KitLog pro

Powered By Kitlog Pro v2.0

Kevin Waterfords Web Site
Work Logs Found: 126
Category Work Time: 354 Hours
 Date
Hours
Work Log Summary

Details

 06-30-2013
4.00
Assemble Firewall
Details
       

 06-07-2013
4.00
Fuselage Kit Arrives
       

 04-10-2013
5.00
Wings Finished
       

 02-18-2013
10.00
Fiberglass Wing Tips
       

 02-10-2013
6.00
Fiberglass Wing Tips
       

 02-04-2013
15.00
Wing Tips and Ailerons
       

 12-28-2012
4.00
Installed Taxi/landing light on the right wing
       

 10-27-2012
3.00
Completed the landing light install for the left w
Details
       

 10-07-2012
2.00
Cut the opening in the left leading edge for the
Details
       

 09-11-2012
1.00
Piano Hinge for the left flap attachment
Details
       

 09-06-2012
3.00
Attached the flaps and aileron to the left wing.
Details
     

 09-01-2012
4.00
Riveting the flap hinge
Details
       

 08-30-2012
3.00
Completed the riveting of the bottom skins on the
Details
       

 08-26-2012
5.00
Riveting the bottom skins on the left wing
Details
       

 11-12-2011
4.00
Fuel tank
Details
       

 11-11-2011
2.00
Dimpled Wing skins
Details
       

 04-20-2011
12.00
New Work Shop
Details
       

 09-23-2009
1.00
Right Aileron
Details

 09-22-2009
1.00
Riveting the bottom skins of the right aileron
Details

 09-21-2009
2.00
Riveting the Right Aileron
Details

 09-20-2009
4.00
Riveting the Right wing skin
Details

 09-08-2009
2.00
Right Aileron
Details

 09-07-2009
3.00
Right Aileron
Details

 09-06-2009
3.00
Right Aileron
Details

 09-05-2009
3.00
Right Aileron
Details

 08-31-2009
2.00
Began assembling the right aileron

 08-30-2009
4.00
Riveting the right wing's bottom skins

 08-21-2009
2.00
Riveted the flap brace
Details

 08-19-2009
1.00
Rebuilt the Aileron hinge
Details

 08-16-2009
5.00
Riveted the outboard top skin
Details
       

 08-09-2009
6.00
Riveting the Top Skins of the right wing
Details
       

 07-07-2009
3.00
Riveted the outboard section of the leading edge.
Details

 07-06-2009
2.00
Riveting the outboard section of the leading edge
Details

 07-05-2009
2.00
Removed 4 rivets in the rear wing spar
Details

 06-15-2009
4.00
Right Wing
Details

 06-14-2009
3.00
Right Wing Leading Edge
Details

 06-09-2009
2.00
Replacing rivets on the Right Fuel tank
Details

 06-05-2009
6.00
Completing the Right Fuel Tank
Details

 06-01-2009
6.00
Right fuel tank
Details
       

 05-30-2009
5.00
Right Fuel Tank
Details

 05-26-2009
3.00
Right Fuel Tank
Details
       

 05-20-2009
3.00
Fuel tanks
Details
       

 05-02-2009
1.00
EAA Technical Advisor Sign-off
Details
     

 04-27-2009
2.00
Right Fuel Tank
Details

 04-26-2009
4.00
Right Fuel Tank
Details

 04-21-2009
5.00
Sun-N-Fun
Details
       

 04-18-2009
4.00
Right wing leading edge.
Details

 04-17-2009
4.00
Right Wing
Details

 04-12-2009
4.00
Drilled rivet holes in the skin to full size
Details

 04-05-2009
4.00
Right Wing skin drilled hoes to full size
Details
       

 03-29-2009
4.00
Right wing
Details
       

 03-22-2009
4.00
Right wings
Details

 03-16-2009
3.00
Main Spars
Details
       

 03-15-2009
4.00
Right Wing
Details

 03-14-2009
3.00
Wing Ribs and Spars
Details
       

 02-01-2009
2.00
Rear wing spars
Details
       

 11-02-2008
3.00
Left Main Wing Spar
Details

 11-01-2008
3.00
Left Main Wing Spar
Details

 10-26-2008
3.00
Right main wing spar
Details

 10-25-2008
3.00
Preparing the main wing spars
Details
       

 10-23-2008
2.00
Build the wing stands
Details

 10-20-2008
2.00
Inventoried wing kit
     

 10-17-2008
2.00
Finished the Empennage
Details
       

 10-16-2008
2.00
Trimming the HS to hang the elevators
Details

 10-12-2008
2.00
Trim Tab Finished
Details

 10-10-2008
2.00
Trim tab
Details
       

 10-07-2008
2.00
Trim Tab
Details

 10-06-2008
1.00
Trim Tab
Details

 10-05-2008
1.00
Trim Tab
Details

 10-04-2008
2.00
Riveting the left elevator.
Details
     

 09-28-2008
1.00
Finished the right elevator
Details
     

 09-25-2008
1.00
Bendiing the forward edge of the right elevator
Details

 09-20-2008
3.00
Riveting the the right and the left elevators
Details

 09-19-2008
4.00
Riveting the Right Elevator
Details

 09-13-2008
3.00
Left elevator
Details
     

 09-06-2008
3.00
Riveted the stiffners to the left elevator
Details

 08-09-2008
2.00
Cutting and shaping the new stiffners for the left
Details

 08-04-2008
1.00
The new stiffners arrive

 08-01-2008
0.00
Attended Airventure 2008 at Oshkosh, WI
Details
       

 07-24-2008
1.00
Left elevator stiffners
Details

 07-18-2008
2.00
Right Elevator
Details

 07-13-2008
2.00
Elevator
Details

 07-11-2008
2.00
Left Elevator
Details

 07-09-2008
2.00
Right Elevator
Details

 07-06-2008
2.00
Right Elevator
Details

 07-05-2008
2.00
Right Elelvator
Details

 06-29-2008
2.00
Right Elevator
Details

 06-28-2008
1.50
Rudder
Details

 06-27-2008
1.50
Rudder
Details

 06-22-2008
3.00
Rudder
Details
       

 06-18-2008
2.00
Rudder
Details

 06-16-2008
2.00
Rudder
Details

 06-15-2008
3.00
Rudder
Details

 06-14-2008
1.00
Rudder
Details

 06-03-2008
1.00
Rudder-- Dimpling
Details

 06-01-2008
0.00
Attended the NE RV Fly-in in Bloomsburg, PA
Details
       

 05-30-2008
1.50
Rudder--More
Details
       

 05-22-2008
2.00
Rudder
Details

 05-20-2008
1.50
Rudder--Completed riveting the stiffiners
Details

 05-18-2008
1.50
Rudder - More riveting of stiffiners
Details

 05-17-2008
5.00
Rudder- Priming and riveting the stiffiners
Details

 05-15-2008
1.50
Rudder
Details

 05-14-2008
1.50
Cutting Rudder Stiffners
Details

 05-12-2008
1.50
Rudder
Details

 05-11-2008
2.00
Vertical Stabilizer
Details

 05-08-2008
2.00
Vertical Stabilizer
Details

 05-06-2008
1.00
Vertical Stabilizer
Details

 05-06-2008
1.00
Horizontal Stabilizer
Details

 05-02-2008
1.00
Wing Kit Arrives
Details
     

 04-30-2008
1.50
Riveting HS Skins

 04-27-2008
2.00
Riveting the right HS Skins
Details

 04-26-2008
2.50
Riveted the left HS Skin
Details

 04-25-2008
3.00
Started riveting the rear HS Spar
Details
     

 04-24-2008
2.00
Primed the HS ribs and spars
Details
     

 04-21-2008
3.00
Dimpled and deburred HS parts

 04-20-2008
2.00
Built the table for the DRDT-2 dimpler device
Details

 04-20-2008
2.00
Built the spray rack for priming parts

 03-13-2008
3.00
More match drilling in HS
Details

 03-09-2008
2.00
match drilled HS skins

 03-08-2008
4.00
Clecoed the HS ribs together
       

 03-03-2008
3.00
Started forming parts for the rear spar.
Details

 03-02-2008
2.00
Inventoried the Empennage kit
Details

 03-01-2008
3.00
Built bench for grinder, drill press, and vise
Details
     

 02-29-2008
1.00
Received the RV tool kit
Details

 02-29-2008
0.50
Empagenage Kit Arrvies
Details

 02-16-2008
3.00
Built the work tables
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.