Date
|
Hours
|
Work Log Summary

|
Details

|
03-29-2006
|
0.00
|
More Pix of Body Fit-up
|
|
|
|
03-29-2006
|
2.80
|
Installed Seat, Floor Pan and Body Parts
|
|
|
|
03-13-2006
|
1.00
|
Fiberglas inside tip of Tail Cone Slider Cover
|
Details
|
 |
|
03-12-2006
|
3.00
|
Final Installation of Tail Rotor
|
|
|
|
03-12-2006
|
2.00
|
Final assembly of Tail Rotor parts
|
|
|
|
03-12-2006
|
0.00
|
A Look at my friend's Heli today
|
|
|
|
01-06-2006
|
4.30
|
Fab Slider to Actuator Clevis Weldment
|
|
|
|
12-30-2005
|
0.40
|
Finalize Fabrication of Vertical Trim Fin Doubler
|
Details
|
 |
|
12-28-2005
|
4.80
|
Final Installation of Tail Rotor Slider Rails
|
|
|
|
12-28-2005
|
0.00
|
Completed tail rotor slider rail installation
|
|
|
|
12-27-2005
|
12.00
|
Fabricated 2 bearing plate adjustment angles
|
|
|
|
12-27-2005
|
0.00
|
Fabricated 2 bearing plate adjustment angles
|
|
|
|
12-27-2005
|
0.00
|
Fabricated 2 bearing plate adjustment angles
|
|
|
|
12-17-2005
|
0.00
|
Final shaping of the lower vertical trim fin plugs
|
|
|
|
12-17-2005
|
4.30
|
Fabrication of vertical stabilizer trim fin plugs
|
|
|
|
12-17-2005
|
0.00
|
Fabrication of the lower vertical trim fin plugs
|
|
|
|
12-16-2005
|
3.30
|
Fabrication of the lower vertical trim fin plugs
|
|
|
|
12-11-2005
|
4.20
|
Fabricate Tail Rotor Pitch Actualtor Arms
|
Details
|
|
|
11-29-2005
|
3.00
|
Completed the Horiz Trim Fin Assembly for the Co-p
|
Details
|
|
|
11-28-2005
|
4.00
|
Assembled Winglet to Horizontal Trim Fin
|
Details
|
|
|
11-27-2005
|
6.10
|
Positioned and drilled Horizontal Trim Fins
|
|
|
|
11-25-2005
|
0.00
|
Final installation of the horizontal stabilizer do
|
|
|
|
11-25-2005
|
0.00
|
Final inspection of the horizontal stabilizer doub
|
|
|
|
11-25-2005
|
4.90
|
Fabricated and Installed Horiz Stabilizer Doublers
|
|
|
|
11-21-2005
|
3.30
|
Not much done on my helo today
|
Details
|
  |
|
11-20-2005
|
7.80
|
Tail Boom Installed
|
Details
|
  |
|
11-20-2005
|
7.80
|
Final Assembly of Tail Boom to Airframe
|
Details
|
|
|
11-20-2005
|
0.00
|
A Glimpse of what mine will look like soon
|
Details
|
|
|
11-16-2005
|
3.80
|
Tail Boom Installation
|
|
|
|
11-14-2005
|
4.00
|
Fabricating Winglets
|
|
|
|
10-23-2005
|
2.70
|
Fiberglass Winglet
|
|
|
|
10-22-2005
|
1.10
|
Went out to buy Fiberglas Supplies
|
|
  |
|
10-22-2005
|
2.40
|
Preparing Boom for Inspection Covers
|
|
|
|
10-22-2005
|
2.20
|
Fabricated Inspection Covers
|
|
|
|
10-16-2005
|
9.50
|
Finalize fuel system mount tube installation
|
Details
|
|
|
10-15-2005
|
6.00
|
Airframe details
|
Details
|
|
|
10-08-2005
|
3.66
|
Fuel system mount tubes
|
Details
|
  |
|
10-06-2005
|
3.50
|
Fit-up engine mount weldment (Initial)
|
Details
|
  |
|
10-03-2005
|
2.50
|
Shortened and tapped 4 bushings for body support p
|
|
|
|
10-03-2005
|
0.80
|
Finished Skid tubes
|
|
|
|
10-02-2005
|
4.30
|
Airframe on Gear & Skids
|
|
|
|
09-30-2005
|
3.50
|
Mounted landing gear on skids
|
Details
|
|
|
09-29-2005
|
5.00
|
Inventoried parts boxes
|
|
  |
|
09-28-2005
|
2.50
|
Inventoried parts boxes A, B, C, E, & G
|
Details
|
  |
|
09-27-2005
|
0.75
|
Cut bands from Airframe
|
Details
|
 |
|
09-26-2005
|
1.50
|
Unpacking
|
|
|
|
09-26-2005
|
1.50
|
Took Delivery of three Exec 162F kits
|
Details
|
|
|
09-26-2005
|
1.50
|
Continuation of delivery
|
|
|