Date
|
Hours
|
Work Log Summary
|
Details
|
12-07-2014
|
0.50
|
SCAT hose from baffle to muffler
|
Details
|
|
|
12-07-2014
|
1.00
|
Left brake line
|
Details
|
|
|
11-28-2014
|
2.00
|
Crankcase breather and fuel pump overflow lines
|
Details
|
|
|
11-27-2014
|
1.00
|
Switched ends of oil cooler line
|
Details
|
|
|
11-26-2014
|
1.00
|
Secured FWF temp probe
|
Details
|
|
|
11-16-2014
|
3.00
|
Wired oil sump heater
|
Details
|
|
|
10-26-2014
|
4.00
|
Firesleeve on remaining tubing
|
Details
|
|
|
10-26-2014
|
8.00
|
Another makeup entry
|
Details
|
|
|
10-15-2014
|
1.00
|
Tried canopy on fuse to measure aft targa strip
|
Details
|
|
|
10-15-2014
|
1.50
|
Standoffs for spark plug wires
|
Details
|
|
|
10-15-2014
|
1.00
|
Rivet remaining aft canopy sheet
|
Details
|
|
|
10-15-2014
|
3.00
|
Crimped and soldered terminal lugs on all large ca
|
Details
|
|
|
10-08-2014
|
3.50
|
Spark plug wires
|
Details
|
|
|
10-01-2014
|
1.00
|
Tightened and marked AN fittings for brakes lines
|
Details
|
|
|
10-01-2014
|
1.50
|
Reversed rudder cables
|
Details
|
|
|
10-01-2014
|
3.00
|
Dynon boxes
|
Details
|
|
|
09-28-2014
|
7.00
|
Mounts for ADSB and EMS modules
|
Details
|
|
|
09-27-2014
|
1.00
|
Wired MAP sensor
|
Details
|
|
|
09-25-2014
|
1.00
|
Attached transponder
|
Details
|
|
|
09-24-2014
|
1.00
|
Drilled/dimpled center holes for access hatch
|
Details
|
|
|
09-24-2014
|
3.00
|
Began placing instruments
|
Details
|
|
|
09-23-2014
|
1.50
|
Wired more sensors
|
Details
|
|
|
09-21-2014
|
3.00
|
Finish forward access plate
|
Details
|
|
|
09-15-2014
|
3.00
|
Manifold Pressure Sensor
|
Details
|
|
|
09-10-2014
|
4.00
|
Made access hatch in upper forward skin
|
Details
|
|
|
09-10-2014
|
1.00
|
Continued access hatch work.
|
Details
|
|
|
09-07-2014
|
1.00
|
Unsoldered/resoldered an ignition wire
|
Details
|
|
|
09-03-2014
|
4.00
|
Secured more lines
|
Details
|
|
|
09-03-2014
|
1.00
|
Placed Al adhesive sheet inside lower cowl
|
Details
|
|
|
09-01-2014
|
2.00
|
Secured wires
|
Details
|
|
|
08-31-2014
|
2.00
|
Secured lines with Adel clamps
|
Details
|
|
|
08-30-2014
|
2.00
|
Torqued steel hose fittings
|
Details
|
|
|
08-29-2014
|
3.50
|
Baffle supports, seal holes
|
Details
|
|
|
08-24-2014
|
2.00
|
Baffle support
|
Details
|
|
|
08-23-2014
|
3.50
|
Blast tubes for alternators
|
Details
|
|
|
08-22-2014
|
2.00
|
Outboard tension rods, other
|
Details
|
|
|
08-21-2014
|
1.00
|
Finished inner tension rods
|
Details
|
|
|
08-20-2014
|
4.00
|
Various
|
Details
|
|
|
08-18-2014
|
1.50
|
Various
|
Details
|
|
|
08-17-2014
|
1.00
|
Sanded outside of air intake
|
Details
|
|
|
08-17-2014
|
1.00
|
Finish sand canopy LE
|
Details
|
|
|
08-17-2014
|
1.00
|
Added jam nuts to FW side of control pass-thrus
|
Details
|
|
|
08-14-2014
|
0.50
|
Attached cabin heat flange to rear baffle
|
Details
|
|
|
08-13-2014
|
1.50
|
Replaced patch
|
Details
|
|
|
08-13-2014
|
2.50
|
Miscellaneous
|
Details
|
|
|
08-13-2014
|
2.00
|
Fit and measure trial fuel lines
|
Details
|
|
|
08-10-2014
|
1.00
|
Final finish sand for canopy
|
Details
|
|
|
08-10-2014
|
0.50
|
Added exhaust shields
|
Details
|
|
|
08-09-2014
|
1.50
|
Finished mixture cable
|
Details
|
|
|
08-09-2014
|
2.00
|
Finished left hangers for exhaust
|
Details
|
|
|
08-08-2014
|
1.50
|
Mixture cable install
|
Details
|
|
|
08-06-2014
|
5.00
|
Exhaust system install
|
Details
|
|
|
08-02-2014
|
2.00
|
Oil cooler, coils
|
Details
|
|
|
07-30-2014
|
4.00
|
Various engine sensors
|
Details
|
|
|
07-27-2014
|
1.00
|
Sanded forward edge again
|
Details
|
|
|
07-27-2014
|
1.50
|
Finish heater cable, baffle adj.
|
Details
|
|
|
07-26-2014
|
0.50
|
Replace too-short bolts, screws
|
Details
|
|
|
07-26-2014
|
1.00
|
Heat box cable
|
Details
|
|
|
07-23-2014
|
3.00
|
Throttle and other controls.
|
Details
|
|
|
07-23-2014
|
1.00
|
Dimpled targa strip
|
Details
|
|
|
07-20-2014
|
4.00
|
Finished targa strip except for dimpling
|
Details
|
|
|
07-19-2014
|
1.00
|
Throttle rod-end bolt, cabin heat control
|
Details
|
|
|
07-16-2014
|
2.00
|
Mixture and Throttle controls
|
Details
|
|
|
07-16-2014
|
1.00
|
Finished riveting fuse side skin
|
Details
|
|
|
07-16-2014
|
1.00
|
Continued sanding canopy leading edge
|
Details
|
|
|
07-13-2014
|
2.00
|
Made targa strip
|
Details
|
|
|
07-11-2014
|
0.50
|
Started fine sanding canopy
|
Details
|
|
|
07-11-2014
|
0.50
|
Clearance for airbox plate/NG
|
Details
|
|
|
07-09-2014
|
4.00
|
Engine controls
|
Details
|
|
|
07-09-2014
|
2.00
|
Canopy release mechanism
|
Details
|
|
|
07-07-2014
|
0.50
|
Finished aft control bracket
|
Details
|
|
|
07-06-2014
|
1.50
|
Sand filler coat, reapply new filler
|
Details
|
|
|
07-06-2014
|
3.50
|
Control Brackets
|
Details
|
|
|
07-04-2014
|
3.50
|
Finish adjusting latches, add latch guides
|
Details
|
|
|
07-03-2014
|
2.50
|
Began re-adjusting canopy lock
|
Details
|
|
|
07-02-2014
|
3.00
|
Sand & Fill leading edge
|
Details
|
|
|
06-29-2014
|
2.00
|
Apply 4 layers of tape to leading edge
|
Details
|
|
|
06-27-2014
|
1.50
|
Rough sand and shape leading edge fiberglass
|
Details
|
|
|
06-25-2014
|
3.00
|
Began fiberglass leading canopy edge
|
Details
|
|
|
06-22-2014
|
1.00
|
Screwed in canopy
|
Details
|
|
|
06-21-2014
|
1.00
|
Sand/smooth lower cowl bulge
|
Details
|
|
|
06-18-2014
|
4.00
|
Riveted canopy skirts
|
Details
|
|
|
06-17-2014
|
1.00
|
Lower cowl bulge
|
Details
|
|
|
06-15-2014
|
1.00
|
Lower cowl bulge work
|
Details
|
|
|
06-04-2014
|
4.00
|
Fiberglassed lower cowl bulge
|
Details
|
|
|
05-20-2014
|
4.00
|
Finished baffling
|
Details
|
|
|
05-17-2014
|
1.50
|
Fuel lines and baffling
|
Details
|
|
|
05-14-2014
|
4.00
|
Continue baffling
|
Details
|
|
|
05-11-2014
|
1.50
|
Right aft baffling
|
Details
|
|
|
05-10-2014
|
1.50
|
Left aft baffling
|
Details
|
|
|
05-09-2014
|
1.00
|
Finished left side baffling
|
Details
|
|
|
05-08-2014
|
1.00
|
Left Baffling
|
Details
|
|
|
05-07-2014
|
4.00
|
Baffling
|
Details
|
|
|
05-04-2014
|
6.25
|
Airbox, Oil cooler brace
|
Details
|
|
|
04-27-2014
|
3.50
|
Baffles, oil cooler
|
Details
|
|
|
04-27-2014
|
2.50
|
Air inlet
|
Details
|
|
|
04-26-2014
|
0.25
|
Torque airbox plate bolts
|
Details
|
|
|
04-26-2014
|
1.50
|
Continue work on air inlet
|
Details
|
|
|
04-24-2014
|
1.00
|
Forward baffles
|
Details
|
|
|
04-24-2014
|
2.50
|
Airbox inlet
|
Details
|
|
|
04-23-2014
|
2.00
|
Glassed Air inlet
|
Details
|
|
|
04-23-2014
|
2.00
|
Airbox work
|
Details
|
|
|
04-20-2014
|
1.00
|
Removed foam in engine air inlet
|
Details
|
|
|
04-19-2014
|
2.00
|
Finished elephant ears
|
Details
|
|
|
04-18-2014
|
1.00
|
Elephant ears again
|
Details
|
|
|
04-16-2014
|
1.50
|
Front baffles
|
Details
|
|
|
04-16-2014
|
2.50
|
Air box
|
Details
|
|
|
04-12-2014
|
1.00
|
Fix Front baffles
|
Details
|
|
|
04-11-2014
|
1.00
|
Rivet front baffles
|
Details
|
|
|
04-11-2014
|
2.00
|
Air box
|
Details
|
|
|
04-09-2014
|
3.00
|
Air box
|
Details
|
|
|
04-08-2014
|
3.00
|
Finished elephant ears
|
Details
|
|
|
04-06-2014
|
2.00
|
Elephant ears
|
Details
|
|
|
04-06-2014
|
1.50
|
Baffle dimpling and riveting
|
Details
|
|
|
04-05-2014
|
1.50
|
Elephant ears
|
Details
|
|
|
04-05-2014
|
2.00
|
Baffle work
|
Details
|
|
|
04-02-2014
|
2.00
|
Trim and fit of cowl
|
Details
|
|
|
04-02-2014
|
2.00
|
Baffles
|
Details
|
|
|
03-30-2014
|
1.00
|
Triangle baffle
|
Details
|
|
|
03-30-2014
|
1.00
|
Continue aft extension
|
Details
|
|
|
03-28-2014
|
0.50
|
Continue aft cowl extension
|
Details
|
|
|
03-26-2014
|
1.50
|
Extend aft cowl
|
Details
|
|
|
03-26-2014
|
2.50
|
Baffles
|
Details
|
|
|
03-23-2014
|
3.00
|
Completed oil door
|
Details
|
|
|
03-19-2014
|
3.50
|
Fit and epoxied upper forward inlets, fit oil door
|
Details
|
|
|
03-16-2014
|
2.00
|
More baffle work
|
Details
|
|
|
03-09-2014
|
1.00
|
Baffle work
|
Details
|
|
|
03-08-2014
|
2.50
|
Baffle work
|
Details
|
|
|
03-05-2014
|
3.00
|
Baffling work
|
Details
|
|
|
12-25-2013
|
4.00
|
Baffles
|
Details
|
|
|
11-30-2013
|
3.00
|
Oil cooler
|
Details
|
|
|
11-26-2013
|
2.00
|
Removed and replaced heater control box
|
Details
|
|
|
08-09-2013
|
1.50
|
Started making forward cover plate
|
Details
|
|
|
08-08-2013
|
1.00
|
Bolted outlet brace
|
Details
|
|
|
07-30-2013
|
1.00
|
Assembled air outlet brace
|
Details
|
|
|
07-28-2013
|
6.50
|
Made air outlet brace
|
Details
|
|
|
07-21-2013
|
3.00
|
Installed from nutplates
|
Details
|
|
|
07-20-2013
|
2.00
|
Cowl re-fitting
|
Details
|
|
|
07-17-2013
|
2.00
|
Cowl work
|
Details
|
|
|
07-16-2013
|
1.00
|
Epoxied lower cowl
|
Details
|
|
|
07-15-2013
|
1.00
|
Finished sanding lower cowl
|
Details
|
|
|
07-13-2013
|
3.00
|
More sanding, lower cowl
|
Details
|
|
|
07-12-2013
|
4.00
|
Upper and lower cowl, more epoxy
|
Details
|
|
|
07-10-2013
|
2.00
|
Upper cowl work
|
Details
|
|
|
07-09-2013
|
1.50
|
Sand, reinforce lower cowl
|
Details
|
|
|
07-07-2013
|
2.00
|
Sand lower cowl
|
Details
|
|
|
07-04-2013
|
2.00
|
Sand lower cowl
|
Details
|
|
|
06-29-2013
|
2.00
|
Upper cowl
|
Details
|
|
|
06-27-2013
|
1.50
|
Sand upper cowl
|
Details
|
|
|
06-26-2013
|
2.50
|
Upper cowl outside surface
|
Details
|
|
|
06-25-2013
|
1.00
|
Sealed inside of lower cowl
|
Details
|
|
|
06-25-2013
|
1.00
|
Riveted hinge strips on upper cowl
|
Details
|
|
|
06-24-2013
|
1.50
|
Riveted hinges
|
Details
|
|
|
06-23-2013
|
3.50
|
Sand and alodine
|
Details
|
|
|
06-23-2013
|
1.50
|
Epoxied hinge strips
|
Details
|
|
|
06-22-2013
|
3.00
|
Sealed lower cowl, sanded upper
|
Details
|
|
|
06-22-2013
|
3.00
|
Sanded upper cowl, lower cowl
|
Details
|
|
|
06-22-2013
|
2.00
|
2nd epoxy seal, scuff/drill hinges
|
Details
|
|
|
06-19-2013
|
3.00
|
Upper/lower cowl epoxy seal
|
Details
|
|
|
06-19-2013
|
3.00
|
Upper cowl epoxy seal
|
Details
|
|
|
06-18-2013
|
1.50
|
Trimmed gap between halves
|
Details
|
|
|
06-16-2013
|
3.00
|
Finished upper cowl Skybolt fasteners
|
Details
|
|
|
06-15-2013
|
2.00
|
Started upper cowl Skybolt fasteners
|
Details
|
|
|
06-14-2013
|
1.00
|
Finished all Skybolt fasteners on lower cowl
|
Details
|
|
|
06-13-2013
|
3.00
|
Finished installing Skybolts on lower sides
|
Details
|
|
|
06-11-2013
|
1.00
|
Finished lower cowl drilling for Skybolt
|
Details
|
|
|
06-10-2013
|
1.00
|
More Skybolt work
|
Details
|
|
|
06-09-2013
|
3.00
|
Right side hinge, Skybolt fasteners
|
Details
|
|
|
06-08-2013
|
2.00
|
Started right hinge
|
Details
|
|
|
06-06-2013
|
1.00
|
Drilled holes for lower left hinge strip
|
Details
|
|
|
06-05-2013
|
4.00
|
Tentative location of left horiz hinge
|
Details
|
|
|
06-04-2013
|
1.00
|
Top and bottom fit
|
Details
|
|
|
06-03-2013
|
1.00
|
More fitting
|
Details
|
|
|
06-02-2013
|
2.50
|
Top/bottom cowl trimming
|
Details
|
|
|
06-01-2013
|
1.50
|
More cowl fitting
|
Details
|
|
|
05-31-2013
|
1.50
|
Right air ramp baffle trimming
|
Details
|
|
|
05-30-2013
|
1.00
|
Top-Center baffle trimming
|
Details
|
|
|
05-29-2013
|
1.50
|
Top-Center baffle trimming
|
Details
|
|
|
05-28-2013
|
2.00
|
Baffle fitting
|
Details
|
|
|
05-25-2013
|
1.50
|
More cowl fitting
|
Details
|
|
|
05-25-2013
|
1.50
|
Baffle fitting
|
Details
|
|
|
05-24-2013
|
1.00
|
More cowl fitting
|
Details
|
|
|
05-23-2013
|
2.00
|
Back to fitting cowl.
|
Details
|
|
|
05-18-2013
|
4.00
|
Baffle work
|
Details
|
|
|
05-12-2013
|
1.50
|
More cowl fitting
|
Details
|
|
|
05-11-2013
|
2.00
|
More cowl fitting
|
Details
|
|
|
05-08-2013
|
4.00
|
Oil door and more fitting/trimming
|
Details
|
|
|
05-07-2013
|
1.50
|
Cowl fitting
|
Details
|
|
|
05-06-2013
|
1.00
|
Removed some Skybolt flanges
|
Details
|
|
|
05-05-2013
|
2.00
|
Riveted and fit remaining Skybolt flanges
|
Details
|
|
|
05-04-2013
|
5.00
|
Lower cowl and Skybolt flange work
|
Details
|
|
|
05-01-2013
|
2.00
|
Bottom cowl and oil door
|
Details
|
|
|
04-27-2013
|
4.00
|
Started fitting top/bottom
|
Details
|
|
|
04-27-2013
|
0.00
|
Cowl fitting, continued from previous entry.
|
|
|
|
04-24-2013
|
1.50
|
Cut oil door opening in top cowl
|
Details
|
|
|
04-20-2013
|
3.00
|
Finally attached prop extension
|
Details
|
|
|
04-19-2013
|
2.00
|
1 step backward
|
Details
|
|
|
04-17-2013
|
2.00
|
Prepped for prop extension
|
Details
|
|
|
03-29-2013
|
1.50
|
Cut slot for nose gear
|
Details
|
|
|
03-21-2013
|
1.00
|
Baffle work continues
|
Details
|
|
|
03-20-2013
|
5.50
|
Mounted Lightspeed modules and cont baffles
|
Details
|
|
|
03-17-2013
|
6.00
|
Add brace for 2nd Lightspeed module pair
|
Details
|
|
|
03-16-2013
|
1.50
|
Continued with baffles
|
Details
|
|
|
03-15-2013
|
1.00
|
Continued tinkering with baffles
|
Details
|
|
|
03-14-2013
|
1.00
|
Finished Lightspeed attachment
|
Details
|
|
|
03-12-2013
|
1.00
|
Continued with Lightspeed attachment
|
Details
|
|
|
03-11-2013
|
3.00
|
Aft baffle brace, Lightspeed attachment
|
Details
|
|
|
03-09-2013
|
4.00
|
Fit baffles
|
Details
|
|
|
03-08-2013
|
1.50
|
Cyls 1 and 2 baffles
|
Details
|
|
|
03-07-2013
|
1.50
|
Cylinder 3 baffles
|
Details
|
|
|
03-06-2013
|
4.00
|
"Finished" cylinder 4 baffles
|
Details
|
|
|
03-04-2013
|
1.50
|
Alodined baffle parts
|
Details
|
|
|
03-01-2013
|
1.50
|
Drilled out rivet holes, fit together first baffle
|
Details
|
|
|
03-01-2013
|
2.50
|
Countersunk and alodined Skybolt flanges
|
Details
|
|
|
02-28-2013
|
1.50
|
Deburred flanges from Skybolt.
|
Details
|
|
|
02-28-2013
|
1.50
|
Cut, trimmed, deburred parts for engine baffle
|
Details
|
|
|
02-27-2013
|
2.00
|
Made cover plate for nose gear bolt
|
Details
|
|
|
02-26-2013
|
4.00
|
Heat box, fuel transducer, cable mount
|
Details
|
|
|
02-25-2013
|
2.50
|
Prepped for heat control
|
Details
|
|
|
02-24-2013
|
0.50
|
Sealed oil sump heater wires
|
Details
|
|
|
02-24-2013
|
1.00
|
Installed Forest of Tabs
|
Details
|
|
|
02-24-2013
|
1.50
|
Installed antennas
|
Details
|
|
|
02-22-2013
|
0.50
|
Tightened nose gear brace
|
Details
|
|
|
02-22-2013
|
0.50
|
Inserted cotter pins
|
Details
|
|
|
02-21-2013
|
1.00
|
Torqued engine bolts
|
Details
|
|
|
02-20-2013
|
1.50
|
Mounted engine on fuselage
|
|
|
|
02-20-2013
|
1.00
|
Added nose gear brace
|
Details
|
|
|
02-19-2013
|
1.00
|
Set nose gear force, added Lip Skid
|
Details
|
|
|
02-18-2013
|
2.00
|
Put fuselage on landing gear
|
|
|
|
02-17-2013
|
3.00
|
Moved emps & flaps to hangar
|
Details
|
|
|
02-12-2013
|
1.50
|
Finished SafeAir1 Pass-Throughs
|
Details
|
|
|
02-11-2013
|
1.50
|
Started mounting Safeair1 pass-thru
|
Details
|
|
|
02-10-2013
|
1.50
|
Mounted cabin lights
|
Details
|
|
|
02-10-2013
|
2.00
|
Finished mounting other main and nose gear
|
Details
|
|
|
02-09-2013
|
1.50
|
Drilled hole in axle for cotter pin
|
Details
|
|
|
02-08-2013
|
2.00
|
Retrieved engine
|
Details
|
|
|
02-07-2013
|
1.50
|
Attached wheel pant braces
|
Details
|
|
|
02-06-2013
|
1.50
|
Got proper bolts and nuts, attached brake flanges
|
Details
|
|
|
02-06-2013
|
2.00
|
Cabin lights
|
Details
|
|
|
02-05-2013
|
1.50
|
Almost finished power adapters for baggage area
|
Details
|
|
|
02-04-2013
|
1.50
|
Prepped Al wheel pant brackets
|
Details
|
|
|
02-03-2013
|
4.00
|
Trying to figure out wheel and brake flange config
|
Details
|
|
|
02-03-2013
|
2.00
|
Mounted tubes/tires to wheels
|
Details
|
|
|
01-27-2013
|
2.00
|
Re-attached brakes lines to forward fuse.
|
|
|
|
01-26-2013
|
4.00
|
Baggage area wiring
|
Details
|
|
|
01-20-2013
|
4.00
|
Started engine mount, access holes
|
Details
|
|
|
12-16-2012
|
4.50
|
Trimmed aft edge of canopy.
|
Details
|
|
|
12-15-2012
|
3.00
|
Forgot a trim strip
|
Details
|
|
|
12-15-2012
|
3.00
|
Forgot a trim strip
|
Details
|
|
|
12-14-2012
|
2.00
|
Finished/installed canopy stops
|
Details
|
|
|
12-09-2012
|
5.00
|
Mounted struts, started canopy stops
|
Details
|
|
|
12-07-2012
|
1.00
|
Painted canopy parts
|
Details
|
|
|
12-05-2012
|
4.00
|
Aggregated day
|
Details
|
|
|
11-12-2012
|
2.00
|
Started assembling canopy again
|
Details
|
|
|
11-11-2012
|
8.00
|
Painted frame, skin
|
Details
|
|
|
10-21-2012
|
2.00
|
Primed canopy frame
|
Details
|
|
|
10-20-2012
|
4.00
|
Painted canopy frame
|
Details
|
|
|
10-14-2012
|
4.00
|
Attached fresh air inlets to fuse
|
Details
|
|
|
10-13-2012
|
2.50
|
Finished gas strut install
|
Details
|
|
|
10-12-2012
|
1.50
|
Continued gas strut installation
|
Details
|
|
|
10-10-2012
|
2.00
|
Continued work on gas struts
|
Details
|
|
|
10-07-2012
|
5.50
|
Finished finger latches, handle
|
Details
|
|
|
10-06-2012
|
4.00
|
Continue working on latch fingers
|
Details
|
|
|
10-05-2012
|
2.00
|
Canopy latch fingers
|
Details
|
|
|
10-04-2012
|
1.50
|
Started canopy latch fingers
|
Details
|
|
|
09-30-2012
|
5.50
|
Finished frame reinforcement
|
Details
|
|
|
09-29-2012
|
3.50
|
Started canopy frame reinforcement
|
Details
|
|
|
09-24-2012
|
1.00
|
Cleaned & alodined side skins
|
Details
|
|
|
09-23-2012
|
4.00
|
Countersinking, match drilling, riveting frame
|
Details
|
|
|
09-21-2012
|
2.50
|
Right side skin
|
Details
|
|
|
09-20-2012
|
1.00
|
Left side skin
|
Details
|
|
|
09-19-2012
|
2.50
|
Canopy side skins
|
Details
|
|
|
09-16-2012
|
4.00
|
Finished canopy
|
Details
|
|
|
09-15-2012
|
3.00
|
Finished drilling aft canopy, ...
|
Details
|
|
|
09-14-2012
|
3.00
|
Fit/trimmed/drilled aft canopy
|
Details
|
|
|
09-13-2012
|
1.50
|
Drilled canopy and frame sides
|
Details
|
|
|
09-12-2012
|
2.00
|
Clamped, drilled canopy to roll bar
|
Details
|
|
|
09-10-2012
|
1.50
|
Trimmed sides of canopy
|
Details
|
|
|
09-09-2012
|
5.00
|
1 Step Forward
|
Details
|
|
|
09-07-2012
|
1.50
|
Made addtl splice plate, drilled
|
Details
|
|
|
09-05-2012
|
2.00
|
Started fitting to F-631 frame
|
Details
|
|
|
09-03-2012
|
3.00
|
Trim-fit
|
Details
|
|
|
09-02-2012
|
3.00
|
Trim-fit
|
Details
|
|
|
08-31-2012
|
1.50
|
Trim-fit
|
Details
|
|
|
08-28-2012
|
1.50
|
Another fit-trim on fwd edge
|
Details
|
|
|
08-26-2012
|
3.00
|
More fit-trim
|
Details
|
|
|
08-25-2012
|
4.00
|
The Big Cut
|
Details
|
|
|
08-22-2012
|
2.50
|
3 more fit-trim cycles
|
Details
|
|
|
08-19-2012
|
1.50
|
Another fit-trim cycle
|
|
|
|
08-18-2012
|
3.00
|
Two fit-trim cycles
|
Details
|
|
|
08-12-2012
|
4.00
|
First trim on canopy
|
Details
|
|
|
08-11-2012
|
1.00
|
Riveted channel to cabin frame
|
Details
|
|
|
07-26-2012
|
5.00
|
Riveted side rails
|
Details
|
|
|
07-23-2012
|
6.00
|
Finished side rails
|
Details
|
|
|
07-21-2012
|
3.00
|
Finished canopy rear hoop, started side rails
|
Details
|
|
|
07-19-2012
|
5.00
|
Canopy frame shims, spacer blocks...
|
Details
|
|
|
07-18-2012
|
5.00
|
Continue canopy frame
|
Details
|
|
|
07-17-2012
|
6.00
|
Continue fitting canopy frame
|
Details
|
|
|
07-16-2012
|
6.00
|
Continue fitting canopy frame
|
Details
|
|
|
07-15-2012
|
3.00
|
Started adjustment of canopy frame/skin
|
Details
|
|
|
07-14-2012
|
3.00
|
Started work on fwd canopy frame weldment
|
Details
|
|
|
07-13-2012
|
1.00
|
More work on aft canopy latch
|
Details
|
|
|
07-06-2012
|
4.00
|
Installed aft canopy latch
|
Details
|
|
|
07-05-2012
|
3.00
|
Continue canopy work
|
Details
|
|
|
07-04-2012
|
4.00
|
Finished side latch handle
|
Details
|
|
|
07-03-2012
|
1.00
|
Made C-712
|
Details
|
|
|
07-01-2012
|
5.00
|
Finished riveting fwd sub-assy to fuse, cut slots
|
Details
|
|
|
06-30-2012
|
4.00
|
Continue riveting fwd sub-assy together
|
Details
|
|
|
06-28-2012
|
1.00
|
Started riveting together fwd sub-assy
|
Details
|
|
|
06-27-2012
|
3.50
|
Finished canopy release
|
Details
|
|
|
06-25-2012
|
1.00
|
Continued adjusting canopy release linkage
|
Details
|
|
|
06-24-2012
|
3.00
|
More work on canopy release
|
Details
|
|
|
06-23-2012
|
4.00
|
Finished C-621 & -622 and WD-620
|
Details
|
|
|
06-22-2012
|
4.00
|
Started making parts C-621 -622
|
Details
|
|
|
06-21-2012
|
4.00
|
Fitted canopy parts
|
Details
|
|
|
06-20-2012
|
4.00
|
Deburred forward skin, started canopy build
|
Details
|
|
|
06-18-2012
|
0.50
|
Riveted angles to fuselage
|
Details
|
|
|
06-17-2012
|
6.00
|
Almost finished installing air vents
|
Details
|
|
|
06-15-2012
|
2.00
|
Began install of air vents
|
Details
|
|
|
06-13-2012
|
2.00
|
Riveted angles to fuse
|
Details
|
|
|
06-11-2012
|
0.50
|
Riveted nutplates to angles
|
Details
|
|
|
06-10-2012
|
5.50
|
Drilled and clecoed top fwd skin, fit angles
|
Details
|
|
|
06-09-2012
|
1.50
|
Drilled and clecoed F-743B angle to F-643-1 channe
|
Details
|
|
|
06-08-2012
|
1.50
|
Continue forward sub-assy install
|
Details
|
|
|
06-07-2012
|
1.00
|
Riveted stub ribs to center panel
|
Details
|
|
|
06-06-2012
|
2.50
|
Assembled fwd assy on fuselage
|
Details
|
|
|
06-05-2012
|
1.50
|
Riveted L/R seal support angles, alodined large pa
|
Details
|
|
|
06-03-2012
|
4.00
|
Continued fwd sub-assy
|
Details
|
|
|
06-02-2012
|
4.00
|
Continued work on fwd sub-assy
|
Details
|
|
|
05-31-2012
|
1.00
|
Prepped parts for Fwd Fuselage Sub-Assy
|
Details
|
|
|
05-30-2012
|
5.00
|
Re-did F-703B angle, attached to instrument panel
|
Details
|
|
|
05-29-2012
|
2.00
|
More angles, found mistake
|
Details
|
|
|
05-28-2012
|
6.00
|
Began upper forward fuselage for tip-up
|
Details
|
|
|
05-27-2012
|
1.00
|
Re-did rudder links
|
Details
|
|
|
05-26-2012
|
4.00
|
Finished re-route of vent lines.
|
Details
|
|
|
05-25-2012
|
2.00
|
Started re-do of vent lines
|
Details
|
|
|
05-25-2012
|
1.50
|
Attached rudder cables to pedals
|
Details
|
|
|
05-24-2012
|
1.50
|
Permanently installed rudder pedals
|
Details
|
|
|
05-23-2012
|
1.00
|
Made, installed more interior clips
|
Details
|
|
|
05-22-2012
|
1.50
|
Installed seat panel floors
|
Details
|
|
|
05-20-2012
|
1.50
|
Added missing nutplates to left seat fuse ribs
|
Details
|
|
|
05-19-2012
|
1.00
|
Added nutplates to right sidearm brace
|
Details
|
|
|
05-18-2012
|
2.00
|
Screwed in seat panels, primed/painted braces
|
Details
|
|
|
05-16-2012
|
4.50
|
Finished flap indicator install
|
Details
|
|
|
05-15-2012
|
1.00
|
Started placement of flap indicator
|
Details
|
|
|
05-15-2012
|
0.50
|
Installed 3-conductor AMP connector to flap indica
|
Details
|
|
|
05-14-2012
|
0.50
|
Painted last panel, installed center baggage panel
|
Details
|
|
|
05-13-2012
|
5.00
|
Misc items, see description
|
Details
|
|
|
05-12-2012
|
4.00
|
Installed wear blocks for shoulder harness cables
|
Details
|
|
|
05-11-2012
|
2.00
|
Finished top rivets
|
Details
|
|
|
05-10-2012
|
1.00
|
Attempted top rivets
|
Details
|
|
|
05-06-2012
|
4.00
|
Mostly riveted the area where the canopy frame bol
|
Details
|
|
|
05-05-2012
|
2.00
|
Finished items to re-install baggage floors and F-
|
Details
|
|
|
05-05-2012
|
1.00
|
Baggage lights
|
Details
|
|
|
05-03-2012
|
1.00
|
"Fixed" fuselage dent
|
Details
|
|
|
05-02-2012
|
5.00
|
Installed steps
|
Details
|
|
|
05-01-2012
|
1.50
|
NOW finished canopy cabin frame
|
Details
|
|
|
04-30-2012
|
3.00
|
Finished canopy cabin frame
|
Details
|
|
|
04-29-2012
|
4.00
|
Bolted angles to fuse, started attaching frame
|
Details
|
|
|
04-28-2012
|
4.00
|
Riveted angles and trimmed parts for tipup
|
Details
|
|
|
04-27-2012
|
1.00
|
Match-drilled, cleaned and primed F-631C/D parts
|
|
|
|
04-26-2012
|
1.00
|
Fit angles onto cabin frame assy
|
Details
|
|
|
04-25-2012
|
5.00
|
Riveted cabin frame assy, made light holder
|
Details
|
|
|
04-24-2012
|
1.00
|
Cleaned and primed cabin frame parts
|
Details
|
|
|
04-23-2012
|
1.00
|
Counter-sunk all drilled holes on assy
|
Details
|
|
|
04-22-2012
|
2.00
|
Finished basic cabin frame assy
|
Details
|
|
|
04-20-2012
|
2.00
|
Continue with forward side of canopy cabin frame
|
Details
|
|
|
04-19-2012
|
2.00
|
Continue canopy cabin frame
|
Details
|
|
|
04-18-2012
|
1.00
|
More canopy cabin frame work
|
Details
|
|
|
04-17-2012
|
1.00
|
Continued fitting outer strap
|
Details
|
|
|
04-16-2012
|
6.00
|
Continued canopy cabin frame
|
Details
|
|
|
04-15-2012
|
3.00
|
Canopy cabin frame
|
Details
|
|
|
04-14-2012
|
2.00
|
Continue canopy cabin frame
|
Details
|
|
|
04-12-2012
|
3.00
|
Made parts F-631C and F-631D
|
Details
|
|
|
04-09-2012
|
1.00
|
Finished riveting aft skin
|
Details
|
|
|
04-08-2012
|
4.00
|
Most rivets driven for aft skin
|
Details
|
|
|
04-07-2012
|
4.00
|
Final prep before aft wing skin riveting
|
Details
|
|
|
04-06-2012
|
6.00
|
Aft wing skin and tip-up cabin frame
|
Details
|
|
|
04-04-2012
|
2.00
|
Misc cleanup, prep for aft top skin
|
Details
|
|
|
04-04-2012
|
3.00
|
Drilled out pop rivets, dimpled skin
|
Details
|
|
|
04-01-2012
|
1.50
|
Finished wing strobe wiring in fuse, part 2
|
Details
|
|
|
04-01-2012
|
0.00
|
Finished wing strobe wiring in fuse, part 1
|
|
|
|
03-31-2012
|
3.00
|
Re-did strobe cables
|
Details
|
|
|
03-30-2012
|
1.00
|
Made shielded 3-wire cable
|
Details
|
|
|
03-28-2012
|
1.00
|
Wing strobe wiring
|
Details
|
|
|
03-28-2012
|
2.00
|
Heat resistant spray paint and reinstall
|
Details
|
|
|
03-25-2012
|
1.00
|
Final coat of Contego paint
|
|
|
|
03-23-2012
|
1.00
|
Added 3rd coat of Contego paint
|
|
|
|
03-22-2012
|
1.00
|
Added 2nd coat of Contego paint
|
|
|
|
03-21-2012
|
4.00
|
Recess box, paint
|
Details
|
|
|
03-20-2012
|
1.00
|
Started riveting recess box to firewall
|
|
|
|
03-07-2012
|
3.00
|
Fit master relay and firewall recess
|
Details
|
|
|
03-04-2012
|
3.00
|
Drilled holes, riveted nutplates
|
Details
|
|
|
03-03-2012
|
4.00
|
Continue battery box work
|
Details
|
|
|
03-02-2012
|
1.00
|
Started battery box work
|
|
|
|
02-08-2012
|
3.00
|
Finished installing electric aileron trim
|
Details
|
|
|
02-06-2012
|
1.00
|
Continued electric aileron trim control
|
|
|
|
02-05-2012
|
3.00
|
Continued electric aileron trim control
|
|
|
|
02-04-2012
|
3.00
|
Continued electric aileron trim control
|
|
|
|
02-01-2012
|
4.00
|
Installed armrest braces, started aileron trim ins
|
Details
|
|
|
01-29-2012
|
3.00
|
Finished armrest braces
|
Details
|
|
|
01-28-2012
|
5.00
|
Made braces for armrests
|
Details
|
|
|
01-23-2012
|
1.50
|
OAT probe wiring
|
Details
|
|
|
01-21-2012
|
2.00
|
More final wiring changes
|
Details
|
|
|
01-15-2012
|
3.00
|
Tail lights and control stick wiring
|
Details
|
|
|
01-08-2012
|
3.00
|
Misc electrical wiring
|
Details
|
|
|
01-02-2012
|
1.00
|
Put Molex connectors back on wires
|
Details
|
|
|
12-31-2011
|
1.00
|
Made F-912D elevator stop
|
Details
|
|
|
12-17-2011
|
2.00
|
Moved Adel clamps
|
Details
|
|
|
12-14-2011
|
1.00
|
Riveted F-712E to F712, drilled holes in F712 for
|
Details
|
|
|
12-14-2011
|
1.00
|
Removed/cut Molex connectors
|
Details
|
|
|
12-11-2011
|
4.00
|
Tail light wire routing, tail tiedown
|
Details
|
|
|
12-10-2011
|
2.00
|
Finished bottom rudder tip fitting
|
Details
|
|
|
12-07-2011
|
3.00
|
Bottom rudder fiberglass tip
|
Details
|
|
|
11-26-2011
|
2.00
|
Cut holes for Delta-Pop antennas
|
Details
|
|
|
11-25-2011
|
4.00
|
Finished Garmin cable, ELT testing
|
Details
|
|
|
11-20-2011
|
4.00
|
Started attaching tail light to fiberglass
|
Details
|
|
|
11-20-2011
|
2.00
|
Started adding terminals to Garmin cable
|
Details
|
|
|
11-16-2011
|
4.00
|
Finished AOA & Pitot re-do 2/2
|
|
|
|
11-16-2011
|
4.00
|
Finished AOA & Pitot re-do 1/1
|
Details
|
|
|
11-16-2011
|
2.00
|
Added more supports for electrical wiring
|
Details
|
|
|
11-15-2011
|
1.00
|
Continue AOA & Pitot tubing re-do
|
|
|
|
11-14-2011
|
1.00
|
Started AOA & Pitot tube re-do
|
Details
|
|
|
11-13-2011
|
3.00
|
AOA & Pitot tube routing
|
Details
|
|
|
11-12-2011
|
5.00
|
ELT wiring
|
Details
|
|
|
11-11-2011
|
3.00
|
Finished top skin reinforcement for ELT antenna
|
Details
|
|
|
11-10-2011
|
4.00
|
ELT bracket and aft fuse skin
|
Details
|
|
|
11-09-2011
|
4.00
|
Support frame for ELT
|
Details
|
|
|
11-06-2011
|
4.00
|
Extended Static line to fwd fuse
|
Details
|
|
|
11-02-2011
|
4.00
|
Continued installation of static line
|
Details
|
|
|
10-30-2011
|
2.50
|
Painted seat backs
|
Details
|
|
|
10-29-2011
|
2.00
|
Installed static lines
|
Details
|
|
|
10-29-2011
|
1.00
|
Added Adel clamps
|
Details
|
|
|
10-27-2011
|
1.00
|
Routed wires
|
Details
|
|
|
10-26-2011
|
3.00
|
Wired strobe pwr supplies, tail lite,...
|
Details
|
|
|
10-26-2011
|
2.00
|
Added static ports
|
Details
|
|
|
10-23-2011
|
3.00
|
Primed seat backs
|
Details
|
|
|
10-21-2011
|
5.00
|
Strobe trays and ADAHRS tray
|
Details
|
|
|
10-14-2011
|
2.00
|
Started tray for tail strobe pwr supply
|
Details
|
|
|
10-14-2011
|
3.00
|
NOW I finished the ADAHRS tray
|
Details
|
|
|
10-13-2011
|
1.00
|
Finished ADAHRS tray
|
Details
|
|
|
10-12-2011
|
3.00
|
Continued work on ADAHRS tray
|
Details
|
|
|
10-09-2011
|
2.00
|
Started ADAHRS tray
|
Details
|
|
|
10-09-2011
|
1.00
|
Added D-Sub connector to elev servo
|
Details
|
|
|
10-08-2011
|
1.00
|
Installed shoulder harness cables
|
Details
|
|
|
10-08-2011
|
1.50
|
Installed elevator AP servo bracket
|
Details
|
|
|
10-08-2011
|
0.50
|
Crimped pins onto elevator servo wires
|
Details
|
|
|
10-07-2011
|
1.00
|
Installed right rudder cable cover
|
Details
|
|
|
10-07-2011
|
1.00
|
Cleaned garage
|
Details
|
|
|
10-07-2011
|
2.00
|
Cleaned and alodined parts
|
|
|
|
10-07-2011
|
2.00
|
Cleaned & alodined parts
|
|
|
|
10-06-2011
|
1.50
|
Installed left rudder cable fairing
|
Details
|
|
|
10-05-2011
|
2.00
|
Threaded rudder cables
|
Details
|
|
|
10-05-2011
|
1.00
|
Finished adding jam nuts
|
Details
|
|
|
10-04-2011
|
1.00
|
Continue add jam nuts...
|
Details
|
|
|
10-03-2011
|
1.00
|
What's worse....
|
Details
|
|
|
10-02-2011
|
2.00
|
Finished connecting controls
|
Details
|
|
|
10-01-2011
|
3.00
|
More control column work
|
Details
|
|
|
09-29-2011
|
1.00
|
Installed control column WD-610
|
Details
|
|
|
09-28-2011
|
5.00
|
Installed elev bellcrank, push-pull tubes
|
Details
|
|
|
09-27-2011
|
1.00
|
Drilled & riveted control rod end to elevator tube
|
|
|
|
09-25-2011
|
2.00
|
Deburred, cleaned, primed parts
|
Details
|
|
|
09-24-2011
|
2.00
|
Cleaned, primed elevator push-pull tubes
|
Details
|
|
|
09-18-2011
|
3.00
|
Painted fuselage parts
|
Details
|
|
|
09-17-2011
|
4.00
|
More prep
|
Details
|
|
|
09-16-2011
|
2.00
|
Continue prepping fuselage parts.
|
|
|
|
09-15-2011
|
1.50
|
Continue preparing more sheet metal parts
|
|
|
|
09-14-2011
|
2.00
|
Prep parts for painting
|
Details
|
|
|
09-11-2011
|
2.00
|
Added flap wiring
|
Details
|
|
|
09-05-2011
|
4.00
|
Electrical routing
|
Details
|
|
|
09-04-2011
|
2.50
|
Finish wiring placement for fuel pump
|
Details
|
|
|
09-04-2011
|
2.50
|
Finish flap bar install
|
Details
|
|
|
09-03-2011
|
2.00
|
Torque center section/landing gear bolts, touchup
|
|
|
|
09-01-2011
|
2.00
|
Torque fuel/brake fittings, Re-did fuel line clamp
|
Details
|
|
|
08-31-2011
|
2.00
|
Wired fuel pump
|
Details
|
|
|
08-31-2011
|
3.00
|
Finalize fuel pump install
|
Details
|
|
|
08-28-2011
|
1.00
|
Plumbing inspection
|
Details
|
|
|
08-14-2011
|
5.00
|
Finished plumbing and covers
|
Details
|
|
|
06-26-2011
|
4.00
|
Continue electric fuel pump cover
|
Details
|
|
|
06-25-2011
|
15.00
|
Fuel lines
|
Details
|
|
|
05-10-2011
|
2.00
|
Boost fuel pump work
|
Details
|
|
|
05-08-2011
|
3.00
|
Boost pump work
|
Details
|
|
|
05-07-2011
|
2.50
|
Elect. boost pump plumbing
|
Details
|
|
|
05-04-2011
|
2.50
|
Finished bolting landing gear weldments
|
Details
|
|
|
05-02-2011
|
0.50
|
Installed some bolts on right landing gear weldmen
|
|
|
|
05-01-2011
|
3.50
|
Finished torqueing plumbing fittings; bolted left
|
Details
|
|
|
04-29-2011
|
1.00
|
Continue tightening plumbing fittings
|
|
|
|
04-25-2011
|
1.00
|
Torqued fittings
|
Details
|
|
|
04-24-2011
|
15.00
|
Finished lines on spar
|
Details
|
|
|
03-14-2011
|
1.50
|
More brake line progress
|
Details
|
|
|
03-13-2011
|
5.00
|
Fuel/brake line progress
|
Details
|
|
|
03-09-2011
|
3.00
|
Modest progress on fuel lines
|
Details
|
|
|
03-06-2011
|
3.00
|
Fuel pump work
|
Details
|
|
|
03-05-2011
|
3.00
|
Continue fuel lines
|
Details
|
|
|
02-27-2011
|
4.00
|
Started fuel lines
|
Details
|
|
|
02-26-2011
|
5.00
|
Finished vent lines
|
Details
|
|
|
02-23-2011
|
3.50
|
Started fuel vent lines
|
Details
|
|
|
02-22-2011
|
2.00
|
Finish left brake line firewall to spar
|
Details
|
|
|
02-21-2011
|
4.00
|
Brake lines firewall to spar
|
Details
|
|
|
02-20-2011
|
3.00
|
Redid brake lines along spar
|
Details
|
|
|
02-12-2011
|
2.00
|
2nd enamel paint coat
|
Details
|
|
|
02-09-2011
|
2.00
|
Painted fuse interior
|
Details
|
|
|
02-06-2011
|
4.50
|
More painting and prep
|
Details
|
|
|
02-05-2011
|
5.00
|
Wash and prime
|
Details
|
|
|
02-04-2011
|
1.00
|
Started adding a bracket
|
Details
|
|
|
01-30-2011
|
5.00
|
Started fuel pump install, substituted bulkhead co
|
Details
|
|
|
01-29-2011
|
5.00
|
Had to remake one of the brake lines...
|
Details
|
|
|
01-27-2011
|
1.00
|
Finished bending brake lines from firewall to cent
|
Details
|
|
|
01-26-2011
|
2.00
|
One step backward...
|
Details
|
|
|
01-25-2011
|
1.00
|
Finished cutting and bending brake lines
|
Details
|
|
|
01-24-2011
|
1.00
|
Finished left side brake line
|
Details
|
|
|
01-23-2011
|
4.00
|
Started bending brake line
|
Details
|
|
|
01-21-2011
|
3.00
|
Finished brake fluid reservoir, installed Bonaco b
|
Details
|
|
|
01-18-2011
|
2.00
|
Measured and drilled for brake fluid reservoir
|
Details
|
|
|
01-17-2011
|
2.00
|
Finished landing gear support install
|
Details
|
|
|
01-15-2011
|
2.50
|
Continue installing landing gear supports
|
Details
|
|
|
01-12-2011
|
2.50
|
Continue fitting landing gear supports
|
Details
|
|
|
01-09-2011
|
5.00
|
Continue landing gear support install
|
Details
|
|
|
01-08-2011
|
2.00
|
Continue landing gear support install
|
Details
|
|
|
01-02-2011
|
4.00
|
Landing gear support
|
Details
|
|
|
12-22-2010
|
20.00
|
Finished Center Section
|
Details
|
|
|
12-01-2010
|
20.00
|
Finished floorboard install
|
Details
|
|
|
09-01-2010
|
8.00
|
Continue adding nutplates to fuselage flooring
|
|
|
|
08-29-2010
|
15.00
|
many tasks in one entry
|
Details
|
|
|
07-30-2010
|
4.00
|
Fitting brake pedals into rudder pedals
|
Details
|
|
|
07-25-2010
|
3.00
|
Continued installation of rudder pedal bracket
|
Details
|
|
|
07-24-2010
|
2.00
|
Fit rudder pedal bracket, drilled holes to fuselag
|
|
|
|
07-22-2010
|
1.00
|
Started rudder pedal assy into fuselage.
|
Details
|
|
|
07-18-2010
|
4.00
|
Paint brake pedals
|
Details
|
|
|
07-13-2010
|
2.00
|
Rivet brake pedal assys
|
Details
|
|
|
07-12-2010
|
1.00
|
Countersunk brake plates
|
Details
|
|
|
07-11-2010
|
4.00
|
Finish fitting brake pedals, reprimed
|
Details
|
|
|
07-10-2010
|
4.00
|
Drilled and fitted support angles to brake pedals
|
|
|
|
07-09-2010
|
1.00
|
Cut and deburred brake pedal angles (brackets)
|
|
|
|
07-08-2010
|
1.00
|
Primed brake pedals and brackets with zinc chroma
|
|
|
|
07-07-2010
|
4.00
|
Began flap parts, brake parts
|
Details
|
|
|
06-26-2010
|
2.00
|
Finish steps
|
Details
|
|
|
06-25-2010
|
3.00
|
Steps again
|
Details
|
|
|
06-24-2010
|
2.00
|
Continue right step installation
|
Details
|
|
|
06-23-2010
|
6.00
|
Right step
|
Details
|
|
|
06-21-2010
|
2.00
|
Heat treated, cleaned and primed left step
|
Details
|
|
|
06-20-2010
|
8.00
|
Left step
|
Details
|
|
|
06-19-2010
|
6.00
|
Began left step installation
|
|
|
|
06-16-2010
|
8.00
|
Reorganized garage corner
|
Details
|
|
|
06-14-2010
|
6.00
|
Finished seat back assys
|
Details
|
|
|
06-13-2010
|
5.00
|
Seat back brace slot on fuse bulkhead
|
Details
|
|
|
06-11-2010
|
4.00
|
Finished riveting seat backs
|
Details
|
|
|
06-10-2010
|
1.00
|
Zinc-chromated right seat back
|
Details
|
|
|
06-09-2010
|
4.00
|
Seat back priming and riveting
|
Details
|
|
|
06-07-2010
|
1.50
|
Finished inventory of finishing kit HW
|
|
|
|
06-06-2010
|
3.00
|
Inventory finishing kit
|
Details
|
|
|
05-30-2010
|
6.00
|
Left seatback assy
|
Details
|
|
|
05-29-2010
|
4.00
|
Seatback assy
|
Details
|
|
|
05-28-2010
|
3.00
|
continue seat backs
|
Details
|
|
|
05-22-2010
|
5.00
|
Continue seat backs
|
Details
|
|
|
05-21-2010
|
4.00
|
Continue seat back
|
Details
|
|
|
05-20-2010
|
1.50
|
Seat back braces
|
Details
|
|
|
05-12-2010
|
4.00
|
Wing tip stiffener, fuel tank access covers
|
Details
|
|
|
05-09-2010
|
6.00
|
Remade fuselage cradle
|
Details
|
|
|
05-08-2010
|
4.00
|
Moved wings and fuse.
|
Details
|
|
|
05-07-2010
|
2.00
|
Proseal fuel tank access covers
|
Details
|
|
|
05-05-2010
|
2.00
|
Fuel tank access cover plates
|
Details
|
|
|
04-30-2010
|
3.00
|
Cut holes in wing stand
|
Details
|
|
|
04-25-2010
|
4.00
|
Install pitot tube support
|
Details
|
|
|
02-15-2010
|
1.00
|
Fuel float senders
|
Details
|
|
|
01-18-2010
|
2.00
|
Installed Bob Archer VOR antenna
|
Details
|
|
|
01-16-2010
|
4.00
|
More work on right wing tip.
|
Details
|
|
|
01-13-2010
|
1.00
|
Finished dimpling left bottom wing panel
|
Details
|
|
|
01-13-2010
|
2.50
|
Drilled, deburred, dimpled right bottom wing panel
|
Details
|
|
|
01-13-2010
|
0.50
|
Added remaining nutplates, ground rivet heads
|
Details
|
|
|
01-12-2010
|
1.00
|
Started dimpling bottom wing panel
|
Details
|
|
|
01-11-2010
|
0.80
|
Finished deburring one bottom wing panel
|
Details
|
|
|
01-10-2010
|
3.00
|
Cleaned garage, moved wing, started deburring
|
Details
|
|
|
01-08-2010
|
3.00
|
Wired right landing light
|
Details
|
|
|
01-07-2010
|
1.50
|
Added ground block to right wing
|
Details
|
|
|
01-06-2010
|
1.50
|
Riveted nutplates to lamp bracket
|
Details
|
|
|
01-04-2010
|
1.00
|
Dimpled skin, attached rivet strip plate
|
Details
|
|
|
01-03-2010
|
2.00
|
Primed some parts, riveted
|
Details
|
|
|
01-02-2010
|
3.50
|
More work on landing light
|
Details
|
|
|
01-01-2010
|
4.00
|
More work on Duckworks landing light
|
Details
|
|
|
12-31-2009
|
1.00
|
moved wing, prepared for duckworks cut
|
Details
|
|
|
12-29-2009
|
1.00
|
Cut openings in wing tip for LED heatsinks
|
Details
|
|
|
12-27-2009
|
0.50
|
Epoxied remaining nav LEDs to other plexi
|
Details
|
|
|
12-26-2009
|
2.00
|
Drilled mirrored plexi, started epoxy attachment
|
Details
|
|
|
12-24-2009
|
2.00
|
Fit mirror plexi and lens cover right wing tip
|
Details
|
|
|
12-20-2009
|
3.00
|
LED Nav light assy for right wing
|
Details
|
|
|
12-09-2009
|
3.00
|
APRS antenna, more epoxy
|
Details
|
|
|
12-05-2009
|
1.00
|
Epoxied LED nav light assy
|
Details
|
|
|
12-02-2009
|
1.00
|
Epoxied one of the LED nav light assemblies
|
|
|
|
11-15-2009
|
4.00
|
More wingtip/nav light work.
|
Details
|
|
|
11-04-2009
|
2.00
|
Nav lights
|
Details
|
|
|
09-29-2009
|
1.50
|
Finished attaching wingtip.
|
Details
|
|
|
09-28-2009
|
1.50
|
Continued riveting nutplates
|
Details
|
|
|
09-19-2009
|
2.00
|
Finished countersinking wing tip holes....
|
Details
|
|
|
09-18-2009
|
4.00
|
Finished left wing tip, returned to right wing tip
|
Details
|
|
|
09-16-2009
|
4.00
|
Began squeezing rivets to attach nutplates.
|
Details
|
|
|
09-15-2009
|
1.00
|
Countersink wing tip for rivets
|
Details
|
|
|
09-14-2009
|
1.00
|
2/2 Drilling for nutplates
|
|
|
|
09-14-2009
|
1.00
|
1/2 Drilling for nut plates
|
Details
|
|
|
09-13-2009
|
6.00
|
Continued with aluminum backing strips
|
Details
|
|
|
09-12-2009
|
5.00
|
Work on wing tips
|
Details
|
|
|
09-07-2009
|
5.00
|
Fixed mistake with wing tip rib
|
Details
|
|
|
09-06-2009
|
4.00
|
@!#%!& wing tip rib W-916
|
Details
|
|
|
09-05-2009
|
5.00
|
Epoxied other wing tip, riveted wing tip rib.
|
Details
|
|
|
09-01-2009
|
1.00
|
Finished epoxying one wing tip.
|
Details
|
|
|
08-30-2009
|
4.00
|
Started epoxying back together the wing tip ends.
|
Details
|
|
|
08-26-2009
|
5.00
|
Cut ends of wing tips; continued fitting
|
|
|
|
08-25-2009
|
1.50
|
Finished fitting/drilling holes for left wing tip
|
|
|
|
08-23-2009
|
3.00
|
Clecoed and drilled left wing bottom skin
|
|
|
|
08-22-2009
|
4.00
|
Clecoed and drilled right wing bottom skin
|
|
|
|
08-21-2009
|
3.00
|
Continue fitting wing tip ribs
|
|
|
|
08-19-2009
|
3.00
|
Continued with W-916 and W-938 wing tip ribs
|
|
|
|
08-17-2009
|
2.00
|
Fitted/drilled right wing tip rib W-916.
|
|
|
|
08-16-2009
|
4.00
|
Continued wing tip rib.
|
Details
|
|
|
08-15-2009
|
4.00
|
Started wing tip rib; cleaned garage, moved wings
|
Details
|
|
|
08-14-2009
|
4.00
|
Finish fitting right wing tip
|
Details
|
|
|
08-12-2009
|
4.00
|
Begin fitting of right wing fiberglass tip
|
Details
|
|
|
08-09-2009
|
4.00
|
Fit fiberglass wing tip
|
Details
|
|
|
08-02-2009
|
2.00
|
Fixed ground connectors.
|
Details
|
|
|
07-29-2009
|
2.00
|
Continued pitot tube support bracket
|
Details
|
|
|
07-26-2009
|
3.00
|
Continued pitot tube support bracket
|
Details
|
|
|
07-24-2009
|
2.00
|
Pitot tube support bracket
|
Details
|
|
|
07-08-2009
|
3.00
|
Riveted right wing aileron gap fairing
|
|
|
|
07-04-2009
|
2.00
|
Aileron bracket rivets and pitot tube mast.
|
Details
|
|
|
07-03-2009
|
2.00
|
Worked on pitot tube
|
Details
|
|
|
06-28-2009
|
3.00
|
Drilled out bad rivets and re-riveted.
|
Details
|
|
|
06-27-2009
|
2.00
|
Fitted roll servo mounting kit to aileron bracket
|
Details
|
|
|
06-25-2009
|
1.00
|
Roll autopilot bracket; removed old bracket
|
|
|
|
06-21-2009
|
4.00
|
Drill out more bad rivets, redo. Prep wing tip rib
|
Details
|
|
|
06-20-2009
|
1.00
|
Cleaned and primed aileron gap fairings.
|
|
|
|
06-17-2009
|
5.00
|
Aileron gap fairing, drilled out bad rivets.
|
Details
|
|
|
06-14-2009
|
4.00
|
Right wing flap gap, fixes
|
Details
|
|
|
06-12-2009
|
2.00
|
Right wing flap gap: dimpled, removed ailerons
|
|
|
|
06-10-2009
|
4.00
|
More gap work
|
Details
|
|
|
06-07-2009
|
4.00
|
Riveted left flap gap fairing to wing.
|
|
|
|
06-06-2009
|
2.00
|
scotch brited, cleaned, and primed left wing flap
|
|
|
|
06-05-2009
|
1.00
|
Finished dimpling left wing and flap gap fairing
|
|
|
|
06-03-2009
|
1.00
|
Deburred, started dimpling left flap gap fairing
|
|
|
|
05-30-2009
|
4.00
|
Started flap gap fairing
|
|
|
|
05-14-2009
|
2.00
|
Replaced two ground wire pop rivets with driven.
|
Details
|
|
|
05-13-2009
|
6.00
|
Install Dynon pitot tube heater controller
|
Details
|
|
|
04-22-2009
|
1.00
|
Cut out holes for left wing strobe light in mirror
|
|
|
|
04-18-2009
|
4.00
|
Finished left wing landing light, screwed in lens
|
|
|
|
04-16-2009
|
1.00
|
Ran wires thru conduit for nav, landing lights
|
|
|
|
04-12-2009
|
4.00
|
Ground block, power supplies in left wing tip
|
Details
|
|
|
04-08-2009
|
6.00
|
Finishing up left Duckworks Landing Light
|
|
|
|
04-05-2009
|
4.00
|
Drilled lens holes, ctrsnk, dimpled holes in LE
|
|
|
|
03-30-2009
|
1.00
|
Smoothed edges of landing light cover
|
|
|
|
03-29-2009
|
6.00
|
Continue Duckworks LL: ctrsnk and riveted nutplate
|
|
|
|
03-28-2009
|
2.00
|
Duckworks LL-finished riveting nutplates to ribs
|
|
|
|
03-27-2009
|
2.00
|
Duckworks LL
|
|
|
|
03-26-2009
|
2.00
|
Duckworks LL
|
|
|
|
03-25-2009
|
6.00
|
Duckworks landing light
|
|
|
|
03-21-2009
|
2.00
|
Sac RVators meeting...
|
Details
|
|
|
03-20-2009
|
6.00
|
Nav lights continued
|
|
|
|
03-19-2009
|
6.00
|
Nav lights continued
|
|
|
|
03-18-2009
|
6.00
|
Nav lights
|
Details
|
|
|
03-07-2009
|
6.00
|
More nav light work
|
Details
|
|
|
03-06-2009
|
6.00
|
Cut, sand left wing tip lens, mirror plexi
|
Details
|
|
|
03-04-2009
|
4.00
|
Finished cabling for strobes
|
|
|
|
03-01-2009
|
4.00
|
Navigation lights
|
Details
|
|
|
02-20-2009
|
2.00
|
Finished conduit in right wing
|
Details
|
|
|
02-16-2009
|
4.00
|
Work on right wing aileron pushrod, conduit
|
Details
|
|
|
02-14-2009
|
2.00
|
Adjusted aileron
|
Details
|
|
|
02-08-2009
|
3.00
|
Continued aileron brackets
|
Details
|
|
|
02-06-2009
|
2.00
|
Work on aileron attach brackets
|
Details
|
|
|
02-01-2009
|
1.00
|
Finished one of the brackets
|
Details
|
|
|
01-31-2009
|
4.00
|
Aileron attach brackets
|
Details
|
|
|
01-24-2009
|
2.00
|
Conduit, aileron hinge brackets
|
Details
|
|
|
12-13-2008
|
4.00
|
Finished conduit hangars
|
Details
|
|
|
12-10-2008
|
2.00
|
Began conduit install
|
Details
|
|
|
11-30-2008
|
2.00
|
Conduit;cut hole in rib
|
Details
|
|
|
11-23-2008
|
2.00
|
Adjusted aileron
|
Details
|
|
|
11-14-2008
|
4.00
|
Riveted aileron attach brackets to wing
|
Details
|
|
|
10-13-2008
|
6.00
|
Riveted together pieces for aileron attach bracket
|
Details
|
|
|
10-09-2008
|
2.00
|
Attached left aileron attach brackets
|
Details
|
|
|
10-08-2008
|
6.00
|
Finished parts for W-913 and W-914 attach brackets
|
Details
|
|
|
10-06-2008
|
1.50
|
Cleaned ailerons, flaps
|
|
|
|
10-05-2008
|
3.00
|
Finished right aileron bellcrank assy
|
|
|
|
10-04-2008
|
6.00
|
Finished left wing aileron bellcrank assy
|
Details
|
|
|
10-02-2008
|
1.00
|
Found bellcrank parts, reamed brass bushings
|
Details
|
|
|
10-01-2008
|
2.00
|
Redid two rivets, taped pushrods
|
Details
|
|
|
09-28-2008
|
2.00
|
Prepped and Riveted bellcrank to aileron pushrods
|
Details
|
|
|
09-27-2008
|
2.00
|
Moved QB fuse to hangar
|
Details
|
|
|
09-24-2008
|
3.00
|
Started aileron bellcrank to aileron pushrod
|
Details
|
|
|
09-21-2008
|
6.00
|
Finished aileron stick-to-bellcrank pushrods
|
Details
|
|
|
09-14-2008
|
4.00
|
Cut and finished aileron-stick pushrods
|
Details
|
|
|
09-10-2008
|
4.00
|
Wing on table, primed aileron pushrods
|
Details
|
|
|
09-07-2008
|
2.00
|
Continue fussing with squeezer
|
Details
|
|
|
09-06-2008
|
4.00
|
Rebuilt pneumatic squeezer AGAIN
|
Details
|
|
|
09-03-2008
|
1.00
|
Finished cleaning wings and fuse
|
|
|
|
09-01-2008
|
2.00
|
Finished storing emps and started cleaning wings.
|
Details
|
|
|
08-31-2008
|
4.00
|
Moved firehose attachments
|
Details
|
|
|
08-30-2008
|
4.00
|
Drilled elevator horns to attach elevs to HS
|
Details
|
|
|
08-26-2008
|
0.20
|
Finished riveting ctr wt nut plate
|
Details
|
|
|
08-25-2008
|
1.50
|
Tried to rivet nutplate for left elevator ctr wt
|
Details
|
|
|
08-24-2008
|
6.00
|
Trim and attach counter weights for left elevator.
|
Details
|
|
|
08-21-2008
|
1.00
|
Inventoried back-ordered Vans parts bag
|
Details
|
|
|
08-20-2008
|
1.00
|
Mounted power strip
|
Details
|
|
|
08-20-2008
|
1.00
|
Installed nutplate
|
Details
|
|
|
08-17-2008
|
4.00
|
Install elevator rod ends, rt elev counterweight
|
Details
|
|
|
08-16-2008
|
1.00
|
Finish elev trim tab link, hinge pin bend
|
Details
|
|
|
08-13-2008
|
1.00
|
Garage cleanup, 20deg bend in elev trim tab rod
|
Details
|
|
|
08-02-2008
|
3.00
|
Added cap for noise reduction
|
Details
|
|
|
07-27-2008
|
4.00
|
Electrical work on elevator servo trim
|
Details
|
|
|
07-23-2008
|
6.00
|
Nearly finished electric elevator trim
|
Details
|
|
|
07-19-2008
|
0.50
|
Riveted middle elevator hinge assy
|
Details
|
|
|
07-19-2008
|
4.00
|
Finished restoring pneumatic squeezer
|
Details
|
|
|
07-17-2008
|
2.00
|
Continue cleaning squeezer
|
|
|
|
07-16-2008
|
6.00
|
Cleaning and fixing the pneumatic squeezer
|
Details
|
|
|
07-13-2008
|
6.00
|
Adj. dustbox height, built fuse stand
|
Details
|
|
|
07-12-2008
|
2.00
|
Trim VS fiberglass tip, joined rudder to VS
|
|
|
|
07-11-2008
|
1.00
|
Put in Vert Stab end rod bearings, set length
|
|
|
|
07-06-2008
|
2.00
|
Finish sorting and organizing HW parts
|
Details
|
|
|
07-05-2008
|
8.00
|
Continue sorting
|
|
|
|
07-04-2008
|
6.00
|
Finish Inventory, Continue Sorting
|
Details
|
|
|
06-28-2008
|
3.00
|
Continue inventory QB kits
|
|
|
|
06-27-2008
|
1.50
|
Continue inventory of QB kits
|
|
|
|
06-26-2008
|
1.50
|
Started inventory of QB Fuse and Wings
|
|
|
|
06-24-2008
|
2.00
|
Mount dust collector box on pedestal
|
Details
|
|
|
06-22-2008
|
6.00
|
Finish air filter box
|
Details
|
|
|
06-21-2008
|
4.00
|
Continue air filter box
|
|
|
|
06-17-2008
|
2.00
|
Continue air filter box: filter bracket
|
Details
|
|
|
06-15-2008
|
8.00
|
Build air filter box
|
Details
|
|
|
06-12-2008
|
6.00
|
QB fuse + wings arrive
|
Details
|
|
|
06-01-2008
|
2.00
|
Trim rudder fiberglass tip further.
|
Details
|
|
|
06-01-2008
|
2.00
|
More garage organizing
|
Details
|
|
|
05-26-2008
|
2.00
|
Clean & Polish collection of used tools
|
Details
|
|
|
05-23-2008
|
1.00
|
Started fiberglass rudder tailcone
|
Details
|
|
|
05-14-2008
|
1.50
|
Fitted tips on HS
|
Details
|
|
|
05-11-2008
|
4.00
|
Elevator fiberglass tips
|
Details
|
|
|
05-07-2008
|
0.50
|
Drill & cleco rudder fiberglass
|
Details
|
|
|
05-04-2008
|
4.00
|
Fiberglass tips--fitting
|
Details
|
|
|
03-01-2008
|
30.00
|
Garage setup
|
Details
|
|
|
02-01-2008
|
30.00
|
Set up compressor, air hoses
|
Details
|
|
|
01-11-2008
|
10.00
|
Finish emps
|
|
|
|
01-10-2008
|
9.00
|
Continue emps
|
|
|
|
01-09-2008
|
8.00
|
Continue emps
|
|
|
|
01-08-2008
|
9.00
|
Continue emps
|
|
|
|
01-08-2008
|
9.00
|
Continue emps
|
|
|
|
01-07-2008
|
8.00
|
Begin empennage work
|
|
|