Powered By Kitlog Pro v2.0
MAT ISAs Web Site
Sonerai II (Original)
All
Work Logs Found:
155
Category Work Time:
520 Hours
Date
Hours
Work Log Summary
Details
09-15-2009
5.00
Drilling (Cont.)
Details
09-14-2009
1.30
Drilling (Cont.)
Details
09-11-2009
3.00
Drilling (Cont.)
Details
09-10-2009
6.00
Drilling
Details
08-17-2009
1.60
Misc Item -shaping (cont)
Details
08-01-2009
6.80
Misc Item - cutting & shaping (cont)
Details
07-30-2009
3.50
Misc Item -shaping (cont)
Details
07-11-2009
3.00
Misc Item -shaping (cont)
Details
07-10-2009
2.00
Misc Item -shaping (cont)
Details
07-09-2009
4.50
Misc Item -shaping (cont)
Details
07-05-2009
4.00
Misc Item -shaping (cont)
Details
06-28-2009
3.50
Misc Item -shaping (cont)
Details
06-27-2009
3.00
Misc Item - shaping
Details
05-02-2009
2.00
0.09" steel sheet misc items (Cont)
Details
04-19-2009
2.00
0.125" steel sheet misc items (cont)
Details
04-16-2009
0.30
0.09" steel sheet misc items
Details
04-12-2009
2.00
0.125" steel sheet misc items (cont)
Details
04-09-2009
0.30
0.125" steel sheet misc items
Details
03-19-2009
1.50
Steel Tabs
Details
03-18-2009
2.00
Tail wheel spring holder & support
Details
03-17-2009
3.50
Tailwheel spring holder
Details
01-10-2009
1.50
Hor stab, elevator & rudder prep
Details
01-03-2009
3.00
Fuel tank support
Details
01-02-2009
3.50
Seat support
Details
01-01-2009
6.30
Turtle deck cont.
Details
12-31-2008
2.50
Turtle Deck
Details
12-29-2008
5.00
Tail area cont.
Details
12-28-2008
4.00
Tail area
Details
12-26-2008
3.00
Prep work b4 welding
Details
12-25-2008
3.00
Tack weld - turtle deck bracing
Details
12-14-2008
3.50
Torque tube support
Details
12-13-2008
3.50
Vertical stab bracing
Details
12-11-2008
3.60
Vertical stab rib & misc metal items
Details
12-10-2008
1.80
Turtle Deck
Details
11-29-2008
3.00
Turtle deck Bracing
Details
10-26-2008
2.50
Turtle Deck
Details
10-12-2008
2.50
Tail Longeron and Vertical Stab
Details
09-20-2008
3.00
Canopy and Turtle deck bow
Details
09-14-2008
2.00
Canopy and turtle deck bow
Details
09-13-2008
1.50
Vertical Stabilisor
Details
09-06-2008
0.50
Vertical Stab Prep
Details
08-19-2008
4.00
Metal strip - misc. items
Details
08-17-2008
3.00
Metal strip - misc. items
Details
08-09-2008
5.50
Metal sheet - misc. items
Details
08-02-2008
4.30
The Elevator
Details
07-27-2008
3.20
The elevator
Details
07-26-2008
4.60
Elevator preparation
Details
06-08-2008
1.00
Elevator jig prep
Details
06-06-2008
4.00
Horizontal Stab Preparation (Left)
Details
06-05-2008
3.50
Horizontal stab preparation (Right)
Details
06-04-2008
2.00
Rudder
Details
06-04-2008
3.50
Preparation of the horizontal stabilisor
Details
06-03-2008
2.30
Metal strip bending
Details
05-02-2008
2.00
Elevator metal rib
Details
04-16-2008
2.50
Tail ribs
Details
04-13-2008
1.50
Tail diagonal longeron
Details
04-12-2008
1.50
Tail diagonal longeron
Details
04-05-2008
3.00
Rib Metal Strip
Details
03-29-2008
4.50
Bench Bender
Details
03-23-2008
1.50
Rib metal strip
Details
03-22-2008
2.50
Horizontal Stabiliser
Details
03-02-2008
2.00
Horizontal Stab Prep
Details
02-26-2008
1.50
Rudder rib cutting
Details
02-25-2008
1.00
Rudder ribs sketch
Details
02-23-2008
2.50
Rudder Prep
Details
02-10-2008
3.00
Rudder Prep
Details
02-07-2008
1.00
Rudder Prep
Details
01-27-2008
5.00
Seat
Details
01-26-2008
3.00
Seat Prep
Details
01-23-2008
3.00
Rudder Pedal
Details
01-13-2008
2.00
Seat
Details
01-06-2008
2.80
Seat
Details
01-03-2008
1.00
Seat Jig
Details
01-01-2008
5.00
Final Tail Adjustment & Tack weld
Details
12-31-2007
4.00
Tail End Prep
Details
12-30-2007
3.00
Horizontal Stab Prep
Details
12-29-2007
1.80
Vertical & Horizontal Stab Prep
Details
12-28-2007
7.00
Vertical Stab Prep
Details
12-27-2007
2.50
Tail aligment
Details
12-26-2007
1.50
Tail alignment
Details
12-25-2007
6.50
Vertical Stab Jig Prep
Details
12-24-2007
1.00
Prep for the tail section
Details
12-08-2007
4.30
Jig Gear Bushing
Details
11-28-2007
3.50
Fuel Tank Support
Details
11-27-2007
5.50
Fuel Tank Support
Details
11-26-2007
6.80
Fuel Tank Support
Details
11-25-2007
2.30
Jig Height Adjustment
Details
11-10-2007
0.80
Jig Height Adjustment
Details
11-09-2007
4.00
Fuel Tank Support
Details
11-08-2007
1.30
Prep for supporting the fuel tank
Details
10-12-2007
4.00
Fuselage Welding
Details
10-06-2007
7.30
Fuselage Welding
Details
09-30-2007
4.00
Fuselage Welding
Details
09-29-2007
5.80
Fuselage Welding
Details
09-23-2007
4.30
Fuselage Welding
Details
09-22-2007
6.50
Fuselage Welding
Details
09-21-2007
1.20
Fuselage Welding
Details
09-20-2007
4.50
Fuselage Welding
Details
09-19-2007
3.00
Cleaning Tube Jointing
Details
09-17-2007
1.50
Fuselage Prep & blowhole
Details
02-03-2006
1.80
Fuselage Tack Weld Broken
Details
02-12-2005
2.00
Turn Over fuselage Stand
Details
02-12-2005
1.50
Tack Weld Tail Area
Details
02-09-2005
2.00
Turn Over Fuselage Stand
Details
06-28-2004
0.30
Tail Area checking
Details
06-28-2004
0.80
Fuselage Rotisserie Prep.
Details
06-02-2004
5.90
Tack Weld Tail Area
Details
06-01-2004
3.80
Fuselage Tail Area
Details
05-28-2004
5.90
Fuselage Tail Area
Details
05-23-2004
7.00
Fuselage Tail Area
Details
05-22-2004
3.00
Fuselage Tail Area
Details
05-08-2004
7.40
Fuselage Tail Area
Details
03-21-2004
4.80
Alignment of the tail area
Details
03-07-2004
5.40
Alignment of the tail area
Details
03-06-2004
6.80
Fuselage Front & Aft Preparation
Details
02-29-2004
6.60
Fuselage Front
Details
02-28-2004
2.50
Fuselage Front
Details
02-23-2004
3.80
Fuselage Front
Details
02-21-2004
5.30
Tack Welding Cockpit Area
Details
02-15-2004
2.80
Cockpit Area Alignment
Details
02-08-2004
1.50
Longeron Adjustment
Details
02-03-2004
1.80
Cockpit Area Adjustment
Details
01-25-2004
8.10
Cockpit Area Tube Fitting
Details
01-23-2004
2.00
Cockpit Area Tube Fitting
Details
01-17-2004
5.50
Cockpit Area Tube Fitting
Details
10-18-2003
5.50
Cockpit Area Tube Fitting
Details
08-24-2003
3.00
Cockpit Area Tube Fitting
Details
07-19-2003
6.20
Fuselage Jig Preparation
Details
07-13-2003
2.00
Fuselage Jig Preparation
Details
06-28-2003
1.00
Table top preparation
Details
06-21-2003
6.40
Table top preparation.
Details
06-07-2003
0.60
Tack Weld tubing
Details
06-07-2003
2.50
Table top adjustment
Details
06-01-2003
2.00
Re check the 2nd frame.
Details
05-24-2003
1.00
Fuselage checking
Details
05-18-2003
4.30
Tack Weld the second frame
Details
05-18-2003
2.00
Checking welding & fitting
Details
05-17-2003
5.30
Rear diagonal fitting
Details
05-15-2003
4.40
Diagonal fitting rear fuselage
Details
05-14-2003
6.20
Diagonal fitting at rear
Details
05-11-2003
5.90
Square tube fitting
Details
05-10-2003
2.50
Diagonal fitting front end
Details
05-04-2003
2.50
Tube fitting second frame
Details
05-04-2003
4.00
Fuselage tack weld
Details
04-27-2003
4.00
Again Tack Weld practice
Details
04-20-2003
5.00
Practice Tack Weld
Details
04-13-2003
3.50
Rear diagonal longeron
Details
04-12-2003
2.70
Diag. longeron fuselage rear
Details
04-05-2003
6.50
Diagonal longeron (cockpit area)
Details
03-30-2003
4.00
Square tubing fitting
Details
03-25-2003
2.80
Side longeron cutting and fitting
Details
03-23-2003
5.80
Tube bending by heating
Details
03-09-2003
2.80
Fuselage side bending preparation
Details
03-04-2003
5.80
Re cut longeron
Details
02-15-2003
1.30
Cut upper & lower longeron
Details
SITE NAVIGATION
Contact Builder
Sonerai II (Original) Home
Category
# Logs
# Hours
All
155
521
Empennage
27
69
Fuselage
75
270
Miscellaneous
37
114
Welding
16
68
Copyright © 2001-2024 Matronics. All Rights Reserved.