Date
|
Hours
|
Work Log Summary
|
Details
|
09-23-2012
|
3.00
|
Brakes again.
|
Details
|
|
|
09-10-2012
|
5.00
|
Gascolator, papaerwork, brakes
|
Details
|
|
|
08-23-2012
|
5.00
|
Engine tests. Wing stub.
|
Details
|
|
|
08-22-2012
|
6.00
|
Static system.
|
Details
|
|
|
08-16-2012
|
2.00
|
Wings, brakes
|
Details
|
|
|
08-13-2012
|
3.00
|
Balanced carbs
|
Details
|
|
|
08-01-2012
|
3.00
|
Labels, Steps
|
Details
|
|
|
07-29-2012
|
4.00
|
Heat shield, interior
|
Details
|
|
|
07-28-2012
|
2.00
|
Ran engine
|
Details
|
|
|
07-21-2012
|
3.00
|
Instrument panel, tunnel
|
Details
|
|
|
07-20-2012
|
6.00
|
Oil System
|
Details
|
|
|
07-17-2012
|
5.00
|
Trutle deck, Skyview
|
Details
|
|
|
07-15-2012
|
5.00
|
installed tank, fuselage work
|
Details
|
|
|
07-14-2012
|
2.00
|
Gas tank sealant, prop adjustment
|
Details
|
|
|
07-05-2012
|
4.00
|
Installed prop. Tail cone work.
|
Details
|
|
|
06-25-2012
|
4.00
|
Control cables, wing root connectors
|
Details
|
|
|
06-24-2012
|
3.00
|
Controls
|
Details
|
|
|
06-21-2012
|
4.00
|
Connectors
|
Details
|
|
|
06-20-2012
|
6.00
|
Wing wiring
|
Details
|
|
|
06-17-2012
|
4.00
|
Lighting
|
Details
|
|
|
06-13-2012
|
4.00
|
Heater, engine controls, lighting
|
Details
|
|
|
06-11-2012
|
3.50
|
Heater, trim
|
Details
|
|
|
06-07-2012
|
5.00
|
GPS, lighting, trim
|
Details
|
|
|
05-29-2012
|
4.50
|
Panel work
|
Details
|
|
|
05-27-2012
|
9.00
|
Instrument deck work
|
Details
|
|
|
05-26-2012
|
3.00
|
Paint
|
Details
|
|
|
05-23-2012
|
4.00
|
|
Details
|
|
|
05-21-2012
|
6.00
|
ADHARS, wiring
|
Details
|
|
|
05-19-2012
|
4.50
|
Tunnel cleanup
|
Details
|
|
|
05-17-2012
|
6.00
|
Tunnel wiring
|
Details
|
|
|
05-16-2012
|
4.00
|
Tunnel work
|
Details
|
|
|
05-15-2012
|
4.00
|
Wiring
|
Details
|
|
|
05-09-2012
|
4.00
|
Wire routing
|
Details
|
|
|
05-07-2012
|
2.50
|
ADHARS
|
Details
|
|
|
05-06-2012
|
4.00
|
Instrument panel preparation
|
Details
|
|
|
04-30-2012
|
4.00
|
Autopilot installation
|
Details
|
|
|
04-29-2012
|
3.00
|
fiberglass work
|
Details
|
|
|
04-26-2012
|
4.00
|
Fiberglassed duct
|
Details
|
|
|
04-22-2012
|
2.00
|
modified duct
|
Details
|
|
|
04-21-2012
|
4.00
|
air duct installation
|
Details
|
|
|
04-19-2012
|
2.00
|
cowling air duct work
|
Details
|
|
|
04-18-2012
|
4.00
|
cowling fitting
|
Details
|
|
|
04-15-2012
|
5.00
|
Fitting cowling
|
Details
|
|
|
03-25-2012
|
4.00
|
Duct work
|
Details
|
|
|
03-22-2012
|
4.50
|
Oil cooler, air duct
|
Details
|
|
|
03-21-2012
|
4.50
|
radiator
|
Details
|
|
|
03-18-2012
|
3.00
|
sevice bulletin 11-12-14
|
Details
|
|
|
03-14-2012
|
3.00
|
Cooling box, oil tank
|
Details
|
|
|
02-22-2012
|
5.00
|
engine installation
|
Details
|
|
|
02-20-2012
|
4.00
|
banjo bolt, attachment bolts
|
Details
|
|
|
02-19-2012
|
4.00
|
locktite to engine mount. Carb pans
|
Details
|
|
|
02-16-2012
|
4.00
|
top componenets, applied RTV
|
Details
|
|
|
02-15-2012
|
5.00
|
Cooling shroud
|
Details
|
|
|
02-14-2012
|
3.00
|
Exposed top of engine.
|
Details
|
|
|
02-13-2012
|
3.50
|
Firewall wiring. Engine uncrated.
|
Details
|
|
|
02-11-2012
|
2.00
|
oil door
|
Details
|
|
|
02-08-2012
|
4.00
|
Upper cowl work
|
Details
|
|
|
01-30-2012
|
4.00
|
More cowl sanding and fitting
|
Details
|
|
|
01-29-2012
|
2.00
|
Sanding
|
Details
|
|
|
01-25-2012
|
5.00
|
Upper-lower cow fitting
|
Details
|
|
|
01-23-2012
|
4.00
|
Bottom Cowl work
|
Details
|
|
|
01-22-2012
|
2.00
|
Bottom cowl trimming
|
Details
|
|
|
01-21-2012
|
3.00
|
Figerglass work
|
Details
|
|
|
01-15-2012
|
6.00
|
Electrical work
|
Details
|
|
|
01-09-2012
|
4.00
|
nosewheel gear leg fairing
|
Details
|
|
|
01-08-2012
|
3.50
|
nose fairing
|
Details
|
|
|
01-04-2012
|
2.50
|
nose fairing
|
Details
|
|
|
01-02-2012
|
4.50
|
Nose wheel pants.
|
Details
|
|
|
01-01-2012
|
4.00
|
work on both main and nose pants
|
Details
|
|
|
12-31-2011
|
4.00
|
Pants nutplates
|
Details
|
|
|
12-29-2011
|
4.50
|
more wheel pants work
|
Details
|
|
|
12-28-2011
|
5.00
|
More wheel pant work
|
Details
|
|
|
12-27-2011
|
2.00
|
Right wheel work
|
Details
|
|
|
12-26-2011
|
5.50
|
upper-lower cowling hinges
|
Details
|
|
|
12-17-2011
|
3.00
|
Glued canopy on
|
Details
|
|
|
12-15-2011
|
3.50
|
Right and Front wheels
|
Details
|
|
|
12-14-2011
|
4.00
|
Right wheel pants, canopy
|
Details
|
|
|
12-12-2011
|
4.00
|
Left wheel work
|
Details
|
|
|
12-11-2011
|
2.50
|
Left pants
|
Details
|
|
|
12-03-2011
|
2.00
|
Canopy fairing
|
Details
|
|
|
11-30-2011
|
2.00
|
Canopy foam blocks
|
Details
|
|
|
11-28-2011
|
2.00
|
Canopy guide blocks
|
Details
|
|
|
11-27-2011
|
3.00
|
Canopy latch
|
Details
|
|
|
11-20-2011
|
4.50
|
Mount canopy on frame
|
Details
|
|
|
11-16-2011
|
5.00
|
Brakes
|
Details
|
|
|
11-07-2011
|
3.00
|
Checked alingnment.
|
Details
|
|
|
11-05-2011
|
3.00
|
Installed landing gear
|
Details
|
|
|
11-04-2011
|
2.00
|
Installed main wheels.
|
Details
|
|
|
11-03-2011
|
3.00
|
Enigne mount, wheels.
|
Details
|
|
|
11-02-2011
|
3.00
|
Drilled canopy
|
Details
|
|
|
10-30-2011
|
3.50
|
Tank window sealed.
|
Details
|
|
|
10-28-2011
|
2.00
|
Canopy fitting.
|
Details
|
|
|
10-26-2011
|
5.50
|
Canopy trim work
|
Details
|
|
|
10-22-2011
|
5.00
|
Fuel window leaks!
|
Details
|
|
|
10-19-2011
|
4.00
|
Closed tank
|
Details
|
|
|
10-17-2011
|
5.00
|
Tank top work.
|
Details
|
|
|
10-13-2011
|
2.00
|
Rear bulkhead, bracket.
|
Details
|
|
|
10-12-2011
|
5.00
|
Sending unit, more sealant
|
Details
|
|
|
10-11-2011
|
3.00
|
Started sealing process
|
Details
|
|
|
10-10-2011
|
2.50
|
Rivetted tank pieces
|
Details
|
|
|
10-09-2011
|
2.50
|
Initial tank work
|
Details
|
|
|
10-06-2011
|
4.00
|
canopy initial fitting
|
Details
|
|
|
10-04-2011
|
2.00
|
painted canopy frame
|
Details
|
|
|
10-03-2011
|
4.00
|
Canopy frame
|
Details
|
|
|
10-01-2011
|
3.00
|
started on canopy frame
|
Details
|
|
|
09-30-2011
|
2.00
|
Crotch strap. Cover plates
|
Details
|
|
|
09-29-2011
|
3.50
|
Stabilator turnbuckles. Seatbelts.
|
Details
|
|
|
09-25-2011
|
2.50
|
Stabilator cables
|
Details
|
|
|
09-21-2011
|
3.00
|
installed horizontal stabilator
|
Details
|
|
|
09-12-2011
|
3.00
|
Stabilator installation
|
Details
|
|
|
09-08-2011
|
5.00
|
Tailcone fairings
|
Details
|
|
|
09-04-2011
|
4.00
|
Tailcone fairings
|
Details
|
|
|
09-03-2011
|
4.00
|
Tailcone fairings
|
Details
|
|
|
08-29-2011
|
3.00
|
Rudder, Empennage fairings
|
Details
|
|
|
08-28-2011
|
3.00
|
Empennage installation
|
Details
|
|
|
08-24-2011
|
3.00
|
Rudder Cables
|
Details
|
|
|
08-22-2011
|
3.00
|
Torque tubes.
|
Details
|
|
|
08-20-2011
|
2.50
|
Torque tubes
|
Details
|
|
|
08-19-2011
|
2.00
|
Paint
|
Details
|
|
|
08-18-2011
|
2.50
|
Flapperons
|
Details
|
|
|
08-07-2011
|
3.00
|
Flapperon controls
|
Details
|
|
|
08-06-2011
|
2.00
|
Controls
|
Details
|
|
|
08-05-2011
|
1.00
|
Control stick pushrods
|
Details
|
|
|
08-03-2011
|
2.00
|
Paint
|
Details
|
|
|
08-01-2011
|
4.00
|
Wiring, Flapperon controls
|
Details
|
|
|
07-31-2011
|
2.00
|
Static Line, wiring
|
Details
|
|
|
07-30-2011
|
6.00
|
Tailcone reivetting, wiring
|
Details
|
|
|
07-28-2011
|
4.00
|
Mated tailcone
|
Details
|
|
|
07-27-2011
|
5.00
|
Control sticks and wiring
|
Details
|
|
|
07-26-2011
|
4.00
|
More wiring
|
Details
|
|
|
07-25-2011
|
3.00
|
Wiring
|
Details
|
|
|
07-21-2011
|
3.00
|
Spar interlock pins
|
Details
|
|
|
07-20-2011
|
5.00
|
Tunnel Harness
|
Details
|
|
|
07-18-2011
|
5.00
|
Wiring
|
Details
|
|
|
07-14-2011
|
3.00
|
Fitted Wings
|
Details
|
|
|
07-07-2011
|
4.00
|
Roll Bar brackets, Inventory
|
Details
|
|
|
07-06-2011
|
3.00
|
Roll bar and Baggage bulkhead
|
Details
|
|
|
07-04-2011
|
4.00
|
Paint
|
Details
|
|
|
06-19-2011
|
3.00
|
Seats
|
Details
|
|
|
06-17-2011
|
4.00
|
Paint
|
Details
|
|
|
06-09-2011
|
4.50
|
Map Box
|
Details
|
|
|
06-06-2011
|
2.50
|
Work on firewall
|
Details
|
|
|
06-02-2011
|
4.00
|
Canopy, Panel
|
Details
|
|
|
06-01-2011
|
4.00
|
Canopy attachment structure
|
Details
|
|
|
05-28-2011
|
4.50
|
Forward fuselage shelf
|
Details
|
|
|
05-19-2011
|
4.00
|
Fuel lines
|
Details
|
|
|
05-16-2011
|
3.00
|
Fuel Lines
|
Details
|
|
|
05-12-2011
|
2.50
|
Seats
|
Details
|
|
|
05-11-2011
|
2.50
|
Seats
|
Details
|
|
|
05-09-2011
|
3.00
|
Fit roll bar
|
Details
|
|
|
05-05-2011
|
1.00
|
Roll Bar
|
Details
|
|
|
05-03-2011
|
4.00
|
Roll Bar Assy.
|
Details
|
|
|
05-02-2011
|
5.50
|
Roll bar assembly
|
Details
|
|
|
04-28-2011
|
4.00
|
Completed section 23
|
Details
|
|
|
04-27-2011
|
5.50
|
Left dkin
|
Details
|
|
|
04-21-2011
|
7.00
|
Painting
|
Details
|
|
|
04-21-2011
|
6.00
|
Interior Painting
|
Details
|
|
|
04-20-2011
|
6.00
|
masking and prepping for paint
|
Details
|
|
|
04-18-2011
|
4.00
|
Deburring, Air vents
|
Details
|
|
|
04-17-2011
|
3.00
|
Deburring, Spar cutouts
|
Details
|
|
|
04-16-2011
|
2.00
|
Deburring
|
Details
|
|
|
04-11-2011
|
3.50
|
Right Longeron, F-1234
|
Details
|
|
|
04-10-2011
|
4.00
|
Longerons
|
Details
|
|
|
04-07-2011
|
4.00
|
Forward fuselage
|
Details
|
|
|
03-30-2011
|
5.00
|
Steps, Autopilot brackets
|
Details
|
|
|
03-29-2011
|
3.00
|
Primed step brackets
|
Details
|
|
|
03-28-2011
|
1.00
|
Steps
|
Details
|
|
|
03-27-2011
|
5.00
|
Bottom skin, step attachment
|
Details
|
|
|
03-26-2011
|
3.50
|
Bottom skin,
|
Details
|
|
|
03-25-2011
|
2.00
|
Bottom skin stiffeners
|
Details
|
|
|
03-24-2011
|
5.00
|
Step ribs, corner skins
|
Details
|
|
|
03-17-2011
|
4.50
|
Bulkhead, seats, control colum
|
Details
|
|
|
03-16-2011
|
7.00
|
F-1203 Bulkhead
|
Details
|
|
|
03-15-2011
|
4.00
|
Forward upright assemblies.
|
Details
|
|
|
03-12-2011
|
6.00
|
Seat floors
|
Details
|
|
|
03-11-2011
|
4.00
|
Seat ribs and floors
|
Details
|
|
|
03-10-2011
|
5.00
|
Autopilot bracket, crotch strap brackets
|
Details
|
|
|
03-09-2011
|
3.00
|
Pulley bracket
|
Details
|
|
|
03-08-2011
|
4.00
|
Seat fib assemblies
|
Details
|
|
|
03-07-2011
|
3.00
|
Pulley brackets, flapperon mixer
|
Details
|
|
|
03-06-2011
|
5.00
|
Baggage bulkhead and ribs
|
Details
|
|
|
03-05-2011
|
6.00
|
Baggage Floors
|
Details
|
|
|
02-14-2011
|
5.00
|
Completed center section bulkhead
|
Details
|
|
|
02-10-2011
|
4.00
|
Skin flanges,
|
Details
|
|
|
02-03-2011
|
4.00
|
Center section bulkhead
|
Details
|
|
|
02-02-2011
|
6.00
|
Right Flapperon
|
Details
|
|
|
01-31-2011
|
5.00
|
Completed left flapperon, started right
|
Details
|
|
|
01-30-2011
|
4.00
|
Left flapperon
|
Details
|
|
|
01-23-2011
|
4.50
|
Flapperon parts fabrication
|
Details
|
|
|
01-20-2011
|
4.00
|
Flapperon ribs, priming brackets.
|
Details
|
|
|
01-13-2011
|
5.00
|
Flapperon parts fabrication
|
Details
|
|
|
01-03-2011
|
3.00
|
Position Lights work
|
Details
|
|
|
01-02-2011
|
5.00
|
Left Wingtip work
|
Details
|
|
|
12-29-2010
|
2.00
|
Left Wingtip skins.
|
Details
|
|
|
12-28-2010
|
3.00
|
Inboard and middle Left skins
|
Details
|
|
|
12-23-2010
|
5.00
|
Upper Left wing skins
|
Details
|
|
|
12-21-2010
|
4.00
|
Bottom Left Wing skins
|
Details
|
|
|
12-19-2010
|
3.00
|
Finished Right wing. Left Wing skins
|
Details
|
|
|
12-16-2010
|
6.00
|
Left Wing tip
|
Details
|
|
|
12-09-2010
|
3.00
|
Installed landing light
|
Details
|
|
|
12-07-2010
|
4.00
|
completed right wing
|
Details
|
|
|
12-06-2010
|
5.00
|
Right wing skins
|
Details
|
|
|
12-05-2010
|
5.00
|
Landing light, right wing panels
|
Details
|
|
|
12-02-2010
|
4.00
|
Bottom skin right wing
|
Details
|
|
|
11-29-2010
|
4.00
|
Right wing skin
|
Details
|
|
|
11-21-2010
|
6.00
|
Light wiring
|
Details
|
|
|
11-18-2010
|
6.00
|
Light install preparation.
|
Details
|
|
|
11-16-2010
|
6.00
|
Right Wing skeleton
|
Details
|
|
|
11-15-2010
|
6.00
|
Stall warnng, left wing wiring
|
Details
|
|
|
11-13-2010
|
3.00
|
Completed left wing skeleton
|
Details
|
|
|
11-11-2010
|
3.00
|
Left wing rear ribs
|
Details
|
|
|
11-08-2010
|
5.00
|
Final rib preparation.
|
Details
|
|
|
11-07-2010
|
4.00
|
Completed rear and stub spars, hinge brackets.
|
Details
|
|
|
11-01-2010
|
4.00
|
Started on Spars
|
Details
|
|
|
10-27-2010
|
4.00
|
New spars arrive
|
Details
|
|
|
10-24-2010
|
3.00
|
Preparing Ribs
|
Details
|
|
|
10-22-2010
|
6.00
|
Deburred and Fluted ribs.
|
Details
|
|
|
10-11-2010
|
3.00
|
Resolved bent spar proglem. Cleaned up Ribs
|
Details
|
|
|
10-07-2010
|
4.00
|
Inventory, organized hangar
|
Details
|
|
|
10-06-2010
|
5.00
|
Inventory
|
Details
|
|
|
09-09-2010
|
5.50
|
Trim/servo assembly
|
Details
|
|
|
09-08-2010
|
3.00
|
Anti Servo Tab installation
|
Details
|
|
|
09-05-2010
|
3.00
|
Attached VS and Stabilator
|
Details
|
|
|
09-04-2010
|
8.00
|
Top Skin installation
|
Details
|
|
|
09-03-2010
|
8.00
|
Upper Side Skins
|
Details
|
|
|
09-02-2010
|
8.00
|
Side skin installation
|
Details
|
|
|
08-23-2010
|
4.00
|
Bottom Skins
|
Details
|
|
|
08-21-2010
|
8.00
|
Rear Bulkhead
|
Details
|
|
|
08-18-2010
|
8.00
|
F-1211B preparation
|
Details
|
|
|
08-17-2010
|
4.00
|
Skin preparation
|
Details
|
|
|
08-16-2010
|
7.00
|
Completed HS assembly
|
Details
|
|
|
08-15-2010
|
6.00
|
Completed VS skeleton
|
Details
|
|
|
08-08-2010
|
8.00
|
|
Details
|
|
|
08-05-2010
|
4.00
|
Vertical Stabilizer Spar
|
Details
|
|
|
08-04-2010
|
3.00
|
Started on Stabilator
|
Details
|
|
|
08-03-2010
|
8.00
|
Completed Rudder Assy.
|
Details
|
|
|
08-02-2010
|
8.00
|
Rudder Skeleton
|
Details
|
|
|
08-01-2010
|
3.00
|
Finished Vertical Stabilizer.
|
Details
|
|
|
07-30-2010
|
6.00
|
Completed VS Skeleton, Clecoed VS skin.
|
Details
|
|
|
07-29-2010
|
4.00
|
Completed VS Spar
|
Details
|
|
|
07-28-2010
|
5.00
|
Wedge tool, rudder hinges, Vertical Stab. Spar
|
Details
|
|
|
07-27-2010
|
3.00
|
Inventory
|
Details
|
|