Powered By Kitlog Pro v2.0
Tims Web Site
RV8A
All
Work Logs Found:
150
Category Work Time:
248 Hours
Date
Hours
Work Log Summary
Details
10-04-2009
1.00
The spar fits
10-04-2009
1.00
More canopy pictures
10-04-2009
1.00
hack saw blade to finish edge
10-04-2009
1.00
Attach spacers for sikaflex process
09-29-2009
1.00
trim the canopy
09-29-2009
1.00
The big cut
09-29-2009
1.00
more trim work and fitting
09-29-2009
1.00
canopy frame adjustments
08-31-2009
1.00
Reinstall rudder pedals after painting
08-28-2009
1.00
installed brake fittings in fuse floor
08-27-2009
1.00
Reinstalled fuel lines after their removal for pai
07-11-2009
1.00
final torque elevator control horn bolts elevator
07-06-2009
1.00
Right seat floor
07-06-2009
1.00
Nutplates to fwd seat floor
07-06-2009
1.00
Left seat floor
07-06-2009
1.00
floor stiffners
07-06-2009
1.00
aft baggage floor
07-03-2009
1.00
baggage door lock
06-14-2009
1.00
Baggage door assembly
05-28-2009
1.00
install windscreen support base
05-28-2009
1.00
Forward upper fuselage assembly
05-26-2009
1.00
elevator trim contrl cable
05-25-2009
1.00
Shoulder harness anchors, canopy rail receptacle
05-25-2009
1.00
make boards for work in tail cone
05-19-2009
1.00
Install master cyl.
05-19-2009
1.00
Assemble rudder pedals
05-16-2009
1.00
run rudder cables
05-16-2009
1.00
flap motor
05-15-2009
1.00
rudder stops
05-10-2009
1.00
angle and control stop travel
05-08-2009
1.00
assemble pushrod assembly to control sitcks
05-04-2009
1.00
shape control stick bushing
05-04-2009
1.00
file tubes that sleeve control stick bushings
05-04-2009
1.00
assemble control sticks
05-03-2009
1.00
drill elevator horns
05-02-2009
1.00
attach elevators
04-29-2009
1.00
Match drill vertical stab. aft spar
04-29-2009
1.00
centering vertical stab
04-29-2009
1.00
bolt vertical stab rear spar
04-27-2009
1.00
trim fromt spar
04-26-2009
1.00
Mounting horizontal stabilizer
04-26-2009
1.00
leveling fuselage
04-19-2009
1.00
Throttle quadrant cover and cable anchor
04-18-2009
1.00
assemble F841 pushrod
04-18-2009
1.00
assemble F840 pushrod assembly
04-18-2009
1.00
assemble elevator bellcrank
04-16-2009
1.00
Fuel Valve
04-16-2009
1.00
Console Side ribs
04-15-2009
1.00
Consoles and Seat Ramp
02-24-2009
1.00
Install vents
02-21-2009
1.00
Install fuel vent lines
02-21-2009
1.00
Install fuel lines in fuselage
02-21-2009
1.00
Install brake fluid reservoir on firewall
02-21-2009
1.00
fuel filter floor bracket
02-14-2009
1.00
install floor fuel pump bracked
02-14-2009
1.00
install elbows and plug in fuel valve
02-11-2009
1.00
Shape end of fuel handle
04-13-2008
0.50
Moving wing from stand to table
Details
04-12-2008
3.00
riveting top skins
Details
04-12-2008
1.00
Riveting Top Skins
04-11-2008
0.50
Kerfing aluminum at overlap
Details
04-01-2008
1.00
Drill out and replace 19 problem rivets left wing
03-31-2008
1.00
Attaching Fuel Tanks to Wings
Details
03-29-2008
2.50
Rivet top skins to rear spar
Details
03-26-2008
1.50
3 separate leaks in right tank
Details
03-05-2008
2.00
Install Lights in Wings
Details
03-03-2008
3.00
Install Landing & Taxi Lights
Details
03-03-2008
3.00
fabricated and installed
Details
03-03-2008
3.00
Fabricate Landing & Taxi Lights from scratch
10-18-2007
1.00
Flip aileron assem. weight it down
10-15-2007
1.00
Left aileron main ribs to spar & aft skin
10-14-2007
1.00
Nose ribs to counterbalance with blind rivets
10-13-2007
1.00
Leading edge and trailing edge skin
Details
10-11-2007
1.00
Nose Ribs on both ailerons
Details
10-11-2007
1.00
Cleco A705 main ribs to spars
10-08-2007
1.00
Bend aileron skin
10-07-2007
3.00
Dimple ailersons and stiffners
Details
09-27-2007
2.50
Cut and trim stiffeners
Details
07-07-2007
2.00
Fuel tank stiffeners cut deburred, dimpled
06-24-2007
0.20
organize shop and start on fuel tank level senders
06-24-2007
1.00
Install fuel senders
Details
06-24-2007
0.20
final adjustment of wire supporting float
06-21-2007
0.25
prep inboard ribs for fuel senders
06-21-2007
1.00
inboard rib installation
06-21-2007
2.00
attaching inboard rib
06-20-2007
5.00
Z channel installled to main spar
06-17-2007
3.00
proseal interior ribs ready for rivets
06-16-2007
1.00
proseal rivet nuts
06-16-2007
2.00
pro seal interior ribs
06-15-2007
0.20
proseal rivets
06-12-2007
2.00
rivet nut countersink drilling of Z channel
06-12-2007
1.50
dimpling the ribs with squeezer
06-11-2007
0.50
more fuel tank rib work
06-10-2007
1.50
sealing outboard rib tool hole with patch
06-10-2007
1.00
proseal tank fittings and anti rotation fittings
06-10-2007
2.00
Install fuel tank drains
06-10-2007
3.00
install fuel filler fittings
06-09-2007
3.00
fuel tank stiffners completed
05-31-2007
1.00
tank stiffeners cut and deburred
05-31-2007
2.00
machine countersink rear baffle rivet locations
05-31-2007
2.00
C Frame dimpling of tank rib rivet locations
05-30-2007
1.50
C frame dimple of stiffer rivet locations
05-18-2007
2.00
Leading edge fitting
05-12-2007
2.00
squeeze rivet nut attachemt rivets
04-30-2007
1.00
final drill top sheets
Details
04-29-2007
1.00
Clecoed the inboard and outboard upper skins
Details
04-28-2007
1.00
Install wings in vertical jgs
Details
04-22-2007
1.25
Installing conduit in right wing
Details
04-22-2007
2.00
Assemble Right Wing for riveting
Details
04-21-2007
4.00
Prep and prime ribs
Details
04-20-2007
1.50
The start of about 3 houurs cleaning
Details
04-19-2007
1.25
Final Drill the main ribs to spars
Details
04-18-2007
2.00
Rivet main ribs to rear and main spar left wing
Details
04-15-2007
2.00
Spray Primer on rear ribs left wing
Details
04-15-2007
3.00
Rib preparation for primer
Details
04-15-2007
0.75
Cleco rear ribs to front and rear spar
04-13-2007
1.50
A long process of primer prep
04-10-2007
1.00
Drilling conduit holes in ribs
Details
04-08-2007
1.00
Attaching Ribs to Rear and Main Spar
Details
04-02-2007
12.00
Built Paint Booth
Details
04-01-2007
6.00
Built Wing Stands
Details
02-15-2007
3.00
Install main spar nut plates
11-30-2006
2.00
Rivet Rear Spar Assem.
Details
11-24-2006
3.00
Cleco & Rivet HS707 to HS 801PP
Details
11-23-2006
1.00
Rivet HS404 and HS405 to front spar assembly
11-21-2006
2.00
Rivet HS810-1 and Hs814-1 to HS 702 front spars
11-19-2006
1.00
Rivet HS412PP and HS413PP hinge brackets to spar
11-19-2006
1.00
Bolt HS411PP and HS413PP hinge bracket to spar
11-15-2006
0.50
36 inch Shear
Details
11-12-2006
1.00
Rivet HS609PP bars to 603PP spar channels
10-30-2006
2.00
Riveting front spar
Details
10-30-2006
2.00
Mark and disassemble all parts
Details
10-29-2006
2.00
Rivet Setback Problem with HS404 Nose Ribs
10-29-2006
1.00
Drill to final size all attachment to HS801PP
10-29-2006
2.00
Cleco HS810 to HS702
10-08-2006
1.00
drill HS801PP to HS405 using 801 as quide
10-07-2006
2.00
Drill & Cleco aft flange HS 405 & 603
10-02-2006
2.00
Prep drill HS404 & 405
09-30-2006
2.00
Un-cleco, debur recleco, cleco skin
09-27-2006
1.00
Prep Ribs
Details
09-27-2006
1.00
Drilling Horizontal Stabilizer
Details
09-25-2006
1.00
Bending of outboard ends HS810-1and HS814-1
09-17-2006
1.00
Taper HS810-1 and HS814-1
09-13-2006
15.00
Home built 6 foot brake
Details
09-10-2006
2.00
Front Spar Assembly
07-13-2006
6.00
Built C Frame Dimpler
Details
07-03-2006
12.00
Building Construction Table
Details
02-15-2006
0.25
Additional must have tools for your shop
Details
02-08-2006
0.25
3 of my most used tools for this plane project
02-01-2006
1.00
A handy Modification to cheap table saw.
Details
SITE NAVIGATION
Contact Builder
RV8A Home
Category
# Logs
# Hours
All
150
248
Brakes
3
3
canopy
7
7
Empennage
8
8
Flaps
1
1
Fuel system
7
7
Fuel Tanks
26
42
Fuselage
26
26
Horizontal Stabilize
21
33
Rudder
4
4
Shop Supplies
9
54
Taxi & landing Light
4
11
Wings
34
52
Zodiac CH 601 XL Home
Copyright © 2001-2024 Matronics. All Rights Reserved.