KitLog pro

Powered By Kitlog Pro v2.0

Jeff & Connies Webb site
Work Logs Found: 94
Category Work Time: 342 Hours
 Date
Hours
Work Log Summary

Details

 06-27-2011
15.00
Arm rest, seat panels, seat belt anchors, flap mou
Details
       

 06-24-2011
5.00
Torque Tube Bearing Support
       

 05-28-2011
3.00
Forward fuselage vertical & horizontal L angles
Details
       

 05-24-2011
3.00
Rear Bulkheads
     

 05-23-2011
3.00
Rear Upright Channels & baggage floor supports.
     

 05-07-2011
8.00
Spar Uprights & gussets.
Details
       

 04-30-2011
2.00
Side skin doubler above the center spar.
Details
     

 04-30-2011
3.00
Placed right forward skin in place.
Details
       

 04-30-2011
2.00
Landing gear brackets & uprights (right side)
Details
       

 04-23-2011
2.00
Upper Seat Panel
Details
       

 04-23-2011
2.00
Instrument Panel
Details
       

 04-21-2011
8.00
Upper longerons & engine mounts
Details
       

 02-26-2011
8.00
Rudder Pedal installation.
Details
     

 02-19-2011
3.50
Finishing Firewall
Details
       

 02-12-2011
4.00
Fire Wall
Details
       

 02-07-2011
2.00
Floor pan heel support & rudder pedal channel
Details
       

 02-06-2011
2.00
Drilled gear channel & rear seat panel
       

 02-04-2011
3.00
Rear Fuselage riveting
Details
       

 01-30-2011
4.00
Deburring
Details
     

 01-29-2011
1.00
Upper Rudder Hinge
Details

 01-23-2011
4.00
HT Frame
Details
       

 01-17-2011
5.00
Rear fuselage side skins
Details
       

 01-15-2011
4.00
Horizontal tail frame & lower rudder hinge
Details
       

 01-09-2011
3.00
Bottom Skin L & Z angle & Cross stiffners
Details
       

 01-08-2011
4.50
Started Fuselage
Details
       

 12-11-2010
15.00
Center Spar Upgrade
Details
       

 11-21-2010
2.00
Center Spar tear down
Details
       

 11-20-2010
3.00
Final rivets in nose skin at Spar, top & bottom

 10-31-2010
4.00
Rivited top skin in place.

 10-30-2010
1.00
Torqued all blots in upgraded spar.
Details
       

 10-16-2010
3.00
Pitot tube & plumbing
Details
       

 10-09-2010
4.00
Left wing wiring
Details
       

 09-25-2010
4.00
Left Aileron Upgrade with trim
Details
       

 09-06-2010
5.00
Left Nose Skin & Fuel tank
Details
       

 08-30-2010
5.00
Left Wing bottom skin
Details
     

 08-22-2010
4.00
Left wing. Top skin.
Details
     

 08-14-2010
4.00
Left Aileron Bellcrank
Details
       

 08-08-2010
2.00
Aileron Bellcrank Support & upgraded channel
Details
       

 08-01-2010
2.00
Nose RIbs
Details

 07-31-2010
2.00
Nose Ribs 1 through 4
Details

 07-24-2010
2.00
Rear RIbs
Details
       

 07-24-2010
2.00
Rear Channel Work
Details
       

 07-19-2010
3.00
Left Wing
       

 07-11-2010
3.00
Left wing extrusion & Root doubler
Details
       

 07-10-2010
2.00
Left Wing Spar
Details
 

 06-19-2010
5.00
Finished Right Wing
Details
       

 04-03-2010
3.00
Aileron Upgrade & balance
Details
       

 03-20-2010
6.00
Rear channel, Root & Aileron Doubler.
Details
       

 03-13-2010
5.00
Nose rib modification
Details
       

 02-28-2010
20.00
Wing Upgrade
Details
       

 10-03-2009
2.00
Right Wing locker door bracing
Details
       

 09-26-2009
1.50
Tested right fuel tank for leaks.
Details
     

 09-06-2009
4.00
Wing locker & fuel tank
Details
       

 08-23-2009
2.00
Finished drilling Nose Skin
Details
     

 08-16-2009
4.00
Nose skin for right wing
Details
       

 08-15-2009
4.00
Drilled bottom skin for right wing
Details
       

 08-14-2009
3.00
Top skin for right wing.
Details
       

 08-08-2009
8.00
Drilled & deburred right wing skeleton.
Details
       

 08-02-2009
4.00
Right wing rear ribs
Details
       

 08-01-2009
2.50
Right Aileron Bellcrank.
Details
       

 08-01-2009
2.50
Prepared Right wing nose ribs.
Details
     

 07-31-2009
4.00
Spar tip and Nose ribs 1-3 for right wing
Details
       

 07-18-2009
8.50
Ribs 1-4 & rear channel
Details
       

 07-12-2009
3.00
Completed Right Aileron
Details

 07-11-2009
1.00
Riveted Trim Tab to Aileron
       

 07-10-2009
1.00
Aileron Trim Motor installation
     

 07-06-2009
3.00
Aileron Trim Tab
Details
       

 07-05-2009
3.00
Left aileron construction
     

 07-04-2009
6.00
Right flap
Details
       

 06-15-2009
3.00
Left Flap finished.
Details
       

 06-12-2009
2.00
More holes drilled on left flap.
       

 06-07-2009
2.00
Left Flap
Details
     

 05-29-2009
0.00
Wings arrive via Toyota!
     

 03-26-2009
0.30
ODERED WINGS TODAY!
Details

 10-05-2008
3.00
Riveted everything together
       

 10-04-2008
2.00
Elevator Trim Tab control horn & servo
Details

 09-29-2008
3.50
Elevator Trim Tab
       

 09-28-2008
3.50
Elevator control horns.
Details
       

 09-27-2008
3.50
ELEVATOR
Details

 09-22-2008
3.00
ELEVATOR
Details
     

 09-20-2008
3.00
Finished Horizontal Stab
Details
     

 09-19-2008
4.00
Horizontal stab work.
Details
       

 09-18-2008
3.00
Elevator Skin
Details
       

 09-13-2008
5.00
Horizontal Stab Work
Details
       

 09-10-2008
3.50
Horizontal Stabilizer Skeleton
Details
       

 09-08-2008
4.00
Started on the Horizontal Stabilizer
Details
       

 08-09-2008
3.00
Finished Rudder
Details
     

 08-06-2008
2.00
Attached Rudder Nose Skin
     

 08-03-2008
2.00
Skinned Rudder
Details
     

 07-04-2008
3.00
Rudder Work
Details
       

 06-30-2008
0.50
Drilled & clicoed rudder ribs 2,3 & 4
     

 06-29-2008
1.30
Started Project Today.
Details
       

 04-22-2008
0.00
Ordered Rudder Starter Kit from Zenith

 04-21-2008
0.00
Demo flight of Zodiac
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.