Powered By Kitlog Pro v2.0
Josephs Web Site
Q2
All
Work Logs Found:
65
Category Work Time:
259 Hours
Date
Hours
Work Log Summary
Details
01-23-2008
5.00
Tested engine mount
Details
01-22-2008
1.00
Testing emgine mount
Details
01-18-2008
2.50
Paint engine mount
Details
01-17-2008
1.50
Sandblasted engine mount; primer
Details
01-16-2008
4.00
Engine mount
Details
01-14-2008
3.00
Engine mount
Details
01-13-2008
3.50
Engine mount
Details
01-12-2008
3.00
Airfilter/carb heat box
Details
01-11-2008
2.50
Baffel leaks; engine mount
Details
01-10-2008
4.00
Safety shaft nut, top cover, starter
Details
01-09-2008
2.50
Oil cooler; baffeling
Details
01-08-2008
2.50
Alternator Bracket
Details
01-07-2008
2.50
Alternator Bracket
Details
01-05-2008
5.00
Engine assembly
Details
01-04-2008
4.50
Engine assembly
Details
12-03-2007
4.00
Engine mount
Details
12-01-2007
3.00
Engine Mount Repair
Details
11-30-2007
5.00
Brakes
Details
10-04-2007
7.00
Engine assembly
Details
10-03-2007
5.00
Installed crankshaft , cam, case bolts, rear cover
Details
09-21-2007
2.50
Master Brake Cylinders
Details
09-21-2007
4.50
Left Pilot master brake cylinder
Details
09-20-2007
2.25
Fuel sensor
Details
09-19-2007
3.00
RemovedEngine mount
Details
09-18-2007
4.00
Engine disassembly
Details
09-17-2007
5.00
Engine disassembly
Details
09-16-2007
4.50
Engine disassembly
Details
09-15-2007
2.50
Micro Repair
Details
09-14-2007
3.50
Micro Repair
Details
09-12-2007
3.00
Micro repair
Details
09-10-2007
3.50
Checked Engine Level
Details
09-09-2007
5.00
Installed right elevator
Details
09-08-2007
4.00
Installed left canard elevator
Details
09-07-2007
3.50
Paint Cleanup
Details
09-06-2007
6.00
Paint controls
Details
09-05-2007
4.50
Paint Canopy
Details
09-04-2007
6.00
Canopy Prep
Details
09-03-2007
5.50
Paint fuselage
Details
09-02-2007
5.00
Painted Fuselage
Details
09-01-2007
6.00
Paint Prep & Primer
Details
08-31-2007
4.75
Repaired surface defects on canard
Details
08-30-2007
3.00
Sanded surface defects
Details
08-29-2007
3.50
Sanded canard
Details
08-28-2007
4.25
Sanded left wing and canard tops to remove defects
Details
08-27-2007
3.00
Wiring security
Details
08-26-2007
4.00
Secured wiring
Details
08-25-2007
3.50
Wire security
Details
08-24-2007
4.50
ELT,TXP,GPS
Details
08-23-2007
3.75
GPS
Details
08-22-2007
4.25
ELT remote
Details
08-21-2007
2.50
ELT Antenna
Details
08-20-2007
6.50
TXP/ELT
Details
08-19-2007
7.00
Transponder Installation
Details
08-18-2007
7.50
Preparation for final paint
Details
08-17-2007
3.00
Install TXP
Details
08-16-2007
3.50
Installing Transponder
Details
08-15-2007
4.50
Sanding Filler
Details
08-14-2007
4.00
Repair of surface defects
Details
08-13-2007
6.00
Sanded Primer
Details
08-12-2007
3.00
Cockpit assembly
Details
08-11-2007
5.25
Prep and paint fuselage with primer
08-10-2007
4.00
Prep and Paint cockpit
Details
08-09-2007
5.50
Surface defect repair
Details
07-14-1993
0.75
Acquired construction manual
Details
07-09-1993
2.30
Acquired Kit
Details
SITE NAVIGATION
Contact Builder
Q2 Home
Category
# Logs
# Hours
All
65
259
Avionics
11
46
Engine
24
86
Fuselage
28
124
Miscellaneous
2
3
Copyright © 2001-2024 Matronics. All Rights Reserved.