RV-8 N605TT
Work Logs Found: 285
Category Work Time: 1076 Hours
 Date
Hours
Work Log Summary

Details

 08-29-2014
1.00
Building break
Details
     

 07-29-2014
4.00
Heat muff installation
Details
       

 07-04-2014
3.00
Exhaust
Details
       

 07-01-2014
3.00
Engine Hang Day
Details
       

 05-08-2014
1.00
Engine delivered
Details
       

 03-31-2014
10.00
Electric Fuel Pump
Details
       

 09-18-2013
4.00
Panel and battery tray
Details
       

 09-16-2013
4.00
Wiring Checks contd
Details

 09-04-2013
2.00
Tech Counselor visit
Details

 08-27-2013
2.00
Wiring
Details

 08-26-2013
2.00
Wiring Checks contd
Details

 08-25-2013
3.00
Wiring Checks
Details

 08-24-2013
1.50
Fuel and Brake Lines contd
Details
     

 08-06-2013
3.00
Wiring Detail Spreadsheet
Details

 08-05-2013
3.00
Wiring Detail Spreadsheet
Details

 07-11-2013
6.00
Brake lines - fuselage - part 2
Details
       

 07-10-2013
5.00
Brake lines - fuselage - part 1
Details
       

 07-08-2013
4.00
Fuel lines - fuselage
Details
       

 07-03-2013
3.00
wheel pants part 3
Details
       

 07-01-2013
3.00
wheel pants part 2
Details
       

 06-24-2013
3.00
wheel pants part 1
Details
       

 06-23-2013
4.00
wheels and brackets are on, almost complete
Details
       

 06-22-2013
3.00
Brake calipers and fairing brackets
Details
       

 06-05-2013
100.00
updating build log
Details

 06-05-2013
100.00
updating build log
Details

 05-26-2013
10.00
gear leg final torue
Details
       

 05-25-2013
3.00
Gear leg U-bracket trim
Details
       

 05-22-2013
4.00
tube flaring and fuel lines
Details

 05-11-2013
2.00
Brake fluid reservoirs
Details
       

 04-30-2013
2.00
Power socket installation
Details
     

 04-22-2013
3.00
GRT backup battery
Details
       

 04-07-2013
3.00
Infinity stick grip part 2
Details
       

 04-06-2013
3.00
Infinity stick grip part 1
Details
       

 03-22-2013
2.00
Transponder install
Details
       

 02-07-2013
3.00
aft headphone jacks
Details

 01-03-2013
2.00
Avionics harness progess check
Details
     

 12-07-2012
3.00
PAR comm radio install
Details
       

 11-15-2012
8.00
Panel (fit checks)
Details
       

 10-05-2012
3.00
Flap position sensor
Details
       

 10-01-2012
6.00
Pitch Servo bracket
Details
       

 09-28-2012
10.00
Throttle Quadrant
Details
       

 09-28-2012
3.00
GRT roll servo part 2
Details
       

 09-17-2012
4.00
AHRS installation
Details
       

 07-21-2012
1.00
Garmin battery
Details
     

 07-19-2012
3.00
VP-X mounting
Details
     

 06-08-2012
3.00
GRT autopilot roll servos part 1
Details
       

 06-06-2012
15.00
Canopy drilling to frame
Details
       

 02-22-2012
4.00
priming & painting
Details
       

 02-20-2012
2.00
misc parts prep, prime, paint
Details

 02-19-2012
3.00
paint and rivet seat backs
Details

 02-18-2012
3.00
prime misc fuse sub-assemblies
Details

 02-17-2012
3.00
throttle quad, aileron trim bracket, elevator bell
Details

 01-22-2012
3.00
Elevator Servo Mount (old BMA)
Details

 12-31-2011
8.00
Strobe light power
Details

 04-08-2010
2.00
wiring/static lines, part 2
Details
       

 04-04-2010
2.00
wiring/static lines
Details

 04-03-2010
1.00
fuselage off the rotissiere
Details

 03-31-2010
2.00
autopilot servos, planning, need photos
Details

 03-30-2010
2.00
avionics bench testing
Details
       

 03-22-2010
2.00
prop arrived
Details
       

 10-12-2009
2.50
Landing gear boxes & weldments
Details

 10-10-2009
3.00
Rear Seat, part 2
Details
       

 10-09-2009
4.00
Rear Seat
Details

 10-04-2009
3.00
Seats, need photo
Details

 10-01-2009
3.00
Battery tray
Details
       

 09-27-2009
2.00
Grove gear install part 4
Details

 09-26-2009
5.00
Grove gear install part 3
Details

 09-07-2009
5.00
Grove gear install part 2
Details

 09-06-2009
10.00
Grove gear install part 1
Details
       

 08-04-2009
5.00
canopy frame
Details

 08-03-2009
3.00
more shop work....
Details

 08-02-2009
5.00
rework machining table, building shelving

 07-19-2009
3.00
hangar/workshop mx
Details

 07-03-2009
5.50
canopy frame
Details

 07-01-2009
2.50
canopy slider rail
Details

 06-28-2009
5.00
canopy frame, shop set up, plans study
Details
       

 06-27-2009
3.00
unpacking & hangar setup continues

 06-16-2009
4.00
unpacking continues

 05-30-2009
0.00
moved to 2W6
Details

 04-25-2009
3.00
started the packup
Details

 04-24-2009
0.50
Tanner in the shop
Details
     

 04-15-2009
2.00
F840 blunder
Details
     

 04-10-2009
4.00
F840 & 841 pushrods
Details

 04-09-2009
2.00
VS/HS mounting continued
Details

 04-08-2009
5.00
VS/HS mounting continues
Details
       

 04-07-2009
0.50
VS mounting cont'd
Details
       

 04-07-2009
5.00
VS mounting
Details
       

 03-28-2009
7.00
emp mounting
Details

 03-15-2009
5.00
HS mounting
Details
     

 03-14-2009
1.00
prep fuse for emp mounting
Details
       

 03-14-2009
3.00
empennage mounting
Details
       

 03-08-2009
3.00
elevators, static system
Details
     

 03-07-2009
4.00
misc deburring, priming prep
Details

 02-19-2009
2.00
floor boards prep
Details

 02-16-2009
3.00
canopy rails
Details

 02-14-2009
5.00
canopy slider rail
Details

 02-11-2009
3.00
misc floorboard work, canopy rail layout
Details

 02-08-2009
3.00
baggage tie-downs, forward bag door
Details

 02-07-2009
3.00
baggage compartment tie-downs
Details

 02-01-2009
0.50
compressor drain kit repair
Details

 01-31-2009
1.00
elevator bellcrank
Details

 01-30-2009
3.50
Misc deburring, cleaning, trimming
Details

 01-28-2009
4.00
aileron trim system, part 2
Details

 01-27-2009
4.00
Aileron Trim System
Details

 01-18-2009
4.00
instrument access panel
Details
       

 01-11-2009
3.50
cabin air intakes, NACA scoops
Details
       

 01-09-2009
3.00
throttle quad, panel layout
Details
       

 01-08-2009
3.00
throttle quad mount, redesign attach bracket
Details

 01-03-2009
3.00
throttle quad mounting
Details

 12-03-2008
2.50
baggage door hidden hinge brackets
Details
       

 12-01-2008
2.00
throttle quad top mount plate
Details

 11-30-2008
2.00
fwd baggage door hinge
Details

 11-27-2008
3.50
throttle quad
Details

 11-24-2008
3.00
seat backs
Details

 11-23-2008
2.00
throttle quadrant, bag door hidden hinge
Details

 11-13-2008
2.50
misc debur
Details

 11-11-2008
3.50
debur f821 top skin, inst panel flange
Details

 11-10-2008
2.50
bending brake, misc debur
Details

 10-29-2008
1.00
flap actuator cover
Details
     

 10-25-2008
4.00
rollbar attach
Details
       

 10-24-2008
4.00
rudder pedals, rollbar
Details
       

 10-08-2008
2.00
map cases, rollbar
Details
     

 10-05-2008
4.00
instrument panel access door
Details

 10-01-2008
3.00
throttle quadrant
Details

 09-30-2008
4.00
throttle quad mockup
Details

 09-28-2008
2.00
throttle quad mod
Details

 09-28-2008
2.00
panel layout
Details

 09-26-2008
4.00
miscellaneous debur
Details

 09-15-2008
2.00
static system, instrument access panel
Details

 09-14-2008
4.00
avionics access door & wd814 study
Details

 09-10-2008
3.50
fwd baggage compartment support brace
Details

 09-06-2008
4.00
Top skin, misc interior panels
Details

 09-02-2008
3.00
forward top skin
Details

 08-25-2008
4.00
forward top skin drilling
Details
       

 08-23-2008
2.00
riveted nutplates
Details

 08-21-2008
4.00
fwd baggage compartment, more of
Details

 08-19-2008
3.00
forward baggage hold, more of
Details

 08-13-2008
3.00
forward baggage hold
Details

 08-12-2008
1.50
baggage door
Details

 08-11-2008
4.00
forward baggage compartment
Details

 08-03-2008
7.00
fuselage fitup and instrument panel
Details

 08-02-2008
10.00
fuselage interior fitup
Details

 08-01-2008
6.00
floorboards
Details

 07-26-2008
4.00
climate controlled workshop
Details

 07-11-2008
5.00
parts inventory and organization
Details

 07-01-2008
20.00
new "shop" open for business
Details

 04-21-2008
4.00
more floor nutplate installation
Details

 04-16-2008
1.00
deburred and primed floor ribs for platenuts
Details

 04-15-2008
3.00
rear baggage compartment platenuts --dooooeee!
Details

 04-14-2008
3.00
floor/bulkhead interface, front seat
Details

 04-13-2008
4.50
front seat
Details

 04-10-2008
4.00
more rear seat work
Details

 03-01-2008
5.00
rudder pedal assembly
Details

 02-29-2008
2.00
tail wheel mount
Details

 02-24-2008
3.00
rudder pedal assembly
Details

 02-20-2008
4.00
still floor work - nutplates
Details

 02-18-2008
4.00
floor
Details

 02-16-2008
1.50
forward seat ramp, cont'd
Details

 02-15-2008
2.50
fuel selector valve & cabin covers
Details
       

 02-15-2008
1.50
forward seat ramp
Details
       

 02-12-2008
1.50
bulkhead holes in f804 channels
Details

 02-11-2008
3.00
throttle quadrant
Details
       

 01-02-2008
3.00
throttle quadrant & port channel cap
Details
       

 12-29-2007
3.00
starboard console & channel cap
Details
       

 12-26-2007
2.00
more floorboard work
Details

 12-24-2007
1.00
rear seat attach hinge
Details
       

 12-24-2007
0.50
aft floor misalignment
Details
       

 12-23-2007
2.00
floor nutplate countersink
Details
       

 12-18-2007
4.00
rear baggage compartment, floorboards
Details

 12-17-2007
2.50
floorboard nutplates
Details

 12-16-2007
2.00
floorboard nutplates
Details

 12-14-2007
6.00
floorboards, control sticks, aft side panels
Details
     

 12-03-2007
2.00
aft baggage compartment
Details

 11-30-2007
3.50
aft cabin covers & aft baggage compartment
Details
       

 11-26-2007
3.00
control column hanger & aft cabin covers
Details
       

 11-25-2007
4.00
control column
Details
       

 11-24-2007
1.50
shop cleanup and reorganization
Details

 11-23-2007
5.00
flap motor & actuator
Details
       

 11-19-2007
3.00
floor stiffeners
Details

 11-18-2007
4.00
cabin floor
Details
       

 11-15-2007
2.00
rear pax footwells & rudder cables
Details

 10-01-2007
2.50
fuselage rotissiere stand
Details
       

 09-25-2007
3.00
inventoried fuse and finish kits
Details

 09-21-2007
1.00
QB fuse kit arrived
Details
       

 08-02-2007
3.00
flaps and aileron fit
Details
       

 07-31-2007
3.00
starboard, lower wing skin
Details

 07-30-2007
4.00
port, lower wing skins
Details
       

 07-01-2007
2.00
starboard flap hinge
Details
     

 06-26-2007
3.00
port flap hinge
Details

 06-02-2007
4.00
ailerons & pushrods
Details

 05-15-2007
2.00
aileron bellcranks
Details

 04-15-2007
4.00
aileron pushrods
Details
       

 04-13-2007
1.00
pushrods
Details

 04-10-2007
1.50
aileron gap fairings
Details

 04-01-2007
1.00
compressor maintenance
Details

 04-01-2007
1.00
aileron brackets
Details
       

 04-01-2007
2.00
aileron bracket, flap brace attach
Details
       

 03-31-2007
4.00
flap brace and aileron gap fairing
Details
     

 03-30-2007
5.00
aileron bracket & flap brace
Details

 03-22-2007
0.50
aileron brackets
Details

 03-15-2007
2.00
tail feather cradle
Details
       

 03-07-2007
3.00
elevator installation
Details
       

 03-03-2007
1.00
elevator rigging
Details
       

 03-01-2007
3.00
rudder rigging
Details

 02-27-2007
0.20
rod end bearing tool
Details
     

 02-26-2007
0.50
pitch trim actuator rigging, part II
Details
       

 02-26-2007
2.00
pitch trim actuator rigging, part I
Details
       

 01-25-2007
3.00
rolled leading edges
Details

 01-23-2007
2.00
3rd Technical Counselor visit
Details
     

 01-19-2007
1.00
installed trim tab & cleanup shop
Details
       

 01-16-2007
2.00
fitting trim tab
Details
       

 01-16-2007
2.00
elevator end ribs & counterweights
Details
       

 01-15-2007
2.00
starboard elevator
Details
       

 01-15-2007
2.00
rudder skin
Details
       

 01-14-2007
4.00
port elevator
Details
       

 01-14-2007
2.00
installed pitch trim servo
Details
       

 01-13-2007
0.00
rivet damage repair
Details
     

 01-13-2007
0.00
port elevator rivet damage/repair
Details
       

 01-13-2007
3.50
empennage controls skeletons
Details
       

 01-12-2007
3.00
empennage control surface spars
Details
       

 01-11-2007
2.00
more trim tab work
Details
       

 01-01-2007
3.00
primed rudder & elevator
Details
       

 12-29-2006
2.00
elevator trim tab part ii
Details
       

 12-29-2006
3.00
elevator trim tab
Details
       

 12-23-2006
3.00
port elevator internals
Details
       

 12-18-2006
4.00
rudder internals
Details
       

 11-18-2006
1.00
starboard elevator
Details
       

 11-16-2006
1.00
inventoried wing kit
Details

 11-12-2006
2.00
QB wings arrive !
Details
       

 11-08-2006
3.00
wing cradle construction
Details
       

 10-29-2006
2.00
plans study
Details

 10-24-2006
4.00
elevator counterbalance set up
Details

 10-21-2006
3.50
finished starboard elev stiffeners & bending
Details
     

 10-20-2006
1.00
2nd Tech Counselor visit
Details

 10-15-2006
3.00
replacing rivets
Details

 10-04-2006
1.00
Starboard Elevator stiffener set up
Details
       

 10-04-2006
1.00
Port Elevator Stifferers
Details
       

 10-04-2006
2.00
Pitch trim servo mount
Details
       

 10-03-2006
2.00
riveted rudder stiffeners
Details
       

 10-02-2006
3.00
Priming Rudder, elevator skins
Details
       

 10-01-2006
3.00
shop maintenance
Details

 09-29-2006
2.50
Elevator skin dimple
Details
       

 09-28-2006
2.00
Port Elevator work
Details

 09-27-2006
1.50
Starboard Elevator work
Details

 09-26-2006
1.50
Elevator stiffeners
Details

 09-23-2006
0.10
Tucker is born!!
Details

 09-19-2006
3.00
Rudder skin dimpling
Details
     

 09-18-2006
6.00
Rudder skeleton
Details

 09-17-2006
2.00
Rudder skin stiffeners
Details
       

 09-15-2006
3.00
HS completed
Details
       

 09-13-2006
1.00
HS riveting
Details
       

 09-11-2006
1.00
HS nose rivets
Details
       

 09-10-2006
4.00
HS prep for final riveing
Details
       

 09-09-2006
5.00
VS competed
Details
       

 09-04-2006
1.00
1st Tech Counselor visit
Details
       

 09-03-2006
3.00
more HS & VS riveting
Details
       

 09-02-2006
3.00
rivet replace
Details
       

 09-01-2006
5.00
HS and VS skeleton riveting
Details

 08-24-2006
3.50
HS & VS priming QA and prep for riveting
Details
       

 08-19-2006
4.00
priming VS and HS
Details
       

 08-18-2006
3.00
prepared VS for priming
Details

 08-13-2006
4.00
Vertical stabilizer
Details
       

 08-11-2006
3.00
began vertical stabilizer work
Details

 08-06-2006
3.00
primed hs skeleton
Details
       

 07-12-2006
3.00
priming prep
Details
     

 07-10-2006
6.00
final debur & dimple HS
Details

 07-09-2006
5.00
HS 702, 810, 405 part deaux
Details
       

 07-02-2006
1.50
work table
Details

 06-29-2006
1.00
deburring skins, 2
Details
       

 06-29-2006
3.00
deburring skins, 1
Details
       

 06-27-2006
2.00
match drilling skins
Details
       

 06-23-2006
2.00
New HS810-1
Details
     

 06-22-2006
2.00
rib prep
Details

 06-20-2006
3.00
match drilled skeleton (and oops...)
Details
       

 06-14-2006
4.00
front spar prep
Details

 06-10-2006
3.00
hinge brackets
Details
     

 06-09-2006
2.00
rear spar reinforcement bars
Details
       

 05-20-2006
4.00
built drafting table
Details
       

 05-12-2006
4.00
machining bench & dimple tables
Details
 

 05-09-2006
1.00
emp kit arrived, part 2
Details

 05-08-2006
0.50
partial kit arrived
Details

 05-01-2006
0.25
ordered empennage kit
Details

 01-17-2006
5.00
finished training kit

 10-11-2005
1.00
Rec'd preview plans
Details

 10-05-2005
0.25
ordered preview plans & training kit