
|
02-29-2004
|
4.50
|
Unpack & sort
|
Details
|
|