Powered By Kitlog Pro v2.0
BOB'S WEB SITE
601 XL
All
Work Logs Found:
139
Category Work Time:
850 Hours
Date
Hours
Work Log Summary
Details
06-01-2011
1.00
closing of project
Details
08-16-2010
57.00
Center Spar and Fuselage re-enforcement
Details
05-29-2010
31.00
Upgrade installation began
Details
04-01-2009
0.00
change in Building see Celebrity listing at bottom
Details
03-20-2009
0.10
Temporary hold on building - time TBD
Details
03-12-2009
6.00
Top Forward Skin - Fuse - Part #2
Details
03-12-2009
8.00
Forward Top Skin Part #1
Details
03-08-2009
4.00
Wing Tanks
Details
03-05-2009
5.00
Fuel Tank
Details
02-17-2009
4.00
Canopy frame fitting page 2
Details
02-16-2009
14.00
Canopy Frame Fitting
Details
01-29-2009
8.00
Triangle "L's" iinstalled in side of Fuse
Details
01-16-2009
4.00
Hor Stab fitting to the Fuse
Details
01-15-2009
1.00
Wing progress Part 2 for this date
Details
01-15-2009
11.00
Wing - Rt top skin and nose skin
Details
12-29-2008
10.00
Left Wing
Details
12-26-2008
10.00
Wing - Left Side
Details
12-08-2008
5.00
Wing - Right
Details
12-07-2008
4.00
Wing - Right - Wing Locker Structure
Details
12-04-2008
7.00
Wing - Right Structure
Details
11-22-2008
3.00
AP/IA Inspection
Details
11-21-2008
8.00
Right Wing Assemble
Details
11-21-2008
6.00
Clean and restage the Shop/Hanger
Details
11-10-2008
0.00
Corvair College #12
Details
11-03-2008
1.00
Corvair Engine Entry #1-2
Details
11-03-2008
25.00
Corvair Engine "core" #1
Details
11-03-2008
1.00
Corvair Core (entry #2)
Details
10-24-2008
18.00
Rudder polish and top rear skin polished
Details
10-20-2008
15.00
Panel frame, top skin, console
Details
10-09-2008
6.00
Nose Gear Bearing & Tube + Top Skin - Forward Fuse
Details
09-09-2008
5.00
Fuselage - top rear skin
Details
09-08-2008
6.00
Cockpit - riveted parts
Details
09-05-2008
8.00
Cockpit Seat Area
Details
09-04-2008
7.00
Cockpit
Details
09-01-2008
8.00
Fuselage Riveting Part 2
Details
09-01-2008
8.00
Fuselage Riveting Part 1
Details
08-24-2008
8.00
Fuselage - Front Seat Panel and Bag Floor Part 1
Details
08-24-2008
4.00
Baggage Floor Part 2
Details
08-18-2008
8.00
Fuselage - front side skin - pass
Details
08-14-2008
4.00
Fuselage - forward skins
Details
08-13-2008
5.00
Fuselage forward skins
Details
08-12-2008
5.00
Fuselage forward skin pilot side
Details
08-08-2008
6.00
Fuselage - Front side skin - Pilot side
Details
08-07-2008
7.00
Fuselage - Front side skin
Details
08-06-2008
2.00
Fuselage - front section parts installed part 2
Details
08-06-2008
3.00
Fuselage - front section parts added part 1
Details
08-05-2008
5.00
Fuselage - front floor connect and set-up
Details
08-04-2008
5.00
"hanger" restage - Bench out
Details
08-03-2008
1.00
Fuselage Cockpit floor and Center Spar 3
Details
08-03-2008
4.00
Fuselage and Center Spar Wing Jigs 1
Details
08-03-2008
1.00
Fuselage an Center Wing Spar Jigs 2
Details
08-02-2008
5.00
Fuselage - front cockpit floor
Details
07-28-2008
5.00
Fuselage - Parts
Details
07-25-2008
6.00
Fuselage - Rear
Details
07-25-2008
2.00
Fuselage - Checking Square part 2 for the day
Details
07-24-2008
7.00
Fuselage - rear
Details
07-23-2008
6.00
Firewall
Details
07-21-2008
6.00
Firewall
Details
07-20-2008
3.00
Firewall
Details
07-19-2008
6.00
Firewall
Details
07-15-2008
4.00
Fuse rear/rear sides continuation
Details
07-13-2008
5.00
Fuse Sides - Rear
Details
07-09-2008
5.00
Fuse Bottom
Details
07-08-2008
6.00
Fuse Rear Side Panels
Details
07-08-2008
3.00
Fuse Bottom
Details
07-07-2008
5.00
Elevator
Details
07-03-2008
4.00
Elevator
Details
06-30-2008
3.00
Material Deliveries
Details
06-15-2008
8.00
Early right Wing assembly
Details
06-10-2008
16.00
Wing Main Spar and Center Main Spar together
Details
06-04-2008
2.00
Wing Main Spar right
Details
06-04-2008
2.00
Wing Main Spar right
Details
06-04-2008
4.00
Center Spar
Details
06-01-2008
3.00
Left Main Wing Spar
Details
05-30-2008
6.00
Spar final drilling table
Details
05-29-2008
5.00
Spars and Wing Tips
Details
05-28-2008
6.00
Right Main Wing Spar
Details
05-26-2008
20.00
Wing and Center Spar
Details
05-26-2008
6.00
Left Wing and Center Spar's
Details
05-26-2008
6.00
Center Main and Left Wing Spars
Details
05-25-2008
6.00
Center Main and Left Wing Spar
Details
05-20-2008
5.00
Spar Doublers
Details
05-17-2008
3.00
Spar Rivet set
Details
05-16-2008
5.00
Bulkheads & Instrument Panel Base
Details
05-15-2008
2.00
Form Blocks for bulkheads
Details
05-13-2008
5.00
Fuse Bottom
Details
05-09-2008
5.00
Forming - Wing Ribs
Details
05-08-2008
5.00
Wing Ribs
Details
05-05-2008
6.00
Spar Work
Details
05-04-2008
4.00
Many Small Parts
Details
05-03-2008
4.00
Fuse Parts 6B2 & Spar Hat Stiffeners
Details
05-02-2008
7.00
Fuse Parts
Details
05-01-2008
5.00
Wing Ribs
Details
04-29-2008
5.00
Wing Ribs
Details
04-28-2008
5.00
#1 Wing Ribs
Details
04-27-2008
4.00
Wing Rib Forms
Details
04-26-2008
5.00
Rest of Nose Ribs
Details
04-24-2008
5.00
Nose Rib Blanks
Details
04-23-2008
6.00
Rudder complete
Details
04-21-2008
6.00
Rudder
Details
04-20-2008
8.00
Bulding Parts
Details
04-18-2008
5.00
Wing Parts
Details
04-15-2008
5.00
Left Flap
Details
04-13-2008
3.00
Right Side Flap and Aileron Ribs
Details
04-13-2008
4.00
Flap skin and assembly
Details
04-12-2008
3.00
Flap/Aileron Ribs
Details
04-11-2008
4.00
Trim Tab Elevator- Wing Forms
Details
04-10-2008
5.00
Closing Stab
Details
04-09-2008
13.00
Assemble Stab
Details
04-06-2008
7.00
Horizonal Stab
Details
04-04-2008
5.00
Horizonal Stab - Begin
Details
04-03-2008
7.00
Rudder Assembly
Details
04-02-2008
6.00
Top Rib & Skin prep
Details
03-31-2008
6.00
Re-do Rudder Parts
Details
03-30-2008
6.00
Taill parts
Details
03-29-2008
6.00
Parts making begins
Details
03-28-2008
6.00
Stowing 4'X12" sheets of Alumunum
Details
03-27-2008
5.00
1st Material Delivery
Details
03-25-2008
1.00
Tracking Material's
Details
03-24-2008
5.00
Stab and Rudder Rib Forms
Details
03-18-2008
5.00
Set of Matched Wg Rib Forms
Details
03-17-2008
4.00
Wing Rib Forms
Details
03-16-2008
2.00
2"X2" Steel spacer bars
Details
03-15-2008
5.00
Rib Patterns
Details
03-14-2008
2.00
More Tools
Details
03-13-2008
4.00
Brake completion
Details
03-11-2008
8.00
more lay-out
Details
03-07-2008
3.00
More lay-out
Details
03-06-2008
6.00
Try Rib layout again
Details
03-05-2008
6.00
Began layout of wing ribs
Details
03-04-2008
3.00
Began layout of rib Forms
Details
03-03-2008
2.00
Painted Brake /#N742SL Requested
Details
03-02-2008
6.00
10' "Dave's" Brake
Details
03-01-2008
6.00
Began to build "Dave's" angle Brake
Details
02-29-2008
6.00
Finished 8' table
Details
02-27-2008
6.00
Lumber and table start
Details
02-27-2008
5.00
First attempt at forms
Details
02-26-2008
1.00
Plans Arrived
Details
02-23-2008
14.00
Basement Construction area
Details
SITE NAVIGATION
Contact Builder
Clebrity (quick) Steel Fuse Home
601 XL Home
Category
# Logs
# Hours
All
133
1159
Cockpit
3
21
Empennage
19
133
Engine
4
27
Fuselage
43
368
Hanger - Home
5
34
Miscellaneous
4
51
Plans and Manuals
1
3
Tools
8
31
Upgrade Kit Installa
3
89
Wings
43
402
Copyright © 2001-2024 Matronics. All Rights Reserved.