Powered By Kitlog Pro v2.0
Rans S-7S Courier
S7S
All
Work Logs Found:
164
Category Work Time:
692 Hours
Date
Hours
Work Log Summary
Details
05-12-2012
6.00
Doors and Elevators turn yellow
Details
05-06-2012
6.00
Ailerons and Flaps turn yellow
Details
05-05-2012
4.00
Stabilizers turn yellow
Details
04-29-2012
6.00
Doors and Elevators white Poly-Tone
Details
04-28-2012
8.00
Stabilizers,Ailerons and Flaps 1 coat of white Pol
Details
04-19-2012
8.00
Control surfaces
Details
04-15-2012
8.00
Doors, Stabilizers and Elevators 1 coat Poly-spray
Details
04-14-2012
6.00
Ailerons and Flaps 1 coat Poly-spray
Details
04-12-2012
6.00
Doors, Elevators 1 coat Polu-brush
Details
04-07-2012
8.00
Stabilzers,Flaps,Ailerons 1 coat Poly-brush
Details
01-08-2012
1.00
Stabilizer
Details
01-08-2012
7.00
Stabilizer
Details
01-07-2012
4.00
Elevator
Details
01-03-2012
4.00
Doors
Details
12-29-2011
4.00
Rudder
Details
12-22-2011
8.00
Ailerons and Flaps
Details
12-18-2011
2.00
Elevators
Details
12-18-2011
1.00
Doors
Details
12-18-2011
3.00
Ailerons and Flaps
Details
12-17-2011
8.00
Elevator
Details
12-03-2011
8.00
Doors
Details
11-20-2011
9.00
Aileron and Flaps
Details
11-19-2011
2.00
Aileron and Flaps
Details
11-13-2011
1.00
Trimtab Yellow
Details
11-12-2011
1.00
Trimtab white
Details
11-09-2011
2.00
Trimtab
Details
11-07-2011
2.00
Inspection Covers
Details
10-12-2011
6.00
Cowlings
Details
10-05-2011
6.00
Bootcowl
Details
09-01-2011
5.00
RH Wing final Color
Details
08-22-2011
5.00
RH Wing final Color
Details
08-14-2011
5.00
RH Wing White Polytone
Details
08-08-2011
5.00
RH Wing 3 rd Coat of Polyspray
Details
08-04-2011
4.00
2 Crosscoat RH Wing
Details
07-30-2011
6.00
1 Coat of Polyspray on RH Wing
Details
07-28-2011
4.00
RH Wing Second Coat of Polybrush
Details
07-24-2011
4.00
1 Coat Polybrush on RH Wing
Details
07-23-2011
4.00
1 Coat Polybrush on RH Wing
Details
07-20-2011
5.00
RH Wing Tapes
Details
07-17-2011
8.00
RH Wing Inspection Rings
Details
07-10-2011
4.00
RH Wing Cover Straps
Details
07-09-2011
4.00
RH Wing Cover Straps
Details
07-03-2011
8.00
RH Wing Polybrush
Details
06-25-2011
8.00
RH Wing Covering
Details
06-24-2011
4.00
RH Wing Covering
Details
04-10-2011
4.00
RH Wing Covering
Details
04-03-2011
4.00
RH Wing Covering
Details
04-01-2011
4.00
Wing RH Covering preparation
Details
09-20-2010
7.00
LH Wing final Color
Details
09-18-2010
5.00
LH Wing Polytone
Details
09-16-2010
5.00
LH Wing 3 rd Coat of Polyspray
Details
09-15-2010
4.00
Sanding LH Wing
Details
09-13-2010
4.00
2 Crosscoat LH Wing
Details
09-12-2010
4.00
2 Crosscoat LH Wing
Details
09-09-2010
5.00
1 Coat of Polyspray on LH Wing
Details
09-07-2010
5.00
1 Coat of Polyspray on LH Wing
Details
09-06-2010
4.00
LH Wing Second Coat of Polybrush
Details
09-04-2010
4.00
1 Coat Polybrush on LH Wing
Details
09-01-2010
4.00
1 Coat Polybrush on LH Wing
Details
08-31-2010
3.00
Preparing Paintbooth
Details
08-16-2010
8.00
LH Wing Inspection Rings
Details
08-13-2010
3.00
LH Wing Bottom Riveting
Details
08-10-2010
5.00
LH Wing Tapes
Details
08-07-2010
4.00
LH Wing Cover Straps
Details
08-04-2010
8.00
LH Wing Polybrush
Details
07-31-2010
8.00
LH Wing Covering
Details
07-25-2010
5.00
LH Wing Covering
Details
07-24-2010
6.00
LH Wing Covering
Details
07-18-2010
6.00
LH Wing Covering
Details
07-17-2010
3.00
Wing LH Covering preparation
Details
10-14-2009
6.00
Top And Bottom Root Skins
Details
10-13-2009
1.00
Pitot and Static System Installation
Details
10-12-2009
1.00
Flap Cable Installation
Details
10-11-2009
1.00
Fuel and Vent Line installation
Details
10-10-2009
4.00
Fuel Tank Installation
Details
10-10-2009
1.00
Aileron Cable Installation
Details
10-06-2009
5.00
Leading Edge Skin Support Tubes
Details
10-05-2009
3.00
Bottom Root Skin
Details
10-01-2009
4.00
Leading Edge Wrap
Details
09-30-2009
4.00
Wing-Sheet Metal Installation
Details
09-21-2009
1.00
Flap Cable Installation
Details
09-20-2009
3.00
Fuel Tank Assembly
Details
09-19-2009
1.00
Aileron Bellcrank Installation
Details
09-16-2009
8.00
Wing Rib Installation
Details
09-12-2009
8.00
Wing Frame Assembly
Details
09-12-2009
8.00
Wing Frame Assembly
Details
08-30-2009
3.00
Fuel Tank Installation
Details
08-30-2009
1.00
Aileron Bellcrank and Cable Installation
Details
08-29-2009
3.00
Aileron Bellcrank Assembly
Details
08-28-2009
2.00
Fueltank Assembly and Installation
Details
08-15-2009
1.00
Fuel Tank Final Shape
Details
08-12-2009
1.00
Fuel Cap Assembly
Details
07-23-2009
3.00
Fuel Tank Assembly
Details
07-19-2009
6.00
Wing Rib Installation
Details
07-18-2009
4.00
Wing Rib Installation
Details
05-23-2009
4.00
Rudder/ Stabilizer
Details
04-24-2009
2.00
Wing Rib Assembly
Details
04-22-2009
2.00
Wing Rib Assembly
Details
04-17-2009
4.00
Wing Rib Assembly
Details
04-15-2009
1.00
Wing Rib Assembly
Details
04-13-2009
12.00
Wing Rib Assembly
Details
04-02-2009
6.00
Wing Frame Assembly
Details
03-29-2009
4.00
Wing Spar Assembly
Details
03-28-2009
4.00
Wing Spar Assembly
Details
03-16-2009
2.00
Trim Tab Assembly
Details
03-16-2009
1.00
Elevator Assembly
Details
03-14-2009
4.00
Rudder Pedal Installation
Details
02-23-2009
6.00
Horizontal Stabilizer right
Details
02-22-2009
6.00
Horizontal Stabilizer Left
Details
02-15-2009
6.00
Rudder
Details
02-13-2009
3.00
Bootcowl Fit Up
Details
11-29-2008
2.00
Throttle Lever Installation
Details
11-29-2008
1.00
Seat Belt Assembly
Details
11-29-2008
3.00
Elevator Control System
Details
11-29-2008
2.00
Aileron Control System
Details
11-19-2008
1.00
Tailwheel Assembly and Installation
Details
11-19-2008
2.00
Floorboard Installation
Details
11-19-2008
1.00
Flap Lever installation
Details
11-11-2008
4.00
Final Control Stick Assembly and Installation
Details
11-10-2008
2.00
Wheel assembly
11-10-2008
1.00
Main Gear Assembly
Details
11-09-2008
8.00
Spraying final color
Details
11-06-2008
3.00
Cleaning
Details
11-05-2008
4.00
Painting
Details
11-04-2008
3.00
Cleaning
Details
11-02-2008
4.00
Polyspray
Details
11-01-2008
3.00
Sanding
Details
10-28-2008
9.00
A day in the paintbooth
Details
10-23-2008
8.00
A day in the paintbooth
Details
10-08-2008
3.00
Applying Patches and Tapes
10-07-2008
6.00
Building a Paintbooth
Details
10-07-2008
6.00
Applying Patches and Tapes
09-28-2008
1.00
Painting equipment
Details
09-20-2008
7.00
Applying Patches and Tapes
09-19-2008
7.00
Applying Patches and Tapes
Details
09-17-2008
3.00
Making Patches
09-15-2008
7.00
Applying Poly-Brush
Details
09-07-2008
11.00
Covering Fuselage
Details
09-03-2008
3.00
Covering Fuselage
Details
09-02-2008
3.00
Covering Fuselage
Details
08-31-2008
6.00
Covering Fuselage
Details
08-23-2008
9.00
Covering Fuselage
Details
08-23-2008
0.00
Covering Fuselage
Details
08-20-2008
2.00
Elevator Push Pull Tube Assembly
Details
08-05-2008
1.00
Painting controls
Details
08-05-2008
2.00
Flap Lever Assembly
Details
07-31-2008
5.00
Main Gear Fit Up
Details
07-23-2008
1.00
Seat Assembly trial fit
Details
07-21-2008
5.00
Seat Assembly
Details
07-17-2008
1.00
Rudder Fit Up
Details
07-13-2008
4.00
Torque tube fit up
Details
07-12-2008
3.00
Baggage Compartment
Details
07-07-2008
1.00
Elt and Communication Antenna Mount Plates
Details
07-07-2008
2.00
Battery Box Assembly
Details
07-02-2008
3.00
Doorframe Battery Acces Panel
Details
06-29-2008
1.00
Rib Vertical Stabilizer
Details
06-29-2008
3.00
Floorboard Fit Up
Details
06-28-2008
1.00
Tail Wheel Assembly
Details
06-28-2008
1.00
Rudder System Assembly
Details
06-28-2008
2.00
Fuselage Former Installation
Details
06-14-2008
4.00
Unpacking the Crate
Details
06-04-2008
5.00
Open the crate
Details
05-30-2008
12.00
Pick up the big box at Rotterdam
Details
04-09-2008
0.00
Rans Courier on his way to Europe
Details
SITE NAVIGATION
Contact Builder
S7S Home
Category
# Logs
# Hours
All
197
810
Control Systems
7
18
Covering
46
251
Delivery
4
21
Fuselage
21
45
Gear
3
4
LH Wing
11
42
Painting
50
235
Wing LH
11
42
Wing RH
22
76
Wings
22
76
Copyright © 2001-2024 Matronics. All Rights Reserved.