07-07-2009
|
2.10
|
Finishing the sides of the canopy
|
Details
|
|
|
06-24-2009
|
1.00
|
Made the final trim of the canopy
|
Details
|
|
|
06-20-2009
|
1.50
|
Made the Big Cut!
|
Details
|
|
|
06-18-2009
|
2.30
|
Getting closer to the final canopy trimming
|
Details
|
|
|
06-15-2009
|
0.80
|
More canopy trimming
|
Details
|
|
|
06-14-2009
|
21.00
|
Placed canopy spacers and made the 3rd cut
|
Details
|
|
|
06-09-2009
|
1.90
|
Started cutting the canopy
|
Details
|
|
|
06-08-2009
|
2.90
|
Polished and installed the canopy rails
|
Details
|
|
|
06-07-2009
|
3.00
|
Finished bending canopy frame & drilled canopy rai
|
Details
|
|
|
05-26-2009
|
2.50
|
Began fitting the canopy frame
|
Details
|
|
|
05-22-2009
|
1.80
|
Started fabricating the canopy rails
|
Details
|
|
|
05-21-2009
|
1.70
|
Finished canopy rail
|
Details
|
|
|
05-20-2009
|
3.20
|
Riveted flap fairings
|
Details
|
|
|
05-19-2009
|
2.50
|
Started Finishing Kit
|
Details
|
|
|
05-16-2009
|
1.50
|
Flap fairing work
|
Details
|
|
|
05-11-2009
|
1.00
|
Riveted the step
|
Details
|
|
|
05-10-2009
|
0.50
|
Worked on step some more
|
Details
|
|
|
05-09-2009
|
29.00
|
Installing the step
|
Details
|
|
|
05-07-2009
|
2.80
|
Began installing step
|
Details
|
|
|
05-06-2009
|
2.40
|
More nutplate installations
|
Details
|
|
|
04-29-2009
|
1.20
|
Back on the project, glued in the vent scoop under
|
Details
|
|
|
04-26-2009
|
0.00
|
Back from Sun-N-Fun 2009
|
Details
|
|
|
04-13-2009
|
2.00
|
Installed nutplates in wing root leading edge
|
Details
|
|
|
04-12-2009
|
1.20
|
More wing finishing issues
|
Details
|
|
|
04-03-2009
|
2.10
|
Finished aileron pushrods and installed some wing
|
Details
|
|
|
04-01-2009
|
1.20
|
Removed the wings
|
Details
|
|
|
03-18-2009
|
2.00
|
Removed wing bolts
|
Details
|
|
|
03-17-2009
|
3.00
|
Ran a tap through the floorboard nutplates
|
Details
|
|
|
03-16-2009
|
2.60
|
Fixed floor nutplates
|
Details
|
|
|
03-11-2009
|
1.50
|
Floorboard madness
|
Details
|
|
|
03-10-2009
|
2.70
|
Fitted flap actuators through the floorboards
|
Details
|
|
|
03-09-2009
|
2.60
|
Finished floor board nutplates
|
Details
|
|
|
03-06-2009
|
306.00
|
More nutplate installation for floorboards
|
Details
|
|
|
02-19-2009
|
2.60
|
Riveting on the floor support nutplates
|
Details
|
|
|
02-18-2009
|
2.60
|
Drilled for floor board nutplates
|
Details
|
|
|
02-12-2009
|
2.70
|
Removed flaps and started on floor nut plates
|
Details
|
|
|
02-11-2009
|
3.10
|
Flaps are moving!
|
Details
|
|
|
02-10-2009
|
2.50
|
Fitted the right flap
|
Details
|
|
|
02-09-2009
|
2.70
|
Fitted left flap fairing
|
Details
|
|
|
02-01-2009
|
2.80
|
More trimming and fitting left flap
|
Details
|
|
|
01-26-2009
|
1.20
|
Trimmed the left flap top skin
|
Details
|
|
|
01-24-2009
|
3.50
|
Finished aileron pushrods and installed right one
|
Details
|
|
|
01-20-2009
|
1.80
|
Right wing root fairings
|
Details
|
|
|
01-16-2009
|
2.50
|
Fabricated the left wing root fairing
|
Details
|
|
|
01-13-2009
|
2.80
|
Back in action
|
Details
|
|
|
11-03-2008
|
2.10
|
Started on the aileron torque tubes
|
Details
|
|
|
10-31-2008
|
2.20
|
Fuel lines Finito!
|
Details
|
|
|
09-14-2008
|
2.20
|
Fabricated and installed fuel pump brackets
|
Details
|
|
|
09-10-2008
|
1.80
|
More fuel vent lines and start on fuel injection s
|
Details
|
|
|
09-08-2008
|
1.50
|
Fabricated Right Tank Vent Line
|
Details
|
|
|
09-06-2008
|
2.20
|
Installed left fuel tank vent line
|
Details
|
|
|
09-04-2008
|
0.70
|
Started on fuel system
|
Details
|
|
|
09-03-2008
|
1.50
|
Drilled and bolted fwd wing attach angles
|
Details
|
|
|
09-02-2008
|
2.90
|
Fabricated Forward Wing attach angles
|
Details
|
|
|
09-01-2008
|
4.70
|
Positioned wings and drilled the aft spar
|
Details
|
|
|
08-08-2008
|
0.00
|
August 8, 2008
|
Details
|
|
|
08-07-2008
|
0.30
|
Painted the cockpit rail
|
Details
|
|
|
08-06-2008
|
2.10
|
More wing dinging
|
Details
|
|
|
08-05-2008
|
1.50
|
More wing fitting work
|
Details
|
|
|
08-04-2008
|
2.50
|
The Wings Go On!!
|
Details
|
|
|
08-03-2008
|
0.00
|
Returned from Oshkosh
|
Details
|
|
|
07-18-2008
|
2.00
|
More preparation to fit the wings
|
Details
|
|
|
07-15-2008
|
1.60
|
Began wing prep
|
Details
|
|
|
07-14-2008
|
1.50
|
Finished rear seat
|
Details
|
|
|
06-23-2008
|
2.30
|
Working on the rear seat
|
Details
|
|
|
06-12-2008
|
2.40
|
Riveted and finished painting front seat
|
Details
|
|
|
06-11-2008
|
3.00
|
Deburred and primed seat parts
|
Details
|
|
|
05-28-2008
|
0.50
|
Started work on seats
|
Details
|
|
|
05-27-2008
|
3.50
|
Installed the windshield bow
|
Details
|
|
|
05-26-2008
|
3.50
|
Riveted cockpit side rails
|
Details
|
|
|
05-22-2008
|
1.80
|
Masked off cockpit for paint
|
Details
|
|
|
05-21-2008
|
1.50
|
Scuffed the cockpit paint for a second coat
|
Details
|
|
|
05-06-2008
|
2.70
|
Deburring, dimpling and countersinking cockpit rai
|
Details
|
|
|
05-05-2008
|
2.50
|
Drilled forward rail angle support
|
Details
|
|
|
05-01-2008
|
2.20
|
Drilled on the welded seat support -Marked 1000 ho
|
Details
|
|
|
04-30-2008
|
2.20
|
Drilled cockpit rails
|
Details
|
|
|
04-13-2008
|
0.00
|
Sun-N-Fun 2008
|
Details
|
|
|
04-04-2008
|
1.00
|
Fabricated shims for the side of the instrument pa
|
Details
|
|
|
03-26-2008
|
2.50
|
Seat back support side plates drilled in
|
Details
|
|
|
03-23-2008
|
0.50
|
Easter Sunday and the family makes its mark
|
Details
|
|
|
03-21-2008
|
3.10
|
More fuselage top skin prep
|
Details
|
|
|
03-20-2008
|
2.50
|
More work on the fuselage top skin
|
Details
|
|
|
03-19-2008
|
0.50
|
Top skin work
|
Details
|
|
|
03-17-2008
|
3.00
|
Installed the instrument panel
|
Details
|
|
|
03-16-2008
|
3.50
|
Drilled on forward top skin
|
Details
|
|
|
03-15-2008
|
2.60
|
Installed throttle and fuel selector valve console
|
Details
|
|
|
03-13-2008
|
3.20
|
Mid cabin consoles
|
Details
|
|
|
03-11-2008
|
3.30
|
Wrestled with Fuel Selector Valve Installation
|
Details
|
|
|
03-08-2008
|
3.50
|
Seat ramp
|
Details
|
|
|
02-23-2008
|
3.80
|
Bolted in left main gear weldment
|
Details
|
|
|
02-16-2008
|
3.80
|
main gear weldments installation
|
Details
|
|
|
02-13-2008
|
1.50
|
Riveted Cooling ramp
|
Details
|
|
|
01-31-2008
|
1.80
|
Prep cooling ramp for riveting
|
Details
|
|
|
01-26-2008
|
4.60
|
Riveted the remaining belly skin and fabicated the
|
Details
|
|
|
01-25-2008
|
1.00
|
Prosealed the remaining belly skin ribs and skin
|
Details
|
|
|
01-21-2008
|
1.50
|
Riveted longitudinal belly skin ribs
|
Details
|
|
|
12-31-2007
|
1.80
|
Yet even more belly skin work
|
Details
|
|
|
12-29-2007
|
1.60
|
Started riveting belly ribs with proseal
|
Details
|
|
|
12-17-2007
|
2.80
|
Primed belly skin parts
|
Details
|
|
|
12-15-2007
|
3.50
|
Belly skin redux
|
Details
|
|
|
12-10-2007
|
1.50
|
Miscellaneous belly work
|
Details
|
|
|
12-05-2007
|
1.80
|
Forward belly
|
Details
|
|
|
12-03-2007
|
1.50
|
Belly flop
|
Details
|
|
|
12-02-2007
|
3.50
|
Forward fuselage belly structure
|
Details
|
|
|
12-01-2007
|
0.00
|
I am a pilot once again
|
Details
|
|
|
11-26-2007
|
1.80
|
Riveted aft top bulkhead & fabricated canopy rail
|
Details
|
|
|
11-25-2007
|
3.50
|
Drilled shoulder harness attach points
|
Details
|
|
|
11-24-2007
|
5.60
|
Plumbed brake system and drilled top aft fuselage
|
Details
|
|
|
11-23-2007
|
5.30
|
Fabricated the rudder stops
|
Details
|
|
|
11-13-2007
|
2.30
|
Assembled rudder pedals
|
Details
|
|
|
11-11-2007
|
2.20
|
Misc. nuts and bolts
|
Details
|
|
|
11-10-2007
|
0.50
|
Fabricated the pitch servo push rod
|
Details
|
|
|
11-08-2007
|
3.10
|
Mounted the autopilot pitch servo
|
Details
|
|
|
11-03-2007
|
3.60
|
Installed the stick assembly
|
Details
|
|
|
11-02-2007
|
2.00
|
Hanged the rudder and started rigging elevator
|
Details
|
|
|
10-31-2007
|
3.30
|
Set the elevator stops
|
Details
|
|
|
10-29-2007
|
0.00
|
Poppa's got a brand new prop!
|
Details
|
|
|
10-26-2007
|
0.00
|
Sam Beale takes delivery of his tail kit!
|
Details
|
|
|
10-25-2007
|
2.50
|
Fabricated elevator up stop
|
Details
|
|
|
10-24-2007
|
1.00
|
Began fitting the elevators
|
Details
|
|
|
10-22-2007
|
2.90
|
Set the forward vertical stabilizer spar
|
Details
|
|
|
10-21-2007
|
1.20
|
Big weekend then cleaned the shop
|
Details
|
|
|
10-18-2007
|
1.70
|
Fabricated the elevator bell crank
|
Details
|
|
|
10-17-2007
|
1.70
|
More messing with the Vertical Stabilizer
|
Details
|
|
|
10-16-2007
|
0.50
|
Began installing the vertical stabilizer
|
Details
|
|
|
10-15-2007
|
1.50
|
Cogitating on the Vertical Stabilizer installation
|
Details
|
|
|
10-14-2007
|
1.70
|
Fabricate and install a new F-810C reinforcing bra
|
Details
|
|
|
10-13-2007
|
3.50
|
Drilled horizontal stabilizer to the fuselage
|
Details
|
|
|
10-10-2007
|
1.20
|
Began fitting the horizontal stabilizer
|
Details
|
|
|
10-08-2007
|
2.60
|
Finished aft baggage bin and rudder pedals
|
Details
|
|
|
10-03-2007
|
2.50
|
Painted aft baggage bin parts
|
Details
|
|
|
10-02-2007
|
2.20
|
More aft baggage bin work and rivet on the fwd bag
|
Details
|
|
|
10-01-2007
|
2.60
|
Drilled and clecoed aft baggage bin
|
Details
|
|
|
09-29-2007
|
6.50
|
Finished throttle console and started on aft bagga
|
Details
|
|
|
09-24-2007
|
2.50
|
Finished right console and started on the throttle
|
Details
|
|
|
09-20-2007
|
2.50
|
Worked on right console
|
Details
|
|
|
09-19-2007
|
1.80
|
Began right console installation
|
Details
|
|
|
09-18-2007
|
2.50
|
Installed the arm rests
|
Details
|
|
|
09-17-2007
|
3.50
|
Finish painting the cockpit
|
Details
|
|
|
08-23-2007
|
2.70
|
Sam and I work on miscellaneous fuselage stuff
|
Details
|
|
|
08-19-2007
|
2.50
|
Finished assembling the forward baggage compartmen
|
Details
|
|
|
08-18-2007
|
3.00
|
Worked on forward baggage compartment components
|
Details
|
|
|
08-13-2007
|
3.30
|
Fabricated baggage bulkhead access door
|
Details
|
|
|
08-10-2007
|
1.70
|
Fabricate a doubler for the baggage bulkhead acces
|
Details
|
|
|
07-30-2007
|
1.20
|
Finishing Kit Delivered
|
Details
|
|
|
07-29-2007
|
0.00
|
Airventure 2007
|
Details
|
|
|
07-16-2007
|
2.60
|
Final install of battery tray
|
Details
|
|
|
07-12-2007
|
2.20
|
Painting interior parts
|
Details
|
|
|
07-10-2007
|
2.20
|
Paint cancer strikes
|
Details
|
|
|
07-09-2007
|
2.00
|
Miscellaneous painting
|
Details
|
|
|
06-27-2007
|
3.10
|
Working on the forward baggage bin and cutting an
|
Details
|
|
|
06-26-2007
|
0.00
|
Witnessed Jamie Painter's first engine start
|
Details
|
|
|
06-24-2007
|
0.00
|
Played hooky on the motorcycle
|
Details
|
|
|
06-21-2007
|
2.80
|
Fabricated the forward baggage compartment
|
Details
|
|
|
06-20-2007
|
2.30
|
Sam and I fit the bagage bulkhead
|
Details
|
|
|
06-19-2007
|
2.30
|
Installed flap motor
|
Details
|
|
|
06-17-2007
|
2.80
|
Finished paint test and drilled arm rests
|
Details
|
|
|
06-16-2007
|
4.70
|
Paint test and nutplate mania
|
Details
|
|
|
06-15-2007
|
3.20
|
Finished battery tray and side cockpit covers
|
Details
|
|
|
06-14-2007
|
1.40
|
Fabricated the battery tray
|
Details
|
|
|
06-13-2007
|
2.90
|
Fabricated rear control column mount and more
|
Details
|
|
|
06-12-2007
|
2.80
|
Installed flap actuator
|
Details
|
|
|
06-10-2007
|
5.50
|
Finished up cockpit floors
|
Details
|
|
|
06-06-2007
|
2.20
|
Prepared aft cockpit floors
|
Details
|
|
|
06-05-2007
|
2.50
|
Riveted aft deck and passenger footwells
|
Details
|
|
|
06-04-2007
|
2.70
|
Fabricated the rear seat passenger footwells
|
Details
|
|
|
06-03-2007
|
2.30
|
Tranquility Base gets environmental enhancement an
|
Details
|
|
|
06-02-2007
|
3.20
|
PDK Neighbor Day and working on fuselage gussets
|
Details
|
|
|
05-31-2007
|
3.30
|
Fixing seat support angles
|
Details
|
|
|
05-27-2007
|
0.00
|
That's one small step for man
|
Details
|
|
|
05-26-2007
|
2.20
|
Fitted internal rudder cable fairings
|
Details
|
|
|
05-24-2007
|
3.10
|
Installed miscellaneous support angles
|
Details
|
|
|
05-20-2007
|
0.00
|
Bob and Steve's big adventure
|
Details
|
|
|
05-17-2007
|
3.30
|
Fitted and drilled the rear deck
|
Details
|
|
|
05-16-2007
|
2.00
|
Fabricated tail angles
|
Details
|
|
|
05-13-2007
|
2.50
|
Fabricated and installed the tail tie down
|
Details
|
|
|
05-10-2007
|
2.40
|
Disassembled the fuselage jig
|
Details
|
|
|
05-09-2007
|
2.80
|
The Fuselage comes out of the jig and we have a ca
|
Details
|
|
|
05-08-2007
|
2.70
|
Jim Weed helps rivet the forward side skins
|
Details
|
|
|
05-05-2007
|
0.00
|
Drew graduates from law school
|
Details
|
|
|
05-02-2007
|
1.40
|
Riveted some of forward side skins
|
Details
|
|
|
05-01-2007
|
2.80
|
Finished bottom skins
|
Details
|
|
|
04-29-2007
|
2.10
|
More riveting and clecoing the skins
|
Details
|
|
|
04-27-2007
|
0.00
|
Road trip to help Jamie Painter install his wings
|
Details
|
|
|
04-26-2007
|
3.00
|
Bottom skin bingo
|
Details
|
|
|
04-25-2007
|
2.00
|
Installed the forward bottom skin
|
Details
|
|
|
04-18-2007
|
0.00
|
Sun-N-Fun 2007
|
Details
|
|
|
04-14-2007
|
0.00
|
Sun-N-Fun Week, RV flyin at Leeward Air Ranch
|
Details
|
|
|
04-11-2007
|
2.70
|
Sam and I finish the cockpit side skins
|
Details
|
|
|
04-07-2007
|
2.00
|
Mark helps rivet the cockpit side skins
|
Details
|
|
|
04-03-2007
|
2.00
|
Riveting on the cockpit side skins
|
Details
|
|
|
03-31-2007
|
2.60
|
working on the cockpit side skins
|
Details
|
|
|
03-30-2007
|
2.30
|
Finished aft left side skin
|
Details
|
|
|
03-29-2007
|
3.50
|
Finished riveting the right aft side skin, started
|
Details
|
|
|
03-28-2007
|
3.20
|
Sam and I rivet fuselage skins
|
Details
|
|
|
03-27-2007
|
3.10
|
Began riveting the bottom skins
|
Details
|
|
|
03-15-2007
|
3.00
|
Finished priming fuselage skins
|
Details
|
|
|
03-14-2007
|
1.50
|
Primed the longerons
|
Details
|
|
|
03-13-2007
|
3.20
|
Deburred and countersunk the longerons
|
Details
|
|
|
03-11-2007
|
0.00
|
No work done, but I spoke with a legend
|
Details
|
|
|
03-07-2007
|
2.70
|
Fuselage skeleton prep, the saga continues
|
Details
|
|
|
03-06-2007
|
3.50
|
Yet even more skeleton prep
|
Details
|
|
|
03-01-2007
|
3.10
|
More fuselage skeleton prep
|
Details
|
|
|
02-28-2007
|
2.80
|
Begin prep of fuselage skeleton
|
Details
|
|
|
02-16-2007
|
1.40
|
Almost finished skin prep
|
Details
|
|
|
02-15-2007
|
2.90
|
Yet even more skin prep madness at 700+ hours
|
Details
|
|
|
02-14-2007
|
1.70
|
Right aft side skin prep
|
Details
|
|
|
02-13-2007
|
2.70
|
More skin prep and an old friend croaks
|
Details
|
|
|
02-11-2007
|
2.30
|
Prep one more skin and retire an old friend
|
Details
|
|
|
02-08-2007
|
2.70
|
Yet more fuselage skin prep
|
Details
|
|
|
02-07-2007
|
2.40
|
More skin prep with Sam
|
Details
|
|
|
02-06-2007
|
2.90
|
Fuselage skin prep. The saga continues
|
Details
|
|
|
02-03-2007
|
2.10
|
Preparing the forward side skins
|
Details
|
|
|
02-01-2007
|
2.30
|
Repositioned the forward gussets and began skin pr
|
Details
|
|
|
01-31-2007
|
2.30
|
Fit forward bulkheads and gussets
|
Details
|
|
|
01-27-2007
|
2.30
|
Finished drilling the bottom skins
|
Details
|
|
|
01-25-2007
|
3.10
|
Drilled the aft bottom skin to the fuselage
|
Details
|
|
|
01-24-2007
|
1.70
|
Fitting the bottom middle skins
|
Details
|
|
|
01-23-2007
|
2.10
|
Finished rear seat belt brackets
|
Details
|
|
|
01-22-2007
|
1.80
|
Fabricated rear seat belt brackets
|
Details
|
|
|
01-20-2007
|
0.00
|
Lakeland RV flyin
|
Details
|
|
|
01-17-2007
|
3.50
|
Sam Beale and I drill on the right side aft skin
|
Details
|
|
|
01-13-2007
|
0.00
|
My EAA chapter visits the shop
|
Details
|
|
|
01-07-2007
|
8.80
|
Fit the midship side skins
|
Details
|
|
|
01-06-2007
|
1.50
|
Fit auxilliary longeron and doubler
|
Details
|
|
|
01-04-2007
|
2.50
|
Drilled the forward side skins
|
Details
|
|
|
01-03-2007
|
3.50
|
Fit forward side skins
|
Details
|
|
|
12-30-2006
|
2.30
|
Drilled the forward floor skin to the fuselage ske
|
Details
|
|
|
12-28-2006
|
3.70
|
Installed lower longerons in forward fuselage
|
Details
|
|
|
12-26-2006
|
5.70
|
More fuselage skeleton work
|
Details
|
|
|
12-21-2006
|
3.20
|
Leveled the jig cross braces and fit more bulkhead
|
Details
|
|
|
12-19-2006
|
1.20
|
Fixed the jig legs to the floor
|
Details
|
|
|
12-18-2006
|
2.10
|
More work needed on the jig
|
Details
|
|
|
12-17-2006
|
3.80
|
Fixed the firewall and aft bulkhead to the jig
|
Details
|
|
|
12-13-2006
|
2.70
|
Bent the upper longerons
|
Details
|
|
|
12-11-2006
|
1.70
|
Finished the 811 bulkhead
|
Details
|
|
|
12-10-2006
|
4.60
|
Finished the floor ribs
|
Details
|
|
|
12-09-2006
|
4.30
|
Working on the floor ribs
|
Details
|
|
|
12-07-2006
|
3.10
|
Floor ribs redux
|
Details
|
|
|
12-06-2006
|
2.30
|
Working on the floor ribs
|
Details
|
|
|
12-03-2006
|
0.00
|
Helped install an engine in Jim Anderson's Healey
|
Details
|
|
|
12-02-2006
|
4.50
|
Priming bulkheads and fabricating floor ribs
|
Details
|
|
|
12-01-2006
|
3.20
|
Back to work on the bulkheads
|
Details
|
|
|
11-30-2006
|
0.50
|
Peter DiTomaso visits the shop
|
Details
|
|
|
11-26-2006
|
2.00
|
Constructed a paint shelf
|
Details
|
|
|
11-20-2006
|
1.10
|
Drilled 812 Bulkhead
|
Details
|
|
|
11-16-2006
|
1.00
|
Drilled the bars to the 811 bulkhead: HUH?
|
Details
|
|
|
11-15-2006
|
2.70
|
Bought a Corvette and worked on bulkheads
|
Details
|
|
|
11-12-2006
|
2.90
|
Finished 807 Bulkhead
|
Details
|
|
|
11-11-2006
|
3.20
|
Started working on 807 Bulkhead
|
Details
|
|
|
11-09-2006
|
2.50
|
Completed the firewall
|
Details
|
|
|
11-08-2006
|
2.20
|
Prepared firewall angles
|
Details
|
|
|
11-07-2006
|
2.50
|
Working on the firewall, take two
|
Details
|
|
|
11-06-2006
|
2.30
|
Finished up center section
|
Details
|
|
|
11-05-2006
|
3.80
|
Even more work on the center section
|
Details
|
|
|
11-03-2006
|
2.30
|
Still working on the center section
|
Details
|
|
|
11-02-2006
|
2.40
|
Fitted the landing gear weldments to the center se
|
Details
|
|
|
11-01-2006
|
3.30
|
Sam and I work of the center section
|
Details
|
|
|
10-31-2006
|
3.20
|
Center Section, contd.
|
Details
|
|
|
10-26-2006
|
3.60
|
Muffed the firewall!
|
Details
|
|
|
10-25-2006
|
2.00
|
Began center section construction
|
Details
|
|
|
10-24-2006
|
3.30
|
Riveted the firewall
|
Details
|
|
|
10-23-2006
|
3.20
|
Firewall prep
|
Details
|
|
|
10-20-2006
|
1.00
|
Clecoed firewall together
|
Details
|
|
|
10-19-2006
|
4.10
|
Finished the fuselage jig
|
Details
|
|
|
10-17-2006
|
1.80
|
Started assembling fuselage jig
|
Details
|
|
|
10-16-2006
|
0.00
|
Cleaned out the basement
|
Details
|
|
|
10-11-2006
|
2.00
|
Began construction of fuselage jig
|
Details
|
|
|
10-10-2006
|
2.20
|
Finished wings!
|
Details
|
|
|
10-09-2006
|
1.00
|
Fitted the right flap (again)
|
Details
|
|
|
10-05-2006
|
1.70
|
Finished bottom skins of right wing
|
Details
|
|
|
10-03-2006
|
2.80
|
Almost finished riveting bottome wing skins
|
Details
|
|
|
10-02-2006
|
2.90
|
Finished riveting left inboard bottom wing skin
|
Details
|
|
|
09-28-2006
|
1.80
|
Began riveting right wing bottom skin
|
Details
|
|
|
09-27-2006
|
2.00
|
Finished installation of autopilot roll servo
|
Details
|
|
|
09-26-2006
|
2.90
|
Fabricated servo doubler for right wing
|
Details
|
|
|
09-25-2006
|
3.50
|
Hung the left flap (take 3)
|
Details
|
|
|
09-22-2006
|
2.00
|
Finished riveting the left wing
|
Details
|
|
|
09-21-2006
|
3.10
|
Solo riveting on the bottom left wing skin
|
Details
|
|
|
09-19-2006
|
1.80
|
Finished left inboard bottom skin
|
Details
|
|
|
09-18-2006
|
3.10
|
Sam and I begin riveting the left wing bottom skin
|
Details
|
|
|
09-14-2006
|
0.80
|
Routed the pitot line
|
Details
|
|
|
09-13-2006
|
1.50
|
Preclose work on left wing
|
Details
|
|
|
09-12-2006
|
2.80
|
Installed left flap
|
Details
|
|
|
09-11-2006
|
3.10
|
Drilled right flap to wing and drilled out wiring
|
Details
|
|
|
09-09-2006
|
2.00
|
Aligned ailerons and started flap installation
|
Details
|
|
|
09-06-2006
|
3.20
|
Finished right flap
|
Details
|
|
|
09-04-2006
|
3.70
|
Dimpled, primed and began riveting right flap
|
Details
|
|
|
09-03-2006
|
0.00
|
Vick and I go to the Balloon Festival at Callaway
|
Details
|
|
|
08-31-2006
|
3.60
|
Deburred right flap and smoothed the edges
|
Details
|
|
|
08-30-2006
|
3.10
|
Finished drilling right flap
|
Details
|
|
|
08-29-2006
|
4.50
|
Attempt left flap untwist and start right flap
|
Details
|
|
|
08-27-2006
|
1.80
|
Finished riveting left flap
|
Details
|
|
|
08-25-2006
|
3.40
|
More riveting of left flap
|
Details
|
|
|
08-22-2006
|
3.10
|
Primed and began riveting the left flap
|
Details
|
|
|
08-19-2006
|
0.00
|
Trip to Flight Safety
|
Details
|
|
|
08-18-2006
|
3.20
|
Deburred and dimpled the left flap
|
Details
|
|
|
08-15-2006
|
2.20
|
Finally figured out the flap brackets
|
Details
|
|
|
08-14-2006
|
0.30
|
Drilled the flap spar to rib holes to final size
|
Details
|
|
|
08-13-2006
|
1.30
|
Fabricating the flap actuator brackets
|
Details
|
|
|
08-12-2006
|
2.80
|
Figuring out the flaps
|
Details
|
|
|
08-07-2006
|
0.80
|
Received Trio Aileron Servo
|
Details
|
|
|
08-06-2006
|
2.20
|
Finished right aileron
|
Details
|
|
|
08-04-2006
|
2.70
|
Riveted the tough set on the right aileron
|
Details
|
|
|
08-03-2006
|
2.80
|
Back from Oshkosh -Debur right aileron
|
Details
|
|
|
07-21-2006
|
1.70
|
Drilled right aileron
|
Details
|
|
|
07-20-2006
|
1.50
|
Started right aileron
|
Details
|
|
|
07-19-2006
|
2.00
|
Finished left aileron
|
Details
|
|
|
07-13-2006
|
2.40
|
Began to rivet left aileron
|
Details
|
|
|
07-12-2006
|
2.70
|
Dimpled and primed the left aileron
|
Details
|
|
|
07-11-2006
|
2.80
|
Drilled the left aileron
|
Details
|
|
|
07-10-2006
|
0.00
|
No Construction, Vacation in Virginia Beach
|
Details
|
|
|
06-30-2006
|
2.30
|
Rivet aileron stiffeners
|
Details
|
|
|
06-29-2006
|
1.60
|
Dimpled the aileron skins
|
Details
|
|
|
06-28-2006
|
1.50
|
Finished inventorying the fuselage kit
|
Details
|
|
|
06-27-2006
|
5.60
|
Fuselage kit arrives!
|
Details
|
|
|
06-25-2006
|
3.60
|
Prep stiffeners and inside of aileron skins
|
Details
|
|
|
06-23-2006
|
1.20
|
Started left aileron
|
Details
|
|
|
06-21-2006
|
2.20
|
Riveted flap brace and aileron gap seal for right
|
Details
|
|
|
06-20-2006
|
2.80
|
Riveted left aileron brace and aileron gap seal
|
Details
|
|
|
06-19-2006
|
2.90
|
Installed left flap brace and aileron gap seal
|
Details
|
|
|
06-17-2006
|
3.20
|
Riveted aileron brackets to rear spar
|
Details
|
|
|
06-16-2006
|
1.00
|
Riveted aileron brackets
|
Details
|
|
|
06-15-2006
|
3.10
|
Prepared aileron brackets
|
Details
|
|
|
06-14-2006
|
3.20
|
Finished right wing top skin
|
Details
|
|
|
06-12-2006
|
2.10
|
Began riveting top right wing skin
|
Details
|
|
|
06-11-2006
|
2.20
|
Built wing cradle
|
Details
|
|
|
06-06-2006
|
1.70
|
Repositioned right wing tank and clecoed top skins
|
Details
|
|
|
06-05-2006
|
1.00
|
Final prep of top right wing skins
|
Details
|
|
|
06-03-2006
|
2.70
|
Deburred and dimpled right wing skeleton
|
Details
|
|
|
05-31-2006
|
2.80
|
Finished riveting top skin on left wing
|
Details
|
|
|
05-30-2006
|
2.20
|
More riveting of left wing top skin
|
Details
|
|
|
05-29-2006
|
2.00
|
Began riveting the top skin to the left wing
|
Details
|
|
|
05-25-2006
|
2.90
|
Dimpled left wing ribs and clecoed on top skin
|
Details
|
|
|
05-24-2006
|
1.80
|
Installed fuel tank on right wing
|
Details
|
|
|
05-23-2006
|
2.30
|
Installed fuel tank on left wing
|
Details
|
|
|
05-22-2006
|
3.20
|
Riveted right leading edge to wing spar
|
Details
|
|
|
05-18-2006
|
3.10
|
Prep for right leading edge
|
Details
|
|
|
05-16-2006
|
3.20
|
Final riveting of left leading edge to spar
|
Details
|
|
|
05-10-2006
|
2.50
|
Finished riveting the right leading edge
|
Details
|
|
|
05-09-2006
|
0.50
|
Started to rivet right leading edge
|
Details
|
|
|
05-05-2006
|
3.60
|
Finished prep of right leading edge
|
Details
|
|
|
05-02-2006
|
2.80
|
Installed pitot tube bracket
|
Details
|
|
|
04-30-2006
|
0.00
|
Vick and I go to Paris
|
Details
|
|
|
04-12-2006
|
2.60
|
Deburred right wing leading edge
|
Details
|
|
|
04-11-2006
|
3.30
|
Riveted the left leading edge
|
Details
|
|
|
04-10-2006
|
0.00
|
Back from Sun-N-Fun
|
Details
|
|
|
04-01-2006
|
6.20
|
Prepared left leading edge for riveting
|
Details
|
|
|
03-31-2006
|
0.00
|
She Held!
|
Details
|
|
|
03-30-2006
|
2.80
|
Pressure tested right tank
|
Details
|
|
|
03-28-2006
|
2.70
|
Wing prep day 5
|
Details
|
|
|
03-27-2006
|
0.00
|
Real home building in Mississippi
|
Details
|
|
|
03-21-2006
|
0.10
|
Complied with fuel pickup Service Bulletin
|
Details
|
|
|
03-19-2006
|
0.00
|
Off day
|
Details
|
|
|
03-18-2006
|
7.60
|
Wing prep, day four
|
Details
|
|
|
03-17-2006
|
2.80
|
Wing skin prep, day three
|
Details
|
|
|
03-16-2006
|
3.20
|
Wing skin prep, day three
|
Details
|
|
|
03-15-2006
|
2.50
|
Wing skin prep, day two
|
Details
|
|
|
03-14-2006
|
2.70
|
Started wing skin prep
|
Details
|
|
|
03-12-2006
|
3.50
|
Finished right fuel tank!
|
Details
|
|
|
03-08-2006
|
3.00
|
Final prep before closing the right tank
|
Details
|
|
|
03-06-2006
|
0.80
|
Sealed fittings in the right tank access plate
|
Details
|
|
|
03-04-2006
|
1.70
|
Slammed last tank rib!
|
Details
|
|
|
03-02-2006
|
1.20
|
Sealed and riveted the right outboard tank rib.
|
Details
|
|
|
02-28-2006
|
1.50
|
Prep right tank end ribs
|
Details
|
|
|
02-27-2006
|
1.50
|
Last interior right tank rib
|
Details
|
|
|
02-26-2006
|
0.30
|
Masking the last 3 tank ribs
|
Details
|
|
|
02-25-2006
|
3.00
|
Sealed and riveted 4 ribs in right tank
|
Details
|
|
|
02-24-2006
|
2.20
|
Final prep for right tank rib riveting
|
Details
|
|
|
02-23-2006
|
1.80
|
Stop me before I tape again
|
Details
|
|
|
02-21-2006
|
3.30
|
Sealed and riveted the stiffeners, drain flange an
|
Details
|
|
|
02-19-2006
|
0.00
|
No work today
|
Details
|
|
|
02-18-2006
|
3.70
|
Right tank prep.
|
Details
|
|
|
02-13-2006
|
2.70
|
Deburred and dimpled the right tank ribs
|
Details
|
|
|
02-12-2006
|
0.00
|
Engineering calculations for fuel tank test pressu
|
Details
|
|
|
02-10-2006
|
0.00
|
Meet a woman race pilot
|
Details
|
|
|
02-09-2006
|
2.70
|
Right tank prep
|
Details
|
|
|
02-08-2006
|
2.50
|
Left fuel tank passes pressure test
|
Details
|
|
|
02-07-2006
|
2.70
|
Prep right tank skin
|
Details
|
|
|
02-06-2006
|
0.50
|
Installed left fuel tank access plate
|
Details
|
|
|
02-05-2006
|
0.00
|
Road trip to Davidson, NC
|
Details
|
|
|
02-04-2006
|
3.00
|
Closed out Left Tank
|
Details
|
|
|
02-03-2006
|
0.50
|
Prep for tank closure
|
Details
|
|
|
01-30-2006
|
0.50
|
Preparing to close the left fuel tank
|
Details
|
|
|
01-29-2006
|
2.00
|
Sealed and riveted the last rib in the left tank
|
Details
|
|
|
01-28-2006
|
1.00
|
Fabricated fuel pickup and tank vent line
|
Details
|
|
|
01-24-2006
|
0.30
|
Ran fuel tank vent line
|
Details
|
|
|
01-22-2006
|
2.00
|
Sealed outboard left tank rib
|
Details
|
|
|
01-21-2006
|
3.00
|
Finished left tank interior ribs
|
Details
|
|
|
01-16-2006
|
1.50
|
One more tank rib
|
Details
|
|
|
01-15-2006
|
2.50
|
Riveted first two tank ribs
|
Details
|
|
|
01-03-2006
|
28.00
|
Final left tank rib prep
|
Details
|
|
|
01-01-2006
|
2.00
|
Finally confronted Black Death
|
Details
|
|
|
12-31-2005
|
1.10
|
Even more tank prep
|
Details
|
|
|
12-30-2005
|
1.50
|
Prep for tank work
|
Details
|
|
|
12-28-2005
|
2.80
|
Dimpled left tank skins, stiffeners & ribs
|
Details
|
|
|
12-25-2005
|
1.60
|
Deburrer tank ribs
|
Details
|
|
|
12-22-2005
|
1.20
|
Drilled fuel tank filler flange and drain flange
|
Details
|
|
|
12-19-2005
|
1.80
|
|
Details
|
|
|
12-18-2005
|
6.30
|
Tank prep work
|
Details
|
|
|
12-17-2005
|
6.80
|
Fit and drilled out fuel tanks
|
Details
|
|
|
12-16-2005
|
3.50
|
Clecoed tank together & drilled Z brackets
|
Details
|
|
|
12-13-2005
|
2.50
|
Attached nutplates to Z brackets & bolted them to
|
Details
|
|
|
12-11-2005
|
2.70
|
Primed the Z brackets and started riveting on nutp
|
Details
|
|
|
12-10-2005
|
1.00
|
Drilled Z brackets for nutplates
|
Details
|
|
|
12-08-2005
|
1.50
|
Drilled Z brackets for fuel tanks
|
Details
|
|
|
12-04-2005
|
3.70
|
Fit, drill and finish the right wing leading edge
|
Details
|
|
|
12-03-2005
|
4.00
|
Fabricated Leading Edge Cradle & L leading edge
|
Details
|
|
|
11-30-2005
|
1.50
|
Right wing skin
|
Details
|
|
|
11-29-2005
|
0.70
|
Wing skin drilling
|
Details
|
|
|
11-28-2005
|
5.20
|
Wing skin fitting
|
Details
|
|
|
11-27-2005
|
3.50
|
Clecoed left wing skins
|
Details
|
|
|
11-25-2005
|
3.20
|
Finshshed right wing skeleton
|
Details
|
|
|
11-24-2005
|
0.40
|
Clecoed ribs onto right wing spar
|
Details
|
|
|
11-23-2005
|
3.30
|
Preparing and priming right wing ribs
|
Details
|
|
|
11-22-2005
|
2.70
|
Fit, drilled and deburred the right wing skeleton
|
Details
|
|
|
11-21-2005
|
3.20
|
Finishing wing jig and placing left wing in it
|
Details
|
|
|
11-20-2005
|
3.20
|
Riveted left wing ribs to spars
|
Details
|
|
|
11-19-2005
|
4.80
|
Left wing skeleton prep
|
Details
|
|
|
11-18-2005
|
6.50
|
Wing Rib Straightening, take two, three, four
|
Details
|
|
|
11-14-2005
|
0.60
|
Wing rib straightening, take one
|
Details
|
|
|
11-13-2005
|
0.00
|
Constructed wing jig and rib straightening station
|
Details
|
|
|
11-10-2005
|
2.80
|
Wing and tank rib deburring.
|
Details
|
|
|
11-09-2005
|
2.80
|
Primed and riveted rear spars
|
Details
|
|
|
11-07-2005
|
2.10
|
Worked on rear spar
|
Details
|
|
|
11-06-2005
|
2.20
|
Rear spar doublers
|
Details
|
|
|
11-05-2005
|
0.50
|
Tapped the tiedown fitting
|
Details
|
|
|
11-05-2005
|
2.00
|
Started on rear spars
|
Details
|
|
|
11-02-2005
|
3.40
|
More Nut Plate Mania!
|
Details
|
|
|
11-01-2005
|
1.80
|
More drilling and some fabrication
|
Details
|
|
|
10-31-2005
|
1.00
|
Drilling and countersinking the spar
|
Details
|
|
|
10-31-2005
|
0.00
|
Countersink backing plate description continued
|
|
|
|
10-30-2005
|
1.60
|
Countersunk tank attachment plate nut holes
|
Details
|
|
|
10-29-2005
|
3.50
|
Inventoried the wing kit
|
Details
|
|
|
10-28-2005
|
0.30
|
Finished the Empenage!
|
Details
|
|
|
10-27-2005
|
3.30
|
Rolled leading edges of elevators
|
Details
|
|
|
10-26-2005
|
2.00
|
Final assembly of trim tab
|
Details
|
|
|
10-25-2005
|
2.00
|
Trim tab priming
|
Details
|
|
|
10-24-2005
|
2.80
|
Trim tab construction
|
Details
|
|
|
10-20-2005
|
2.70
|
Riveted skin to left elevator
|
Details
|
|
|
10-18-2005
|
2.00
|
Riveted Left Elevator Skeleton
|
Details
|
|
|
10-17-2005
|
2.80
|
Tab bending hell.
|
Details
|
|
|
10-15-2005
|
0.00
|
Wing Kit Arrives!
|
Details
|
|
|
10-13-2005
|
3.00
|
Primed left elevator parts
|
Details
|
|
|
10-04-2005
|
2.30
|
Trim Tab Servo Mania
|
Details
|
|
|
10-03-2005
|
3.00
|
Drilled left elevator skins
|
Details
|
|
|
09-30-2005
|
2.90
|
Finished Left Elevator, started on the right
|
Details
|
|
|
09-29-2005
|
2.80
|
Riveting the elevator
|
Details
|
|
|
09-23-2005
|
1.70
|
Deburred, dimpled and primed right elevator.
|
Details
|
|
|
09-19-2005
|
3.20
|
Clecoed and drilled Rt. elevator
|
Details
|
|
|
09-14-2005
|
2.50
|
Prep Left elevator skeleton
|
Details
|
|
|
09-12-2005
|
2.90
|
Riveted stiffeners onto elevator skins
|
Details
|
|
|
09-10-2005
|
4.20
|
Prepared elevator stiffeners
|
Details
|
|
|
09-04-2005
|
4.50
|
Riveted rudder skin to skeleton
|
Details
|
|
|
09-03-2005
|
2.50
|
Finished rudder skeleton
|
Details
|
|
|
09-01-2005
|
2.70
|
Dimpled and primed rudder
|
Details
|
|
|
08-31-2005
|
1.20
|
Deburred rudder parts
|
Details
|
|
|
08-30-2005
|
2.60
|
Rudder skeleton
|
Details
|
|
|
08-23-2005
|
1.50
|
Finished elevator stiffeners.
|
Details
|
|
|
08-22-2005
|
1.80
|
Cut out elevator stiffeners
|
Details
|
|
|
08-21-2005
|
2.20
|
Finishing the rudder trailing edge and messing up
|
Details
|
|
|
08-20-2005
|
3.00
|
Back riveted rudder stiffeners to skin.
|
Details
|
|
|
08-19-2005
|
2.80
|
Debur, dimple and prime rudder skin & stiffeners
|
Details
|
|
|
08-18-2005
|
3.00
|
Starting on the rudder
|
Details
|
|
|
08-17-2005
|
1.80
|
Finished Vertical Stabilizer
|
Details
|
|
|
08-16-2005
|
3.10
|
Finished Horizontal Stabilizer
|
Details
|
|
|
08-14-2005
|
5.50
|
Riveting HS skin
|
Details
|
|
|
08-08-2005
|
0.80
|
Prime and clecoed VS skin
|
Details
|
|
|
08-07-2005
|
3.50
|
Prime and assemble the VS skeleton
|
Details
|
|
|
08-01-2005
|
0.10
|
Back from Oshkosh
|
Details
|
|
|
07-18-2005
|
1.80
|
Dimpled VS skin
|
Details
|
|
|
07-17-2005
|
1.60
|
Drilled VS rear spar doubler lightening holes
|
Details
|
|
|
07-16-2005
|
1.80
|
Deburred VS skeleton and rear spar doubler
|
Details
|
|
|
07-15-2005
|
2.20
|
Finished VS skeleton, match drilled VS skin
|
Details
|
|
|
07-14-2005
|
1.00
|
Assembled Vertical Stabilizer Spar and straightene
|
Details
|
|
|
07-13-2005
|
1.60
|
Riveted HS nose rib
|
Details
|
|
|
07-12-2005
|
2.80
|
Riveted HS skeleton, reprimed parts
|
Details
|
|
|
07-11-2005
|
3.50
|
Primed left HS skin and inside of HS skins
|
Details
|
|
|
07-10-2005
|
0.00
|
Rivet practice
|
Details
|
|
|
07-06-2005
|
1.00
|
Primed right half of HS skeleton
|
Details
|
|
|
06-23-2005
|
0.00
|
Install 2 shop lighting fixtures
|
Details
|
|
|
06-22-2005
|
1.60
|
Finished dimpling HS skins, primed one rib
|
Details
|
|
|
06-21-2005
|
1.80
|
Dimpled HS skins
|
Details
|
|
|
06-17-2005
|
1.20
|
Build jig for C-Frame dimpler
|
Details
|
|
|
06-15-2005
|
3.30
|
Deburred and dimpled HS skeleton
|
Details
|
|
|
06-14-2005
|
3.50
|
HS drilling and blue plastic removal
|
Details
|
|
|
06-13-2005
|
3.20
|
Finish HS skeleton and drill to skins
|
Details
|
|
|
06-12-2005
|
0.60
|
HS rib straightening
|
Details
|
|
|
06-11-2005
|
8.30
|
Horizontal Stabilizer front spar and skeleton
|
Details
|
|
|
06-09-2005
|
4.30
|
Vertical Stabilizer rear spar
|
Details
|
|
|
06-06-2005
|
3.10
|
Empenage kit arrives
|
Details
|
|