Ralph Finch RV-9A Build
Work Logs Found: 741
Category Work Time: 2078 Hours
 Date
Hours
Work Log Summary

Details

 12-07-2014
0.50
SCAT hose from baffle to muffler
Details
     

 12-07-2014
1.00
Left brake line
Details
       

 11-28-2014
2.00
Crankcase breather and fuel pump overflow lines
Details
       

 11-27-2014
1.00
Switched ends of oil cooler line
Details

 11-26-2014
1.00
Secured FWF temp probe
Details
       

 11-16-2014
3.00
Wired oil sump heater
Details
       

 10-26-2014
4.00
Firesleeve on remaining tubing
Details

 10-26-2014
8.00
Another makeup entry
Details

 10-15-2014
1.00
Tried canopy on fuse to measure aft targa strip
Details

 10-15-2014
1.50
Standoffs for spark plug wires
Details

 10-15-2014
1.00
Rivet remaining aft canopy sheet
Details

 10-15-2014
3.00
Crimped and soldered terminal lugs on all large ca
Details

 10-08-2014
3.50
Spark plug wires
Details

 10-01-2014
1.00
Tightened and marked AN fittings for brakes lines
Details

 10-01-2014
1.50
Reversed rudder cables
Details

 10-01-2014
3.00
Dynon boxes
Details

 09-28-2014
7.00
Mounts for ADSB and EMS modules
Details

 09-27-2014
1.00
Wired MAP sensor
Details

 09-25-2014
1.00
Attached transponder
Details

 09-24-2014
1.00
Drilled/dimpled center holes for access hatch
Details

 09-24-2014
3.00
Began placing instruments
Details
       

 09-23-2014
1.50
Wired more sensors
Details

 09-21-2014
3.00
Finish forward access plate
Details

 09-15-2014
3.00
Manifold Pressure Sensor
Details
       

 09-10-2014
4.00
Made access hatch in upper forward skin
Details
     

 09-10-2014
1.00
Continued access hatch work.
Details

 09-07-2014
1.00
Unsoldered/resoldered an ignition wire
Details
     

 09-03-2014
4.00
Secured more lines
Details

 09-03-2014
1.00
Placed Al adhesive sheet inside lower cowl
Details
     

 09-01-2014
2.00
Secured wires
Details
       

 08-31-2014
2.00
Secured lines with Adel clamps
Details

 08-30-2014
2.00
Torqued steel hose fittings
Details
     

 08-29-2014
3.50
Baffle supports, seal holes
Details

 08-24-2014
2.00
Baffle support
Details
     

 08-23-2014
3.50
Blast tubes for alternators
Details
       

 08-22-2014
2.00
Outboard tension rods, other
Details

 08-21-2014
1.00
Finished inner tension rods
Details

 08-20-2014
4.00
Various
Details

 08-18-2014
1.50
Various
Details
       

 08-17-2014
1.00
Sanded outside of air intake
Details

 08-17-2014
1.00
Finish sand canopy LE
Details

 08-17-2014
1.00
Added jam nuts to FW side of control pass-thrus
Details

 08-14-2014
0.50
Attached cabin heat flange to rear baffle
Details
     

 08-13-2014
1.50
Replaced patch
Details

 08-13-2014
2.50
Miscellaneous
Details

 08-13-2014
2.00
Fit and measure trial fuel lines
Details

 08-10-2014
1.00
Final finish sand for canopy
Details

 08-10-2014
0.50
Added exhaust shields
Details

 08-09-2014
1.50
Finished mixture cable
Details
     

 08-09-2014
2.00
Finished left hangers for exhaust
Details
     

 08-08-2014
1.50
Mixture cable install
Details

 08-06-2014
5.00
Exhaust system install
Details
       

 08-02-2014
2.00
Oil cooler, coils
Details
       

 07-30-2014
4.00
Various engine sensors
Details

 07-27-2014
1.00
Sanded forward edge again
Details

 07-27-2014
1.50
Finish heater cable, baffle adj.
Details

 07-26-2014
0.50
Replace too-short bolts, screws
Details

 07-26-2014
1.00
Heat box cable
Details

 07-23-2014
3.00
Throttle and other controls.
Details

 07-23-2014
1.00
Dimpled targa strip
Details

 07-20-2014
4.00
Finished targa strip except for dimpling
Details
       

 07-19-2014
1.00
Throttle rod-end bolt, cabin heat control
Details

 07-16-2014
2.00
Mixture and Throttle controls
Details

 07-16-2014
1.00
Finished riveting fuse side skin
Details

 07-16-2014
1.00
Continued sanding canopy leading edge
Details

 07-13-2014
2.00
Made targa strip
Details

 07-11-2014
0.50
Started fine sanding canopy
Details

 07-11-2014
0.50
Clearance for airbox plate/NG
Details

 07-09-2014
4.00
Engine controls
Details
     

 07-09-2014
2.00
Canopy release mechanism
Details
     

 07-07-2014
0.50
Finished aft control bracket
Details

 07-06-2014
1.50
Sand filler coat, reapply new filler
Details

 07-06-2014
3.50
Control Brackets
Details

 07-04-2014
3.50
Finish adjusting latches, add latch guides
Details
     

 07-03-2014
2.50
Began re-adjusting canopy lock
Details

 07-02-2014
3.00
Sand & Fill leading edge
Details
     

 06-29-2014
2.00
Apply 4 layers of tape to leading edge
Details
       

 06-27-2014
1.50
Rough sand and shape leading edge fiberglass
Details

 06-25-2014
3.00
Began fiberglass leading canopy edge
Details
     

 06-22-2014
1.00
Screwed in canopy
Details

 06-21-2014
1.00
Sand/smooth lower cowl bulge
Details

 06-18-2014
4.00
Riveted canopy skirts
Details

 06-17-2014
1.00
Lower cowl bulge
Details

 06-15-2014
1.00
Lower cowl bulge work
Details

 06-04-2014
4.00
Fiberglassed lower cowl bulge
Details

 05-20-2014
4.00
Finished baffling
Details

 05-17-2014
1.50
Fuel lines and baffling
Details

 05-14-2014
4.00
Continue baffling
Details

 05-11-2014
1.50
Right aft baffling
Details
     

 05-10-2014
1.50
Left aft baffling
Details
     

 05-09-2014
1.00
Finished left side baffling
Details
     

 05-08-2014
1.00
Left Baffling
Details

 05-07-2014
4.00
Baffling
Details
     

 05-04-2014
6.25
Airbox, Oil cooler brace
Details

 04-27-2014
3.50
Baffles, oil cooler
Details

 04-27-2014
2.50
Air inlet
Details

 04-26-2014
0.25
Torque airbox plate bolts
Details

 04-26-2014
1.50
Continue work on air inlet
Details

 04-24-2014
1.00
Forward baffles
Details

 04-24-2014
2.50
Airbox inlet
Details

 04-23-2014
2.00
Glassed Air inlet
Details
     

 04-23-2014
2.00
Airbox work
Details
       

 04-20-2014
1.00
Removed foam in engine air inlet
Details
     

 04-19-2014
2.00
Finished elephant ears
Details
       

 04-18-2014
1.00
Elephant ears again
Details

 04-16-2014
1.50
Front baffles
Details

 04-16-2014
2.50
Air box
Details

 04-12-2014
1.00
Fix Front baffles
Details

 04-11-2014
1.00
Rivet front baffles
Details

 04-11-2014
2.00
Air box
Details

 04-09-2014
3.00
Air box
Details
       

 04-08-2014
3.00
Finished elephant ears
Details
     

 04-06-2014
2.00
Elephant ears
Details
       

 04-06-2014
1.50
Baffle dimpling and riveting
Details
       

 04-05-2014
1.50
Elephant ears
Details
       

 04-05-2014
2.00
Baffle work
Details
       

 04-02-2014
2.00
Trim and fit of cowl
Details

 04-02-2014
2.00
Baffles
Details

 03-30-2014
1.00
Triangle baffle
Details

 03-30-2014
1.00
Continue aft extension
Details

 03-28-2014
0.50
Continue aft cowl extension
Details

 03-26-2014
1.50
Extend aft cowl
Details

 03-26-2014
2.50
Baffles
Details

 03-23-2014
3.00
Completed oil door
Details
     

 03-19-2014
3.50
Fit and epoxied upper forward inlets, fit oil door
Details

 03-16-2014
2.00
More baffle work
Details
     

 03-09-2014
1.00
Baffle work
Details

 03-08-2014
2.50
Baffle work
Details

 03-05-2014
3.00
Baffling work
Details

 12-25-2013
4.00
Baffles
Details

 11-30-2013
3.00
Oil cooler
Details

 11-26-2013
2.00
Removed and replaced heater control box
Details

 08-09-2013
1.50
Started making forward cover plate
Details

 08-08-2013
1.00
Bolted outlet brace
Details

 07-30-2013
1.00
Assembled air outlet brace
Details

 07-28-2013
6.50
Made air outlet brace
Details
     

 07-21-2013
3.00
Installed from nutplates
Details
       

 07-20-2013
2.00
Cowl re-fitting
Details

 07-17-2013
2.00
Cowl work
Details

 07-16-2013
1.00
Epoxied lower cowl
Details

 07-15-2013
1.00
Finished sanding lower cowl
Details

 07-13-2013
3.00
More sanding, lower cowl
Details

 07-12-2013
4.00
Upper and lower cowl, more epoxy
Details

 07-10-2013
2.00
Upper cowl work
Details
     

 07-09-2013
1.50
Sand, reinforce lower cowl
Details

 07-07-2013
2.00
Sand lower cowl
Details

 07-04-2013
2.00
Sand lower cowl
Details

 06-29-2013
2.00
Upper cowl
Details

 06-27-2013
1.50
Sand upper cowl
Details

 06-26-2013
2.50
Upper cowl outside surface
Details
       

 06-25-2013
1.00
Sealed inside of lower cowl
Details

 06-25-2013
1.00
Riveted hinge strips on upper cowl
Details

 06-24-2013
1.50
Riveted hinges
Details

 06-23-2013
3.50
Sand and alodine
Details

 06-23-2013
1.50
Epoxied hinge strips
Details
     

 06-22-2013
3.00
Sealed lower cowl, sanded upper
Details
     

 06-22-2013
3.00
Sanded upper cowl, lower cowl
Details

 06-22-2013
2.00
2nd epoxy seal, scuff/drill hinges
Details

 06-19-2013
3.00
Upper/lower cowl epoxy seal
Details

 06-19-2013
3.00
Upper cowl epoxy seal
Details
     

 06-18-2013
1.50
Trimmed gap between halves
Details

 06-16-2013
3.00
Finished upper cowl Skybolt fasteners
Details
       

 06-15-2013
2.00
Started upper cowl Skybolt fasteners
Details

 06-14-2013
1.00
Finished all Skybolt fasteners on lower cowl
Details
     

 06-13-2013
3.00
Finished installing Skybolts on lower sides
Details
       

 06-11-2013
1.00
Finished lower cowl drilling for Skybolt
Details

 06-10-2013
1.00
More Skybolt work
Details
       

 06-09-2013
3.00
Right side hinge, Skybolt fasteners
Details
       

 06-08-2013
2.00
Started right hinge
Details

 06-06-2013
1.00
Drilled holes for lower left hinge strip
Details
       

 06-05-2013
4.00
Tentative location of left horiz hinge
Details
       

 06-04-2013
1.00
Top and bottom fit
Details

 06-03-2013
1.00
More fitting
Details
       

 06-02-2013
2.50
Top/bottom cowl trimming
Details
       

 06-01-2013
1.50
More cowl fitting
Details

 05-31-2013
1.50
Right air ramp baffle trimming
Details

 05-30-2013
1.00
Top-Center baffle trimming
Details

 05-29-2013
1.50
Top-Center baffle trimming
Details

 05-28-2013
2.00
Baffle fitting
Details

 05-25-2013
1.50
More cowl fitting
Details

 05-25-2013
1.50
Baffle fitting
Details

 05-24-2013
1.00
More cowl fitting
Details

 05-23-2013
2.00
Back to fitting cowl.
Details

 05-18-2013
4.00
Baffle work
Details
       

 05-12-2013
1.50
More cowl fitting
Details
       

 05-11-2013
2.00
More cowl fitting
Details

 05-08-2013
4.00
Oil door and more fitting/trimming
Details
       

 05-07-2013
1.50
Cowl fitting
Details
       

 05-06-2013
1.00
Removed some Skybolt flanges
Details

 05-05-2013
2.00
Riveted and fit remaining Skybolt flanges
Details

 05-04-2013
5.00
Lower cowl and Skybolt flange work
Details
       

 05-01-2013
2.00
Bottom cowl and oil door
Details

 04-27-2013
4.00
Started fitting top/bottom
Details
       

 04-27-2013
0.00
Cowl fitting, continued from previous entry.
     

 04-24-2013
1.50
Cut oil door opening in top cowl
Details
     

 04-20-2013
3.00
Finally attached prop extension
Details
       

 04-19-2013
2.00
1 step backward
Details

 04-17-2013
2.00
Prepped for prop extension
Details

 03-29-2013
1.50
Cut slot for nose gear
Details
     

 03-21-2013
1.00
Baffle work continues
Details

 03-20-2013
5.50
Mounted Lightspeed modules and cont baffles
Details
       

 03-17-2013
6.00
Add brace for 2nd Lightspeed module pair
Details

 03-16-2013
1.50
Continued with baffles
Details

 03-15-2013
1.00
Continued tinkering with baffles
Details

 03-14-2013
1.00
Finished Lightspeed attachment
Details
       

 03-12-2013
1.00
Continued with Lightspeed attachment
Details

 03-11-2013
3.00
Aft baffle brace, Lightspeed attachment
Details

 03-09-2013
4.00
Fit baffles
Details

 03-08-2013
1.50
Cyls 1 and 2 baffles
Details

 03-07-2013
1.50
Cylinder 3 baffles
Details

 03-06-2013
4.00
"Finished" cylinder 4 baffles
Details

 03-04-2013
1.50
Alodined baffle parts
Details

 03-01-2013
1.50
Drilled out rivet holes, fit together first baffle
Details

 03-01-2013
2.50
Countersunk and alodined Skybolt flanges
Details

 02-28-2013
1.50
Deburred flanges from Skybolt.
Details

 02-28-2013
1.50
Cut, trimmed, deburred parts for engine baffle
Details

 02-27-2013
2.00
Made cover plate for nose gear bolt
Details

 02-26-2013
4.00
Heat box, fuel transducer, cable mount
Details
       

 02-25-2013
2.50
Prepped for heat control
Details

 02-24-2013
0.50
Sealed oil sump heater wires
Details

 02-24-2013
1.00
Installed Forest of Tabs
Details
     

 02-24-2013
1.50
Installed antennas
Details
       

 02-22-2013
0.50
Tightened nose gear brace
Details

 02-22-2013
0.50
Inserted cotter pins
Details

 02-21-2013
1.00
Torqued engine bolts
Details

 02-20-2013
1.50
Mounted engine on fuselage
       

 02-20-2013
1.00
Added nose gear brace
Details

 02-19-2013
1.00
Set nose gear force, added Lip Skid
Details

 02-18-2013
2.00
Put fuselage on landing gear
       

 02-17-2013
3.00
Moved emps & flaps to hangar
Details
       

 02-12-2013
1.50
Finished SafeAir1 Pass-Throughs
Details
       

 02-11-2013
1.50
Started mounting Safeair1 pass-thru
Details

 02-10-2013
1.50
Mounted cabin lights
Details
       

 02-10-2013
2.00
Finished mounting other main and nose gear
Details
     

 02-09-2013
1.50
Drilled hole in axle for cotter pin
Details
     

 02-08-2013
2.00
Retrieved engine
Details
       

 02-07-2013
1.50
Attached wheel pant braces
Details

 02-06-2013
1.50
Got proper bolts and nuts, attached brake flanges
Details
     

 02-06-2013
2.00
Cabin lights
Details
     

 02-05-2013
1.50
Almost finished power adapters for baggage area
Details
       

 02-04-2013
1.50
Prepped Al wheel pant brackets
Details

 02-03-2013
4.00
Trying to figure out wheel and brake flange config
Details

 02-03-2013
2.00
Mounted tubes/tires to wheels
Details

 01-27-2013
2.00
Re-attached brakes lines to forward fuse.

 01-26-2013
4.00
Baggage area wiring
Details

 01-20-2013
4.00
Started engine mount, access holes
Details
       

 12-16-2012
4.50
Trimmed aft edge of canopy.
Details

 12-15-2012
3.00
Forgot a trim strip
Details

 12-15-2012
3.00
Forgot a trim strip
Details

 12-14-2012
2.00
Finished/installed canopy stops
Details
     

 12-09-2012
5.00
Mounted struts, started canopy stops
Details

 12-07-2012
1.00
Painted canopy parts
Details

 12-05-2012
4.00
Aggregated day
Details

 11-12-2012
2.00
Started assembling canopy again
Details

 11-11-2012
8.00
Painted frame, skin
Details

 10-21-2012
2.00
Primed canopy frame
Details

 10-20-2012
4.00
Painted canopy frame
Details
       

 10-14-2012
4.00
Attached fresh air inlets to fuse
Details

 10-13-2012
2.50
Finished gas strut install
Details

 10-12-2012
1.50
Continued gas strut installation
Details

 10-10-2012
2.00
Continued work on gas struts
Details

 10-07-2012
5.50
Finished finger latches, handle
Details

 10-06-2012
4.00
Continue working on latch fingers
Details

 10-05-2012
2.00
Canopy latch fingers
Details

 10-04-2012
1.50
Started canopy latch fingers
Details

 09-30-2012
5.50
Finished frame reinforcement
Details
       

 09-29-2012
3.50
Started canopy frame reinforcement
Details

 09-24-2012
1.00
Cleaned & alodined side skins
Details

 09-23-2012
4.00
Countersinking, match drilling, riveting frame
Details

 09-21-2012
2.50
Right side skin
Details

 09-20-2012
1.00
Left side skin
Details

 09-19-2012
2.50
Canopy side skins
Details

 09-16-2012
4.00
Finished canopy
Details

 09-15-2012
3.00
Finished drilling aft canopy, ...
Details

 09-14-2012
3.00
Fit/trimmed/drilled aft canopy
Details

 09-13-2012
1.50
Drilled canopy and frame sides
Details

 09-12-2012
2.00
Clamped, drilled canopy to roll bar
Details

 09-10-2012
1.50
Trimmed sides of canopy
Details

 09-09-2012
5.00
1 Step Forward
Details

 09-07-2012
1.50
Made addtl splice plate, drilled
Details

 09-05-2012
2.00
Started fitting to F-631 frame
Details

 09-03-2012
3.00
Trim-fit
Details

 09-02-2012
3.00
Trim-fit
Details

 08-31-2012
1.50
Trim-fit
Details

 08-28-2012
1.50
Another fit-trim on fwd edge
Details

 08-26-2012
3.00
More fit-trim
Details

 08-25-2012
4.00
The Big Cut
Details
       

 08-22-2012
2.50
3 more fit-trim cycles
Details

 08-19-2012
1.50
Another fit-trim cycle
       

 08-18-2012
3.00
Two fit-trim cycles
Details

 08-12-2012
4.00
First trim on canopy
Details
     

 08-11-2012
1.00
Riveted channel to cabin frame
Details

 07-26-2012
5.00
Riveted side rails
Details

 07-23-2012
6.00
Finished side rails
Details

 07-21-2012
3.00
Finished canopy rear hoop, started side rails
Details

 07-19-2012
5.00
Canopy frame shims, spacer blocks...
Details

 07-18-2012
5.00
Continue canopy frame
Details

 07-17-2012
6.00
Continue fitting canopy frame
Details

 07-16-2012
6.00
Continue fitting canopy frame
Details
       

 07-15-2012
3.00
Started adjustment of canopy frame/skin
Details

 07-14-2012
3.00
Started work on fwd canopy frame weldment
Details

 07-13-2012
1.00
More work on aft canopy latch
Details

 07-06-2012
4.00
Installed aft canopy latch
Details

 07-05-2012
3.00
Continue canopy work
Details

 07-04-2012
4.00
Finished side latch handle
Details
       

 07-03-2012
1.00
Made C-712
Details

 07-01-2012
5.00
Finished riveting fwd sub-assy to fuse, cut slots
Details
     

 06-30-2012
4.00
Continue riveting fwd sub-assy together
Details

 06-28-2012
1.00
Started riveting together fwd sub-assy
Details

 06-27-2012
3.50
Finished canopy release
Details
       

 06-25-2012
1.00
Continued adjusting canopy release linkage
Details

 06-24-2012
3.00
More work on canopy release
Details

 06-23-2012
4.00
Finished C-621 & -622 and WD-620
Details

 06-22-2012
4.00
Started making parts C-621 -622
Details
       

 06-21-2012
4.00
Fitted canopy parts
Details

 06-20-2012
4.00
Deburred forward skin, started canopy build
Details

 06-18-2012
0.50
Riveted angles to fuselage
Details

 06-17-2012
6.00
Almost finished installing air vents
Details

 06-15-2012
2.00
Began install of air vents
Details

 06-13-2012
2.00
Riveted angles to fuse
Details

 06-11-2012
0.50
Riveted nutplates to angles
Details

 06-10-2012
5.50
Drilled and clecoed top fwd skin, fit angles
Details
       

 06-09-2012
1.50
Drilled and clecoed F-743B angle to F-643-1 channe
Details
       

 06-08-2012
1.50
Continue forward sub-assy install
Details

 06-07-2012
1.00
Riveted stub ribs to center panel
Details

 06-06-2012
2.50
Assembled fwd assy on fuselage
Details
       

 06-05-2012
1.50
Riveted L/R seal support angles, alodined large pa
Details

 06-03-2012
4.00
Continued fwd sub-assy
Details

 06-02-2012
4.00
Continued work on fwd sub-assy
Details

 05-31-2012
1.00
Prepped parts for Fwd Fuselage Sub-Assy
Details

 05-30-2012
5.00
Re-did F-703B angle, attached to instrument panel
Details
     

 05-29-2012
2.00
More angles, found mistake
Details

 05-28-2012
6.00
Began upper forward fuselage for tip-up
Details

 05-27-2012
1.00
Re-did rudder links
Details
       

 05-26-2012
4.00
Finished re-route of vent lines.
Details
       

 05-25-2012
2.00
Started re-do of vent lines
Details
     

 05-25-2012
1.50
Attached rudder cables to pedals
Details
     

 05-24-2012
1.50
Permanently installed rudder pedals
Details

 05-23-2012
1.00
Made, installed more interior clips
Details

 05-22-2012
1.50
Installed seat panel floors
Details
     

 05-20-2012
1.50
Added missing nutplates to left seat fuse ribs
Details

 05-19-2012
1.00
Added nutplates to right sidearm brace
Details

 05-18-2012
2.00
Screwed in seat panels, primed/painted braces
Details

 05-16-2012
4.50
Finished flap indicator install
Details
       

 05-15-2012
1.00
Started placement of flap indicator
Details
       

 05-15-2012
0.50
Installed 3-conductor AMP connector to flap indica
Details
     

 05-14-2012
0.50
Painted last panel, installed center baggage panel
Details

 05-13-2012
5.00
Misc items, see description
Details

 05-12-2012
4.00
Installed wear blocks for shoulder harness cables
Details
       

 05-11-2012
2.00
Finished top rivets
Details

 05-10-2012
1.00
Attempted top rivets
Details

 05-06-2012
4.00
Mostly riveted the area where the canopy frame bol
Details

 05-05-2012
2.00
Finished items to re-install baggage floors and F-
Details
       

 05-05-2012
1.00
Baggage lights
Details

 05-03-2012
1.00
"Fixed" fuselage dent
Details

 05-02-2012
5.00
Installed steps
Details
       

 05-01-2012
1.50
NOW finished canopy cabin frame
Details

 04-30-2012
3.00
Finished canopy cabin frame
Details
       

 04-29-2012
4.00
Bolted angles to fuse, started attaching frame
Details
       

 04-28-2012
4.00
Riveted angles and trimmed parts for tipup
Details

 04-27-2012
1.00
Match-drilled, cleaned and primed F-631C/D parts
     

 04-26-2012
1.00
Fit angles onto cabin frame assy
Details

 04-25-2012
5.00
Riveted cabin frame assy, made light holder
Details
       

 04-24-2012
1.00
Cleaned and primed cabin frame parts
Details
     

 04-23-2012
1.00
Counter-sunk all drilled holes on assy
Details

 04-22-2012
2.00
Finished basic cabin frame assy
Details

 04-20-2012
2.00
Continue with forward side of canopy cabin frame
Details
       

 04-19-2012
2.00
Continue canopy cabin frame
Details
       

 04-18-2012
1.00
More canopy cabin frame work
Details

 04-17-2012
1.00
Continued fitting outer strap
Details

 04-16-2012
6.00
Continued canopy cabin frame
Details
       

 04-15-2012
3.00
Canopy cabin frame
Details
     

 04-14-2012
2.00
Continue canopy cabin frame
Details

 04-12-2012
3.00
Made parts F-631C and F-631D
Details

 04-09-2012
1.00
Finished riveting aft skin
Details

 04-08-2012
4.00
Most rivets driven for aft skin
Details
       

 04-07-2012
4.00
Final prep before aft wing skin riveting
Details
       

 04-06-2012
6.00
Aft wing skin and tip-up cabin frame
Details

 04-04-2012
2.00
Misc cleanup, prep for aft top skin
Details
       

 04-04-2012
3.00
Drilled out pop rivets, dimpled skin
Details
     

 04-01-2012
1.50
Finished wing strobe wiring in fuse, part 2
Details
       

 04-01-2012
0.00
Finished wing strobe wiring in fuse, part 1
       

 03-31-2012
3.00
Re-did strobe cables
Details

 03-30-2012
1.00
Made shielded 3-wire cable
Details

 03-28-2012
1.00
Wing strobe wiring
Details

 03-28-2012
2.00
Heat resistant spray paint and reinstall
Details
       

 03-25-2012
1.00
Final coat of Contego paint

 03-23-2012
1.00
Added 3rd coat of Contego paint
     

 03-22-2012
1.00
Added 2nd coat of Contego paint

 03-21-2012
4.00
Recess box, paint
Details
       

 03-20-2012
1.00
Started riveting recess box to firewall

 03-07-2012
3.00
Fit master relay and firewall recess
Details

 03-04-2012
3.00
Drilled holes, riveted nutplates
Details
     

 03-03-2012
4.00
Continue battery box work
Details

 03-02-2012
1.00
Started battery box work

 02-08-2012
3.00
Finished installing electric aileron trim
Details
       

 02-06-2012
1.00
Continued electric aileron trim control

 02-05-2012
3.00
Continued electric aileron trim control
     

 02-04-2012
3.00
Continued electric aileron trim control

 02-01-2012
4.00
Installed armrest braces, started aileron trim ins
Details
     

 01-29-2012
3.00
Finished armrest braces
Details
     

 01-28-2012
5.00
Made braces for armrests
Details
     

 01-23-2012
1.50
OAT probe wiring
Details

 01-21-2012
2.00
More final wiring changes
Details

 01-15-2012
3.00
Tail lights and control stick wiring
Details

 01-08-2012
3.00
Misc electrical wiring
Details

 01-02-2012
1.00
Put Molex connectors back on wires
Details
       

 12-31-2011
1.00
Made F-912D elevator stop
Details

 12-17-2011
2.00
Moved Adel clamps
Details
     

 12-14-2011
1.00
Riveted F-712E to F712, drilled holes in F712 for
Details

 12-14-2011
1.00
Removed/cut Molex connectors
Details
     

 12-11-2011
4.00
Tail light wire routing, tail tiedown
Details

 12-10-2011
2.00
Finished bottom rudder tip fitting
Details

 12-07-2011
3.00
Bottom rudder fiberglass tip
Details

 11-26-2011
2.00
Cut holes for Delta-Pop antennas
Details

 11-25-2011
4.00
Finished Garmin cable, ELT testing
Details

 11-20-2011
4.00
Started attaching tail light to fiberglass
Details

 11-20-2011
2.00
Started adding terminals to Garmin cable
Details

 11-16-2011
4.00
Finished AOA & Pitot re-do 2/2
       

 11-16-2011
4.00
Finished AOA & Pitot re-do 1/1
Details
       

 11-16-2011
2.00
Added more supports for electrical wiring
Details
       

 11-15-2011
1.00
Continue AOA & Pitot tubing re-do

 11-14-2011
1.00
Started AOA & Pitot tube re-do
Details

 11-13-2011
3.00
AOA & Pitot tube routing
Details

 11-12-2011
5.00
ELT wiring
Details

 11-11-2011
3.00
Finished top skin reinforcement for ELT antenna
Details

 11-10-2011
4.00
ELT bracket and aft fuse skin
Details
       

 11-09-2011
4.00
Support frame for ELT
Details

 11-06-2011
4.00
Extended Static line to fwd fuse
Details
       

 11-02-2011
4.00
Continued installation of static line
Details
       

 10-30-2011
2.50
Painted seat backs
Details

 10-29-2011
2.00
Installed static lines
Details
     

 10-29-2011
1.00
Added Adel clamps
Details

 10-27-2011
1.00
Routed wires
Details

 10-26-2011
3.00
Wired strobe pwr supplies, tail lite,...
Details
       

 10-26-2011
2.00
Added static ports
Details
       

 10-23-2011
3.00
Primed seat backs
Details

 10-21-2011
5.00
Strobe trays and ADAHRS tray
Details
       

 10-14-2011
2.00
Started tray for tail strobe pwr supply
Details
     

 10-14-2011
3.00
NOW I finished the ADAHRS tray
Details
     

 10-13-2011
1.00
Finished ADAHRS tray
Details
     

 10-12-2011
3.00
Continued work on ADAHRS tray
Details

 10-09-2011
2.00
Started ADAHRS tray
Details

 10-09-2011
1.00
Added D-Sub connector to elev servo
Details

 10-08-2011
1.00
Installed shoulder harness cables
Details

 10-08-2011
1.50
Installed elevator AP servo bracket
Details

 10-08-2011
0.50
Crimped pins onto elevator servo wires
Details

 10-07-2011
1.00
Installed right rudder cable cover
Details
     

 10-07-2011
1.00
Cleaned garage
Details

 10-07-2011
2.00
Cleaned and alodined parts
     

 10-07-2011
2.00
Cleaned & alodined parts
     

 10-06-2011
1.50
Installed left rudder cable fairing
Details
     

 10-05-2011
2.00
Threaded rudder cables
Details
     

 10-05-2011
1.00
Finished adding jam nuts
Details

 10-04-2011
1.00
Continue add jam nuts...
Details

 10-03-2011
1.00
What's worse....
Details

 10-02-2011
2.00
Finished connecting controls
Details
     

 10-01-2011
3.00
More control column work
Details

 09-29-2011
1.00
Installed control column WD-610
Details

 09-28-2011
5.00
Installed elev bellcrank, push-pull tubes
Details
     

 09-27-2011
1.00
Drilled & riveted control rod end to elevator tube

 09-25-2011
2.00
Deburred, cleaned, primed parts
Details
     

 09-24-2011
2.00
Cleaned, primed elevator push-pull tubes
Details
     

 09-18-2011
3.00
Painted fuselage parts
Details
       

 09-17-2011
4.00
More prep
Details

 09-16-2011
2.00
Continue prepping fuselage parts.

 09-15-2011
1.50
Continue preparing more sheet metal parts

 09-14-2011
2.00
Prep parts for painting
Details

 09-11-2011
2.00
Added flap wiring
Details
       

 09-05-2011
4.00
Electrical routing
Details

 09-04-2011
2.50
Finish wiring placement for fuel pump
Details
       

 09-04-2011
2.50
Finish flap bar install
Details
       

 09-03-2011
2.00
Torque center section/landing gear bolts, touchup

 09-01-2011
2.00
Torque fuel/brake fittings, Re-did fuel line clamp
Details
       

 08-31-2011
2.00
Wired fuel pump
Details
       

 08-31-2011
3.00
Finalize fuel pump install
Details
     

 08-28-2011
1.00
Plumbing inspection
Details

 08-14-2011
5.00
Finished plumbing and covers
Details
       

 06-26-2011
4.00
Continue electric fuel pump cover
Details
       

 06-25-2011
15.00
Fuel lines
Details
       

 05-10-2011
2.00
Boost fuel pump work
Details

 05-08-2011
3.00
Boost pump work
Details

 05-07-2011
2.50
Elect. boost pump plumbing
Details
     

 05-04-2011
2.50
Finished bolting landing gear weldments
Details

 05-02-2011
0.50
Installed some bolts on right landing gear weldmen

 05-01-2011
3.50
Finished torqueing plumbing fittings; bolted left
Details

 04-29-2011
1.00
Continue tightening plumbing fittings

 04-25-2011
1.00
Torqued fittings
Details

 04-24-2011
15.00
Finished lines on spar
Details
       

 03-14-2011
1.50
More brake line progress
Details
     

 03-13-2011
5.00
Fuel/brake line progress
Details

 03-09-2011
3.00
Modest progress on fuel lines
Details
     

 03-06-2011
3.00
Fuel pump work
Details

 03-05-2011
3.00
Continue fuel lines
Details

 02-27-2011
4.00
Started fuel lines
Details

 02-26-2011
5.00
Finished vent lines
Details
       

 02-23-2011
3.50
Started fuel vent lines
Details
       

 02-22-2011
2.00
Finish left brake line firewall to spar
Details
       

 02-21-2011
4.00
Brake lines firewall to spar
Details
       

 02-20-2011
3.00
Redid brake lines along spar
Details
       

 02-12-2011
2.00
2nd enamel paint coat
Details
     

 02-09-2011
2.00
Painted fuse interior
Details

 02-06-2011
4.50
More painting and prep
Details
       

 02-05-2011
5.00
Wash and prime
Details
       

 02-04-2011
1.00
Started adding a bracket
Details

 01-30-2011
5.00
Started fuel pump install, substituted bulkhead co
Details
       

 01-29-2011
5.00
Had to remake one of the brake lines...
Details

 01-27-2011
1.00
Finished bending brake lines from firewall to cent
Details

 01-26-2011
2.00
One step backward...
Details
     

 01-25-2011
1.00
Finished cutting and bending brake lines
Details
       

 01-24-2011
1.00
Finished left side brake line
Details

 01-23-2011
4.00
Started bending brake line
Details

 01-21-2011
3.00
Finished brake fluid reservoir, installed Bonaco b
Details
       

 01-18-2011
2.00
Measured and drilled for brake fluid reservoir
Details

 01-17-2011
2.00
Finished landing gear support install
Details

 01-15-2011
2.50
Continue installing landing gear supports
Details

 01-12-2011
2.50
Continue fitting landing gear supports
Details

 01-09-2011
5.00
Continue landing gear support install
Details
       

 01-08-2011
2.00
Continue landing gear support install
Details

 01-02-2011
4.00
Landing gear support
Details
       

 12-22-2010
20.00
Finished Center Section
Details
       

 12-01-2010
20.00
Finished floorboard install
Details
       

 09-01-2010
8.00
Continue adding nutplates to fuselage flooring
     

 08-29-2010
15.00
many tasks in one entry
Details
       

 07-30-2010
4.00
Fitting brake pedals into rudder pedals
Details

 07-25-2010
3.00
Continued installation of rudder pedal bracket
Details

 07-24-2010
2.00
Fit rudder pedal bracket, drilled holes to fuselag

 07-22-2010
1.00
Started rudder pedal assy into fuselage.
Details

 07-18-2010
4.00
Paint brake pedals
Details

 07-13-2010
2.00
Rivet brake pedal assys
Details

 07-12-2010
1.00
Countersunk brake plates
Details

 07-11-2010
4.00
Finish fitting brake pedals, reprimed
Details

 07-10-2010
4.00
Drilled and fitted support angles to brake pedals

 07-09-2010
1.00
Cut and deburred brake pedal angles (brackets)

 07-08-2010
1.00
Primed brake pedals and brackets with zinc chroma

 07-07-2010
4.00
Began flap parts, brake parts
Details

 06-26-2010
2.00
Finish steps
Details
     

 06-25-2010
3.00
Steps again
Details

 06-24-2010
2.00
Continue right step installation
Details

 06-23-2010
6.00
Right step
Details
     

 06-21-2010
2.00
Heat treated, cleaned and primed left step
Details
     

 06-20-2010
8.00
Left step
Details
       

 06-19-2010
6.00
Began left step installation

 06-16-2010
8.00
Reorganized garage corner
Details

 06-14-2010
6.00
Finished seat back assys
Details
       

 06-13-2010
5.00
Seat back brace slot on fuse bulkhead
Details
       

 06-11-2010
4.00
Finished riveting seat backs
Details

 06-10-2010
1.00
Zinc-chromated right seat back
Details

 06-09-2010
4.00
Seat back priming and riveting
Details
     

 06-07-2010
1.50
Finished inventory of finishing kit HW

 06-06-2010
3.00
Inventory finishing kit
Details

 05-30-2010
6.00
Left seatback assy
Details

 05-29-2010
4.00
Seatback assy
Details
     

 05-28-2010
3.00
continue seat backs
Details

 05-22-2010
5.00
Continue seat backs
Details

 05-21-2010
4.00
Continue seat back
Details

 05-20-2010
1.50
Seat back braces
Details

 05-12-2010
4.00
Wing tip stiffener, fuel tank access covers
Details
       

 05-09-2010
6.00
Remade fuselage cradle
Details
       

 05-08-2010
4.00
Moved wings and fuse.
Details

 05-07-2010
2.00
Proseal fuel tank access covers
Details
       

 05-05-2010
2.00
Fuel tank access cover plates
Details
       

 04-30-2010
3.00
Cut holes in wing stand
Details

 04-25-2010
4.00
Install pitot tube support
Details
       

 02-15-2010
1.00
Fuel float senders
Details

 01-18-2010
2.00
Installed Bob Archer VOR antenna
Details
       

 01-16-2010
4.00
More work on right wing tip.
Details
       

 01-13-2010
1.00
Finished dimpling left bottom wing panel
Details
       

 01-13-2010
2.50
Drilled, deburred, dimpled right bottom wing panel
Details
       

 01-13-2010
0.50
Added remaining nutplates, ground rivet heads
Details
     

 01-12-2010
1.00
Started dimpling bottom wing panel
Details

 01-11-2010
0.80
Finished deburring one bottom wing panel
Details
     

 01-10-2010
3.00
Cleaned garage, moved wing, started deburring
Details

 01-08-2010
3.00
Wired right landing light
Details

 01-07-2010
1.50
Added ground block to right wing
Details
     

 01-06-2010
1.50
Riveted nutplates to lamp bracket
Details
       

 01-04-2010
1.00
Dimpled skin, attached rivet strip plate
Details
     

 01-03-2010
2.00
Primed some parts, riveted
Details

 01-02-2010
3.50
More work on landing light
Details

 01-01-2010
4.00
More work on Duckworks landing light
Details
     

 12-31-2009
1.00
moved wing, prepared for duckworks cut
Details

 12-29-2009
1.00
Cut openings in wing tip for LED heatsinks
Details

 12-27-2009
0.50
Epoxied remaining nav LEDs to other plexi
Details

 12-26-2009
2.00
Drilled mirrored plexi, started epoxy attachment
Details

 12-24-2009
2.00
Fit mirror plexi and lens cover right wing tip
Details

 12-20-2009
3.00
LED Nav light assy for right wing
Details

 12-09-2009
3.00
APRS antenna, more epoxy
Details

 12-05-2009
1.00
Epoxied LED nav light assy
Details

 12-02-2009
1.00
Epoxied one of the LED nav light assemblies

 11-15-2009
4.00
More wingtip/nav light work.
Details

 11-04-2009
2.00
Nav lights
Details

 09-29-2009
1.50
Finished attaching wingtip.
Details

 09-28-2009
1.50
Continued riveting nutplates
Details

 09-19-2009
2.00
Finished countersinking wing tip holes....
Details

 09-18-2009
4.00
Finished left wing tip, returned to right wing tip
Details

 09-16-2009
4.00
Began squeezing rivets to attach nutplates.
Details

 09-15-2009
1.00
Countersink wing tip for rivets
Details

 09-14-2009
1.00
2/2 Drilling for nutplates
       

 09-14-2009
1.00
1/2 Drilling for nut plates
Details
       

 09-13-2009
6.00
Continued with aluminum backing strips
Details
       

 09-12-2009
5.00
Work on wing tips
Details
       

 09-07-2009
5.00
Fixed mistake with wing tip rib
Details
       

 09-06-2009
4.00
@!#%!& wing tip rib W-916
Details

 09-05-2009
5.00
Epoxied other wing tip, riveted wing tip rib.
Details
       

 09-01-2009
1.00
Finished epoxying one wing tip.
Details
     

 08-30-2009
4.00
Started epoxying back together the wing tip ends.
Details

 08-26-2009
5.00
Cut ends of wing tips; continued fitting

 08-25-2009
1.50
Finished fitting/drilling holes for left wing tip

 08-23-2009
3.00
Clecoed and drilled left wing bottom skin

 08-22-2009
4.00
Clecoed and drilled right wing bottom skin

 08-21-2009
3.00
Continue fitting wing tip ribs

 08-19-2009
3.00
Continued with W-916 and W-938 wing tip ribs

 08-17-2009
2.00
Fitted/drilled right wing tip rib W-916.

 08-16-2009
4.00
Continued wing tip rib.
Details
     

 08-15-2009
4.00
Started wing tip rib; cleaned garage, moved wings
Details

 08-14-2009
4.00
Finish fitting right wing tip
Details
     

 08-12-2009
4.00
Begin fitting of right wing fiberglass tip
Details

 08-09-2009
4.00
Fit fiberglass wing tip
Details
       

 08-02-2009
2.00
Fixed ground connectors.
Details

 07-29-2009
2.00
Continued pitot tube support bracket
Details

 07-26-2009
3.00
Continued pitot tube support bracket
Details
       

 07-24-2009
2.00
Pitot tube support bracket
Details

 07-08-2009
3.00
Riveted right wing aileron gap fairing

 07-04-2009
2.00
Aileron bracket rivets and pitot tube mast.
Details
       

 07-03-2009
2.00
Worked on pitot tube
Details
     

 06-28-2009
3.00
Drilled out bad rivets and re-riveted.
Details

 06-27-2009
2.00
Fitted roll servo mounting kit to aileron bracket
Details
     

 06-25-2009
1.00
Roll autopilot bracket; removed old bracket

 06-21-2009
4.00
Drill out more bad rivets, redo. Prep wing tip rib
Details

 06-20-2009
1.00
Cleaned and primed aileron gap fairings.

 06-17-2009
5.00
Aileron gap fairing, drilled out bad rivets.
Details

 06-14-2009
4.00
Right wing flap gap, fixes
Details

 06-12-2009
2.00
Right wing flap gap: dimpled, removed ailerons

 06-10-2009
4.00
More gap work
Details

 06-07-2009
4.00
Riveted left flap gap fairing to wing.

 06-06-2009
2.00
scotch brited, cleaned, and primed left wing flap

 06-05-2009
1.00
Finished dimpling left wing and flap gap fairing

 06-03-2009
1.00
Deburred, started dimpling left flap gap fairing
     

 05-30-2009
4.00
Started flap gap fairing
       

 05-14-2009
2.00
Replaced two ground wire pop rivets with driven.
Details

 05-13-2009
6.00
Install Dynon pitot tube heater controller
Details
       

 04-22-2009
1.00
Cut out holes for left wing strobe light in mirror

 04-18-2009
4.00
Finished left wing landing light, screwed in lens

 04-16-2009
1.00
Ran wires thru conduit for nav, landing lights

 04-12-2009
4.00
Ground block, power supplies in left wing tip
Details
       

 04-08-2009
6.00
Finishing up left Duckworks Landing Light
       

 04-05-2009
4.00
Drilled lens holes, ctrsnk, dimpled holes in LE

 03-30-2009
1.00
Smoothed edges of landing light cover

 03-29-2009
6.00
Continue Duckworks LL: ctrsnk and riveted nutplate

 03-28-2009
2.00
Duckworks LL-finished riveting nutplates to ribs

 03-27-2009
2.00
Duckworks LL

 03-26-2009
2.00
Duckworks LL

 03-25-2009
6.00
Duckworks landing light

 03-21-2009
2.00
Sac RVators meeting...
Details
       

 03-20-2009
6.00
Nav lights continued

 03-19-2009
6.00
Nav lights continued

 03-18-2009
6.00
Nav lights
Details

 03-07-2009
6.00
More nav light work
Details

 03-06-2009
6.00
Cut, sand left wing tip lens, mirror plexi
Details

 03-04-2009
4.00
Finished cabling for strobes

 03-01-2009
4.00
Navigation lights
Details
       

 02-20-2009
2.00
Finished conduit in right wing
Details

 02-16-2009
4.00
Work on right wing aileron pushrod, conduit
Details

 02-14-2009
2.00
Adjusted aileron
Details

 02-08-2009
3.00
Continued aileron brackets
Details

 02-06-2009
2.00
Work on aileron attach brackets
Details

 02-01-2009
1.00
Finished one of the brackets
Details

 01-31-2009
4.00
Aileron attach brackets
Details

 01-24-2009
2.00
Conduit, aileron hinge brackets
Details

 12-13-2008
4.00
Finished conduit hangars
Details

 12-10-2008
2.00
Began conduit install
Details
       

 11-30-2008
2.00
Conduit;cut hole in rib
Details

 11-23-2008
2.00
Adjusted aileron
Details

 11-14-2008
4.00
Riveted aileron attach brackets to wing
Details

 10-13-2008
6.00
Riveted together pieces for aileron attach bracket
Details

 10-09-2008
2.00
Attached left aileron attach brackets
Details

 10-08-2008
6.00
Finished parts for W-913 and W-914 attach brackets
Details

 10-06-2008
1.50
Cleaned ailerons, flaps

 10-05-2008
3.00
Finished right aileron bellcrank assy

 10-04-2008
6.00
Finished left wing aileron bellcrank assy
Details

 10-02-2008
1.00
Found bellcrank parts, reamed brass bushings
Details

 10-01-2008
2.00
Redid two rivets, taped pushrods
Details

 09-28-2008
2.00
Prepped and Riveted bellcrank to aileron pushrods
Details

 09-27-2008
2.00
Moved QB fuse to hangar
Details

 09-24-2008
3.00
Started aileron bellcrank to aileron pushrod
Details

 09-21-2008
6.00
Finished aileron stick-to-bellcrank pushrods
Details

 09-14-2008
4.00
Cut and finished aileron-stick pushrods
Details

 09-10-2008
4.00
Wing on table, primed aileron pushrods
Details
       

 09-07-2008
2.00
Continue fussing with squeezer
Details

 09-06-2008
4.00
Rebuilt pneumatic squeezer AGAIN
Details

 09-03-2008
1.00
Finished cleaning wings and fuse

 09-01-2008
2.00
Finished storing emps and started cleaning wings.
Details

 08-31-2008
4.00
Moved firehose attachments
Details
       

 08-30-2008
4.00
Drilled elevator horns to attach elevs to HS
Details
       

 08-26-2008
0.20
Finished riveting ctr wt nut plate
Details

 08-25-2008
1.50
Tried to rivet nutplate for left elevator ctr wt
Details

 08-24-2008
6.00
Trim and attach counter weights for left elevator.
Details

 08-21-2008
1.00
Inventoried back-ordered Vans parts bag
Details

 08-20-2008
1.00
Mounted power strip
Details

 08-20-2008
1.00
Installed nutplate
Details

 08-17-2008
4.00
Install elevator rod ends, rt elev counterweight
Details
       

 08-16-2008
1.00
Finish elev trim tab link, hinge pin bend
Details
       

 08-13-2008
1.00
Garage cleanup, 20deg bend in elev trim tab rod
Details

 08-02-2008
3.00
Added cap for noise reduction
Details
       

 07-27-2008
4.00
Electrical work on elevator servo trim
Details

 07-23-2008
6.00
Nearly finished electric elevator trim
Details

 07-19-2008
0.50
Riveted middle elevator hinge assy
Details
     

 07-19-2008
4.00
Finished restoring pneumatic squeezer
Details

 07-17-2008
2.00
Continue cleaning squeezer

 07-16-2008
6.00
Cleaning and fixing the pneumatic squeezer
Details

 07-13-2008
6.00
Adj. dustbox height, built fuse stand
Details
     

 07-12-2008
2.00
Trim VS fiberglass tip, joined rudder to VS

 07-11-2008
1.00
Put in Vert Stab end rod bearings, set length

 07-06-2008
2.00
Finish sorting and organizing HW parts
Details
       

 07-05-2008
8.00
Continue sorting

 07-04-2008
6.00
Finish Inventory, Continue Sorting
Details

 06-28-2008
3.00
Continue inventory QB kits

 06-27-2008
1.50
Continue inventory of QB kits

 06-26-2008
1.50
Started inventory of QB Fuse and Wings

 06-24-2008
2.00
Mount dust collector box on pedestal
Details

 06-22-2008
6.00
Finish air filter box
Details
       

 06-21-2008
4.00
Continue air filter box

 06-17-2008
2.00
Continue air filter box: filter bracket
Details

 06-15-2008
8.00
Build air filter box
Details

 06-12-2008
6.00
QB fuse + wings arrive
Details
       

 06-01-2008
2.00
Trim rudder fiberglass tip further.
Details

 06-01-2008
2.00
More garage organizing
Details

 05-26-2008
2.00
Clean & Polish collection of used tools
Details

 05-23-2008
1.00
Started fiberglass rudder tailcone
Details

 05-14-2008
1.50
Fitted tips on HS
Details

 05-11-2008
4.00
Elevator fiberglass tips
Details

 05-07-2008
0.50
Drill & cleco rudder fiberglass
Details
       

 05-04-2008
4.00
Fiberglass tips--fitting
Details
       

 03-01-2008
30.00
Garage setup
Details
       

 02-01-2008
30.00
Set up compressor, air hoses
Details
       

 01-11-2008
10.00
Finish emps
       

 01-10-2008
9.00
Continue emps
       

 01-09-2008
8.00
Continue emps
       

 01-08-2008
9.00
Continue emps

 01-08-2008
9.00
Continue emps
       

 01-07-2008
8.00
Begin empennage work
       