KitLog pro

Powered By Kitlog Pro v2.0

MAT ISAs Web Site
Work Logs Found: 155
Category Work Time: 520 Hours
 Date
Hours
Work Log Summary

Details

 09-15-2009
5.00
Drilling (Cont.)
Details
       

 09-14-2009
1.30
Drilling (Cont.)
Details
     

 09-11-2009
3.00
Drilling (Cont.)
Details
       

 09-10-2009
6.00
Drilling
Details
       

 08-17-2009
1.60
Misc Item -shaping (cont)
Details

 08-01-2009
6.80
Misc Item - cutting & shaping (cont)
Details

 07-30-2009
3.50
Misc Item -shaping (cont)
Details

 07-11-2009
3.00
Misc Item -shaping (cont)
Details

 07-10-2009
2.00
Misc Item -shaping (cont)
Details

 07-09-2009
4.50
Misc Item -shaping (cont)
Details

 07-05-2009
4.00
Misc Item -shaping (cont)
Details

 06-28-2009
3.50
Misc Item -shaping (cont)
Details

 06-27-2009
3.00
Misc Item - shaping
Details

 05-02-2009
2.00
0.09" steel sheet misc items (Cont)
Details

 04-19-2009
2.00
0.125" steel sheet misc items (cont)
Details

 04-16-2009
0.30
0.09" steel sheet misc items
Details

 04-12-2009
2.00
0.125" steel sheet misc items (cont)
Details

 04-09-2009
0.30
0.125" steel sheet misc items
Details

 03-19-2009
1.50
Steel Tabs
Details

 03-18-2009
2.00
Tail wheel spring holder & support
Details
     

 03-17-2009
3.50
Tailwheel spring holder
Details

 01-10-2009
1.50
Hor stab, elevator & rudder prep
Details

 01-03-2009
3.00
Fuel tank support
Details
       

 01-02-2009
3.50
Seat support
Details
       

 01-01-2009
6.30
Turtle deck cont.
Details
       

 12-31-2008
2.50
Turtle Deck
Details
       

 12-29-2008
5.00
Tail area cont.
Details
       

 12-28-2008
4.00
Tail area
Details
       

 12-26-2008
3.00
Prep work b4 welding
Details

 12-25-2008
3.00
Tack weld - turtle deck bracing
Details
       

 12-14-2008
3.50
Torque tube support
Details
     

 12-13-2008
3.50
Vertical stab bracing
Details

 12-11-2008
3.60
Vertical stab rib & misc metal items
Details
       

 12-10-2008
1.80
Turtle Deck
Details
     

 11-29-2008
3.00
Turtle deck Bracing
Details
     

 10-26-2008
2.50
Turtle Deck
Details

 10-12-2008
2.50
Tail Longeron and Vertical Stab
Details
       

 09-20-2008
3.00
Canopy and Turtle deck bow
Details

 09-14-2008
2.00
Canopy and turtle deck bow
Details

 09-13-2008
1.50
Vertical Stabilisor
Details

 09-06-2008
0.50
Vertical Stab Prep
Details

 08-19-2008
4.00
Metal strip - misc. items
Details

 08-17-2008
3.00
Metal strip - misc. items
Details

 08-09-2008
5.50
Metal sheet - misc. items
Details

 08-02-2008
4.30
The Elevator
Details
       

 07-27-2008
3.20
The elevator
Details
       

 07-26-2008
4.60
Elevator preparation
Details

 06-08-2008
1.00
Elevator jig prep
Details

 06-06-2008
4.00
Horizontal Stab Preparation (Left)
Details
       

 06-05-2008
3.50
Horizontal stab preparation (Right)
Details
       

 06-04-2008
2.00
Rudder
Details
       

 06-04-2008
3.50
Preparation of the horizontal stabilisor
Details
       

 06-03-2008
2.30
Metal strip bending
Details
       

 05-02-2008
2.00
Elevator metal rib
Details

 04-16-2008
2.50
Tail ribs
Details

 04-13-2008
1.50
Tail diagonal longeron
Details

 04-12-2008
1.50
Tail diagonal longeron
Details

 04-05-2008
3.00
Rib Metal Strip
Details

 03-29-2008
4.50
Bench Bender
Details
       

 03-23-2008
1.50
Rib metal strip
Details

 03-22-2008
2.50
Horizontal Stabiliser
Details
       

 03-02-2008
2.00
Horizontal Stab Prep
Details

 02-26-2008
1.50
Rudder rib cutting
Details

 02-25-2008
1.00
Rudder ribs sketch
Details

 02-23-2008
2.50
Rudder Prep
Details
       

 02-10-2008
3.00
Rudder Prep
Details
       

 02-07-2008
1.00
Rudder Prep
Details

 01-27-2008
5.00
Seat
Details
       

 01-26-2008
3.00
Seat Prep
Details
     

 01-23-2008
3.00
Rudder Pedal
Details
     

 01-13-2008
2.00
Seat
Details

 01-06-2008
2.80
Seat
Details

 01-03-2008
1.00
Seat Jig
Details

 01-01-2008
5.00
Final Tail Adjustment & Tack weld
Details
       

 12-31-2007
4.00
Tail End Prep
Details
       

 12-30-2007
3.00
Horizontal Stab Prep
Details

 12-29-2007
1.80
Vertical & Horizontal Stab Prep
Details
       

 12-28-2007
7.00
Vertical Stab Prep
Details

 12-27-2007
2.50
Tail aligment
Details

 12-26-2007
1.50
Tail alignment
Details
     

 12-25-2007
6.50
Vertical Stab Jig Prep
Details
       

 12-24-2007
1.00
Prep for the tail section
Details

 12-08-2007
4.30
Jig Gear Bushing
Details
       

 11-28-2007
3.50
Fuel Tank Support
Details
       

 11-27-2007
5.50
Fuel Tank Support
Details
       

 11-26-2007
6.80
Fuel Tank Support
Details
     

 11-25-2007
2.30
Jig Height Adjustment
Details
     

 11-10-2007
0.80
Jig Height Adjustment
Details
     

 11-09-2007
4.00
Fuel Tank Support
Details

 11-08-2007
1.30
Prep for supporting the fuel tank
Details

 10-12-2007
4.00
Fuselage Welding
Details

 10-06-2007
7.30
Fuselage Welding
Details

 09-30-2007
4.00
Fuselage Welding
Details

 09-29-2007
5.80
Fuselage Welding
Details

 09-23-2007
4.30
Fuselage Welding
Details

 09-22-2007
6.50
Fuselage Welding
Details

 09-21-2007
1.20
Fuselage Welding
Details

 09-20-2007
4.50
Fuselage Welding
Details
       

 09-19-2007
3.00
Cleaning Tube Jointing
Details

 09-17-2007
1.50
Fuselage Prep & blowhole
Details

 02-03-2006
1.80
Fuselage Tack Weld Broken
Details

 02-12-2005
2.00
Turn Over fuselage Stand
Details

 02-12-2005
1.50
Tack Weld Tail Area
Details

 02-09-2005
2.00
Turn Over Fuselage Stand
Details

 06-28-2004
0.30
Tail Area checking
Details

 06-28-2004
0.80
Fuselage Rotisserie Prep.
Details

 06-02-2004
5.90
Tack Weld Tail Area
Details

 06-01-2004
3.80
Fuselage Tail Area
Details
     

 05-28-2004
5.90
Fuselage Tail Area
Details
     

 05-23-2004
7.00
Fuselage Tail Area
Details

 05-22-2004
3.00
Fuselage Tail Area
Details

 05-08-2004
7.40
Fuselage Tail Area
Details
     

 03-21-2004
4.80
Alignment of the tail area
Details
     

 03-07-2004
5.40
Alignment of the tail area
Details
     

 03-06-2004
6.80
Fuselage Front & Aft Preparation
Details

 02-29-2004
6.60
Fuselage Front
Details
       

 02-28-2004
2.50
Fuselage Front
Details

 02-23-2004
3.80
Fuselage Front
Details
     

 02-21-2004
5.30
Tack Welding Cockpit Area
Details

 02-15-2004
2.80
Cockpit Area Alignment
Details
       

 02-08-2004
1.50
Longeron Adjustment
Details

 02-03-2004
1.80
Cockpit Area Adjustment
Details

 01-25-2004
8.10
Cockpit Area Tube Fitting
Details
       

 01-23-2004
2.00
Cockpit Area Tube Fitting
Details

 01-17-2004
5.50
Cockpit Area Tube Fitting
Details

 10-18-2003
5.50
Cockpit Area Tube Fitting
Details

 08-24-2003
3.00
Cockpit Area Tube Fitting
Details
       

 07-19-2003
6.20
Fuselage Jig Preparation
Details

 07-13-2003
2.00
Fuselage Jig Preparation
Details

 06-28-2003
1.00
Table top preparation
Details

 06-21-2003
6.40
Table top preparation.
Details

 06-07-2003
0.60
Tack Weld tubing
Details

 06-07-2003
2.50
Table top adjustment
Details

 06-01-2003
2.00
Re check the 2nd frame.
Details

 05-24-2003
1.00
Fuselage checking
Details

 05-18-2003
4.30
Tack Weld the second frame
Details

 05-18-2003
2.00
Checking welding & fitting
Details

 05-17-2003
5.30
Rear diagonal fitting
Details
     

 05-15-2003
4.40
Diagonal fitting rear fuselage
Details

 05-14-2003
6.20
Diagonal fitting at rear
Details

 05-11-2003
5.90
Square tube fitting
Details
     

 05-10-2003
2.50
Diagonal fitting front end
Details

 05-04-2003
2.50
Tube fitting second frame
Details

 05-04-2003
4.00
Fuselage tack weld
Details

 04-27-2003
4.00
Again Tack Weld practice
Details

 04-20-2003
5.00
Practice Tack Weld
Details

 04-13-2003
3.50
Rear diagonal longeron
Details

 04-12-2003
2.70
Diag. longeron fuselage rear
Details

 04-05-2003
6.50
Diagonal longeron (cockpit area)
Details
       

 03-30-2003
4.00
Square tubing fitting
Details
     

 03-25-2003
2.80
Side longeron cutting and fitting
Details
       

 03-23-2003
5.80
Tube bending by heating
Details

 03-09-2003
2.80
Fuselage side bending preparation
Details

 03-04-2003
5.80
Re cut longeron
Details
     

 02-15-2003
1.30
Cut upper & lower longeron
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.