Powered By Kitlog Pro v2.0
Matt's Hangar
ME-1XL SKIMMER
All
Work Logs Found:
185
Category Work Time:
651 Hours
Date
Hours
Work Log Summary
Details
10-26-2014
0.10
General Update
Details
10-21-2006
3.60
Aft Canopy Work - Slider System
Details
10-14-2006
4.00
Stub Wings and Canopy Work
Details
10-13-2006
2.50
Stub Wing Layup
Details
10-08-2006
8.50
Stub Wing Construction
Details
10-07-2006
6.50
General Update
Details
09-04-2006
2.00
Cockpit beautification
Details
09-02-2006
4.50
Cockpit work
Details
08-27-2006
6.00
Installed FWD Canopy
Details
07-29-2006
3.50
Trim Tab Construction
Details
07-29-2006
40.00
Project Update
Details
04-30-2006
2.00
Tail attachment
Details
04-30-2006
2.50
Glassing the Rudder
Details
04-26-2006
0.50
Cleaned up the V-Stab
Details
04-25-2006
2.20
Finished and installed drive lugs
Details
04-23-2006
6.00
Creating of drive lugs
Details
04-22-2006
1.50
VStab layup
Details
04-15-2006
5.50
Prop hub finishing
Details
04-09-2006
7.50
Final Carving of the Prop Hub
Details
04-06-2006
3.50
More Prop Hub Maching
Details
04-02-2006
8.50
Machining Prop Hub
Details
04-01-2006
6.00
Machining Prop Hub
Details
03-27-2006
2.50
Fwd Floor Finish and Aft Turtledeck
Details
03-26-2006
5.00
Baggage Compartment/Seat Back
Details
03-24-2006
1.00
Baggage Panel hold downs
Details
03-20-2006
2.50
Baggage Compartment
Details
03-19-2006
4.50
Baggage Compartment
Details
03-18-2006
4.00
More Speed Brake
Details
03-13-2006
1.00
Speed Brake Actuator
Details
03-12-2006
4.00
Speed Brake Actuator
Details
03-12-2006
1.50
Baggage Compartment Parts
Details
03-11-2006
6.00
Speed Brake Actuator
Details
03-10-2006
4.50
Reconstruction of the access panel
Details
03-04-2006
3.50
Tailwheel block installation
Details
02-20-2006
1.20
Aft Section Access Panel
Details
01-16-2006
6.00
More Shaping for the Canopy
Details
01-15-2006
7.00
Canopy Work
01-11-2006
2.00
Canopy First Cut
Details
01-09-2006
3.00
Fwd Turtledeck Permanent
Details
01-08-2006
3.50
Fwd TurtleDeck
Details
01-02-2006
1.50
Dual Point Dizzy
Details
12-13-2005
1.50
Head Assy II
Details
12-11-2005
5.00
Head Assy
Details
12-10-2005
14.00
Head Work
Details
12-04-2005
3.50
Cylinder maching work
Details
11-27-2005
6.00
Pistons and such
Details
11-13-2005
4.00
More engine work
Details
11-09-2005
1.50
Engine Work
Details
10-29-2005
1.50
False bottom work
Details
10-29-2005
0.50
Brake tube lining
Details
10-23-2005
5.50
Fuse false bottom
Details
10-22-2005
4.50
Stub Wing Bottom Skin
Details
10-16-2005
2.00
Template Shaping and lower stub skins
Details
10-16-2005
2.50
Belly board installation and design
Details
10-15-2005
2.00
Creation of belly board concept
Details
09-26-2005
2.00
More work on wing rib templates
Details
09-25-2005
3.00
Rib Template Reconstruction
Details
08-24-2005
1.00
Engine Mount II
Details
08-23-2005
1.50
Engine Mount II - Starting
Details
08-19-2005
1.50
Leg Work
Details
08-15-2005
2.00
Leg Shaping
Details
08-14-2005
4.00
New Legs
Details
08-07-2005
3.00
Paint of interior
Details
07-31-2005
1.00
More tank work
Details
07-31-2005
2.50
Fuselage Sanding
Details
07-31-2005
3.00
Elevator Control Horn
Details
07-30-2005
4.00
General Fuselage Work
Details
07-28-2005
1.00
Filling and Sanding
Details
07-24-2005
1.00
Rear Harness Work
Details
07-24-2005
2.50
Fwd Turtledeck
Details
07-06-2005
2.00
Fwd Turtledeck Plug Work
Details
07-04-2005
1.50
FWD Turtledeck Glassing
Details
06-26-2005
2.50
Rudder Cable Guides
Details
06-25-2005
4.00
Wing Tank Bottoms
Details
06-25-2005
1.50
Tail Wheel - Full Swivel
Details
06-22-2005
4.50
Wing Tank bottoms
Details
06-20-2005
2.50
Cleaned up wing tank flanges.
Details
06-19-2005
5.00
Wing Tank Flanges
Details
06-13-2005
1.50
Engine Work
Details
06-12-2005
7.00
New Motor Mount Jig Created
Details
06-12-2005
6.50
Engine work
Details
06-09-2005
1.20
Firewall bolt bearings
Details
06-08-2005
1.00
Final welding of motor mount
Details
06-06-2005
2.00
More Motor Mount
Details
06-05-2005
7.00
Engine Mount - More
Details
06-04-2005
0.40
Fixing a divot
Details
06-04-2005
5.50
Engine Mount
Details
06-03-2005
1.50
Control stick linkage
Details
06-02-2005
1.50
Various
Details
06-01-2005
2.50
Sanding for varnish
Details
05-31-2005
5.00
Fuse odds and ends
Details
05-30-2005
4.50
Misc Fuselage Stuff
Details
05-19-2005
2.50
Still fighting with the engine
Details
05-16-2005
3.50
Corvair Engine Disassembly
Details
05-15-2005
2.00
Rough cleaning of 'vair engines
Details
05-07-2005
2.00
Fwd Turtledeck
Details
05-01-2005
2.00
More tank work
Details
04-30-2005
2.00
Top and Bottom Glass Layups - Tnks
Details
04-26-2005
2.50
Carved tank top and bottom)
Details
04-13-2005
1.00
More rudder pedal work
Details
04-11-2005
2.00
Rudder Pedal Weldments
Details
04-10-2005
3.50
Adjustable Rudder Pedals
Details
04-09-2005
2.50
Right Main Fuel Tank
Details
04-09-2005
1.50
Interior Coating
Details
04-06-2005
2.00
Aft turtledeck assembly
Details
04-03-2005
2.00
Constuction on Left Main
Details
04-03-2005
5.00
Completed aft turtledeck plug
Details
04-02-2005
4.50
Elevator Crossshaft complete
Details
03-26-2005
2.00
Mounted control stick in plane
Details
03-26-2005
1.50
Fwd Turtledeck
Details
03-26-2005
1.50
Aft turtledeck smoothing
Details
03-25-2005
1.00
More putty
Details
03-25-2005
2.00
Control Stick Mounting Area
Details
03-23-2005
0.50
Modification of Panel Mount
Details
03-21-2005
0.50
Aft Turtledeck plug finishing
Details
03-20-2005
1.00
Seat belt brackets
Details
03-20-2005
1.50
Ramaining gussets installed
Details
03-20-2005
3.00
Glassing aft turtledeck
Details
03-19-2005
2.50
Control stick finishing
Details
03-17-2005
1.50
Rudder Pedals
Details
03-12-2005
4.50
Aft turtledeck work
Details
03-07-2005
1.00
Aft Turtledeck Plug
Details
03-06-2005
2.00
Control Grip
Details
03-06-2005
4.00
Aft Turtledeck Plug
Details
03-05-2005
5.00
Initial Control Stick Assembly
Details
02-27-2005
6.00
Rudder Assembly
Details
02-26-2005
3.00
Rudder Control Horn
Details
02-25-2005
4.50
Created Rudder
Details
11-04-2004
2.50
More tank parts
Details
10-30-2004
3.50
Start of wing tanks
Details
10-24-2004
2.50
Rework...
Details
10-23-2004
6.00
Shaping of VStab
Details
10-17-2004
5.50
Started
Details
10-16-2004
3.00
Finished Horizontal Stab Mounts
Details
10-11-2004
4.00
HStab mounts
Details
10-10-2004
3.50
Horizontal Tail Mount
Details
10-09-2004
5.00
Powder Coating Landing Gear
Details
10-03-2004
5.00
More Legs
Details
10-02-2004
4.50
Gear Leg/Springs
Details
09-26-2004
4.50
Landing Gear Mounts
Details
09-25-2004
6.00
Landing Gear Construction
Details
09-19-2004
3.00
Panel Mounts and aft floor
Details
09-18-2004
5.50
Firewall and Fuse Gussets
Details
08-16-2004
3.00
Fuel Tank Mount, Fwd Floor
Details
08-15-2004
4.50
Fwd Floor and Firewall
Details
06-28-2004
3.00
Seat
Details
06-23-2004
4.50
Mounted aft WAF's
Details
06-20-2004
4.00
Installed the stub wing mounts
Details
06-13-2004
4.50
Floor and Seat
Details
06-12-2004
4.00
Stub Wing work
Details
06-05-2004
4.00
Firewall Work/Spar installation
Details
06-04-2004
0.50
Aft Center Spar Work
Details
06-02-2004
2.50
Firewall Upper Shelf
Details
05-31-2004
3.00
Bottom Fuselage Sheeting
Details
05-30-2004
6.00
Fuselage work... Again
Details
05-23-2004
7.00
Bottom of the boat
Details
05-22-2004
2.00
Boat Construction
Details
05-19-2004
2.50
Attached skin to other fuse side.
Details
05-14-2004
3.00
Attached Skin to Fuselage
Details
05-09-2004
2.50
Bottom skin of elevator
Details
05-06-2004
2.50
Last skin on HStab
Details
05-05-2004
1.00
One side gussets complete
Details
05-03-2004
1.00
Sanding...
Details
05-03-2004
2.50
More fuselage gussets
Details
05-02-2004
2.00
Started gluing gussets
Details
05-01-2004
3.00
Upper surface glassed in
Details
04-30-2004
4.50
One side sheeting
Details
04-25-2004
3.00
Center Spar work
Details
04-22-2004
0.10
Control Stick arrived
Details
04-18-2004
4.00
Glassing begins
Details
04-10-2004
4.00
Shaped elevator tips
Details
04-09-2004
2.00
Fuse Sides Complete (almost)
Details
04-08-2004
2.50
Completed other fuse side
Details
04-07-2004
2.00
First fuse done, second started
Details
04-06-2004
1.50
First fuse side complete
Details
04-05-2004
0.80
Fuse Sides Part I
Details
04-04-2004
1.00
HStab Aero Balance Tabs
Details
04-04-2004
6.50
Fues Side layout
Details
04-03-2004
4.00
HStab/Elev Hinging
Details
04-03-2004
1.50
Fuse layout
Details
04-01-2004
2.00
Unpacked fuselage wood order
Details
03-27-2004
6.50
Elevator Construction
Details
01-03-2004
5.00
HStab Jigs
Details
12-20-2003
6.00
Fuselage Jig
Details
06-12-2003
20.00
Shop setup
Details
SITE NAVIGATION
Contact Builder
A-23 PROMETHEUS Home
GN-1 Home
ME-10 BASTION Home
A-21 INTREPID Home
PA-38 Home
ME-1XL SKIMMER Home
Category
# Logs
# Hours
All
185
1486
Control
19
117
Electrical
1
1
Empennage
1
4
Engine
10
43
Firewall Forward
18
78
Fuel System
13
37
Fuselage
83
555
Horizontal Stabilizer
12
38
Interior
2
4
Landing Gear
11
138
Miscellaneous
1
109
None
1
73
Shop Supplies
1
20
Vertical Stabilizer
7
77
Wings
5
192
Copyright © 2001-2025 Matronics. All Rights Reserved.