Powered By Kitlog Pro v2.0
Don Jones RV9A
RV-9A
All
Work Logs Found:
16
Category Work Time:
75 Hours
Date
Hours
Work Log Summary
Details
07-20-2008
3.00
Trim tab Construction
Details
07-13-2008
5.00
Started Trim Tab
Details
06-29-2008
10.00
Elevator Construction Continued
Details
06-28-2008
5.00
Elevator Construction
Details
06-18-2008
5.00
Elevator construction and OOOPS!
Details
06-16-2008
8.00
Dimpling and priming elevator parts
Details
06-12-2008
6.20
Began Right Elevator Construction
Details
06-08-2008
3.80
Rivet front spar and ribs to skin
Details
06-07-2008
2.00
Primed VS parts
Details
06-07-2008
2.10
Began VS construction
Details
05-24-2008
5.10
One side done! Started on the other one.
Details
05-17-2008
4.20
First rivets! Assembling the HS
Details
05-14-2008
3.60
Match drilled, de-burred and prepped for primer
Details
05-10-2008
3.20
Clecoing and match drilling skins
Details
05-10-2008
3.60
Clecoing and match drilling ribs and spars
Details
05-02-2008
5.50
Horizontal Stabilizer Front and Rear Spars
Details
SITE NAVIGATION
Contact Builder
RV-9A Home
Category
# Logs
# Hours
All
16
75
Elevators
5
34
Horizontal Stabilize
6
25
Trim Tab
2
8
Vertical Stabilizer
3
8
Copyright © 2001-2024 Matronics. All Rights Reserved.