Powered By Kitlog Pro v2.0
Jim Helicopter Web site
Exec 162F
All
Work Logs Found:
48
Category Work Time:
142 Hours
Date
Hours
Work Log Summary
Details
03-29-2006
0.00
More Pix of Body Fit-up
03-29-2006
2.80
Installed Seat, Floor Pan and Body Parts
03-13-2006
1.00
Fiberglas inside tip of Tail Cone Slider Cover
Details
03-12-2006
3.00
Final Installation of Tail Rotor
03-12-2006
2.00
Final assembly of Tail Rotor parts
03-12-2006
0.00
A Look at my friend's Heli today
01-06-2006
4.30
Fab Slider to Actuator Clevis Weldment
12-30-2005
0.40
Finalize Fabrication of Vertical Trim Fin Doubler
Details
12-28-2005
4.80
Final Installation of Tail Rotor Slider Rails
12-28-2005
0.00
Completed tail rotor slider rail installation
12-27-2005
12.00
Fabricated 2 bearing plate adjustment angles
12-27-2005
0.00
Fabricated 2 bearing plate adjustment angles
12-27-2005
0.00
Fabricated 2 bearing plate adjustment angles
12-17-2005
0.00
Final shaping of the lower vertical trim fin plugs
12-17-2005
4.30
Fabrication of vertical stabilizer trim fin plugs
12-17-2005
0.00
Fabrication of the lower vertical trim fin plugs
12-16-2005
3.30
Fabrication of the lower vertical trim fin plugs
12-11-2005
4.20
Fabricate Tail Rotor Pitch Actualtor Arms
Details
11-29-2005
3.00
Completed the Horiz Trim Fin Assembly for the Co-p
Details
11-28-2005
4.00
Assembled Winglet to Horizontal Trim Fin
Details
11-27-2005
6.10
Positioned and drilled Horizontal Trim Fins
11-25-2005
0.00
Final installation of the horizontal stabilizer do
11-25-2005
0.00
Final inspection of the horizontal stabilizer doub
11-25-2005
4.90
Fabricated and Installed Horiz Stabilizer Doublers
11-21-2005
3.30
Not much done on my helo today
Details
11-20-2005
7.80
Tail Boom Installed
Details
11-20-2005
7.80
Final Assembly of Tail Boom to Airframe
Details
11-20-2005
0.00
A Glimpse of what mine will look like soon
Details
11-16-2005
3.80
Tail Boom Installation
11-14-2005
4.00
Fabricating Winglets
10-23-2005
2.70
Fiberglass Winglet
10-22-2005
1.10
Went out to buy Fiberglas Supplies
10-22-2005
2.40
Preparing Boom for Inspection Covers
10-22-2005
2.20
Fabricated Inspection Covers
10-16-2005
9.50
Finalize fuel system mount tube installation
Details
10-15-2005
6.00
Airframe details
Details
10-08-2005
3.66
Fuel system mount tubes
Details
10-06-2005
3.50
Fit-up engine mount weldment (Initial)
Details
10-03-2005
2.50
Shortened and tapped 4 bushings for body support p
10-03-2005
0.80
Finished Skid tubes
10-02-2005
4.30
Airframe on Gear & Skids
09-30-2005
3.50
Mounted landing gear on skids
Details
09-29-2005
5.00
Inventoried parts boxes
09-28-2005
2.50
Inventoried parts boxes A, B, C, E, & G
Details
09-27-2005
0.75
Cut bands from Airframe
Details
09-26-2005
1.50
Unpacking
09-26-2005
1.50
Took Delivery of three Exec 162F kits
Details
09-26-2005
1.50
Continuation of delivery
SITE NAVIGATION
Contact Builder
Exec 162F Home
Category
# Logs
# Hours
All
48
142
A look at the future
2
Airframe
8
34
Cockpit
2
3
Delivery and Invento
6
13
Empennage
27
80
Fuselage
1
8
Miscellaneous
1
3
Shop Supplies
1
1
Copyright © 2001-2024 Matronics. All Rights Reserved.