Marks Rans Courier Project
Work Logs Found: 317
Category Work Time: 1045 Hours
 Date
Hours
Work Log Summary

Details

 10-22-2009
3.00
Prop pitch, first engine run etc
Details

 10-22-2009
1.00
First Flight
Details
       

 10-09-2009
3.00
Airworthiness inspection
Details

 10-08-2009
2.00
prep for airworthiness inspection
Details

 10-07-2009
2.00
Prep for airworthiness inspection
Details

 10-06-2009
2.00
N Numbers, data plate shims etc
Details

 10-05-2009
3.50
Weight & Balance work
Details

 10-04-2009
2.00
Rigging flaps etc
Details

 10-03-2009
2.00
fit and install the rudder cable guard in the cabi
Details

 09-29-2009
2.00
test strobe/nav lights, torque seal asst nuts
Details

 09-28-2009
2.00
wiring strobe and nav lites
Details

 09-25-2009
2.00
Wing root cuffs- installation
       

 09-24-2009
1.50
wiring strobes/nav lites
Details

 09-24-2009
2.50
Rigging Ailerons, elevator etc
Details

 09-23-2009
2.00
fit and paint pitot tube assembly
Details

 09-20-2009
3.00
Wing root cuff fitting
Details

 09-16-2009
2.00
fastening skylite into position
Details
       

 09-15-2009
2.00
installing the skylite
Details
       

 09-14-2009
3.00
lnstall skylite
Details

 09-13-2009
8.00
Struts, washout etc
Details
       

 09-05-2009
1.00
Photo page
Details
       

 08-24-2009
1.00
Hanger set-up, parts re-inventory etc
Details
       

 07-25-2009
1.00
Moving day photos
Details
       

 07-24-2009
1.00
Moving project to the airport
Details
       

 07-23-2009
1.50
Caulkiing
Details

 07-22-2009
1.50
begin fitting bulkhead closeout
Details

 07-15-2009
5.00
wire wingtip nav lites, install wingtips, panel li
Details

 07-12-2009
2.00
Install gear leg fairings
Details

 07-11-2009
2.00
Install cowling 1/4-turn fasteners, trial fit
Details

 07-10-2009
3.00
paint cowling
Details

 07-08-2009
2.00
Install doors

 07-07-2009
3.00
Rivet trim, install top trim etc
Details

 07-07-2009
2.00
Fit elevator yoke to horns, wiring on pitch trim
Details

 07-05-2009
2.00
Door latch hardware on right door, other misc
Details

 07-04-2009
5.00
Paint, install door latch hardware etc
Details
       

 07-03-2009
5.00
Trim painting, assemble second door, stripe layout
Details

 07-02-2009
5.00
Paint trim, fit left door lexan, install lexan & t
Details
       

 07-01-2009
3.00
Paint trim pieces
Details

 06-30-2009
2.50
Fitting right door lexan, start left door trim sti

 06-28-2009
6.00
Assembly of the right door
Details
       

 06-27-2009
7.00
Install windscreen, more work on skylite
Details
       

 06-26-2009
3.50
Painting trim strips, fairings etc
Details

 06-26-2009
1.50
Assembly of door components
Details

 06-25-2009
4.00
Fitting skylite trim strips, painting all trim str
Details

 06-21-2009
2.00
Fitting skylight and associated mounting hardware
Details
       

 06-20-2009
6.00
Fitting trim, start on skylight install
Details
       

 06-19-2009
3.00
More fitting of the trim strips
Details

 06-18-2009
5.00
Trim strips etc
Details
       

 06-18-2009
1.50
Painting aileron stripe
Details
     

 06-17-2009
2.50
Painting wingtips and aileron stripes
Details
       

 06-17-2009
2.50
Fitting windshield trim strip
Details
       

 06-16-2009
3.50
fitting lower windshield trim strip
Details
       

 06-15-2009
2.00
windshield fitting continued
Details

 06-15-2009
2.00
Painting aileron stripes and wingtips
Details

 06-14-2009
2.00
remove ailerons- prep for painting stripes
Details

 06-14-2009
3.00
install elevators, trim/fit fairings
Details

 06-13-2009
1.50
Install Transponder Antenna
Details

 06-12-2009
3.00
Windscreen fitting, support ribs in center section
Details

 06-11-2009
3.00
Fitting windscreen
Details

 06-10-2009
4.00
Install center ribs, start windshield install
Details
       

 06-09-2009
1.00
Begin center rib installation
Details

 06-07-2009
6.00
Install wings in shop
Details
       

 06-06-2009
5.00
Strut fittings etc
Details

 06-05-2009
3.00
Strut fitting installation
Details

 06-03-2009
3.00
Finish root-rib covers, start strut assembly
Details

 06-02-2009
1.00
Root-rib panels (part two)
Details
       

 06-02-2009
1.00
Root rib cover panel installation (part 3)
Details
       

 06-02-2009
3.00
install wing root-rib panels (part one)
Details
       

 06-01-2009
4.00
Begin installation of root-rib covers and misc wor
Details
       

 05-31-2009
3.00
Paint root-rib cover panels, upper motor cowl etc
Details

 05-30-2009
3.00
Paint root rib covers, upper cowl and Jury Strut p
Details

 05-29-2009
3.00
Fit root rib covers, fuel sight gauges
Details
       

 05-28-2009
4.00
Gap seals, flap teleflex cable, fuel vent tube
Details

 05-27-2009
5.00
Wing tip fitting, gap seals
Details
       

 05-26-2009
3.00
Install hinges, nav-lite wiring
Details

 05-25-2009
5.00
Wingtip, aileron & flap fairings etc
Details

 05-24-2009
5.00
Tip fitting, flap teleflex cable installation
Details
       

 05-18-2009
2.00
Wingtip fitting etc
Details

 05-17-2009
3.00
Gap seals & fitting wing tip
Details
       

 05-16-2009
2.00
Gap seals
Details

 05-15-2009
2.00
Gap Seals
Details

 05-14-2009
3.00
Install aileron & start gap seals
Details

 05-13-2009
3.00
Install flap, lay out route for nav lite wires in
Details

 05-12-2009
3.00
Install hinges & horn on Flaps, trial fit flaps

 05-09-2009
3.00
Install spades & counter weights on ailerons
Details
       

 05-08-2009
3.00
Shape and trim to weight- aileron couter weights
Details

 05-06-2009
3.00
casting aileron counter weights
Details
       

 05-04-2009
2.00
installing aileron horns & hinges
       

 05-01-2009
3.00
painting ailerons and flaps
Details

 04-30-2009
3.00
Painting control surfaces
Details

 04-28-2009
3.00
painting control surfaces
Details

 04-24-2009
1.00
Re-configure shop etc
Details
       

 04-20-2009
3.00
Fuel tank issue
Details

 03-20-2009
1.00
Trim Prop flange
Details

 03-19-2009
3.00
Install 1-4 turn receptacles
Details

 03-14-2009
3.00
Cowl fitting
Details
       

 03-04-2009
1.00
More cowl fitting photos
       

 03-03-2009
3.00
Fitting engine cowling
Details
       

 03-02-2009
1.00
Inspection by A&P/IA
Details

 03-01-2009
3.00
Fabricate fuselage stand
Details
       

 02-28-2009
3.00
Backing plate nut-plates
Details
       

 02-27-2009
2.50
Propeller spinner fitting continued
Details
       

 02-27-2009
1.00
Propeller flange bushings, 1" spacer and backing p
Details
       

 02-27-2009
1.50
Prop spinner fitting continued
Details
       

 02-27-2009
1.00
hang propeller
Details
       

 02-27-2009
1.50
Assemble propeller hub and blades
Details
       

 02-26-2009
2.00
installing the prop to fit the spinner
Details
       

 02-26-2009
4.00
boot cowl install, firewall sealed, begin prop spi
Details
       

 02-25-2009
4.00
Install boot cowl and instrument panel
Details
       

 02-24-2009
4.00
instrument panel to glare shield install
Details

 02-23-2009
4.00
Trial fitting boot cowl/instrument panel
Details
       

 02-16-2009
3.00
Boot cowl and wiring
Details
       

 02-15-2009
1.50
Install nutserts
Details
       

 02-15-2009
5.00
Fabirc on boot cowl, trial fit cowl and glare shie
Details
       

 02-14-2009
2.00
Cover glare shield with fabric
Details
     

 02-12-2009
4.00
Wire looming, fastening etc
Details

 02-11-2009
3.00
system power-up and testing
Details

 02-10-2009
3.00
Fabricate cables and install battery
Details
     

 02-08-2009
2.00
Install VHF antenna
Details
       

 02-08-2009
3.00
Install static air lines
Details
       

 02-07-2009
3.00
Finish ELT mount, install ELT antenna
Details
       

 02-06-2009
4.00
Fabricate ELT mount
Details
       

 02-03-2009
3.00
VHF wiring
Details

 02-02-2009
3.00
Wire transponder
Details

 01-31-2009
1.00
Strobe power unit mounting and wiring
Details
       

 01-30-2009
4.00
Misc wiring
Details

 01-29-2009
2.00
GPS power supply
Details
       

 01-28-2009
4.00
MAC stick grip and trim servo indicator wiring
Details
     

 01-27-2009
3.00
wiring MAC stick
Details
       

 01-26-2009
4.00
Forward stick trim and PTT wiring
Details
       

 01-25-2009
6.00
Headphone jacks, Elevator trim etc
Details
       

 01-24-2009
4.00
Fabircate headset jack mounting plates
Details
     

 01-23-2009
8.00
Missed stuff
Details
     

 01-11-2009
5.00
Wiring etc
Details

 01-10-2009
4.00
Panel wiring

 01-08-2009
3.00
Panel wiring

 01-06-2009
2.00
Panel wiring

 12-13-2008
2.00
Install rudder control cables, tailwheel springs

 11-11-2008
3.00
Install battery cables
Details

 11-10-2008
2.00
Swage connectors onto the battery cables
Details

 11-10-2008
2.00
More wiring
Details

 11-08-2008
6.00
Wiring
Details

 11-07-2008
2.00
fabricate copper buss for the primary switches
Details

 11-05-2008
2.00
layout battery cables
Details

 11-03-2008
1.00
Battery contactor
       

 11-02-2008
2.00
Fabricate and install battery contactor mount plat
Details
       

 11-01-2008
4.00
Cabin heat ductwork etc
       

 10-31-2008
4.00
Choke and parking brake control cables
Details
       

 10-26-2008
3.00
Install throttle cables

 10-26-2008
2.00
Install Cabin Heater cable

 10-25-2008
4.00
Cabin heat diverter valve- assemble and install

 10-24-2008
3.00
Finish Carb Heat installation and adjustment

 10-23-2008
1.50
Install carb heat control cables

 10-21-2008
3.00
Apply labels to sub-panels and install incl breake
Details
       

 10-20-2008
2.00
pre-install and paint sub-panels
Details

 10-19-2008
5.00
Sub-panels part deux (plus compass installation)
Details

 10-18-2008
6.00
Sub-panel (first version)
Details

 10-17-2008
3.00
Began wiring instrument gauges

 10-05-2008
4.00
redesign circuits
Details

 10-04-2008
4.00
Wire engine instruments
Details

 09-28-2008
6.00
Modify glare shield
Details
       

 09-28-2008
3.00
install radio and transponder into panel
       

 09-27-2008
4.00
Install switches and flight instruments into panel
       

 09-26-2008
3.00
Create and apply labels to panel
Details
     

 09-21-2008
5.00
finish cutting holes and pre-fit the panel
Details
       

 09-20-2008
4.00
Cutting gauge and instrument holes
Details
       

 09-19-2008
4.00
cut instrument, gauge and switch holes in panel
Details
     

 09-17-2008
2.00
Final (?) panel layout
Details

 09-14-2008
2.00
Panel layout
Details

 09-13-2008
5.00
carb heat
Details
       

 09-07-2008
4.00
Carb heat units
Details
       

 09-06-2008
4.00
firewall forward fuel system
Details
       

 08-31-2008
2.00
Firewall forward fuel lines
Details
     

 08-30-2008
2.00
Firewall forward fuel system
Details

 08-25-2008
1.50
Measuring instruments for final panel layout
Details

 08-24-2008
3.00
Fuel line fitting etc
Details

 08-23-2008
6.00
fabricate panel #1
Details

 08-11-2008
5.00
Panel layout
Details

 08-10-2008
4.00
Radiator and coolant line installation
Details
       

 08-09-2008
4.00
Install oil/lubrication system lines
Details
       

 06-21-2008
2.00
Install oil cooler
Details
       

 06-20-2008
2.00
preparel oil cooler for installation
Details
       

 06-18-2008
5.00
Install exhaust system
Details
       

 06-17-2008
3.00
Assemble muffler/cabin heat exchanger unit
Details
     

 06-16-2008
5.00
Finish and install seats
Details
       

 06-16-2008
1.00
Cover glare-shield with fabric
Details
       

 06-15-2008
3.00
Assemble seats
Details
       

 06-06-2008
2.00
install new elbows on water pump
Details

 05-31-2008
5.00
Installed the motor to the fuselage
Details

 05-29-2008
5.00
Water pump and forward motor mount
Details
     

 05-26-2008
6.00
reconfigure motor for installation
Details

 05-25-2008
5.00
engine re-configuration
Details
       

 05-24-2008
4.00
reconfigure motor pre-installation
Details
       

 05-19-2008
2.00
install fuselage fuel lines part 2
Details
       

 05-19-2008
2.00
Install fuselage fuel lines
Details
       

 05-18-2008
2.00
Motor mounts installation
Details

 05-17-2008
4.00
aileron cable/pulley installation
Details
       

 05-16-2008
3.00
Aileron control assembly installation
Details
       

 05-14-2008
2.00
Throttle lever assembly
Details
       

 05-12-2008
3.00
cast elevator counter-balance weights
Details

 05-11-2008
4.00
Installed trim servo, actuator rod and fittings et
Details
       

 05-10-2008
3.00
Install trim tab onto elevator
Details
     

 05-09-2008
1.00
fitted trim tab servo fairing
Details

 05-08-2008
2.00
Install trim tab servo
Details

 05-07-2008
3.00
paint parts, brake fluid and brake bleeding
Details
       

 05-05-2008
2.00
Painting trim tab etc
Details

 05-04-2008
5.00
Fabrication & painting of the trim tab
Details
       

 05-03-2008
4.00
Horizontal stabilizer
Details
       

 05-02-2008
3.00
Horizontal stabilizer
Details

 05-01-2008
3.00
Installing brake lines
Details

 04-27-2008
4.00
Installing brake cylinders and hoses
Details
       

 04-26-2008
1.00
Main gear reinforcement
Details
       

 04-26-2008
2.00
Gear socket reinforcement
Details
       

 04-19-2008
3.00
install firewall, motor mount and oil tank
Details

 04-18-2008
1.00
Photos of the stripe painting
Details
       

 04-18-2008
8.00
Painting stripes on cowling and tail surfaces
Details
       

 04-17-2008
3.00
Paint prep
Details

 04-15-2008
1.50
Installing accessories on the firewall

 04-14-2008
3.00
Finish paint boot cowl, gear fairings etc
Details
       

 04-14-2008
5.00
Attach accessories to the firewall
Details
       

 04-13-2008
2.00
Prime boot cowl and inspection covers
Details

 04-12-2008
5.00
Installing pedals, cover firewall interior
Details
       

 04-10-2008
1.00
painting parts
Details

 04-10-2008
2.00
Installing floorboards and rudder pedals
Details

 04-07-2008
1.00
Install wear plates on the floorboards
Details
     

 04-06-2008
2.00
Floorboards and paint booth
Details
     

 04-05-2008
5.00
floorboards etc
Details

 04-04-2008
4.00
Instrument panel fitting and layout
Details

 04-01-2008
2.00
Fitting of the instrument panel blank
Details
     

 03-31-2008
1.00
More photos of the Milloway glare shield
Details
       

 03-30-2008
5.00
Install 1/4-turn fittings in boot cowl
Details
       

 03-29-2008
6.00
Continued boot cowl fitting
Details
       

 03-28-2008
3.00
Boot Cowl fitting continued

 03-24-2008
1.00
Fit boot cowl
Details
       

 03-23-2008
4.00
Mount firewall, engine mounts and fit boot cowl
Details
       

 03-22-2008
4.00
install flap control mechanism
Details

 03-21-2008
4.00
Assemble flap control

 03-15-2008
5.00
Assembling elevator control system
Details
       

 03-14-2008
2.00
Elevator push-pull tubes and yoke
Details

 03-12-2008
1.00
Assemble Elevator Yoke
Details
       

 03-11-2008
1.00
Milloway Glare shield modification
Details

 03-09-2008
1.00
Installation torque tube, sticks etc
Details
       

 03-09-2008
3.00
Fitting torque tube, sticks and linkages
Details
       

 03-08-2008
4.00
Fitting the pillow block and torque tube
Details
       

 03-07-2008
4.00
Pillow block fitting
Details
     

 03-07-2008
4.00
Fitting the elevator push-pull tube PVC bushings
Details
       

 03-06-2008
5.00
prep/paint torque tube, sticks etc
Details

 03-02-2008
3.00
Torque tube- first fitting
Details
       

 03-02-2008
1.00
Continuation of the torque tube fitting
Details
       

 03-01-2008
5.00
assemble and fit fairings
Details
       

 02-27-2008
1.00
Tail wheel spring bushings
Details

 02-26-2008
0.50
Assemble tailwheel unit
Details

 02-25-2008
1.50
Fabricate gear fairing
Details

 02-24-2008
2.00
Install right wheel/brake assembly
Details
       

 02-24-2008
3.00
Install left wheel/brake assembly
Details
       

 02-24-2008
2.00
Fitted left axle and brake plate
Details
       

 02-24-2008
2.00
Assemble right wheel/brake
Details
       

 02-18-2008
4.00
install landing gear leg
Details

 02-17-2008
4.00
brake assembly
Details

 02-16-2008
1.00
landing gear
Details

 02-13-2008
1.50
Assembling wheel/brake assembly
Details

 02-12-2008
1.00
fitting landing gear
Details

 02-11-2008
2.00
Rebuild construction bench/table
Details

 02-10-2008
3.00
Reconfigure shop for assembly
Details

 02-08-2008
4.00
Mask and paint second stripes
Details
       

 02-07-2008
4.00
Mask and paint first stripes
Details
       

 02-06-2008
4.00
Layout stripes
Details
       

 02-05-2008
2.00
Layout of stripes on fuselage
Details

 02-03-2008
3.00
prep fuselage for stripe
Details

 02-02-2008
4.00
sand and paint control surfaces
Details

 01-27-2008
5.00
Painting control surfaces and doors
Details

 01-26-2008
5.00
Sanding and painting control surfaces and doors
Details

 01-12-2008
3.50
More primer on the control surfaces
Details

 01-11-2008
4.00
Applied primer to control surfaces
Details

 01-06-2008
2.00
sand primer on control surfaces
Details

 01-05-2008
6.00
Prime control surfaces and doors
Details
       

 01-01-2008
4.00
Apply final coat of finish paint to fuselage
Details
       

 12-31-2007
3.00
Sand first coat of finish paint on the fuselage
Details

 12-31-2007
7.00
Applysecond coat of paint to the fuselage
Details

 12-30-2007
5.00
Apply first cross-coat of finish paint to the fuse
Details

 12-29-2007
3.00
Sand final coat of primer
Details

 12-28-2007
3.00
Apply final coat of primer to fuselage
Details
     

 12-26-2007
3.00
Sand Primer on Fuselage
Details

 12-24-2007
4.00
Primer fuselage
Details

 12-17-2007
9.00
Sand wings- first primer coat
Details
       

 12-15-2007
5.00
sprayed primer on fuselage
Details

 12-14-2007
3.00
Picked up motor
Details

 12-10-2007
3.00
sand fuselage
Details
       

 12-09-2007
7.00
Finish prep work and prime fuselage
Details

 12-08-2007
4.00
fabricate fuselage brackets for stands
Details

 12-07-2007
6.00
Prep shop for fuselage painting
Details

 12-02-2007
7.00
build wing A-Frame
Details
       

 12-01-2007
5.00
Paint grey stripe on wings
Details
       

 12-01-2007
1.00
more photos of grey stripes on wings
       

 11-30-2007
6.00
Paint green trim on wing tips
Details
     

 11-25-2007
10.50
Sand and paint wings
Details
       

 11-24-2007
10.00
sand wings. Apply first finish coat
Details

 11-23-2007
8.00
sanded wings, applied final primer coat as needed
Details

 11-22-2007
3.00
Final coat of primer on wings
Details

 11-21-2007
3.00
Clean and apply star patches
Details

 11-20-2007
5.00
Sanding wings (second cross-coat)

 11-19-2007
2.00
sanding wing primer
Details

 11-18-2007
5.00
Spray second cross-coat of primer on wings
       

 11-16-2007
7.50
Spray first coat of primer on wings
Details

 11-12-2007
2.00
Mask wing roots and fittings for painting
Details
     

 11-12-2007
12.00
Build temporary spray booth
Details
       

 11-11-2007
9.00
Wing stands
       

 11-10-2007
4.00
Fabricate wing stands and attachment hardware
       

 11-10-2007
3.00
Assembly of wing stands and attachment fittings
       

 11-09-2007
3.00
Continuation of wing stands
       

 11-04-2007
3.00
Fabricate wing stands
Details
       

 10-27-2007
5.00
Inventory of parts
       

 10-20-2007
5.00
Continuation of parts inventory
     

 10-13-2007
5.00
Continuation of parts inventory
     

 10-12-2007
5.00
Inventory parts
Details
       

 10-08-2007
5.00
Open crates
Details
       

 10-07-2007
4.00
Pick up the big boxes
       