KitLog pro

Powered By Kitlog Pro v2.0

Jim Helicopter Web site
Work Logs Found: 48
Category Work Time: 142 Hours
 Date
Hours
Work Log Summary

Details

 03-29-2006
0.00
More Pix of Body Fit-up
       

 03-29-2006
2.80
Installed Seat, Floor Pan and Body Parts
       

 03-13-2006
1.00
Fiberglas inside tip of Tail Cone Slider Cover
Details
     

 03-12-2006
3.00
Final Installation of Tail Rotor
       

 03-12-2006
2.00
Final assembly of Tail Rotor parts
       

 03-12-2006
0.00
A Look at my friend's Heli today
       

 01-06-2006
4.30
Fab Slider to Actuator Clevis Weldment
       

 12-30-2005
0.40
Finalize Fabrication of Vertical Trim Fin Doubler
Details
     

 12-28-2005
4.80
Final Installation of Tail Rotor Slider Rails
       

 12-28-2005
0.00
Completed tail rotor slider rail installation
       

 12-27-2005
12.00
Fabricated 2 bearing plate adjustment angles
       

 12-27-2005
0.00
Fabricated 2 bearing plate adjustment angles
       

 12-27-2005
0.00
Fabricated 2 bearing plate adjustment angles
       

 12-17-2005
0.00
Final shaping of the lower vertical trim fin plugs
       

 12-17-2005
4.30
Fabrication of vertical stabilizer trim fin plugs
       

 12-17-2005
0.00
Fabrication of the lower vertical trim fin plugs
       

 12-16-2005
3.30
Fabrication of the lower vertical trim fin plugs
       

 12-11-2005
4.20
Fabricate Tail Rotor Pitch Actualtor Arms
Details
       

 11-29-2005
3.00
Completed the Horiz Trim Fin Assembly for the Co-p
Details
       

 11-28-2005
4.00
Assembled Winglet to Horizontal Trim Fin
Details
       

 11-27-2005
6.10
Positioned and drilled Horizontal Trim Fins
       

 11-25-2005
0.00
Final installation of the horizontal stabilizer do
       

 11-25-2005
0.00
Final inspection of the horizontal stabilizer doub
       

 11-25-2005
4.90
Fabricated and Installed Horiz Stabilizer Doublers
       

 11-21-2005
3.30
Not much done on my helo today
Details

 11-20-2005
7.80
Tail Boom Installed
Details

 11-20-2005
7.80
Final Assembly of Tail Boom to Airframe
Details
       

 11-20-2005
0.00
A Glimpse of what mine will look like soon
Details
       

 11-16-2005
3.80
Tail Boom Installation
       

 11-14-2005
4.00
Fabricating Winglets
       

 10-23-2005
2.70
Fiberglass Winglet
       

 10-22-2005
1.10
Went out to buy Fiberglas Supplies

 10-22-2005
2.40
Preparing Boom for Inspection Covers
       

 10-22-2005
2.20
Fabricated Inspection Covers
       

 10-16-2005
9.50
Finalize fuel system mount tube installation
Details
       

 10-15-2005
6.00
Airframe details
Details
       

 10-08-2005
3.66
Fuel system mount tubes
Details

 10-06-2005
3.50
Fit-up engine mount weldment (Initial)
Details

 10-03-2005
2.50
Shortened and tapped 4 bushings for body support p
       

 10-03-2005
0.80
Finished Skid tubes
       

 10-02-2005
4.30
Airframe on Gear & Skids
       

 09-30-2005
3.50
Mounted landing gear on skids
Details
       

 09-29-2005
5.00
Inventoried parts boxes

 09-28-2005
2.50
Inventoried parts boxes A, B, C, E, & G
Details

 09-27-2005
0.75
Cut bands from Airframe
Details
     

 09-26-2005
1.50
Unpacking
       

 09-26-2005
1.50
Took Delivery of three Exec 162F kits
Details
       

 09-26-2005
1.50
Continuation of delivery
       










Copyright © 2001-2024 Matronics. All Rights Reserved.