Powered By Kitlog Pro v2.0
FERRIS'S WEB SITE
Legacy
All
Work Logs Found:
38
Category Work Time:
481 Hours
Date
Hours
Work Log Summary
Details
04-08-2008
11.00
Installed Aft power grid
Details
04-07-2008
11.00
Bonded battery box mount/TC 2nd visit
03-30-2008
9.00
Nose gear door trial assembly
03-29-2008
21.00
Install fuel pump and selector and check synchroni
03-28-2008
12.00
Hydraulic dump valve installation.
Details
03-27-2008
12.00
Trial fit/trim center console and hydraulic/fuel
03-26-2008
11.00
Check fuel and hydraulic line clearances.
03-25-2008
11.00
Instal the first lot of hydraulic lines
03-24-2008
12.00
Aft power grid and rudder pedal barcket mount.
Details
03-22-2008
9.00
Battery mount
03-21-2008
12.00
03-20-2008
11.00
Redesign and trim battery mount and box
Details
03-19-2008
12.00
Installed hydraulic pump and flap actuator bracket
03-18-2008
10.00
Flap/hydraulic/center seat belt mount.
03-17-2008
10.00
Work on center console/Battery box
Details
03-13-2008
10.00
Identify and Trial fit hydraulic pump and flap mou
Details
03-11-2008
18.00
Work on Hydraulic lines/SAAA chapter 11 meeting
Details
03-04-2008
18.00
Trial fit dummy panel put plane on its nose
Details
03-01-2008
10.00
Prepare workshop for 1st TC inspection by Martin O
Details
02-27-2008
9.00
Assembled tires and inflated them
Details
02-26-2008
20.00
Continue unpacking and inventorying
02-25-2008
24.00
Container arrives and unpacked at Seven Hills
Details
11-30-2007
8.00
Inspect progress of body work/visit to Van's
11-29-2007
8.00
Inspected progress on engine and instrument panel
09-09-2007
18.00
General packing of components
09-08-2007
18.00
Work on center console and wings wiring.
Details
09-07-2007
18.00
Install Canopy and trial fit instrument Panel
09-06-2007
9.00
Assemble and install rudder bellcrank
09-05-2007
12.00
Inspect similar Legacies and select rudder pedal o
09-01-2007
18.00
Closed vertical stab and mockup panel
08-31-2007
18.00
Studying Assembly Manual for various systems
08-30-2007
10.00
Prepare bottom stub wing for bonding to fuselage t
08-30-2007
11.00
Prepare and bond elevators
08-29-2007
10.00
Closed horizontal stabilizer & prepare fuselage br
Details
08-29-2007
10.00
08-28-2007
10.00
Arrive Redmond, start inventory and sand wings
Details
08-28-2007
9.00
Details
12-31-1969
11.00
Nose gear doors
SITE NAVIGATION
Contact Builder
Legacy Home
Category
# Logs
# Hours
All
38
481
electrical
5
54
Empennage
1
18
Fuselage
2
19
Hydraulic lines
5
58
Landing Gear
2
20
Miscellaneous
20
282
Prepare and sand sub
1
10
Wings
2
20
Copyright © 2001-2024 Matronics. All Rights Reserved.