KitLog pro

Powered By Kitlog Pro v2.0

BILL'S WEB SITE
Work Logs Found: 62
Category Work Time: 304 Hours
 Date
Hours
Work Log Summary

Details

 11-20-2008
12.00
Install Propeller
Details
       

 11-11-2008
12.00
Install Engine and Items Listed Above
Details
       

 08-12-2008
8.00
Install and Rig Flaps
Details
       

 07-22-2008
2.00
Install Cables, Wires, and Lines
Details
       

 07-22-2008
3.00
Install and Rig Elevator
Details
       

 07-22-2008
3.00
Fabricate Special Tools or Fixtures
Details
       

 07-10-2008
4.00
Install Landing Gear (mains)
Details
       

 07-10-2008
2.00
Install control yoke
Details
       

 07-10-2008
1.00
Assemble Wheels, Brakes, Tires, Landing Gear
Details
       

 07-09-2008
3.00
Seal Fuel Tank
Details

 07-09-2008
4.00
Install landing gear
Details
       

 07-08-2008
3.00
Install Windshield/Windows/Canopy
Details
       

 07-08-2008
8.00
Install Windshield/Windows/Canopy
Details
       

 07-07-2008
3.00
Install fuel tank components
Details
       

 07-07-2008
4.00
Install Engine & Items Listed Above
Details
       

 07-07-2008
3.00
Fabricate Engine cowling
Details
       

 05-29-2008
5.00
SCAT tubing
Details
       

 05-29-2008
2.00
Aileron install
Details

 05-28-2008
8.00
Environmental control system
Details
       

 05-13-2008
8.00
Install Cables, Wires and Line - static, brake, el
Details
       

 05-13-2008
8.00
Install Aileron Brackets & Fittings
Details
       

 05-12-2008
16.00
Install Electrical System Controls/Switches
Details
       

 04-30-2008
4.00
Installing Flap Brackets and Fittings
Details
       

 04-30-2008
8.00
Install and Rig Rudder
Details
       

 04-30-2008
4.00
Install and rig ailerons
Details
       

 04-29-2008
4.00
Install and Rig Rudder
Details
       

 04-29-2008
4.00
Assemble Control Stick Assembly
Details
       

 04-28-2008
8.00
Install and Rig Rudder
Details
       

 03-10-2008
4.00
Install and rig flaps
Details
       

 03-09-2008
4.00
Install Lines-Static
Details
       

 03-05-2008
4.00
Install elevator brackets and fittings
Details
       

 03-04-2008
3.00
Install fittings and brackets
Details
       

 03-04-2008
6.00
Install Elevator Brackets and Fittings
Details
       

 02-21-2008
4.00
Assemble elevator trim tab
Details
       

 02-20-2008
6.00
Install Aileron Brackets/Cable
Details
       

 02-20-2008
2.00
Assemble Elevator Structure
Details
       

 02-19-2008
4.00
Install aileron brackets & fittings
Details
       

 02-11-2008
5.00
Using special tools or fixtures
Details
       

 02-11-2008
8.00
Pre-mating for rigging all flight controls
Details
       

 02-11-2008
8.00
Fabricate Cables, Wire, and Lines
Details
       

 02-11-2008
2.00
Fabricate Cables, Wire, and Lines
Details
       

 02-04-2008
6.00
Install and Rig Wings and Struts
Details
       

 01-29-2008
6.00
Install wing bracket, fittings, & attachments
Details
       

 01-29-2008
4.00
Install cables
Details
       

 01-29-2008
4.00
Fabricate Special Tools or Fixtures
Details
       

 01-15-2008
3.00
Assemble control yoke assembly

 12-13-2007
3.50
Fabricate cables, wires and lines
Details

 11-08-2007
2.00
Install door
Details
       

 11-08-2007
1.50
Fabricate door
Details
       

 11-07-2007
2.00
Assemble door
Details
       

 10-16-2007
3.50
Assemble empennage structures
Details
     

 10-03-2007
3.50
Assemble wing tips
Details
       

 10-02-2007
8.00
Install and rig wings and struts
Details
       

 10-01-2007
8.50
Install brackets & fittings - chicken blocks
Details

 09-27-2007
3.50
Fabricate aileron trim tab
Details
       

 09-26-2007
6.00
Install Brackets and Fittings/Chicken Blocks
Details
       

 09-26-2007
3.00
Install and Rig Flaps
Details
       

 09-25-2007
3.00
Install brackes and fittings - chicken blocks
Details

 09-24-2007
8.00
Assemble fuselage basic structure
Details

 09-20-2007
4.00
Install Aileron Covering or Skin
Details
       

 09-20-2007
5.00
Assemble Fuselage Basic Structure
Details
       

 09-18-2007
1.50
Bonding the upper wing skin
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.