KitLog pro

Powered By Kitlog Pro v2.0

SHANE'S WEB SITE
Work Logs Found: 37
Category Work Time: 111 Hours
 Date
Hours
Work Log Summary

Details

 04-15-2007
2.00
Tape and polybrush ailerons.
Details

 04-11-2007
3.00
Finished cockpit wiring.
Details

 04-07-2007
4.00
Covered ailerons
Details

 04-05-2007
4.00
Ailerons
Details

 04-05-2007
1.00
Aileron build-up
Details

 03-10-2007
2.00
Fabed installed and adjusted brakes.
Details

 03-09-2007
2.00
First start of new HKS
Details

 03-08-2007
1.50
Leak check plumbing.
Details

 03-03-2007
0.50
Installed stick.
Details

 03-03-2007
6.00
Fabricate exhaust sytem.
Details

 03-02-2007
2.00
Finished control stick.
Details

 02-24-2007
4.00
Modify cowling
Details
       

 08-03-2006
2.00
Aileron build up
Details

 06-30-2006
12.00
First covering experience.
Details

 06-12-2006
2.00
Firewall
Details

 06-11-2006
6.00
Paint Fuselage and Tail
Details

 06-10-2006
1.00
Start sealing fuse with epoxy varnish.

 06-10-2006
6.00
Poly-brush and tape fuselage
Details

 06-05-2006
4.00
Build up oil cooler mount and scoop.
Details

 06-03-2006
3.00
Mock-up panel.
Details

 02-19-2006
4.00
Rough fit canopy frame.

 02-16-2006
2.00
Turtledeck support / Motor mount gussets
Details
       

 02-16-2006
0.25
Pics with the builder, - me!
Details
     

 02-14-2006
0.50
Order engine mounting plate.
Details

 02-13-2006
2.00
Engine mock-up
Details

 02-12-2006
1.50
Turtledeck lay-up.
Details

 02-10-2006
2.00
Build / modify seat and brackets.
Details

 02-09-2006
4.00
Build-up tailwheel mount.
Details
     

 01-07-2006
0.50
Cut away ailerons from wings.
Details

 01-06-2006
1.50
Start building aileron for right wing.
Details

 01-04-2006
2.00
Start building ailerons -Left wing
Details

 01-03-2006
1.50
Compression struts for right wing
Details

 01-02-2006
2.00
Compression struts for left wing.
Details

 01-01-2006
3.00
Affix ribs to spars of left wing.
Details

 12-25-2005
2.00
Affix ribs to spars of right wing.
Details

 12-15-2005
6.00
Join first sections of fuse sides together
Details

 12-10-2005
8.00
Lay out build table and fuse sides.
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.