RAFAEL'S WEB SITE
Work Logs Found: 242
Category Work Time: 972 Hours
 Date
Hours
Work Log Summary

Details

 09-23-2012
3.00
Brakes again.
Details

 09-10-2012
5.00
Gascolator, papaerwork, brakes
Details

 08-23-2012
5.00
Engine tests. Wing stub.
Details

 08-22-2012
6.00
Static system.
Details

 08-16-2012
2.00
Wings, brakes
Details

 08-13-2012
3.00
Balanced carbs
Details

 08-01-2012
3.00
Labels, Steps
Details

 07-29-2012
4.00
Heat shield, interior
Details

 07-28-2012
2.00
Ran engine
Details

 07-21-2012
3.00
Instrument panel, tunnel
Details

 07-20-2012
6.00
Oil System
Details

 07-17-2012
5.00
Trutle deck, Skyview
Details

 07-15-2012
5.00
installed tank, fuselage work
Details

 07-14-2012
2.00
Gas tank sealant, prop adjustment
Details

 07-05-2012
4.00
Installed prop. Tail cone work.
Details

 06-25-2012
4.00
Control cables, wing root connectors
Details

 06-24-2012
3.00
Controls
Details

 06-21-2012
4.00
Connectors
Details

 06-20-2012
6.00
Wing wiring
Details

 06-17-2012
4.00
Lighting
Details

 06-13-2012
4.00
Heater, engine controls, lighting
Details

 06-11-2012
3.50
Heater, trim
Details

 06-07-2012
5.00
GPS, lighting, trim
Details

 05-29-2012
4.50
Panel work
Details
       

 05-27-2012
9.00
Instrument deck work
Details
     

 05-26-2012
3.00
Paint
Details
     

 05-23-2012
4.00

Details
       

 05-21-2012
6.00
ADHARS, wiring
Details

 05-19-2012
4.50
Tunnel cleanup
Details

 05-17-2012
6.00
Tunnel wiring
Details

 05-16-2012
4.00
Tunnel work
Details

 05-15-2012
4.00
Wiring
Details

 05-09-2012
4.00
Wire routing
Details

 05-07-2012
2.50
ADHARS
Details

 05-06-2012
4.00
Instrument panel preparation
Details
       

 04-30-2012
4.00
Autopilot installation
Details
     

 04-29-2012
3.00
fiberglass work
Details

 04-26-2012
4.00
Fiberglassed duct
Details
       

 04-22-2012
2.00
modified duct
Details

 04-21-2012
4.00
air duct installation
Details
       

 04-19-2012
2.00
cowling air duct work
Details
     

 04-18-2012
4.00
cowling fitting
Details
       

 04-15-2012
5.00
Fitting cowling
Details
       

 03-25-2012
4.00
Duct work
Details
       

 03-22-2012
4.50
Oil cooler, air duct
Details
     

 03-21-2012
4.50
radiator
Details
     

 03-18-2012
3.00
sevice bulletin 11-12-14
Details
       

 03-14-2012
3.00
Cooling box, oil tank
Details
       

 02-22-2012
5.00
engine installation
Details
     

 02-20-2012
4.00
banjo bolt, attachment bolts
Details
       

 02-19-2012
4.00
locktite to engine mount. Carb pans
Details
     

 02-16-2012
4.00
top componenets, applied RTV
Details
     

 02-15-2012
5.00
Cooling shroud
Details

 02-14-2012
3.00
Exposed top of engine.
Details
     

 02-13-2012
3.50
Firewall wiring. Engine uncrated.
Details
     

 02-11-2012
2.00
oil door
Details
     

 02-08-2012
4.00
Upper cowl work
Details
     

 01-30-2012
4.00
More cowl sanding and fitting
Details
     

 01-29-2012
2.00
Sanding
Details

 01-25-2012
5.00
Upper-lower cow fitting
Details
     

 01-23-2012
4.00
Bottom Cowl work
Details
       

 01-22-2012
2.00
Bottom cowl trimming
Details

 01-21-2012
3.00
Figerglass work
Details

 01-15-2012
6.00
Electrical work
Details
     

 01-09-2012
4.00
nosewheel gear leg fairing
Details
     

 01-08-2012
3.50
nose fairing
Details
     

 01-04-2012
2.50
nose fairing
Details
       

 01-02-2012
4.50
Nose wheel pants.
Details
     

 01-01-2012
4.00
work on both main and nose pants
Details

 12-31-2011
4.00
Pants nutplates
Details
     

 12-29-2011
4.50
more wheel pants work
Details
     

 12-28-2011
5.00
More wheel pant work
Details
       

 12-27-2011
2.00
Right wheel work
Details

 12-26-2011
5.50
upper-lower cowling hinges
Details
     

 12-17-2011
3.00
Glued canopy on
Details
       

 12-15-2011
3.50
Right and Front wheels
Details
     

 12-14-2011
4.00
Right wheel pants, canopy
Details

 12-12-2011
4.00
Left wheel work
Details
       

 12-11-2011
2.50
Left pants
Details
     

 12-03-2011
2.00
Canopy fairing
Details
       

 11-30-2011
2.00
Canopy foam blocks
Details
     

 11-28-2011
2.00
Canopy guide blocks
Details
     

 11-27-2011
3.00
Canopy latch
Details

 11-20-2011
4.50
Mount canopy on frame
Details
       

 11-16-2011
5.00
Brakes
Details
     

 11-07-2011
3.00
Checked alingnment.
Details
     

 11-05-2011
3.00
Installed landing gear
Details

 11-04-2011
2.00
Installed main wheels.
Details

 11-03-2011
3.00
Enigne mount, wheels.
Details

 11-02-2011
3.00
Drilled canopy
Details

 10-30-2011
3.50
Tank window sealed.
Details

 10-28-2011
2.00
Canopy fitting.
Details

 10-26-2011
5.50
Canopy trim work
Details
     

 10-22-2011
5.00
Fuel window leaks!
Details
     

 10-19-2011
4.00
Closed tank
Details

 10-17-2011
5.00
Tank top work.
Details

 10-13-2011
2.00
Rear bulkhead, bracket.
Details
     

 10-12-2011
5.00
Sending unit, more sealant
Details
       

 10-11-2011
3.00
Started sealing process
Details
     

 10-10-2011
2.50
Rivetted tank pieces
Details
     

 10-09-2011
2.50
Initial tank work
Details
       

 10-06-2011
4.00
canopy initial fitting
Details
       

 10-04-2011
2.00
painted canopy frame
Details
     

 10-03-2011
4.00
Canopy frame
Details
       

 10-01-2011
3.00
started on canopy frame
Details

 09-30-2011
2.00
Crotch strap. Cover plates
Details
     

 09-29-2011
3.50
Stabilator turnbuckles. Seatbelts.
Details
     

 09-25-2011
2.50
Stabilator cables
Details

 09-21-2011
3.00
installed horizontal stabilator
Details
     

 09-12-2011
3.00
Stabilator installation
Details
     

 09-08-2011
5.00
Tailcone fairings
Details

 09-04-2011
4.00
Tailcone fairings
Details

 09-03-2011
4.00
Tailcone fairings
Details
     

 08-29-2011
3.00
Rudder, Empennage fairings
Details
       

 08-28-2011
3.00
Empennage installation
Details
     

 08-24-2011
3.00
Rudder Cables
Details
       

 08-22-2011
3.00
Torque tubes.
Details
       

 08-20-2011
2.50
Torque tubes
Details

 08-19-2011
2.00
Paint
Details
     

 08-18-2011
2.50
Flapperons
Details
     

 08-07-2011
3.00
Flapperon controls
Details
       

 08-06-2011
2.00
Controls
Details
     

 08-05-2011
1.00
Control stick pushrods
Details

 08-03-2011
2.00
Paint
Details

 08-01-2011
4.00
Wiring, Flapperon controls
Details
     

 07-31-2011
2.00
Static Line, wiring
Details
       

 07-30-2011
6.00
Tailcone reivetting, wiring
Details
       

 07-28-2011
4.00
Mated tailcone
Details
       

 07-27-2011
5.00
Control sticks and wiring
Details
     

 07-26-2011
4.00
More wiring
Details

 07-25-2011
3.00
Wiring
Details

 07-21-2011
3.00
Spar interlock pins
Details

 07-20-2011
5.00
Tunnel Harness
Details

 07-18-2011
5.00
Wiring
Details
       

 07-14-2011
3.00
Fitted Wings
Details

 07-07-2011
4.00
Roll Bar brackets, Inventory
Details
     

 07-06-2011
3.00
Roll bar and Baggage bulkhead
Details

 07-04-2011
4.00
Paint
Details

 06-19-2011
3.00
Seats
Details
     

 06-17-2011
4.00
Paint
Details
     

 06-09-2011
4.50
Map Box
Details
       

 06-06-2011
2.50
Work on firewall
Details
     

 06-02-2011
4.00
Canopy, Panel
Details

 06-01-2011
4.00
Canopy attachment structure
Details

 05-28-2011
4.50
Forward fuselage shelf
Details

 05-19-2011
4.00
Fuel lines
Details
       

 05-16-2011
3.00
Fuel Lines
Details

 05-12-2011
2.50
Seats
Details

 05-11-2011
2.50
Seats
Details

 05-09-2011
3.00
Fit roll bar
Details
     

 05-05-2011
1.00
Roll Bar
Details

 05-03-2011
4.00
Roll Bar Assy.
Details

 05-02-2011
5.50
Roll bar assembly
Details
       

 04-28-2011
4.00
Completed section 23
Details

 04-27-2011
5.50
Left dkin
Details

 04-21-2011
7.00
Painting
Details

 04-21-2011
6.00
Interior Painting
Details

 04-20-2011
6.00
masking and prepping for paint
Details
     

 04-18-2011
4.00
Deburring, Air vents
Details
     

 04-17-2011
3.00
Deburring, Spar cutouts
Details
       

 04-16-2011
2.00
Deburring
Details

 04-11-2011
3.50
Right Longeron, F-1234
Details
       

 04-10-2011
4.00
Longerons
Details
     

 04-07-2011
4.00
Forward fuselage
Details
       

 03-30-2011
5.00
Steps, Autopilot brackets
Details

 03-29-2011
3.00
Primed step brackets
Details
       

 03-28-2011
1.00
Steps
Details

 03-27-2011
5.00
Bottom skin, step attachment
Details
     

 03-26-2011
3.50
Bottom skin,
Details
     

 03-25-2011
2.00
Bottom skin stiffeners
Details

 03-24-2011
5.00
Step ribs, corner skins
Details
     

 03-17-2011
4.50
Bulkhead, seats, control colum
Details
     

 03-16-2011
7.00
F-1203 Bulkhead
Details
       

 03-15-2011
4.00
Forward upright assemblies.
Details

 03-12-2011
6.00
Seat floors
Details

 03-11-2011
4.00
Seat ribs and floors
Details
     

 03-10-2011
5.00
Autopilot bracket, crotch strap brackets
Details
     

 03-09-2011
3.00
Pulley bracket
Details

 03-08-2011
4.00
Seat fib assemblies
Details
     

 03-07-2011
3.00
Pulley brackets, flapperon mixer
Details
     

 03-06-2011
5.00
Baggage bulkhead and ribs
Details
       

 03-05-2011
6.00
Baggage Floors
Details
       

 02-14-2011
5.00
Completed center section bulkhead
Details

 02-10-2011
4.00
Skin flanges,
Details

 02-03-2011
4.00
Center section bulkhead
Details

 02-02-2011
6.00
Right Flapperon
Details
     

 01-31-2011
5.00
Completed left flapperon, started right
Details
     

 01-30-2011
4.00
Left flapperon
Details
     

 01-23-2011
4.50
Flapperon parts fabrication
Details

 01-20-2011
4.00
Flapperon ribs, priming brackets.
Details
     

 01-13-2011
5.00
Flapperon parts fabrication
Details
     

 01-03-2011
3.00
Position Lights work
Details

 01-02-2011
5.00
Left Wingtip work
Details
     

 12-29-2010
2.00
Left Wingtip skins.
Details

 12-28-2010
3.00
Inboard and middle Left skins
Details

 12-23-2010
5.00
Upper Left wing skins
Details

 12-21-2010
4.00
Bottom Left Wing skins
Details

 12-19-2010
3.00
Finished Right wing. Left Wing skins
Details
     

 12-16-2010
6.00
Left Wing tip
Details
       

 12-09-2010
3.00
Installed landing light
Details

 12-07-2010
4.00
completed right wing
Details

 12-06-2010
5.00
Right wing skins
Details

 12-05-2010
5.00
Landing light, right wing panels
Details

 12-02-2010
4.00
Bottom skin right wing
Details

 11-29-2010
4.00
Right wing skin
Details
     

 11-21-2010
6.00
Light wiring
Details

 11-18-2010
6.00
Light install preparation.
Details
     

 11-16-2010
6.00
Right Wing skeleton
Details
     

 11-15-2010
6.00
Stall warnng, left wing wiring
Details
     

 11-13-2010
3.00
Completed left wing skeleton
Details
     

 11-11-2010
3.00
Left wing rear ribs
Details
       

 11-08-2010
5.00
Final rib preparation.
Details

 11-07-2010
4.00
Completed rear and stub spars, hinge brackets.
Details
       

 11-01-2010
4.00
Started on Spars
Details
       

 10-27-2010
4.00
New spars arrive
Details

 10-24-2010
3.00
Preparing Ribs
Details

 10-22-2010
6.00
Deburred and Fluted ribs.
Details

 10-11-2010
3.00
Resolved bent spar proglem. Cleaned up Ribs
Details
       

 10-07-2010
4.00
Inventory, organized hangar
Details

 10-06-2010
5.00
Inventory
Details

 09-09-2010
5.50
Trim/servo assembly
Details
       

 09-08-2010
3.00
Anti Servo Tab installation
Details
     

 09-05-2010
3.00
Attached VS and Stabilator
Details
       

 09-04-2010
8.00
Top Skin installation
Details
       

 09-03-2010
8.00
Upper Side Skins
Details
     

 09-02-2010
8.00
Side skin installation
Details
       

 08-23-2010
4.00
Bottom Skins
Details
       

 08-21-2010
8.00
Rear Bulkhead
Details
       

 08-18-2010
8.00
F-1211B preparation
Details
     

 08-17-2010
4.00
Skin preparation
Details
     

 08-16-2010
7.00
Completed HS assembly
Details
     

 08-15-2010
6.00
Completed VS skeleton
Details
     

 08-08-2010
8.00

Details
     

 08-05-2010
4.00
Vertical Stabilizer Spar
Details

 08-04-2010
3.00
Started on Stabilator
Details
       

 08-03-2010
8.00
Completed Rudder Assy.
Details

 08-02-2010
8.00
Rudder Skeleton
Details

 08-01-2010
3.00
Finished Vertical Stabilizer.
Details

 07-30-2010
6.00
Completed VS Skeleton, Clecoed VS skin.
Details
       

 07-29-2010
4.00
Completed VS Spar
Details

 07-28-2010
5.00
Wedge tool, rudder hinges, Vertical Stab. Spar
Details
       

 07-27-2010
3.00
Inventory
Details
     