Date
|
Hours
|
Work Log Summary

|
Details

|
05-20-2018
|
0.10
|
check website
|
|
  |
|
10-20-2011
|
0.10
|
test
|
|
  |
|
10-20-2011
|
2.00
|
Finished riveting flap trailing edges
|
Details
|
|
|
10-18-2011
|
3.00
|
completed flaps and riveted (except trailing edge)
|
Details
|
|
|
10-17-2011
|
1.00
|
Mark and start to cut flap control plates
|
Details
|
|
|
10-16-2011
|
3.00
|
Disassemble flaps and debur
|
Details
|
|
|
10-12-2011
|
2.50
|
Drill both flaps, and open holes for a5 rivet
|
Details
|
|
|
10-11-2011
|
2.00
|
Drill flap rib leading edge, and left flap ribs
|
Details
|
|
|
10-04-2011
|
1.00
|
Open wing box
|
Details
|
|
|
01-31-2009
|
1.50
|
Rivet remaining Elevator
|
Details
|
|
|
01-25-2009
|
2.00
|
rivet elevator horn and side
|
Details
|
|
|
01-24-2009
|
1.00
|
rivet elevator ribs
|
Details
|
|
|
01-18-2009
|
4.50
|
Elevator trim servo installation
|
Details
|
|
|
01-11-2009
|
2.00
|
Elevator Trim tab
|
Details
|
|
|
11-01-2008
|
1.00
|
trimmed the horn doubler and installed the lower h
|
Details
|
|
|
11-01-2008
|
2.00
|
made upper and lower elevator and drilled doubler
|
Details
|
|
|
11-01-2008
|
1.00
|
Cutout for elevator horn (top and bottom)
|
Details
|
|
|
11-01-2008
|
1.00
|
attached the angle 6t3-7 to the elevator
|
Details
|
|
|
11-01-2008
|
1.50
|
attached elevator horn
|
Details
|
|
|
10-17-2008
|
3.00
|
Drill hinge on elevator
|
Details
|
|
|
07-13-2008
|
1.50
|
drilled and cleco'd the bottom and top flanges on
|
Details
|
|
|
07-12-2008
|
1.50
|
center ribs and inboard and outboard ribs drilled
|
Details
|
|
|
07-11-2008
|
3.00
|
FTT Rib and End Rib installation on Stab
|
Details
|
|
|
06-14-2008
|
2.00
|
Reassembled H-Stab and riveted
|
Details
|
|
|
06-13-2008
|
5.00
|
Drilled elevator piano hinge
|
Details
|
|
|
06-08-2008
|
4.00
|
Installed End Ribs
|
Details
|
|
|
06-07-2008
|
6.00
|
clamped stab to table and drilled
|
Details
|
|
|
05-28-2008
|
2.00
|
trimmed top front corner attachments and ready for
|
Details
|
|
|
05-23-2008
|
1.50
|
Reinstalled and riveted bottom skin
|
Details
|
|
|
05-22-2008
|
3.00
|
drilled elevator bottom skin
|
Details
|
|
|
05-20-2008
|
2.00
|
Braced the Skeleton onto the Bench and placed Skin
|
Details
|
|
|
05-11-2008
|
5.50
|
Deburred, cleaned, painted and riveted Hstab Skele
|
Details
|
|
|
05-08-2008
|
2.50
|
Attached the L Angles to the spars and drilled out
|
Details
|
|
|
05-07-2008
|
1.50
|
Drilled Ribs to Rear Spar and made 4 L - Angles
|
Details
|
|
|
05-06-2008
|
1.00
|
Marked clamped and drilled all ribs to front spar
|
Details
|
|
|
05-06-2008
|
2.00
|
drilled and cleco'd 6T2-3 Rear Spar attachment
|
Details
|
|
|
05-04-2008
|
2.00
|
Drilled Shim and cleco'd to the rear spar.
|
Details
|
|
|
05-04-2008
|
2.00
|
Cut Rear Spar attachment per the drawings
|
Details
|
|
|
05-04-2008
|
1.00
|
Attached the doublers 6T1-6HD and 6T1-7HD to rear
|
Details
|
|
|
05-03-2008
|
1.00
|
Marked the rear spar attachment for cutting
|
Details
|
 |
|
05-03-2008
|
2.00
|
Created Plywood Template block for front spar
|
Details
|
  |
|
05-03-2008
|
4.00
|
attachment 6T2-2 and 6T2-1 to front spar
|
Details
|
|
|
04-27-2008
|
2.00
|
drilled the doublers on the front spars
|
Details
|
|
|
04-13-2008
|
1.00
|
Lined up and clamped doublers front spar
|
Details
|
  |
|
03-26-2008
|
1.00
|
Inventory Tail Kit
|
Details
|
|
|
03-18-2008
|
3.00
|
Rassembled rudder, trimmed nose skin, and riveted
|
Details
|
|
|
03-17-2008
|
2.00
|
Dissassembled rudder and prepared for reassembly
|
Details
|
|
|
03-16-2008
|
0.00
|
pic of the cleko'd rudder incl the nose skin
|
Details
|
 |
|
03-16-2008
|
3.00
|
Fitted the nose skin. drilled and cleko'd
|
Details
|
|
|
03-15-2008
|
4.00
|
Drilled and Cleko'd Trailing edge skin
|
Details
|
|
|
03-14-2008
|
2.00
|
Riveted the ribs and spar
|
Details
|
|
|
03-12-2008
|
0.10
|
received part 6T5-5
|
Details
|
  |
|
03-12-2008
|
1.00
|
Drilled 6T5-5 and painted cortec anti corrosion
|
Details
|
|
|
03-10-2008
|
0.10
|
Received Drawings and Serial number 6-7221
|
Details
|
  |
|
03-05-2008
|
0.50
|
Ordered 6T5-5, Tail Kit, and Drawings
|
Details
|
  |
|
03-05-2008
|
0.50
|
Deburred all drill holes, and clean.
|
Details
|
  |
|
03-04-2008
|
2.00
|
Drill ribs 2, 3 and 4
|
Details
|
|
|
02-24-2008
|
2.00
|
Rudder Doublers and Bottom rib
|
Details
|
|