Work Logs Found: 491
Category Work Time: 1502 Hours
 Date
Hours
Work Log Summary

Details

 07-07-2009
2.10
Finishing the sides of the canopy
Details

 06-24-2009
1.00
Made the final trim of the canopy
Details
     

 06-20-2009
1.50
Made the Big Cut!
Details
       

 06-18-2009
2.30
Getting closer to the final canopy trimming
Details
       

 06-15-2009
0.80
More canopy trimming
Details

 06-14-2009
21.00
Placed canopy spacers and made the 3rd cut
Details

 06-09-2009
1.90
Started cutting the canopy
Details
       

 06-08-2009
2.90
Polished and installed the canopy rails
Details
       

 06-07-2009
3.00
Finished bending canopy frame & drilled canopy rai
Details

 05-26-2009
2.50
Began fitting the canopy frame
Details
       

 05-22-2009
1.80
Started fabricating the canopy rails
Details
       

 05-21-2009
1.70
Finished canopy rail
Details

 05-20-2009
3.20
Riveted flap fairings
Details
       

 05-19-2009
2.50
Started Finishing Kit
Details
       

 05-16-2009
1.50
Flap fairing work
Details
       

 05-11-2009
1.00
Riveted the step
Details
       

 05-10-2009
0.50
Worked on step some more
Details
       

 05-09-2009
29.00
Installing the step
Details

 05-07-2009
2.80
Began installing step
Details
       

 05-06-2009
2.40
More nutplate installations
Details

 04-29-2009
1.20
Back on the project, glued in the vent scoop under
Details
       

 04-26-2009
0.00
Back from Sun-N-Fun 2009
Details
       

 04-13-2009
2.00
Installed nutplates in wing root leading edge
Details
       

 04-12-2009
1.20
More wing finishing issues
Details
       

 04-03-2009
2.10
Finished aileron pushrods and installed some wing
Details
       

 04-01-2009
1.20
Removed the wings
Details
       

 03-18-2009
2.00
Removed wing bolts
Details

 03-17-2009
3.00
Ran a tap through the floorboard nutplates
Details
       

 03-16-2009
2.60
Fixed floor nutplates
Details

 03-11-2009
1.50
Floorboard madness
Details

 03-10-2009
2.70
Fitted flap actuators through the floorboards
Details

 03-09-2009
2.60
Finished floor board nutplates
Details

 03-06-2009
306.00
More nutplate installation for floorboards
Details
       

 02-19-2009
2.60
Riveting on the floor support nutplates
Details

 02-18-2009
2.60
Drilled for floor board nutplates
Details

 02-12-2009
2.70
Removed flaps and started on floor nut plates
Details

 02-11-2009
3.10
Flaps are moving!
Details

 02-10-2009
2.50
Fitted the right flap
Details

 02-09-2009
2.70
Fitted left flap fairing
Details
       

 02-01-2009
2.80
More trimming and fitting left flap
Details
       

 01-26-2009
1.20
Trimmed the left flap top skin
Details
       

 01-24-2009
3.50
Finished aileron pushrods and installed right one
Details

 01-20-2009
1.80
Right wing root fairings
Details

 01-16-2009
2.50
Fabricated the left wing root fairing
Details
     

 01-13-2009
2.80
Back in action
Details
       

 11-03-2008
2.10
Started on the aileron torque tubes
Details
       

 10-31-2008
2.20
Fuel lines Finito!
Details
       

 09-14-2008
2.20
Fabricated and installed fuel pump brackets
Details
     

 09-10-2008
1.80
More fuel vent lines and start on fuel injection s
Details
       

 09-08-2008
1.50
Fabricated Right Tank Vent Line
Details
       

 09-06-2008
2.20
Installed left fuel tank vent line
Details
     

 09-04-2008
0.70
Started on fuel system
Details
     

 09-03-2008
1.50
Drilled and bolted fwd wing attach angles
Details
       

 09-02-2008
2.90
Fabricated Forward Wing attach angles
Details
       

 09-01-2008
4.70
Positioned wings and drilled the aft spar
Details
       

 08-08-2008
0.00
August 8, 2008
Details
     

 08-07-2008
0.30
Painted the cockpit rail
Details

 08-06-2008
2.10
More wing dinging
Details

 08-05-2008
1.50
More wing fitting work
Details

 08-04-2008
2.50
The Wings Go On!!
Details
       

 08-03-2008
0.00
Returned from Oshkosh
Details
       

 07-18-2008
2.00
More preparation to fit the wings
Details
       

 07-15-2008
1.60
Began wing prep
Details
       

 07-14-2008
1.50
Finished rear seat
Details
       

 06-23-2008
2.30
Working on the rear seat
Details
       

 06-12-2008
2.40
Riveted and finished painting front seat
Details
     

 06-11-2008
3.00
Deburred and primed seat parts
Details

 05-28-2008
0.50
Started work on seats
Details

 05-27-2008
3.50
Installed the windshield bow
Details
       

 05-26-2008
3.50
Riveted cockpit side rails
Details
       

 05-22-2008
1.80
Masked off cockpit for paint
Details
     

 05-21-2008
1.50
Scuffed the cockpit paint for a second coat
Details
     

 05-06-2008
2.70
Deburring, dimpling and countersinking cockpit rai
Details

 05-05-2008
2.50
Drilled forward rail angle support
Details
     

 05-01-2008
2.20
Drilled on the welded seat support -Marked 1000 ho
Details
       

 04-30-2008
2.20
Drilled cockpit rails
Details
       

 04-13-2008
0.00
Sun-N-Fun 2008
Details
       

 04-04-2008
1.00
Fabricated shims for the side of the instrument pa
Details
       

 03-26-2008
2.50
Seat back support side plates drilled in
Details
       

 03-23-2008
0.50
Easter Sunday and the family makes its mark
Details
       

 03-21-2008
3.10
More fuselage top skin prep
Details

 03-20-2008
2.50
More work on the fuselage top skin
Details

 03-19-2008
0.50
Top skin work
Details
     

 03-17-2008
3.00
Installed the instrument panel
Details
       

 03-16-2008
3.50
Drilled on forward top skin
Details
       

 03-15-2008
2.60
Installed throttle and fuel selector valve console
Details
       

 03-13-2008
3.20
Mid cabin consoles
Details

 03-11-2008
3.30
Wrestled with Fuel Selector Valve Installation
Details
       

 03-08-2008
3.50
Seat ramp
Details
     

 02-23-2008
3.80
Bolted in left main gear weldment
Details
       

 02-16-2008
3.80
main gear weldments installation
Details
     

 02-13-2008
1.50
Riveted Cooling ramp
Details
       

 01-31-2008
1.80
Prep cooling ramp for riveting
Details

 01-26-2008
4.60
Riveted the remaining belly skin and fabicated the
Details
       

 01-25-2008
1.00
Prosealed the remaining belly skin ribs and skin
Details

 01-21-2008
1.50
Riveted longitudinal belly skin ribs
Details
       

 12-31-2007
1.80
Yet even more belly skin work
Details
       

 12-29-2007
1.60
Started riveting belly ribs with proseal
Details
       

 12-17-2007
2.80
Primed belly skin parts
Details

 12-15-2007
3.50
Belly skin redux
Details
     

 12-10-2007
1.50
Miscellaneous belly work
Details
       

 12-05-2007
1.80
Forward belly
Details

 12-03-2007
1.50
Belly flop
Details
       

 12-02-2007
3.50
Forward fuselage belly structure
Details
       

 12-01-2007
0.00
I am a pilot once again
Details

 11-26-2007
1.80
Riveted aft top bulkhead & fabricated canopy rail
Details
       

 11-25-2007
3.50
Drilled shoulder harness attach points
Details
     

 11-24-2007
5.60
Plumbed brake system and drilled top aft fuselage
Details
       

 11-23-2007
5.30
Fabricated the rudder stops
Details
       

 11-13-2007
2.30
Assembled rudder pedals
Details
       

 11-11-2007
2.20
Misc. nuts and bolts
Details

 11-10-2007
0.50
Fabricated the pitch servo push rod
Details
       

 11-08-2007
3.10
Mounted the autopilot pitch servo
Details
       

 11-03-2007
3.60
Installed the stick assembly
Details
       

 11-02-2007
2.00
Hanged the rudder and started rigging elevator
Details
       

 10-31-2007
3.30
Set the elevator stops
Details
       

 10-29-2007
0.00
Poppa's got a brand new prop!
Details
       

 10-26-2007
0.00
Sam Beale takes delivery of his tail kit!
Details
       

 10-25-2007
2.50
Fabricated elevator up stop
Details
       

 10-24-2007
1.00
Began fitting the elevators
Details
       

 10-22-2007
2.90
Set the forward vertical stabilizer spar
Details
       

 10-21-2007
1.20
Big weekend then cleaned the shop
Details
       

 10-18-2007
1.70
Fabricated the elevator bell crank
Details
       

 10-17-2007
1.70
More messing with the Vertical Stabilizer
Details
       

 10-16-2007
0.50
Began installing the vertical stabilizer
Details
       

 10-15-2007
1.50
Cogitating on the Vertical Stabilizer installation
Details
       

 10-14-2007
1.70
Fabricate and install a new F-810C reinforcing bra
Details
     

 10-13-2007
3.50
Drilled horizontal stabilizer to the fuselage
Details
       

 10-10-2007
1.20
Began fitting the horizontal stabilizer
Details
       

 10-08-2007
2.60
Finished aft baggage bin and rudder pedals
Details
       

 10-03-2007
2.50
Painted aft baggage bin parts
Details

 10-02-2007
2.20
More aft baggage bin work and rivet on the fwd bag
Details
       

 10-01-2007
2.60
Drilled and clecoed aft baggage bin
Details
       

 09-29-2007
6.50
Finished throttle console and started on aft bagga
Details
       

 09-24-2007
2.50
Finished right console and started on the throttle
Details
       

 09-20-2007
2.50
Worked on right console
Details

 09-19-2007
1.80
Began right console installation
Details
       

 09-18-2007
2.50
Installed the arm rests
Details
       

 09-17-2007
3.50
Finish painting the cockpit
Details

 08-23-2007
2.70
Sam and I work on miscellaneous fuselage stuff
Details

 08-19-2007
2.50
Finished assembling the forward baggage compartmen
Details
       

 08-18-2007
3.00
Worked on forward baggage compartment components
Details
     

 08-13-2007
3.30
Fabricated baggage bulkhead access door
Details
       

 08-10-2007
1.70
Fabricate a doubler for the baggage bulkhead acces
Details
       

 07-30-2007
1.20
Finishing Kit Delivered
Details
       

 07-29-2007
0.00
Airventure 2007
Details
       

 07-16-2007
2.60
Final install of battery tray
Details
       

 07-12-2007
2.20
Painting interior parts
Details

 07-10-2007
2.20
Paint cancer strikes
Details
       

 07-09-2007
2.00
Miscellaneous painting
Details

 06-27-2007
3.10
Working on the forward baggage bin and cutting an
Details
       

 06-26-2007
0.00
Witnessed Jamie Painter's first engine start
Details
       

 06-24-2007
0.00
Played hooky on the motorcycle
Details
       

 06-21-2007
2.80
Fabricated the forward baggage compartment
Details
       

 06-20-2007
2.30
Sam and I fit the bagage bulkhead
Details
       

 06-19-2007
2.30
Installed flap motor
Details
     

 06-17-2007
2.80
Finished paint test and drilled arm rests
Details
       

 06-16-2007
4.70
Paint test and nutplate mania
Details
       

 06-15-2007
3.20
Finished battery tray and side cockpit covers
Details
       

 06-14-2007
1.40
Fabricated the battery tray
Details
     

 06-13-2007
2.90
Fabricated rear control column mount and more
Details
       

 06-12-2007
2.80
Installed flap actuator
Details
       

 06-10-2007
5.50
Finished up cockpit floors
Details
       

 06-06-2007
2.20
Prepared aft cockpit floors
Details

 06-05-2007
2.50
Riveted aft deck and passenger footwells
Details
       

 06-04-2007
2.70
Fabricated the rear seat passenger footwells
Details
     

 06-03-2007
2.30
Tranquility Base gets environmental enhancement an
Details
       

 06-02-2007
3.20
PDK Neighbor Day and working on fuselage gussets
Details
       

 05-31-2007
3.30
Fixing seat support angles
Details
     

 05-27-2007
0.00
That's one small step for man
Details
       

 05-26-2007
2.20
Fitted internal rudder cable fairings
Details
       

 05-24-2007
3.10
Installed miscellaneous support angles
Details
       

 05-20-2007
0.00
Bob and Steve's big adventure
Details
     

 05-17-2007
3.30
Fitted and drilled the rear deck
Details
       

 05-16-2007
2.00
Fabricated tail angles
Details
     

 05-13-2007
2.50
Fabricated and installed the tail tie down
Details
       

 05-10-2007
2.40
Disassembled the fuselage jig
Details
       

 05-09-2007
2.80
The Fuselage comes out of the jig and we have a ca
Details
       

 05-08-2007
2.70
Jim Weed helps rivet the forward side skins
Details
       

 05-05-2007
0.00
Drew graduates from law school
Details
       

 05-02-2007
1.40
Riveted some of forward side skins
Details

 05-01-2007
2.80
Finished bottom skins
Details
       

 04-29-2007
2.10
More riveting and clecoing the skins
Details

 04-27-2007
0.00
Road trip to help Jamie Painter install his wings
Details
       

 04-26-2007
3.00
Bottom skin bingo
Details
     

 04-25-2007
2.00
Installed the forward bottom skin
Details
       

 04-18-2007
0.00
Sun-N-Fun 2007
Details
       

 04-14-2007
0.00
Sun-N-Fun Week, RV flyin at Leeward Air Ranch
Details
       

 04-11-2007
2.70
Sam and I finish the cockpit side skins
Details
     

 04-07-2007
2.00
Mark helps rivet the cockpit side skins
Details
       

 04-03-2007
2.00
Riveting on the cockpit side skins
Details

 03-31-2007
2.60
working on the cockpit side skins
Details

 03-30-2007
2.30
Finished aft left side skin
Details

 03-29-2007
3.50
Finished riveting the right aft side skin, started
Details
       

 03-28-2007
3.20
Sam and I rivet fuselage skins
Details
       

 03-27-2007
3.10
Began riveting the bottom skins
Details
       

 03-15-2007
3.00
Finished priming fuselage skins
Details
     

 03-14-2007
1.50
Primed the longerons
Details

 03-13-2007
3.20
Deburred and countersunk the longerons
Details
       

 03-11-2007
0.00
No work done, but I spoke with a legend
Details
     

 03-07-2007
2.70
Fuselage skeleton prep, the saga continues
Details
       

 03-06-2007
3.50
Yet even more skeleton prep
Details

 03-01-2007
3.10
More fuselage skeleton prep
Details
     

 02-28-2007
2.80
Begin prep of fuselage skeleton
Details
       

 02-16-2007
1.40
Almost finished skin prep
Details
       

 02-15-2007
2.90
Yet even more skin prep madness at 700+ hours
Details

 02-14-2007
1.70
Right aft side skin prep
Details
       

 02-13-2007
2.70
More skin prep and an old friend croaks
Details
       

 02-11-2007
2.30
Prep one more skin and retire an old friend
Details
       

 02-08-2007
2.70
Yet more fuselage skin prep
Details
     

 02-07-2007
2.40
More skin prep with Sam
Details
     

 02-06-2007
2.90
Fuselage skin prep. The saga continues
Details
       

 02-03-2007
2.10
Preparing the forward side skins
Details

 02-01-2007
2.30
Repositioned the forward gussets and began skin pr
Details
       

 01-31-2007
2.30
Fit forward bulkheads and gussets
Details
       

 01-27-2007
2.30
Finished drilling the bottom skins
Details
       

 01-25-2007
3.10
Drilled the aft bottom skin to the fuselage
Details
       

 01-24-2007
1.70
Fitting the bottom middle skins
Details
       

 01-23-2007
2.10
Finished rear seat belt brackets
Details
       

 01-22-2007
1.80
Fabricated rear seat belt brackets
Details
     

 01-20-2007
0.00
Lakeland RV flyin
Details
       

 01-17-2007
3.50
Sam Beale and I drill on the right side aft skin
Details
       

 01-13-2007
0.00
My EAA chapter visits the shop
Details
       

 01-07-2007
8.80
Fit the midship side skins
Details
       

 01-06-2007
1.50
Fit auxilliary longeron and doubler
Details
     

 01-04-2007
2.50
Drilled the forward side skins
Details
       

 01-03-2007
3.50
Fit forward side skins
Details
       

 12-30-2006
2.30
Drilled the forward floor skin to the fuselage ske
Details
     

 12-28-2006
3.70
Installed lower longerons in forward fuselage
Details
       

 12-26-2006
5.70
More fuselage skeleton work
Details
       

 12-21-2006
3.20
Leveled the jig cross braces and fit more bulkhead
Details
       

 12-19-2006
1.20
Fixed the jig legs to the floor
Details
       

 12-18-2006
2.10
More work needed on the jig
Details
       

 12-17-2006
3.80
Fixed the firewall and aft bulkhead to the jig
Details
       

 12-13-2006
2.70
Bent the upper longerons
Details
       

 12-11-2006
1.70
Finished the 811 bulkhead
Details
     

 12-10-2006
4.60
Finished the floor ribs
Details
       

 12-09-2006
4.30
Working on the floor ribs
Details
       

 12-07-2006
3.10
Floor ribs redux
Details
       

 12-06-2006
2.30
Working on the floor ribs
Details
       

 12-03-2006
0.00
Helped install an engine in Jim Anderson's Healey
Details
       

 12-02-2006
4.50
Priming bulkheads and fabricating floor ribs
Details
       

 12-01-2006
3.20
Back to work on the bulkheads
Details
       

 11-30-2006
0.50
Peter DiTomaso visits the shop
Details
     

 11-26-2006
2.00
Constructed a paint shelf
Details
       

 11-20-2006
1.10
Drilled 812 Bulkhead
Details
     

 11-16-2006
1.00
Drilled the bars to the 811 bulkhead: HUH?
Details
       

 11-15-2006
2.70
Bought a Corvette and worked on bulkheads
Details
       

 11-12-2006
2.90
Finished 807 Bulkhead
Details
       

 11-11-2006
3.20
Started working on 807 Bulkhead
Details
       

 11-09-2006
2.50
Completed the firewall
Details
       

 11-08-2006
2.20
Prepared firewall angles
Details
     

 11-07-2006
2.50
Working on the firewall, take two
Details
     

 11-06-2006
2.30
Finished up center section
Details
       

 11-05-2006
3.80
Even more work on the center section
Details
       

 11-03-2006
2.30
Still working on the center section
Details
       

 11-02-2006
2.40
Fitted the landing gear weldments to the center se
Details
       

 11-01-2006
3.30
Sam and I work of the center section
Details
       

 10-31-2006
3.20
Center Section, contd.
Details
       

 10-26-2006
3.60
Muffed the firewall!
Details
       

 10-25-2006
2.00
Began center section construction
Details
       

 10-24-2006
3.30
Riveted the firewall
Details
       

 10-23-2006
3.20
Firewall prep
Details
     

 10-20-2006
1.00
Clecoed firewall together
Details
     

 10-19-2006
4.10
Finished the fuselage jig
Details
       

 10-17-2006
1.80
Started assembling fuselage jig
Details
       

 10-16-2006
0.00
Cleaned out the basement
Details

 10-11-2006
2.00
Began construction of fuselage jig
Details

 10-10-2006
2.20
Finished wings!
Details

 10-09-2006
1.00
Fitted the right flap (again)
Details

 10-05-2006
1.70
Finished bottom skins of right wing
Details

 10-03-2006
2.80
Almost finished riveting bottome wing skins
Details
       

 10-02-2006
2.90
Finished riveting left inboard bottom wing skin
Details

 09-28-2006
1.80
Began riveting right wing bottom skin
Details
     

 09-27-2006
2.00
Finished installation of autopilot roll servo
Details
       

 09-26-2006
2.90
Fabricated servo doubler for right wing
Details
       

 09-25-2006
3.50
Hung the left flap (take 3)
Details
       

 09-22-2006
2.00
Finished riveting the left wing
Details
     

 09-21-2006
3.10
Solo riveting on the bottom left wing skin
Details
       

 09-19-2006
1.80
Finished left inboard bottom skin
Details

 09-18-2006
3.10
Sam and I begin riveting the left wing bottom skin
Details
     

 09-14-2006
0.80
Routed the pitot line
Details
       

 09-13-2006
1.50
Preclose work on left wing
Details
       

 09-12-2006
2.80
Installed left flap
Details
     

 09-11-2006
3.10
Drilled right flap to wing and drilled out wiring
Details
     

 09-09-2006
2.00
Aligned ailerons and started flap installation
Details
       

 09-06-2006
3.20
Finished right flap
Details
       

 09-04-2006
3.70
Dimpled, primed and began riveting right flap
Details
     

 09-03-2006
0.00
Vick and I go to the Balloon Festival at Callaway
Details
       

 08-31-2006
3.60
Deburred right flap and smoothed the edges
Details
       

 08-30-2006
3.10
Finished drilling right flap
Details
       

 08-29-2006
4.50
Attempt left flap untwist and start right flap
Details
       

 08-27-2006
1.80
Finished riveting left flap
Details
       

 08-25-2006
3.40
More riveting of left flap
Details
       

 08-22-2006
3.10
Primed and began riveting the left flap
Details
     

 08-19-2006
0.00
Trip to Flight Safety
Details
       

 08-18-2006
3.20
Deburred and dimpled the left flap
Details
     

 08-15-2006
2.20
Finally figured out the flap brackets
Details
       

 08-14-2006
0.30
Drilled the flap spar to rib holes to final size
Details

 08-13-2006
1.30
Fabricating the flap actuator brackets
Details

 08-12-2006
2.80
Figuring out the flaps
Details
       

 08-07-2006
0.80
Received Trio Aileron Servo
Details
       

 08-06-2006
2.20
Finished right aileron
Details
     

 08-04-2006
2.70
Riveted the tough set on the right aileron
Details
       

 08-03-2006
2.80
Back from Oshkosh -Debur right aileron
Details
       

 07-21-2006
1.70
Drilled right aileron
Details

 07-20-2006
1.50
Started right aileron
Details
     

 07-19-2006
2.00
Finished left aileron
Details
       

 07-13-2006
2.40
Began to rivet left aileron
Details
       

 07-12-2006
2.70
Dimpled and primed the left aileron
Details

 07-11-2006
2.80
Drilled the left aileron
Details
       

 07-10-2006
0.00
No Construction, Vacation in Virginia Beach
Details
     

 06-30-2006
2.30
Rivet aileron stiffeners
Details
       

 06-29-2006
1.60
Dimpled the aileron skins
Details
     

 06-28-2006
1.50
Finished inventorying the fuselage kit
Details

 06-27-2006
5.60
Fuselage kit arrives!
Details
       

 06-25-2006
3.60
Prep stiffeners and inside of aileron skins
Details
       

 06-23-2006
1.20
Started left aileron
Details
       

 06-21-2006
2.20
Riveted flap brace and aileron gap seal for right
Details
       

 06-20-2006
2.80
Riveted left aileron brace and aileron gap seal
Details
       

 06-19-2006
2.90
Installed left flap brace and aileron gap seal
Details
       

 06-17-2006
3.20
Riveted aileron brackets to rear spar
Details
       

 06-16-2006
1.00
Riveted aileron brackets
Details

 06-15-2006
3.10
Prepared aileron brackets
Details
       

 06-14-2006
3.20
Finished right wing top skin
Details
       

 06-12-2006
2.10
Began riveting top right wing skin
Details
     

 06-11-2006
2.20
Built wing cradle
Details
       

 06-06-2006
1.70
Repositioned right wing tank and clecoed top skins
Details
     

 06-05-2006
1.00
Final prep of top right wing skins
Details
     

 06-03-2006
2.70
Deburred and dimpled right wing skeleton
Details

 05-31-2006
2.80
Finished riveting top skin on left wing
Details
       

 05-30-2006
2.20
More riveting of left wing top skin
Details
       

 05-29-2006
2.00
Began riveting the top skin to the left wing
Details
       

 05-25-2006
2.90
Dimpled left wing ribs and clecoed on top skin
Details

 05-24-2006
1.80
Installed fuel tank on right wing
Details

 05-23-2006
2.30
Installed fuel tank on left wing
Details
       

 05-22-2006
3.20
Riveted right leading edge to wing spar
Details

 05-18-2006
3.10
Prep for right leading edge
Details
       

 05-16-2006
3.20
Final riveting of left leading edge to spar
Details
       

 05-10-2006
2.50
Finished riveting the right leading edge
Details
       

 05-09-2006
0.50
Started to rivet right leading edge
Details

 05-05-2006
3.60
Finished prep of right leading edge
Details
       

 05-02-2006
2.80
Installed pitot tube bracket
Details
       

 04-30-2006
0.00
Vick and I go to Paris
Details
       

 04-12-2006
2.60
Deburred right wing leading edge
Details

 04-11-2006
3.30
Riveted the left leading edge
Details
     

 04-10-2006
0.00
Back from Sun-N-Fun
Details
       

 04-01-2006
6.20
Prepared left leading edge for riveting
Details
       

 03-31-2006
0.00
She Held!
Details

 03-30-2006
2.80
Pressure tested right tank
Details
       

 03-28-2006
2.70
Wing prep day 5
Details
       

 03-27-2006
0.00
Real home building in Mississippi
Details
     

 03-21-2006
0.10
Complied with fuel pickup Service Bulletin
Details
     

 03-19-2006
0.00
Off day
Details
     

 03-18-2006
7.60
Wing prep, day four
Details
       

 03-17-2006
2.80
Wing skin prep, day three
Details
       

 03-16-2006
3.20
Wing skin prep, day three
Details

 03-15-2006
2.50
Wing skin prep, day two
Details
       

 03-14-2006
2.70
Started wing skin prep
Details
       

 03-12-2006
3.50
Finished right fuel tank!
Details
       

 03-08-2006
3.00
Final prep before closing the right tank
Details
       

 03-06-2006
0.80
Sealed fittings in the right tank access plate
Details
       

 03-04-2006
1.70
Slammed last tank rib!
Details
       

 03-02-2006
1.20
Sealed and riveted the right outboard tank rib.
Details
     

 02-28-2006
1.50
Prep right tank end ribs
Details
       

 02-27-2006
1.50
Last interior right tank rib
Details
       

 02-26-2006
0.30
Masking the last 3 tank ribs
Details
     

 02-25-2006
3.00
Sealed and riveted 4 ribs in right tank
Details
       

 02-24-2006
2.20
Final prep for right tank rib riveting
Details
       

 02-23-2006
1.80
Stop me before I tape again
Details
       

 02-21-2006
3.30
Sealed and riveted the stiffeners, drain flange an
Details
       

 02-19-2006
0.00
No work today
Details
     

 02-18-2006
3.70
Right tank prep.
Details
       

 02-13-2006
2.70
Deburred and dimpled the right tank ribs
Details

 02-12-2006
0.00
Engineering calculations for fuel tank test pressu
Details
       

 02-10-2006
0.00
Meet a woman race pilot
Details
     

 02-09-2006
2.70
Right tank prep
Details
       

 02-08-2006
2.50
Left fuel tank passes pressure test
Details
       

 02-07-2006
2.70
Prep right tank skin
Details
       

 02-06-2006
0.50
Installed left fuel tank access plate
Details

 02-05-2006
0.00
Road trip to Davidson, NC
Details
       

 02-04-2006
3.00
Closed out Left Tank
Details
     

 02-03-2006
0.50
Prep for tank closure
Details

 01-30-2006
0.50
Preparing to close the left fuel tank
Details
     

 01-29-2006
2.00
Sealed and riveted the last rib in the left tank
Details
       

 01-28-2006
1.00
Fabricated fuel pickup and tank vent line
Details
       

 01-24-2006
0.30
Ran fuel tank vent line
Details
       

 01-22-2006
2.00
Sealed outboard left tank rib
Details
       

 01-21-2006
3.00
Finished left tank interior ribs
Details

 01-16-2006
1.50
One more tank rib
Details

 01-15-2006
2.50
Riveted first two tank ribs
Details
       

 01-03-2006
28.00
Final left tank rib prep
Details

 01-01-2006
2.00
Finally confronted Black Death
Details
       

 12-31-2005
1.10
Even more tank prep
Details
       

 12-30-2005
1.50
Prep for tank work
Details
       

 12-28-2005
2.80
Dimpled left tank skins, stiffeners & ribs
Details
       

 12-25-2005
1.60
Deburrer tank ribs
Details

 12-22-2005
1.20
Drilled fuel tank filler flange and drain flange
Details
       

 12-19-2005
1.80

Details
       

 12-18-2005
6.30
Tank prep work
Details
       

 12-17-2005
6.80
Fit and drilled out fuel tanks
Details
       

 12-16-2005
3.50
Clecoed tank together & drilled Z brackets
Details
       

 12-13-2005
2.50
Attached nutplates to Z brackets & bolted them to
Details
     

 12-11-2005
2.70
Primed the Z brackets and started riveting on nutp
Details

 12-10-2005
1.00
Drilled Z brackets for nutplates
Details
       

 12-08-2005
1.50
Drilled Z brackets for fuel tanks
Details
       

 12-04-2005
3.70
Fit, drill and finish the right wing leading edge
Details
     

 12-03-2005
4.00
Fabricated Leading Edge Cradle & L leading edge
Details
       

 11-30-2005
1.50
Right wing skin
Details

 11-29-2005
0.70
Wing skin drilling
Details

 11-28-2005
5.20
Wing skin fitting
Details

 11-27-2005
3.50
Clecoed left wing skins
Details
       

 11-25-2005
3.20
Finshshed right wing skeleton
Details
       

 11-24-2005
0.40
Clecoed ribs onto right wing spar
Details
     

 11-23-2005
3.30
Preparing and priming right wing ribs
Details
       

 11-22-2005
2.70
Fit, drilled and deburred the right wing skeleton
Details
       

 11-21-2005
3.20
Finishing wing jig and placing left wing in it
Details
       

 11-20-2005
3.20
Riveted left wing ribs to spars
Details
       

 11-19-2005
4.80
Left wing skeleton prep
Details
     

 11-18-2005
6.50
Wing Rib Straightening, take two, three, four
Details

 11-14-2005
0.60
Wing rib straightening, take one
Details
     

 11-13-2005
0.00
Constructed wing jig and rib straightening station
Details
       

 11-10-2005
2.80
Wing and tank rib deburring.
Details
       

 11-09-2005
2.80
Primed and riveted rear spars
Details

 11-07-2005
2.10
Worked on rear spar
Details

 11-06-2005
2.20
Rear spar doublers
Details

 11-05-2005
0.50
Tapped the tiedown fitting
Details

 11-05-2005
2.00
Started on rear spars
Details

 11-02-2005
3.40
More Nut Plate Mania!
Details

 11-01-2005
1.80
More drilling and some fabrication
Details

 10-31-2005
1.00
Drilling and countersinking the spar
Details
       

 10-31-2005
0.00
Countersink backing plate description continued
       

 10-30-2005
1.60
Countersunk tank attachment plate nut holes
Details
       

 10-29-2005
3.50
Inventoried the wing kit
Details
       

 10-28-2005
0.30
Finished the Empenage!
Details

 10-27-2005
3.30
Rolled leading edges of elevators
Details
     

 10-26-2005
2.00
Final assembly of trim tab
Details
       

 10-25-2005
2.00
Trim tab priming
Details

 10-24-2005
2.80
Trim tab construction
Details

 10-20-2005
2.70
Riveted skin to left elevator
Details
     

 10-18-2005
2.00
Riveted Left Elevator Skeleton
Details
       

 10-17-2005
2.80
Tab bending hell.
Details
       

 10-15-2005
0.00
Wing Kit Arrives!
Details

 10-13-2005
3.00
Primed left elevator parts
Details

 10-04-2005
2.30
Trim Tab Servo Mania
Details

 10-03-2005
3.00
Drilled left elevator skins
Details

 09-30-2005
2.90
Finished Left Elevator, started on the right
Details
       

 09-29-2005
2.80
Riveting the elevator
Details

 09-23-2005
1.70
Deburred, dimpled and primed right elevator.
Details

 09-19-2005
3.20
Clecoed and drilled Rt. elevator
Details
       

 09-14-2005
2.50
Prep Left elevator skeleton
Details
       

 09-12-2005
2.90
Riveted stiffeners onto elevator skins
Details
       

 09-10-2005
4.20
Prepared elevator stiffeners
Details
     

 09-04-2005
4.50
Riveted rudder skin to skeleton
Details
       

 09-03-2005
2.50
Finished rudder skeleton
Details
       

 09-01-2005
2.70
Dimpled and primed rudder
Details
     

 08-31-2005
1.20
Deburred rudder parts
Details

 08-30-2005
2.60
Rudder skeleton
Details
     

 08-23-2005
1.50
Finished elevator stiffeners.
Details
     

 08-22-2005
1.80
Cut out elevator stiffeners
Details

 08-21-2005
2.20
Finishing the rudder trailing edge and messing up
Details
       

 08-20-2005
3.00
Back riveted rudder stiffeners to skin.
Details
       

 08-19-2005
2.80
Debur, dimple and prime rudder skin & stiffeners
Details
       

 08-18-2005
3.00
Starting on the rudder
Details
       

 08-17-2005
1.80
Finished Vertical Stabilizer
Details
       

 08-16-2005
3.10
Finished Horizontal Stabilizer
Details
       

 08-14-2005
5.50
Riveting HS skin
Details
       

 08-08-2005
0.80
Prime and clecoed VS skin
Details
       

 08-07-2005
3.50
Prime and assemble the VS skeleton
Details
     

 08-01-2005
0.10
Back from Oshkosh
Details
       

 07-18-2005
1.80
Dimpled VS skin
Details

 07-17-2005
1.60
Drilled VS rear spar doubler lightening holes
Details

 07-16-2005
1.80
Deburred VS skeleton and rear spar doubler
Details

 07-15-2005
2.20
Finished VS skeleton, match drilled VS skin
Details

 07-14-2005
1.00
Assembled Vertical Stabilizer Spar and straightene
Details

 07-13-2005
1.60
Riveted HS nose rib
Details

 07-12-2005
2.80
Riveted HS skeleton, reprimed parts
Details

 07-11-2005
3.50
Primed left HS skin and inside of HS skins
Details

 07-10-2005
0.00
Rivet practice
Details
     

 07-06-2005
1.00
Primed right half of HS skeleton
Details

 06-23-2005
0.00
Install 2 shop lighting fixtures
Details

 06-22-2005
1.60
Finished dimpling HS skins, primed one rib
Details

 06-21-2005
1.80
Dimpled HS skins
Details

 06-17-2005
1.20
Build jig for C-Frame dimpler
Details
       

 06-15-2005
3.30
Deburred and dimpled HS skeleton
Details

 06-14-2005
3.50
HS drilling and blue plastic removal
Details
     

 06-13-2005
3.20
Finish HS skeleton and drill to skins
Details
     

 06-12-2005
0.60
HS rib straightening
Details

 06-11-2005
8.30
Horizontal Stabilizer front spar and skeleton
Details
       

 06-09-2005
4.30
Vertical Stabilizer rear spar
Details
       

 06-06-2005
3.10
Empenage kit arrives
Details
       