KitLog pro

Powered By Kitlog Pro v2.0

THOMAS'S WEB SITE
Work Logs Found: 196
Category Work Time: 1105 Hours
 Date
Hours
Work Log Summary

Details

 09-27-2006
12.00
Finished
Details
       

 09-01-2006
2.00
Interior Installation
Details
     

 09-01-2006
11.00
Instrument Panel Wire Routing
Details
       

 09-01-2006
1.50
Fuel Tank Final Installation
Details
     

 08-30-2006
4.50
Strobe Power Pack Installation
Details
     

 08-30-2006
0.10
Grandkids Invade The Hanger
Details
     

 08-27-2006
6.00
Seatback Wiring Channel
Details
       

 08-26-2006
50.00
Overhead Switch Panel Overhaul
Details
       

 08-25-2006
1.80
Collective Friction Grip
Details
       

 08-23-2006
4.00
Headset and Intercom Wiring
Details
       

 08-23-2006
4.00
Final Installation of Hoses
Details
       

 08-20-2006
1.10
Fuel Sender Wiring
       

 08-20-2006
1.50
Controls for Cabin Comfort
Details
     

 08-19-2006
3.00
Wire Routing Techniques
Details
       

 08-18-2006
0.75
Transponder and Ground Plane
       

 08-18-2006
1.50
Push Pull Cable Support
Details
       

 08-18-2006
2.10
Encoder Mounting Plate
Details
       

 08-16-2006
2.50
Interior Fiberglass Painting
Details
       

 08-15-2006
1.50
Seatback Painting - Engine Side
Details
     

 08-13-2006
4.50
Infinity Flight Grips
Details
     

 08-12-2006
14.00
Accessory Oil Cooler
Details
       

 08-11-2006
1.00
Intercom Installation
Details
       

 08-11-2006
2.00
Foot Panel Instrument Cut Out
Details
     

 08-11-2006
1.20
Cyclic Boot Cut Out
Details
       

 08-09-2006
8.00
Instrument Panel Assembly
Details
       

 08-06-2006
14.00
Oil and Coolant Lines
       

 08-05-2006
16.00
Electric Clutch Installation
Details
       

 05-03-2006
8.00
Fuel Tank Insulation
Details
       

 05-02-2006
4.00
Fuel Tank Rubber Seal Mod
Details
       

 04-30-2006
0.75
Fuel Sending Unit
Details
     

 04-29-2006
2.10
Passenger Glove Box Mod
Details
       

 04-28-2006
3.00
Installed Tailboom
Details
     

 04-21-2006
20.00
Installed Lower Heat Shields
Details
       

 04-19-2006
3.50
Installed Oil Drain Hoses
Details
       

 04-16-2006
1.50
Insalled Fuel Impact Switches
Details
     

 04-14-2006
5.00
Torque Link Arm Install and Mod
Details
       

 04-12-2006
6.50
Fuel Tank Support II
Details
       

 04-08-2006
2.00
Fuel Tank Supports
Details
       

 04-05-2006
12.00
Fuel Rail Installation
Details
       

 04-01-2006
0.50
Install New Valve Covers
Details
     

 03-31-2006
10.00
Install Fan Jack Shaft
Details
       

 03-29-2006
12.00
Installed Alternator/Water Pump
Details
     

 03-25-2006
1.50
Collective Rod Adjustment
Details
     

 03-24-2006
8.50
Engine Installation
Details
     

 03-20-2006
10.00
Supports for Instrument Panel
Details
     

 03-16-2006
2.00
Panel Modification
Details
     

 03-15-2006
1.50
Installed Collective Rod
Details
     

 03-15-2006
7.50
Installed Collective Crosstube
Details
       

 03-12-2006
4.00
Installed Cyclic Crosstube
Details
       

 03-10-2006
4.00
Exhaust Wrap
Details
     

 03-08-2006
6.00
Installed Foot Pedal Crosstube
Details
       

 03-04-2006
1.50
T/R Cable Bracket
Details
       

 03-01-2006
0.75
Seatback Fire Protection
Details
       

 03-01-2006
0.50
Idler Pulley Mounting
Details
     

 02-08-2006
2.20
Idler Pulley Mounting
Details
     

 02-05-2006
3.20
Installed Airframe to Landing Gear
Details
       

 01-27-2006
6.00
Tail Cone Fitted
Details

 01-25-2006
3.00
Installed Skids and Landing Gear
Details
       

 01-23-2006
2.50
Tail Rotor Belt Pulleys Installed
Details

 01-22-2006
8.50
Tail Rotor Final Install
Details
       

 01-21-2006
2.00
VHF Ground Plane Mounted
Details

 01-20-2006
6.00
Tailboom Strobe Mounted
Details
       

 01-18-2006
1.00
VHF Antenna Fit to Tailboom
Details
       

 01-15-2006
2.00
Tailboom Ballast Weight Weldment Fit
Details
       

 01-11-2006
3.00
Skid Removal For Painting
Details
     

 01-08-2006
16.00
Moving into the new hangar
Details
       

 12-10-2005
0.50
Pitot Tube Hole Cut
     

 12-07-2005
1.50
Overhead Panel Opening Cut
Details
       

 12-03-2005
20.00
Painting Finished
Details
     

 11-30-2005
4.50
Panel - First Attempt
Details
     

 11-25-2005
1.20
Ignition Coil Installation
Details
     

 11-16-2005
6.50
Overhead Panel Fiberglass Box
Details
       

 11-09-2005
36.00
Overhead panel mod
Details
       

 11-02-2005
10.00
Pitot Tube Mod
Details
       

 10-26-2005
6.00
Coolant Drain Mod
Details
       

 10-12-2005
2.10
T/R Bracket Painting
Details
       

 10-05-2005
8.00
Heater Modification
Details
       

 09-28-2005
1.20
Fadec Supports
Details
     

 09-21-2005
40.00
Instrument Panel Design
Details
       

 09-17-2005
12.00
Loading Day
Details
       

 09-16-2005
0.50
Paint Touch Up
Details
       

 09-14-2005
3.00
Disassembly Initiated for Body Mods and Paint
Details

 09-14-2005
2.00
Completed Tailboom Support for Trailering
Details
       

 09-11-2005
4.00
Tailboom Bracket for Trailering
Details
       

 09-11-2005
3.50
Swivel Couplers for Tailboom Supports
Details
       

 09-07-2005
2.00
Tailboom Support for Trailering
Details
     

 09-04-2005
3.50
Clutch Tube Weldment
       

 09-02-2005
1.00
Lower Engine Mount Adjustment
Details
       

 08-31-2005
7.50
Idler Pulley Installation
Details
       

 08-28-2005
8.00
Skid Reversal Continued
Details
       

 08-07-2005
7.50
Muffler Straps
Details
       

 08-05-2005
40.00
Extended Skids Modification
Details
       

 07-24-2005
27.00
Fabricated Exhaust Heat Shielding
Details
       

 07-20-2005
3.00
Exhaust Heat Shield - Passengers
Details
       

 07-15-2005
11.00
Exhaust Heat Shield - Pilots
Details
       

 07-13-2005
2.00
Exhaust Heat Shield Fabrication
Details
       

 07-09-2005
3.00
Engine Installation
Details
       

 07-05-2005
1.50
Tailboom Removal
Details
     

 07-03-2005
7.00
Exhaust Header Installation
Details
     

 07-02-2005
4.00
Engine Preparation
Details
     

 07-01-2005
2.20
Fuel Rail Components
Details
       

 06-18-2005
3.00
Vertical Trim Fin Rear Bracket Modification
Details
     

 06-15-2005
6.00
Tailboom Ballast Weight Weldment Modification
Details
       

 06-11-2005
1.00
Secondary Roll Pin Modification
Details
       

 06-10-2005
3.00
Fuel Main Drain Bracket
Details
       

 06-08-2005
0.50
Upper Engine Mount Weldment Modification
Details

 06-08-2005
1.30
Lower Engine Mount Modification
Details
     

 06-05-2005
10.00
Fan Spacer Fabrication
Details
       

 06-04-2005
2.50
Fan Fiberglass Ring Attached
Details
     

 06-03-2005
3.00
Radiator Straps
Details
     

 06-01-2005
0.90
A/T Pedal Modification
Details
       

 05-29-2005
1.00
Engine Cup Modification
Details
     

 05-28-2005
32.00
Secondary Installation
Details
       

 05-25-2005
3.50
Fuel System Main Drain
Details
       

 05-22-2005
5.00
Clutch Tube Weldment
Details
       

 05-21-2005
12.80
Engine Torque Link
Details
     

 05-18-2005
3.50
Lower Engine Mount Alignment and Mod.
Details
     

 05-15-2005
1.50
Engine Cup Rubber Strip
Details
       

 05-14-2005
2.20
Engine Mount Cup
Details
     

 05-13-2005
1.40
Tailboom Cutout For Tailrotor
Details
     

 05-11-2005
16.00
Tail Rotor Slider Bracket
Details
       

 05-08-2005
4.00
Alternator/Water Pump Bracket Fabrication
Details

 05-07-2005
0.50
Engine Support Ring
Details
       

 05-04-2005
1.50
Upper Engine Mount Spacers
Details

 04-30-2005
2.20
Mounted Oil Filter Weldment
Details
       

 04-25-2005
10.50
Routing of Tail Rotor Cable
Details
     

 04-20-2005
2.00
Tailboom Stringer Modification
Details

 04-16-2005
7.20
Radiator and Fan Shroud
Details
     

 04-13-2005
6.50
Installed Alternator and Water Pump
Details
       

 04-10-2005
3.20
Throttle Correlation Mod
Details

 03-26-2005
9.50
Fan Shaft and Pulleys
Details
     

 03-24-2005
0.90
Vertical Trim Fin Mod
Details
     

 03-23-2005
1.20
Main Shaft Safety Spacer
Details

 03-22-2005
0.75
Cut T/RSlider Opening
Details
     

 03-22-2005
2.50
Bushing Mod for T/R Weldment
Details
       

 03-21-2005
2.00
T/R Cable Attachement Weldment
Details
       

 03-19-2005
1.00
Vertical Trim Fin End Plugs
Details

 03-19-2005
3.00
Cut T/R Shaft Spacers
Details
     

 03-16-2005
6.00
Vertical Trim Fin Bracket Mod
Details
     

 03-13-2005
3.50
Cut Tailboom for Tail Rotor
Details
     

 03-09-2005
3.00
Chopco Slider Modification
Details
     

 03-05-2005
4.00
Drilled The Tail Rotor Shaft
Details
     

 03-02-2005
2.50
Vertical Trim Fin Attachment Bracket
Details
       

 03-02-2005
3.20
Installed Vertical Trim Fin
Details
       

 02-26-2005
3.30
Chopco Slider
Details
       

 02-25-2005
4.50
Re-installation of theTailboom
Details
       

 02-23-2005
1.90
Cooling Fan Mounted to Pulley
Details
       

 02-05-2005
0.80
Modifying Tail Boom Brackets
Details
       

 02-04-2005
6.30
Foot Pedal Cross Tube
Details
       

 02-04-2005
1.00
Filed Secondary Airframe Bushings
Details
     

 01-30-2005
5.50
Mounted Main Sprocket to Rotor Mast
Details
       

 01-28-2005
3.00
Main Sprocket and Hub Drilled
Details
       

 09-30-2004
5.00
Chroming of Various Parts
Details
     

 09-25-2004
3.00
Foot Pedal Scissor Assembly
Details
       

 09-15-2004
4.10
Assembled Foot Pedals and Weldment
Details
     

 09-04-2004
2.80
Foot Pedal Bushings
Details
       

 09-01-2004
3.50
Foot Pedal Fabrication
Details
       

 08-21-2004
4.00
Co-pilot's Storage Box Placed
Details
       

 08-14-2004
3.50
Fabricated ECU Box
Details
       

 08-04-2004
5.00
Fabricated Seat Bottom Panel
Details
       

 07-28-2004
4.30
Fabricated Seatback Access Panels
Details
       

 07-17-2004
4.80
Seatback Access Panels
Details
       

 07-14-2004
3.50
Reassembling The Airframe
       

 06-26-2004
25.00
Disassembled and Painted Airframe
Details
       

 06-16-2004
12.00
Nut Plates and Dzuz Fasteners Placed
Details
     

 06-02-2004
2.80
4 Corner Seam Modification
Details
       

 05-26-2004
1.50
Fiberglass Tub Moodification
Details
       

 05-08-2004
10.00
Dog House Fitting
Details
     

 05-01-2004
3.00
Door Post Placement
       

 04-28-2004
2.10
Roof Panel & Front Inspection Panel
Details
       

 04-24-2004
12.00
Lower Rear Panels Fitted
Details
       

 04-17-2004
8.00
Initial Fit Windscreen and Panels
Details
       

 04-07-2004
6.00
Installing Seatback and Tub
Details
       

 03-27-2004
3.00
Main Rotor Shaft Set
     

 03-24-2004
4.50
Installed Lower Main Bearing Flange
     

 03-20-2004
2.00
Installed Upper Engine Mount Clevis
     

 03-06-2004
3.00
Installing Pedal Crosstube
Details
     

 03-04-2004
8.20
Mounted Main Rotor Bearing
Details
     

 03-03-2004
3.00
Removed tailboom
Details
     

 02-27-2004
4.50
Fabricated Horizontal Trim Fin Doublers
Details
       

 02-21-2004
11.50
Tailboom Installation Continued
Details
     

 02-15-2004
3.00
Fiberglassed winglet halves together
       

 02-05-2004
1.50
Tailboom Bracket Alignment
Details
       

 01-31-2004
4.50
Winglet Construction
Details
       

 01-24-2004
6.20
Tailboom Installation Begins
Details
     

 01-23-2004
7.00
Tailboom Inspection Panels Fabricated
Details
     

 01-22-2004
2.50
Installed Collective Control
Details
       

 01-21-2004
1.90
Preparing Tailboom Brackets
Details
     

 01-18-2004
1.00
Fabricated Battery Box Straps
Details
     

 01-14-2004
10.40
Installing Lower Engine Mount
Details
       

 01-13-2004
1.00
Studied Mounting Lower Engine Mount
Details

 01-11-2004
6.50
Attached Landing Gear To Airframe
Details
       

 01-10-2004
6.00
Attached SkidsTo Landing Gear
Details
       

 01-08-2004
4.50
Tapped Body Support Bushings
Details
     

 01-08-2004
6.00
Fit And Drill Fuel System Mount Tube
Details
     

 01-07-2004
2.00
Arrival!
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.