RV-10 by Nick Nyenhuis jr.
RV-10
All
Work Logs Found:
535
Category Work Time:
1768 Hours
Date
Hours
Work Log Summary
Details
01-06-2022
6.00
Control system
01-05-2022
4.10
Aileron rigging
01-04-2022
5.10
Aileron bracket mod
12-30-2021
5.20
Flap control system
12-29-2021
2.70
Rudder and brake pedals
12-29-2021
3.90
Control system
12-28-2021
6.50
Control system
12-27-2021
5.50
Rudder and brake pedals
12-24-2021
3.20
Rear seat pans and baggage door
12-23-2021
6.30
Rear seats and baggage area
12-22-2021
3.80
Rear seat pans
12-22-2021
2.80
Conduit runs in baggage are
12-21-2021
4.50
Rear seat floor pans
12-20-2021
2.00
Rear seat floors
11-30-2021
2.80
Right gear mount and right cockpit floor pan
11-20-2021
2.70
Left main gear mount and right cocpit floor pan
11-19-2021
3.40
Left main gear mount
07-17-2021
5.80
Cockpit floor
07-16-2021
5.00
Fuselage dolly adjustment
07-12-2021
2.30
Fuselage dolly adjustment
Details
06-16-2021
0.90
Baggage floor stiffeners
06-08-2021
2.00
Rear side vents
06-05-2021
4.30
Baggage Door
Details
06-05-2021
1.30
Antenna access covers in rear seat pans
06-04-2021
5.80
Baggage Door
06-02-2021
6.00
Floor panels etc painting
06-01-2021
1.80
Floor panels etc paint prep
04-01-2021
0.80
Floor panels
03-27-2021
6.60
Floor panels
03-26-2021
5.20
Floor panels
03-19-2021
3.30
Floor panels
03-06-2021
2.30
Floor panlels
03-05-2021
2.20
Floor panels
03-04-2021
0.30
Floor panels
02-27-2021
7.30
Baggage and seat panels and tailcone attach with B
02-23-2021
3.00
Baggage and seat panels
02-20-2021
5.40
Floor access panels
02-16-2021
4.30
Rear side vents. Tailcone attach riveting
02-13-2021
6.40
Baggage door latch switch
02-12-2021
4.80
Baggage door
04-04-2020
0.00
Binging cabin top home from "greenhouse"
02-16-2019
3.00
Tailcone attach
02-16-2019
1.00
Rudder control cable guide
Details
02-15-2019
1.00
Conduit running
02-09-2019
1.10
Conduit running
01-14-2019
2.80
Tailcone bulkhead
01-08-2019
5.00
Step install
01-07-2019
6.30
Tailcone attach
01-04-2019
2.10
Tailcone attachment
01-03-2019
2.00
Tailcone Stand
12-29-2018
2.80
Tailcone attached for the first time
12-28-2018
0.80
Tailcone attach prep
12-28-2018
3.60
Static Ports
12-27-2018
1.30
Wiring brackets on side skins
Details
12-27-2018
3.00
Preparing tailcone for attachment
12-26-2018
1.00
Side skin riveting
12-26-2018
4.60
Flap system work
12-26-2018
1.80
Flap switches
12-24-2018
3.60
Riveting with Brenda
12-22-2018
3.00
Fuselage side skins
12-21-2018
7.60
Fuselage side skins
12-15-2018
2.50
Fuselage side skins
12-11-2018
1.00
Fuselage side skins
12-07-2018
3.70
Wiring clamps in flap control area
12-03-2018
3.80
Flap position sensor
12-01-2018
3.30
Flap limit switches
11-30-2018
3.80
Flap limit switches
Details
11-27-2018
2.50
Flap limit switches
Details
11-26-2018
3.20
Flap limit switches
Details
11-24-2018
4.00
Flap control electrical
Details
11-22-2018
2.00
Fuselage side skins
11-16-2018
6.90
Fuselage side skins
11-10-2018
2.60
Fuselage side skins
11-10-2018
5.30
Flap control system
11-09-2018
3.30
Fuselage
11-08-2018
1.00
Fuselage
11-07-2018
1.80
Electrical conduit planning
11-06-2018
4.20
Fuselage
11-05-2018
7.30
Wiring clamp mounts
11-03-2018
3.00
Fuselage parts prep
11-03-2018
3.80
Control system parts painting
Details
11-02-2018
2.60
Fuselage parts prep
11-01-2018
1.80
Fuselage parts prep
05-19-2018
2.00
Fuselage parts prep
05-18-2018
2.80
Fuselage parts prep
05-17-2018
1.00
Prepping wing aileron hinges for service bulletin
05-17-2018
1.00
Fuselage part organization
05-15-2018
3.30
Eelectrical planning
05-12-2018
4.10
Electrical clamp brackets
05-11-2018
3.30
Electrical planning
04-16-2018
3.00
Electrical planning
04-14-2018
2.50
Panel and console work
04-13-2018
2.30
Fuselage side skins
04-10-2018
4.40
Fuselage side skins
04-07-2018
4.20
Fuselage side skins
04-07-2018
1.80
Brake valve limit switch
04-04-2018
5.20
Fuselage side skins and center console
04-03-2018
3.30
Fuselage side skins and tunnel cover
04-02-2018
6.50
Fuselage side skins
Details
02-20-2018
1.30
Fuselage
02-17-2018
6.00
Fuselage to firewall brackets
Details
02-16-2018
5.80
Fuselage skin bending
02-15-2018
4.50
Fuselage
02-13-2018
4.30
Fuselage side skins
02-10-2018
5.60
Fuselage
02-08-2018
2.20
Fuselage longerons
02-05-2018
2.90
Fuselage
02-03-2018
6.80
Fuselage longerons
Details
02-01-2018
5.20
Brake lines
01-26-2018
3.00
Flap System
01-23-2018
0.50
First rudder install
01-20-2018
1.50
Fuselage
01-18-2018
0.50
Fuselage - deburing skins
01-18-2018
1.90
Fuel lines from primary fuel filter to bulkhead
01-13-2018
3.50
Determining wire runs
01-11-2018
1.50
Raising fuselage stand
Details
01-11-2018
1.00
Fuselage
01-10-2018
1.30
Fuselage
01-09-2018
1.30
Fuselage
01-08-2018
1.50
Fuselage
01-08-2018
0.50
Drill press blower pedal controlled
01-06-2018
8.60
Fuselage
01-05-2018
9.60
Fuselage halves
01-05-2018
0.00
Brake line fitting in fuselage
01-04-2018
7.10
Fuselage stand
01-04-2018
2.00
Fuselage
01-03-2018
1.80
Parking Brake Valve
01-02-2018
5.30
Fuselage
12-30-2017
6.50
Fuselage
12-29-2017
5.00
Fuselage - painting
12-26-2017
5.10
Fuselage
12-20-2017
2.00
Fuselage - paint prep
12-19-2017
6.80
Fuselage - paint prep
12-18-2017
3.00
Fuselage - paint prep
12-16-2017
1.70
Fuselage
12-15-2017
2.80
Fuselage
12-12-2017
2.40
Fuselage
12-11-2017
3.30
Fuselage
12-09-2017
6.70
Fuselage
Details
12-08-2017
2.00
Fuselage (temporary attached)
12-04-2017
3.50
Wingtip lights
Details
12-04-2017
4.70
Wingtip lights
Details
11-16-2017
2.30
Wingtip lights
11-07-2017
4.00
NEW right landing gear mount
10-28-2017
0.50
Riveting nutplates for fuselage antennae mounts
10-28-2017
1.30
FlyLEDS controller board
10-26-2017
2.50
Landing gear brackets
Details
10-24-2017
4.90
Made a new fuel selector valve bracket
10-12-2017
6.60
Fuselage
10-11-2017
0.80
Firewall riveting
10-10-2017
3.00
Fuel system lines
10-09-2017
4.20
FWD bottom skin and firewall passthrough
10-09-2017
1.30
Brakel system lines
Details
10-07-2017
1.80
Primary fuel filter installation
10-07-2017
6.60
Fuselage
10-05-2017
1.00
Primary fuel filter location
Details
10-03-2017
3.80
Fuselage
09-30-2017
7.30
Brake valve bracket
Details
09-29-2017
3.80
Brake valve bracket
Details
09-27-2017
2.80
Right FWD rib assembly
09-26-2017
2.80
Left FWD rib assembly
09-23-2017
1.70
Forward fuselage rib assemblies
09-22-2017
3.80
Fuel selector valve mounting bracket
09-21-2017
4.40
Fuel system tunnel access cover
09-19-2017
1.80
Fuel system tunnel access cover
09-16-2017
1.30
Riveting mid bottom skins
09-16-2017
3.00
Fuel Pump
Details
09-15-2017
2.70
Fuel Pump brackets
09-12-2017
2.20
Firewall
09-09-2017
7.90
Firewall drilling and dimpling
09-08-2017
3.80
Firewall
09-04-2017
3.30
Riveting mid fuselage bottom skins
08-30-2017
1.00
Firewall
08-29-2017
4.40
Dimpling mid fuselage skins
08-24-2017
0.40
Painted Fwd Bottom edge of mid bottom skin
08-18-2017
9.40
Made comm antennae doublers
08-17-2017
6.00
Deburring and dimpling mid fuselage skins
08-16-2017
1.00
Drilling mid fuselage skins
08-14-2017
4.00
Drilling the mid fuselage skins
08-12-2017
7.40
Mid Fuselage assemble
08-11-2017
1.20
Mid Fuselage jig
08-07-2017
3.00
Aileron Actuation
06-01-2017
3.30
Mid Fuselage
05-30-2017
2.30
Mid Fuselage
05-29-2017
1.90
Mid Fuselage
Details
05-27-2017
6.20
Mid Fuselage
Details
05-25-2017
3.00
Mid Fuselage
05-23-2017
2.00
Fuselage
04-17-2017
2.80
Mounted fuel tanks to wings
04-17-2017
2.00
Fuselage
04-15-2017
4.00
Fuselage parts painting
04-04-2017
1.80
Fuselage parts prep
04-01-2017
3.00
Fuselage parts prep
04-01-2017
2.00
Control Column Mount
03-30-2017
2.50
Fuselage parts prep
03-28-2017
2.00
Fuselage parts prep
03-27-2017
1.50
Fuselage parts prep
03-25-2017
3.00
Fuselage parts prep
03-24-2017
3.30
Fuselage parts prep
03-23-2017
1.00
Leak testing fuel tanks with air pressure
Details
03-23-2017
3.60
Fueslage parts prep
03-21-2017
1.00
03-18-2017
3.00
Elevator counter balance weights
03-17-2017
2.30
Installing rudder counter-balance
03-16-2017
2.20
03-14-2017
1.00
Applied extra sealant on baffles
03-11-2017
6.30
03-10-2017
3.30
03-02-2017
2.00
Fuel tank rear baffle prep
02-22-2017
0.70
02-22-2017
1.00
Details
02-21-2017
2.20
02-20-2017
1.30
02-20-2017
1.50
02-18-2017
6.80
02-17-2017
3.00
Details
02-16-2017
1.00
Details
02-15-2017
1.70
02-11-2017
4.20
02-11-2017
1.00
Details
02-10-2017
1.40
02-07-2017
2.90
02-04-2017
4.30
02-03-2017
3.00
02-02-2017
2.50
02-01-2017
2.30
01-31-2017
2.30
Details
01-30-2017
2.30
01-28-2017
5.20
Fuel sender attach hardware
Details
01-24-2017
5.80
More ribs
01-21-2017
5.80
Ribs
01-06-2017
2.80
Misc things
01-05-2017
8.60
Starting to use sealant (aka Black Death!)
01-04-2017
4.80
Dimpling tank skins
01-03-2017
3.60
Z-Brackets etc...
01-02-2017
5.30
12-29-2016
9.80
Fuel sender and skin prep for sealant
12-28-2016
5.50
Final drilling and countersinking
12-27-2016
3.00
Fuel tank parts painting
12-27-2016
1.50
Bottom skin prep
12-23-2016
3.60
12-23-2016
1.00
Details
12-10-2016
2.00
11-21-2016
3.50
11-18-2016
7.50
Fuel Tank vent lines and misc
Details
11-17-2016
3.00
Details
11-16-2016
4.50
11-05-2016
2.00
Testing the fuel guage levels
Details
11-05-2016
4.20
Started fuel tanks and made fuel sender floats
11-03-2016
2.40
10-31-2016
1.00
04-12-2016
2.50
04-11-2016
6.50
Section 26
02-24-2015
3.80
Inboard seat rib
02-23-2015
6.30
Aft center bulkhead
02-20-2015
1.20
02-19-2015
6.30
Aft bulkhead spar
02-16-2015
4.50
Center section bulkhead
02-12-2015
2.50
Making shims for landing gear brackets
02-07-2015
1.00
Misc stuff on fuselage
02-04-2015
4.50
Fitting landing gear to spar
02-02-2015
3.50
FWD spar
01-31-2015
4.80
Fuselage parts painting
01-30-2015
3.70
Fuselage parts prep
01-29-2015
4.10
Fuselage parts prep
Details
01-28-2015
4.60
Fuselage parts prep
01-27-2015
3.50
Fuselage parts prep
05-30-2014
3.00
Fuselage parts prep
04-15-2014
2.70
Fuselage parts prep
04-12-2014
2.80
Fuselage parts prep
04-08-2014
6.00
Fuselage parts prep
04-07-2014
3.00
Wire route planning
Details
04-01-2014
2.00
Electrical wiring planning / parts prep
03-31-2014
3.80
Fuselage Trial Assembly
Details
03-29-2014
1.20
Fuselage parts prep
01-04-2014
3.80
Fuselage parts prep
01-03-2014
4.00
Fuselage part prep
04-18-2013
1.00
Emp attach
04-15-2013
2.00
Tailcone rivet mid aft skin with Jake
04-13-2013
5.70
Elevator and trim
04-12-2013
0.90
Tailcone top middle skin
04-12-2013
4.90
Elevator attach
04-11-2013
4.60
level off tailcone where H/S is supported
Details
04-08-2013
1.20
Tailcone top aft section
04-06-2013
4.10
Tailcone paint touchups
04-06-2013
2.00
Fuel tanks prep
Details
03-30-2013
2.00
Fuselage parts organize
03-28-2013
1.50
Elevator trim servo unit
03-26-2013
3.30
Elevator servo bracket redesign
Details
03-25-2013
5.00
VS attach dry fit
03-18-2013
3.70
Tailcone final assembly
Details
03-16-2013
2.50
Tailcone final assembly
Details
03-15-2013
7.00
Tailcone final assembly
Details
03-14-2013
6.10
Tailcone reassembly
Details
03-13-2013
2.00
Tailcone skins dimpling
03-12-2013
6.00
Tailcone parts deburr and final assembly
02-16-2013
5.30
Tailcone parts deburr and start of final assembly
02-02-2013
2.00
Tailcone parts deburr
01-19-2013
0.80
Tailcone parts deburr
01-11-2013
5.50
Tailcone wire run design and disassemble
Details
12-28-2012
5.60
Tailcone details
12-27-2012
6.70
Tailcone initial assembly
12-26-2012
1.20
Tailcone initial assembly
12-24-2012
4.80
Tailcone initial assembly
12-22-2012
6.10
Tailcone initial assembly
12-21-2012
2.80
Finished rolling leading edges
12-20-2012
6.50
Tailcone parts prep and paint
12-19-2012
3.20
Tailcone parts prep
12-18-2012
2.50
Tailcone parts prep
12-17-2012
4.50
Initial assembly and prep
12-17-2012
0.30
Aileron Actuation
12-11-2012
2.20
Assembling control rods
Details
10-29-2012
0.50
Control rods
01-04-2012
2.00
Prepping tailcone pieces
12-22-2011
1.00
Prepping tailcone pieces
12-21-2011
1.30
Prepping tailcone pieces (J-stiffener deburr)
10-27-2011
0.30
Prepping tailcone pieces (J-stiffener deburr)
10-20-2011
5.80
Prepping tailcone pieces
10-19-2011
3.00
Prepping tailcone pieces
08-01-2011
2.80
Repaired bowed trim tab hinge
07-30-2011
4.50
Finishing up riveting Elevator trailing edges
07-30-2011
1.00
Finishing up riveting Aileron trailing edges
07-25-2011
1.50
Finishing up riveting Flaps
07-25-2011
1.80
Finishing up riveting Elevators
07-25-2011
1.00
Finishing up riveting Ailerons
07-23-2011
3.80
Flap trailing edges
07-23-2011
1.80
Aileron trailing edges
07-22-2011
4.20
Right Flap riveting
Details
07-21-2011
1.30
Left Flap riveting
07-21-2011
3.00
Left Flap nose riveting
04-04-2011
1.70
Riveted the flap skins to the flap spar
04-02-2011
3.30
Riveted the elevator halves together
Details
04-02-2011
2.50
Flap assemble
04-01-2011
8.90
Riveted the elevator halves together
04-01-2011
0.50
Fixed a rivet found bad on inspection
Details
03-31-2011
1.30
Bonding wires for ailerons
03-26-2011
1.60
Installed L wing gap stiffener
03-26-2011
4.60
Installed half of ailerons
03-26-2011
3.60
Aileron actuation (aileron to wing problem)
Details
03-25-2011
4.50
Painted misc parts with new grey
03-25-2011
5.30
Installed R wing gap stiffeners
03-12-2011
2.00
PRE-COVER INSPECTION!!
Details
03-12-2011
2.60
Installed the rear spar on HS
03-12-2011
1.30
Finished VS
Details
02-28-2011
5.80
Making parts
Details
02-23-2011
1.00
Making parts
Details
02-14-2011
4.10
Aileron actuation
02-12-2011
5.70
Aileron actuation
02-07-2011
6.00
Flap assemble
01-29-2011
8.00
Flap assemble
01-28-2011
1.20
Flap assemble
01-27-2011
4.60
Flap assemble
01-26-2011
6.90
Flap assemble
01-25-2011
6.80
Flap assemble
01-15-2011
3.00
Flap assemble
01-14-2011
7.90
Painting Flap parts
01-13-2011
3.50
Deburring Flap parts
01-12-2011
5.70
Deburring Flap parts
01-11-2011
1.40
Deburring Flap parts
01-06-2011
3.60
Organizing Flap parts
01-05-2011
2.80
Landing light lenses
01-05-2011
3.70
Landing light lenses
01-04-2011
4.70
Riveting ailerons
01-03-2011
3.00
Planned for bonding straps and static wicks
01-01-2011
4.60
Aileron final drilling and dimpling
12-29-2010
1.80
Aileron skin riveting
12-29-2010
3.50
Aileron assembly
10-07-2010
3.00
Final drilling of aileron stiffeners
10-02-2010
5.30
Aileron assembling
09-30-2010
2.60
More painting of aileron parts (flap skins as well
09-29-2010
3.50
Painting aileron parts
Details
09-16-2010
4.20
Aileron parts prepping for paint
09-15-2010
6.10
Cutting aileron stiffeners and prepping for paint
09-14-2010
3.20
Riveting left leading edge
09-08-2010
3.60
Dimpling left leading edge
09-04-2010
4.30
Riveting right leading edge
08-21-2010
0.60
Made the new stall warning bracket
08-21-2010
3.50
Landing light mounting brackets
08-20-2010
0.50
Landing light lens brackets
08-19-2010
1.30
Landing light hole in right L.E.
08-11-2010
1.30
Landing light mounts
Details
08-10-2010
1.10
Stall warning hatch
08-07-2010
1.00
Right leading edge clecoed
04-16-2010
4.20
Dimpled leading edges
04-15-2010
8.00
Fuselage inventory
04-14-2010
6.00
Unpacking fuselage kit
04-13-2010
1.00
FUSELAGE KIT ARRIVES!!
Details
04-09-2010
11.50
Final drilled both leading edges
04-07-2010
6.70
Stall warning access hole and L.E. paint
04-06-2010
4.50
Fluted ribs and prepped L.E. for paint
03-30-2010
1.00
Riveted aileron outboard hinge bracket
03-30-2010
4.00
Made wing leading edge cradles
03-23-2010
6.10
Wing top skin seams
03-22-2010
4.50
Wing top skins with Marty
03-20-2010
2.00
Wing top skins with Marty
03-19-2010
4.00
Vertical stab skin with Marty
03-12-2010
5.50
Test fit and final drilled leading edges to spars
02-19-2010
6.70
Stall warning hole in leading edge and deburred ri
02-18-2010
3.60
Starting on wing nose ribs
02-17-2010
3.00
Dimpling skin etc
Details
02-12-2010
2.80
Dimpling ribs etc.
02-11-2010
10.60
Deburr ribs and skin etc
02-03-2010
7.00
Final drill wing skins
02-02-2010
4.00
Painting the wing skins
02-01-2010
4.80
Prepping wing skins
Details
02-01-2010
0.70
Fixing the problem from previous owner
Details
01-27-2010
3.30
Test fit of top skins
01-26-2010
1.00
Test fitting of aileron hinge
01-26-2010
4.60
Right spar rivet
01-26-2010
4.40
Left rear spar rivet
01-19-2010
7.30
Test fitting of wing top skins and rear spar
01-18-2010
6.40
Rivetted wing ribs to spars
01-11-2010
7.30
Installed aileron bearing supports
01-09-2010
4.40
Wing tie downs and aileron control hinges
Details
01-08-2010
10.40
Cleaned and painted wing parts
12-19-2009
2.00
Making aileron pushrod holes in rear spar doublers
Details
12-19-2009
2.00
Bent rib flanges that attach to skin and fluted st
12-17-2009
3.50
Deburred and scuffed wing ribs
12-11-2009
1.70
Deburred and scuffed wing ribs
12-10-2009
1.50
Match-drilled rear spar doublers to 1/8"
Details
12-09-2009
3.00
Deburred and scuffed wing ribs and rear spars
12-07-2009
3.00
Deburred and scuffed wing ribs
12-03-2009
2.00
Drilled 5/8" holes in ribs for wire conduit.
Details
12-02-2009
0.50
Drilled 7/16" holes in ribs for pitot tubes
Details
12-01-2009
1.50
Continued straightening rib flanges
11-30-2009
1.00
Straightened rib flanges.
Details
11-30-2009
1.00
Clecoed ribs to spars
11-28-2009
6.00
Wing torque tube support brackets
Details
11-28-2009
3.50
Made wing cradles / work table.
Details
11-27-2009
1.50
Verified work done by previous owner
Details
11-20-2009
19.00
Wing spar work done by previous owner
Details
11-20-2009
1.50
Straightened main spars at extension
Details
04-03-2009
2.00
Straightened W-1013A aileron hinge brackets
Details
04-02-2009
1.10
Fabricated wing tie-down brackets
04-02-2009
2.60
Cut angle and strips for torque tube support brack
03-30-2009
3.50
Made shelves with Dad
03-27-2009
1.30
Checked how J-stiffeners fit on spars...
03-18-2009
0.30
Replaced some rivets on horizontal stab skins
03-18-2009
2.20
Hung up horizontal stab in garage
03-14-2009
6.00
Riveted horizontal stab skin on
Details
03-13-2009
5.20
Riveted the horizontal stab frame together
Details
03-11-2009
0.60
Riveted hinge to trim tabs
03-09-2009
1.00
Bent the ends of the elevator trim tabs.
03-09-2009
7.30
Assembled the elevator trim tabs
03-03-2009
2.00
Made wooded bending brake to bend the trim tabs
02-28-2009
4.80
Riveted top skin to rear spar...
02-27-2009
2.80
Fixed rivets on right bottom inboard rib
02-23-2009
3.50
Riveting the rib halves to the skins
Details
02-13-2009
0.80
Straightening elevator spars
Details
02-13-2009
2.30
Riveting the spar doublers and horns
02-13-2009
3.00
Riveting the counterbalance skin
02-13-2009
1.80
Dimpling elevator spars
02-12-2009
8.10
Assembling elevator reinforcement plates
Details
02-11-2009
3.50
Assembled elevator and final drilled
01-31-2009
2.70
More clecoing and final drilling of elevators
01-30-2009
8.00
Clecoing and final drilling elevator parts
01-29-2009
8.10
More paint prepping and painting
01-22-2009
2.20
Cut the trim tab hinges, prepping trim tabs
01-21-2009
5.50
Cleaning Elevator guts for paint
01-20-2009
2.00
HS skin dimpling
01-19-2009
1.00
Modified DRDT-2 to have the handle rearward
01-19-2009
1.00
Modified DRDT-2 to have the handle rearward
01-19-2009
5.60
HS skin dimpling and prepping
01-17-2009
4.90
Prepping elevator parts
01-17-2009
0.50
made elevator trim horns
01-17-2009
0.30
HS skin prep
01-16-2009
1.70
More deburring
01-15-2009
1.70
Fluting and fitting elevator tip assemblies
01-13-2009
2.30
More deburring elevator ribs
01-12-2009
2.50
Separating the elevator ribs
01-08-2009
1.80
Shortening of non-adjustable set for air squeezer
01-08-2009
1.80
Shortening of non-adjustable set for air squeezer
01-08-2009
0.50
Fix nose rib edge distance
Details
01-08-2009
0.80
Collecting parts for the elevators
01-07-2009
1.00
Riveting stringers to center web
01-05-2009
1.80
Countersinking HS spars 2
01-03-2009
4.00
Practice riveting with Steve Pyette (ACS Tech)
01-03-2009
1.00
Countersinking HS spars
01-02-2009
5.70
Deburring and dimpling
01-01-2009
2.30
Riveting the front spar doubler
01-01-2009
1.30
Making HS cradles
01-01-2009
4.80
clecoing the guts of the horizontal stabilizer 2
01-01-2009
1.10
clecoing the guts of the horizontal stabilizer
01-01-2009
1.00
Assembling the inspar and nose ribs on front spar
12-31-2008
3.00
HS riveting the rear spar assembly
12-31-2008
4.20
Front spar assermbling
12-30-2008
1.50
HS parts prepping and painting
12-30-2008
1.00
HS nose rib holes
Details
12-29-2008
2.70
Rudder skin riveting
Details
12-29-2008
3.00
HS Parts prepping
12-29-2008
4.90
Deburring and modifying HS stuff
Details
12-27-2008
3.50
HS Riveting the elevator bearing and start of HS d
12-27-2008
2.80
Determined routing of wiring to and in rudder
Details
12-26-2008
1.50
Countersinking holes in rudder trailing edge
12-23-2008
3.30
Painting of rudder parts
12-22-2008
4.00
Designing rudder trim
Details
12-19-2008
4.50
Prepping rudder the parts for painting
12-18-2008
5.70
Clecoing rudder skins and final drilling
12-17-2008
4.00
Start of initial rudder assembly
Details
08-16-2008
1.50
VS Skin dimpling and prep
Details
08-16-2008
2.50
VS Skeleton riveting
Details
08-16-2008
1.00
Organize and label parts drawers
08-15-2008
4.00
VS Riveting
Details
07-08-2008
2.00
VS Rear spar riveting
Details
07-08-2008
1.50
VS Painting
Details
07-05-2008
1.00
VS Preparing for paint
07-05-2008
1.00
Beginning of rudder
Details
07-04-2008
4.00
VS Skeleton
Details
07-03-2008
5.00
VS Initial assembly
Details
07-02-2008
4.00
VS Rear Spar
Details
07-02-2008
2.00
DRDT-2 Assembly
07-02-2008
2.00
DRDT-2 assemble
07-01-2008
1.00
Marty arrives (with tools)
Details
07-01-2008
1.00
Marty arrives (with tools)
Details
06-27-2008
0.50
Straighted HS-906
06-26-2008
1.50
Spar Attchment Brackets
Details
06-26-2008
3.50
Cut and deburred parts
Details
06-25-2008
1.00
Cut and deburred parts
06-20-2008
1.00
VS spar caps
Details
06-17-2008
1.00
Finishing off DRDT-2
06-17-2008
1.00
Finish welding DRDT-2
06-11-2008
0.10
Welding the DRDT-2 (2)
Details
06-10-2008
2.00
Building DRDT-2
Details
06-10-2008
2.00
Building DRDT-2
Details
06-09-2008
3.00
Emp inventory
06-07-2008
2.00
Emp Inventory
06-06-2008
1.00
Emp kit arrives
06-05-2008
0.50
Wing Inventory
06-04-2008
2.50
Wing inventory
06-04-2008
0.50
START OF PROJECT!! Wing kit arrives!!
Details
05-23-2008
1.50
Wing kit Inventory
Details
03-27-2008
1.00
Partial wing kit arrives / Inventory
Details
03-24-2008
4.00
Paint Booth
Details
03-24-2008
4.00
Built paint booth
Details
02-29-2008
1.00
Work benches
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
535
1769
Administration
1
2
Ailerons
15
51
Brakes and Wheels
7
21
Control System
18
64
Electrical
22
69
Elevators
34
116
Empennage Misc
8
19
Flaps
21
84
Fuel System
9
23
Fuel Tanks
37
137
Fuselage
164
580
Horizontal Stab
28
73
Miscellaneous
9
28
Panel
2
6
Rudder
19
46
Shop/Tools
21
39
Tailcone
32
109
Vertical Stab
13
37
Wings
75
265