Date
|
Hours
|
Work Log Summary
|
Details
|
03-21-2010
|
5.00
|
Attached and Rigged Ailerons, Attached Control Sti
|
|
|
|
03-20-2010
|
6.00
|
Fabricated Fuel Tank Attach Brackets
|
|
|
|
03-19-2010
|
3.00
|
Fitted L and R Steps
|
|
|
|
03-18-2010
|
2.50
|
Cut holes in Fuselage for Flap Linkage
|
|
|
|
03-16-2010
|
2.50
|
Drilled Holes in Fuselage to set wing sweep and in
|
|
|
|
03-14-2010
|
2.00
|
Attached Wings to Fuselage for 1st time
|
|
|
|
03-13-2010
|
1.00
|
Finished Riveting On R Wing Bottom Skin
|
|
|
|
03-12-2010
|
2.50
|
Riveted on R Wing Bottom Skin
|
|
|
|
03-10-2010
|
3.00
|
Riveted on L Wing Bottom Skin and Attached Pitot
|
|
|
|
10-10-2009
|
3.00
|
Drilled Brake Pedals to Master Cylinders
|
|
|
|
10-02-2009
|
1.50
|
Riveted Brake Pedals
|
|
|
|
10-01-2009
|
2.00
|
Drilled Holes for Fuselage Steps
|
|
|
|
10-01-2009
|
2.00
|
Assembled and Match Drilled Brake Pedals
|
|
|
|
09-26-2009
|
3.00
|
Cut Main Landing Gear Mount Holes in Fuselage
|
|
|
|
09-15-2009
|
2.00
|
Pulled L+R Wing Conduit (Huge PITA)
|
|
|
|
09-09-2009
|
3.00
|
Match Drill, Deburr & Dimple R Wing Skin and Frame
|
|
|
|
09-07-2009
|
3.50
|
Match Drill, Deburr and Dimple Left Bottom Wing Sk
|
|
|
|
09-07-2009
|
2.50
|
Install Pitot Tube Mast
|
|
|
|
09-06-2009
|
4.00
|
Attach and Secure Flaps and Hinge Pins
|
|
|
|
09-05-2009
|
4.00
|
Drill Holes for Wing Conduit (Major PITA)
|
|
|
|
08-28-2009
|
3.00
|
Drill / CS Right Flap Bracket and Hinge
|
|
|
|
08-27-2009
|
4.00
|
Drill / CS Left Flap Bracket and Hingo
|
|
|
|
08-26-2009
|
3.50
|
Align Ailerons
|
|
|
|
08-24-2009
|
3.50
|
Mount Ailerons
|
|
|
|
08-22-2009
|
4.00
|
Rivet Aileron and Flap Brackets
|
|
|
|
08-21-2009
|
2.00
|
Fit and Match drill Aileron and Flap Brackets
|
|
|
|
08-20-2009
|
2.00
|
Assemble and Rivet Aileron Pushrods
|
|
|
|
08-19-2009
|
1.50
|
Prime and Rivel Aileron and Flap Attach Brackets
|
|
|
|
08-19-2009
|
1.50
|
Assemble Aileron Bell Cranks
|
|
|
|
08-18-2009
|
2.00
|
Match Drill Aileron Attach Brackets
|
|
|
|
08-17-2009
|
6.00
|
Sort QB Hardware
|
|
|
|
08-16-2009
|
4.00
|
Sort QB Hardware
|
|
|
|
08-13-2009
|
2.00
|
Inventory QB Kit
|
|
|
|
08-12-2009
|
2.00
|
QB Kit Delivered
|
|
|
|
03-20-2009
|
2.00
|
Attach Elevator to HStab, Rudder to VStab
|
|
|
|
03-14-2009
|
1.00
|
EAA Tech Inspection
|
|
|
|
03-01-2009
|
4.00
|
Attach Elev Trim To L Elevator
|
|
|
|
02-28-2009
|
1.50
|
Rivet Elevator and Rudder Leading Edges
|
|
|
|
02-11-2009
|
3.00
|
Rolled Elevator and Rudder Leading Edges
|
|
|
|
02-07-2009
|
3.00
|
Final Rivet Rudder
|
|
|
|
01-31-2009
|
2.00
|
Glue Rudder Trailing Edge
|
|
|
|
01-28-2009
|
3.00
|
Match Drill, Deburr and Dimple Rudder
|
|
|
|
01-26-2009
|
3.00
|
Rundder Assembly & Counter Sink Rudder Trailing Ed
|
|
|
|
01-23-2009
|
3.00
|
Final Rivet Right Elevator
|
|
|
|
01-22-2009
|
6.00
|
Final Rivet Left Elevator
|
|
|
|
01-20-2009
|
3.00
|
Bend Elevators with Brake
|
|
|
|
01-17-2009
|
3.00
|
Back Rivet L Ele, Match drill l Ele Frame
|
|
|
|
01-16-2009
|
4.00
|
Cut L Ele Stiffeners, Match drill L Ele Stiffeners
|
|
|
|
01-15-2009
|
4.00
|
Build AL Brake, Bend Right Elevator
|
|
|
|
01-12-2009
|
2.00
|
Rivet R Ele Frame, Back Rivet R Ele Stiffeners to
|
|
|
|
01-10-2009
|
4.00
|
Match Drill R Ele Frame and Skin, Deburr, Dimple a
|
|
|
|
01-07-2009
|
3.00
|
Match Drill R Ele Stiffeners, Deburr and Dimple, C
|
|
|
|
01-06-2009
|
1.50
|
Fabricated R Elevator Stiffeners
|
|
|
|
01-04-2009
|
2.00
|
Removed Blue Vinyl from Elevator
|
|
|
|
01-03-2009
|
2.00
|
Glued Rudder trailing edge
|
|
|
|
01-02-2009
|
5.00
|
Riveted Rudder Skin to Rudder Frame
|
|
|
|
12-16-2008
|
2.00
|
Primed Rudder Components
|
|
|
|
12-08-2008
|
3.00
|
Assembled Rudder Skeleton (fabricated parts)
|
|
|
|
12-06-2008
|
4.00
|
Deburred and Dimpled Rudder Skin
|
|
|
|
12-05-2008
|
2.00
|
Deburred and counter sunk rudder stiffeners
|
|
|
|
10-18-2008
|
2.00
|
Match drilled rudder and stiffeners
|
|
|
|
10-17-2008
|
2.00
|
Cut Rudder Stiffeners
|
|
|
|
07-26-2008
|
2.00
|
Rivet on HStab rear spar
|
|
|
|
07-24-2008
|
2.00
|
Rivet peremeter of HStab Skin
|
|
|
|
07-23-2008
|
1.50
|
Rivet Right Side of HStab Skin
|
|
|
|
07-22-2008
|
1.00
|
Finish Riveting on HStab right skin
|
|
|
|
07-21-2008
|
2.00
|
Riveting on HS Left Skin
|
|
|
|
07-19-2008
|
3.00
|
Deburring HStab edges and priming
|
|
|
|
07-15-2008
|
1.00
|
Dimpling HStab Skins (Interior)
|
|
|
|
07-14-2008
|
2.00
|
Dimpling HStab Skins perimeter
|
|
|
|
07-10-2008
|
3.00
|
Riveting HStab Frame
|
|
|
|
07-08-2008
|
2.00
|
Finish Fluting HStab Ribs
|
|
|
|
07-07-2008
|
2.00
|
Fluting HStab ribs
|
|
|
|
06-28-2008
|
2.00
|
Match drilling HStab Rear spar
|
|
|
|
06-27-2008
|
3.50
|
Riveting VStab Rear Spar and frame
|
|
|
|
06-23-2008
|
2.00
|
Dimpling VStab Skin
|
|
|
|
06-20-2008
|
3.00
|
Edge deburring and clecoing VStab frame togheter
|
|
|
|
06-20-2008
|
2.50
|
Clecoing on VStab Skin and match drilling
|
|
|
|
06-19-2008
|
3.00
|
Verticle Stab
|
Details
|
|
|
06-07-2008
|
2.00
|
Kit Inventory
|
|
|
|
06-04-2008
|
1.00
|
RV-7 Empennage Arrrives
|
|
|