12-07-2020
|
1.30
|
Flight test and in air calibration
|
Details
|
 |
|
11-23-2020
|
3.50
|
final ground check out and re-install interior etc
|
Details
|
|
|
11-21-2020
|
2.25
|
continue ground testing - no pics
|
Details
|
  |
|
11-19-2020
|
4.00
|
fix pin 45; install PFD; begin set up
|
Details
|
|
|
11-16-2020
|
2.00
|
Most instruments back in; tidy up
|
Details
|
|
|
11-12-2020
|
2.75
|
make trim wire connectors to pitch servo; tidy up
|
Details
|
|
|
11-12-2020
|
1.25
|
Can Bus Hi/Lo to P4X02 on PFD
|
Details
|
|
|
11-09-2020
|
1.50
|
trace elev trim cable, open up at pitch servo
|
|
|
|
11-09-2020
|
0.25
|
think through splicing can bus wires in
|
Details
|
|
|
11-09-2020
|
1.75
|
the big cut
|
Details
|
|
|
11-09-2020
|
0.75
|
splice into elev trim cable; run to pitch servo
|
Details
|
|
|
11-09-2020
|
1.75
|
mount rack; drill new hole for clip nutplate, Tig
|
Details
|
|
|
11-09-2020
|
1.00
|
|
Details
|
|
|
10-27-2020
|
4.25
|
Run new harnesses; install servos
|
|
|
|
10-27-2020
|
2.00
|
pull old wiring and servos
|
|
|
|
10-27-2020
|
1.50
|
fool w fit; remove autotrim
|
Details
|
|
|
10-27-2020
|
2.00
|
connect power, AP disc and ground wires
|
Details
|
|
|
10-19-2020
|
1.25
|
remove old TT Sorcerer AP
|
Details
|
|
|
12-09-2019
|
0.00
|
split cowling install cont'd
|
|
|
|
12-09-2019
|
1.00
|
install new split cowling
|
Details
|
|
|
12-09-2019
|
0.50
|
finish up split cowl install
|
|
|
|
12-08-2019
|
0.50
|
fill pinholes and prime
|
Details
|
|
|
12-04-2019
|
0.00
|
begin lower cowling nose repair 4
|
|
|
|
12-04-2019
|
0.00
|
begin lower cowling nose repair 3
|
|
|
|
12-04-2019
|
0.00
|
begin lower cowling nose repair 2
|
Details
|
|
|
12-04-2019
|
2.00
|
begin lower cowling nose repair 1
|
Details
|
|
|
11-24-2019
|
1.50
|
cowl split mod - split and install receptacles
|
|
|
|
11-24-2019
|
0.00
|
cowl split
|
|
|
|
11-18-2019
|
2.50
|
split bottom cowl mod
|
Details
|
|
|
11-18-2019
|
0.00
|
cowl mod layup
|
Details
|
|
|
07-08-2019
|
1.00
|
try alternate strut ball placement
|
Details
|
|
|
07-08-2019
|
1.00
|
re-install baggae door
|
Details
|
|
|
07-06-2019
|
2.00
|
flox in bracket; add 2 BID
|
Details
|
|
|
07-06-2019
|
2.00
|
fab strut attach bracket
|
Details
|
|
|
06-27-2019
|
1.25
|
plan placement' drill hinge for stud; fab phenolic
|
Details
|
  |
|
06-26-2019
|
0.00
|
Order parts for baggage door strut mod
|
Details
|
  |
|
02-23-2019
|
2.00
|
AOA calibration & 4 way TAS calculation
|
Details
|
|
|
08-11-2018
|
2.50
|
SB install switch, test, finalize
|
Details
|
|
|
08-06-2018
|
1.00
|
SB J1 control cable wiring
|
Details
|
|
|
08-06-2018
|
2.00
|
SB install 3A breaker; run ground wire
|
Details
|
|
|
08-06-2018
|
0.75
|
SB couldn't access ground lug properly; butt splic
|
|
 |
|
08-06-2018
|
1.00
|
SB bundle up wires; reinstall some of interior
|
Details
|
|
|
08-06-2018
|
0.75
|
SB drill holes in panel for switch and LED
|
Details
|
|
|
08-02-2018
|
2.25
|
SB; work on wiring
|
Details
|
|
|
08-02-2018
|
1.00
|
SB; did final install of SB units in wing pockets
|
Details
|
|
|
07-30-2018
|
0.50
|
SB; mount ALC unit
|
|
 |
|
07-30-2018
|
1.00
|
SB; make CPC connections at both wing pockets
|
|
|
|
07-30-2018
|
1.50
|
SB; J1 CPC connector at ALC
|
Details
|
|
|
07-30-2018
|
1.50
|
SB; CPC connectors under front seat at ALC
|
Details
|
|
|
07-30-2018
|
0.00
|
SB cable routing on R side
|
Details
|
|
|
07-30-2018
|
0.00
|
SB cable routing L side
|
Details
|
|
|
07-29-2018
|
2.25
|
speed brakes - pull L and R wing wires
|
Details
|
|
|
07-29-2018
|
0.50
|
flox pad for ALC unit in- SB
|
Details
|
|
|
07-21-2018
|
1.25
|
move fuel line adel clamps
|
Details
|
|
|
07-21-2018
|
1.25
|
locate and drill drain holes
|
|
|
|
07-21-2018
|
1.25
|
flox in 8-32 screws for ALC mounting pad
|
Details
|
|
|
07-21-2018
|
1.25
|
ALC mounting location
|
Details
|
|
|
07-16-2018
|
0.00
|
speed brake install planning
|
|
|
|
07-16-2018
|
1.75
|
Beg planning/work on speed brakes
|
Details
|
|
|
07-03-2018
|
3.00
|
adj K factor; adj elev trim indic.; rewire elev tr
|
Details
|
|
|
06-24-2018
|
0.00
|
Fully clean ADSB report - PASS
|
Details
|
  |
|
04-30-2018
|
0.50
|
adj AP VRT and pitch trim speed
|
Details
|
|
|
04-25-2018
|
0.00
|
ADSB pass e-mail
|
Details
|
 |
|
04-23-2018
|
1.50
|
replace front door spindle & adjust latches
|
|
|
|
04-23-2018
|
0.20
|
K factor adjustment #1
|
Details
|
 |
|
04-11-2018
|
1.50
|
attempt to repair spindle in door handle
|
Details
|
|
|
04-07-2018
|
1.00
|
update GNS 530W with correct, current SW
|
Details
|
|
|
04-07-2018
|
1.00
|
install LED status light for TT autotrim; and cali
|
Details
|
|
|
04-02-2018
|
0.50
|
switch wires for Dynon power in....now +5v as it s
|
|
  |
|
04-02-2018
|
0.00
|
install new GPS ground plane
|
Details
|
|
|
04-02-2018
|
1.00
|
get SW version; T Jason no pics...some on phone
|
Details
|
  |
|
04-02-2018
|
2.50
|
fab, fit and install ground plane for GDU 460 and
|
Details
|
|
|
03-05-2018
|
2.00
|
xponder antenna cont'd
|
|
|
|
03-05-2018
|
2.00
|
testing ADSB-530W communication per Garmin
|
Details
|
|
|
03-05-2018
|
2.00
|
Dynon D1 power supply
|
Details
|
|
|
03-05-2018
|
2.00
|
change out transponder antenna
|
Details
|
|
|
03-05-2018
|
2.00
|
AP autotrim trim
|
Details
|
|
|
12-24-2017
|
2.50
|
static ins and outs
|
Details
|
  |
|
12-23-2017
|
5.00
|
pitot-static all good; ARINC 429 good
|
Details
|
|
|
12-18-2017
|
3.00
|
more pitot troubleshooting
|
Details
|
|
|
12-16-2017
|
3.00
|
more troubleshooting ADSB and pitot issues
|
Details
|
  |
|
12-12-2017
|
3.00
|
more TX troubleshooting
|
Details
|
  |
|
12-11-2017
|
3.00
|
more troubleshooting
|
Details
|
|
|
12-11-2017
|
0.00
|
door seal pump; pitot-static test tool
|
|
|
|
11-29-2017
|
2.00
|
T Jason troubleshooting issues
|
Details
|
|
|
11-29-2017
|
1.00
|
redo pitot and AOA fittings at wing tip
|
Details
|
|
|
11-29-2017
|
1.00
|
Adjust prop govenor to stop; was only getting ~250
|
|
|
|
11-19-2017
|
7.00
|
1st flight; troubleshoot squawks
|
Details
|
|
|
10-19-2017
|
3.00
|
fix tach sensor wiring; clear up remaining open it
|
Details
|
  |
|
10-15-2017
|
2.25
|
rewire RPM and FF
|
Details
|
|
|
10-15-2017
|
6.00
|
many Misc items
|
Details
|
|
|
10-09-2017
|
3.00
|
pull R mag; install Garmin RPM sensor
|
Details
|
|
|
10-09-2017
|
2.25
|
Misc. finalizing items
|
Details
|
|
|
10-09-2017
|
2.50
|
misc cont'd
|
Details
|
|
|
10-03-2017
|
4.00
|
pitot-static-xponder cert test
|
Details
|
 |
|
10-02-2017
|
5.75
|
engine start; magnetometer cal., misc
|
Details
|
|
|
09-25-2017
|
0.50
|
partial fix of mount rub
|
Details
|
|
|
09-25-2017
|
2.00
|
mag interference test; calibrate fuel tanks
|
Details
|
|
|
09-25-2017
|
2.50
|
fix P8 flap control; ELT
|
Details
|
  |
|
09-23-2017
|
1.50
|
wire up ELT connection; help hangar neighbor with
|
Details
|
|
|
09-23-2017
|
0.50
|
Batts (2014) A=27.3v, B (2012) =26.2 volts
|
Details
|
|
|
09-16-2017
|
1.50
|
Study P-8 wires CP stick; rewire pitot; zip ties
|
Details
|
|
|
09-16-2017
|
1.50
|
secure all wires mid and aft.
|
|
|
|
09-11-2017
|
1.75
|
troubleshoot co-pilot stick grip issues
|
Details
|
|
|
09-11-2017
|
1.25
|
pitot and ELT
|
Details
|
|
|
09-11-2017
|
1.25
|
load Sorcerer settings; more pitot fooling
|
Details
|
|
|
09-11-2017
|
3.00
|
cont. check out of G3 install
|
Details
|
  |
|
09-09-2017
|
3.25
|
W&B; connect batteries
|
Details
|
|
|
09-09-2017
|
1.50
|
Power up
|
Details
|
|
|
09-04-2017
|
3.75
|
vent hose, adels, shunt, cb cover
|
Details
|
|
|
09-04-2017
|
2.00
|
G3X screens & radios back in. MILESTONE!
|
Details
|
 |
|
09-04-2017
|
1.50
|
CB plate; pitot-aoa-static lines
|
Details
|
|
|
09-04-2017
|
1.25
|
adels behind panel; GPS & XM antennae
|
|
|
|
08-31-2017
|
0.00
|
pics 3
|
Details
|
|
|
08-31-2017
|
0.00
|
pics 2
|
Details
|
|
|
08-31-2017
|
3.75
|
numerous small items
|
Details
|
|
|
08-31-2017
|
0.00
|
firewall schematic drawing-behind panel connection
|
Details
|
  |
|
08-31-2017
|
0.00
|
add 1A fuse to shunt leads
|
Details
|
|
|
08-17-2017
|
1.00
|
work on co-pilot vent hose
|
Details
|
|
|
08-17-2017
|
1.00
|
move ground block to a different, more accessible
|
Details
|
|
|
08-17-2017
|
0.00
|
L side so far
|
|
|
|
08-17-2017
|
1.00
|
Attempt to make main power connection
|
Details
|
|
|
08-15-2017
|
2.75
|
pull GMU 22 cable-run opposite direction, repin
|
Details
|
  |
|
08-14-2017
|
3.00
|
Relocate dimmer; pilot side rails; route and conne
|
Details
|
  |
|
08-13-2017
|
1.00
|
hang panel; install GPS/XM ant.shelf; CR2 batt to
|
Details
|
|
|
08-13-2017
|
5.25
|
begin reconnecting everything
|
Details
|
|
|
08-13-2017
|
0.00
|
additional pics
|
Details
|
|
|
08-07-2017
|
1.00
|
sort & secure wires on panel; clean front window
|
|
  |
|
08-07-2017
|
0.00
|
part 2
|
Details
|
|
|
08-07-2017
|
6.00
|
many final small tasks before hanging panel back o
|
Details
|
|
|
08-07-2017
|
0.50
|
make rough schematic of what needs to be connector
|
Details
|
 |
|
08-03-2017
|
2.00
|
ring out P-2,3; ground block strap, main buss term
|
|
|
|
08-03-2017
|
2.00
|
figure GPS & XM antennas; fab shelf, set 1st click
|
Details
|
|
|
08-03-2017
|
0.00
|
figure ant. shelf; locate, set 1st click bond
|
Details
|
|
|
08-03-2017
|
0.00
|
buss to CB
|
Details
|
 |
|
08-03-2017
|
2.50
|
adels, zip ties, RTV... tidy up wire runs
|
Details
|
|
|
07-30-2017
|
1.00
|
wig-wag wiring to P-1, pin 14; pull some old VP wi
|
Details
|
|
|
07-30-2017
|
0.00
|
P-13 plug end.
|
Details
|
 |
|
07-30-2017
|
2.00
|
P-1-0 fuel probes, ELT, VR #2 sense wires, door se
|
Details
|
 |
|
07-30-2017
|
2.25
|
GTX 345 cable and antenna cable
|
Details
|
|
|
07-30-2017
|
0.50
|
clean up hangar a bit and blow out.
|
|
  |
|
07-29-2017
|
1.50
|
run GMU 22 magnetometer cable - left side
|
Details
|
|
|
07-29-2017
|
1.50
|
re-install RAM air cable
|
Details
|
|
|
07-29-2017
|
1.00
|
plan GTX wiring run; drill holes. No pics yet.
|
Details
|
  |
|
07-24-2017
|
0.50
|
re-install parking brake cable
|
|
  |
|
07-24-2017
|
1.25
|
re-install oil cooler, heat and defrost cables
|
Details
|
|
|
07-24-2017
|
0.75
|
mount magnetometer shelf
|
Details
|
|
|
07-24-2017
|
1.25
|
install power plug for Dynon D1
|
Details
|
|
|
07-24-2017
|
1.50
|
hall effect sensor to Alt 2 B lead
|
Details
|
|
|
07-24-2017
|
0.00
|
3 cables + parking in; just ram air left to do
|
|
 |
|
07-17-2017
|
0.40
|
voltage sense jumper VR1 to VR2
|
Details
|
|
|
07-17-2017
|
2.25
|
final mounting of av fan, dimmer, and 12V converte
|
|
|
|
07-17-2017
|
1.25
|
add alternate static valve and related plumbing
|
Details
|
|
|
07-16-2017
|
1.75
|
replumb pitot-static AOA with SafeAir fittings
|
Details
|
|
|
07-16-2017
|
0.50
|
add 2nd click bonds for avionics fan & dimmer
|
|
|
|
07-02-2017
|
1.00
|
pull new 3C shielded wire in R wing for OAT
|
Details
|
  |
|
07-02-2017
|
0.75
|
place dimmer/fan/inverter; click bond 1
|
Details
|
|
|
07-02-2017
|
0.75
|
misc shop
|
|
  |
|
07-02-2017
|
1.00
|
flox in GTX45R rack under R rear seat
|
Details
|
|
|
07-02-2017
|
1.25
|
finish wiring all connectors for OAT tips & fusela
|
|
  |
|
07-02-2017
|
2.00
|
Figure out and Fab mounting brackets for GTX45R
|
|
|
|
06-26-2017
|
2.00
|
wire VR1 and VR2, ammeter shunt
|
|
|
|
06-26-2017
|
2.00
|
wire up molex for FF and RPM
|
|
 |
|
06-26-2017
|
1.50
|
wire up GTP 59 OAT
|
Details
|
|
|
06-26-2017
|
1.75
|
ring out wig-wag wires and wire up tip ends of bot
|
Details
|
|
|
06-26-2017
|
1.50
|
misc adels and zip ties; plan GTX45R mounting loca
|
Details
|
  |
|
06-26-2017
|
1.25
|
fool with turning mag to get new tach sensor on
|
Details
|
|
|
06-26-2017
|
1.00
|
finish up pitot and AOA plumbing/wiring
|
|
|
|
06-19-2017
|
2.50
|
wire up oil temp, fuel psi, oil psi, map, adels le
|
Details
|
|
|
06-18-2017
|
5.75
|
wire up EGT and CHT; route
|
|
|
|
06-18-2017
|
2.00
|
unpack & inventory panel box
|
|
|
|
06-18-2017
|
2.00
|
sensor manifold
|
Details
|
|
|
06-18-2017
|
0.00
|
sensor manifold
|
|
 |
|
05-25-2017
|
1.00
|
Oil temp sensor
|
Details
|
|
|
05-25-2017
|
0.00
|
GMU 44 bracket final assembly
|
Details
|
|
|
05-25-2017
|
3.00
|
finish GMU 22 bracket & platform
|
Details
|
|
|
05-23-2017
|
2.50
|
work on GMU 22 magnetometer shelf
|
Details
|
|
|
05-23-2017
|
1.00
|
ring out J243 tach wires
|
Details
|
 |
|
05-22-2017
|
3.25
|
Garmin GAP 26 pitot/AOA
|
Details
|
|
|
05-21-2017
|
4.75
|
Begin G3X install
|
Details
|
|
|
05-08-2017
|
2.50
|
install defroster; adels for wire run; ready for i
|
Details
|
|
|
04-10-2017
|
4.50
|
add last click bond for defrost plenum; reroute &
|
Details
|
  |
|
04-03-2017
|
0.00
|
VR #2 cont'd
|
|
|
|
04-03-2017
|
1.25
|
Voltage Reg #2; add SB1B-28, pull LS-1
|
Details
|
|
|
04-03-2017
|
1.25
|
run AOA tubing; verify sync wires for Rec LIghts
|
Details
|
|
|
04-03-2017
|
0.00
|
Rec Light wiring cont'd
|
|
|
|
04-03-2017
|
1.00
|
defroster fit cont'd; add 3 more clic bonds
|
|
  |
|
12-30-2016
|
3.50
|
pull all control cables; ALT, OIL, HEAT, DEFROST,
|
Details
|
  |
|
12-24-2016
|
3.50
|
rang out 3 RG400 lines; run new wire, vac.
|
Details
|
|
|
12-19-2016
|
0.00
|
weigh-in
|
Details
|
|
|
12-19-2016
|
1.00
|
Pul old magnetometer and xponder cable; tidy up wi
|
|
  |
|
12-19-2016
|
1.00
|
plan out mag shelf extension; cut phenolic, drill
|
Details
|
|
|
12-19-2016
|
0.00
|
panel ready for boxing up
|
|
|
|
12-19-2016
|
3.00
|
finish boxing up panel for shipment
|
|
|
|
12-12-2016
|
3.25
|
Continue cleaning up wires; remove rest of interio
|
Details
|
  |
|
11-30-2016
|
2.00
|
Pull remaining parts/wires; ready to pack up
|
Details
|
|
|
11-14-2016
|
5.75
|
pull parts, seats & side panels out, panel out
|
Details
|
|
|
11-08-2016
|
2.50
|
pull ARINC, EM wiring, Cables etc
|
Details
|
  |
|
11-07-2016
|
5.75
|
Pull AFS sensors and VP200 CU unit
|
Details
|
  |
|
10-31-2016
|
0.00
|
Pulling Day 1, part 3
|
|
|
|
10-31-2016
|
6.75
|
Begin removal of original panel for Upgrade
|
Details
|
 |
|
10-31-2016
|
0.00
|
Begin pulling panel
|
Details
|
|
|
08-04-2015
|
6.00
|
Cut foam and wrap armrests in leather
|
Details
|
  |
|
07-26-2015
|
3.00
|
make armrest templates & fab/micro pre-preg
|
Details
|
|
|
06-11-2015
|
949.00
|
6 months in paint shop; final bodywork and paint
|
Details
|
|
|
12-24-2014
|
6.00
|
cover interior panels
|
Details
|
|
|
12-16-2013
|
3.50
|
swap COM1 and COM 2 antenna
|
Details
|
  |
|
12-16-2013
|
2.00
|
install air/oil separator
|
Details
|
|
|
10-07-2013
|
1.00
|
add capacitor to try to quiet ALT noise
|
Details
|
|
|
09-09-2013
|
3.25
|
prep and micro inside of fuselage
|
Details
|
|
|
09-09-2013
|
0.25
|
clean up flox release at seat pans
|
|
|
|
05-28-2013
|
3.00
|
Dynamic prop balance
|
Details
|
 |
|
03-18-2013
|
3.50
|
rehang door and adjust pump
|
|
|
|
03-18-2013
|
0.00
|
mess with door seal pump; adjust, troubleshoot
|
Details
|
|
|
03-17-2013
|
0.00
|
turn 1/2 turn CCW
|
Details
|
 |
|
03-17-2013
|
4.00
|
pull door; prep to install door seal
|
|
|
|
03-17-2013
|
0.00
|
modify caulk gun to apply silicone
|
Details
|
|
|
03-17-2013
|
2.50
|
Install door seal with silicone adhesive
|
Details
|
|
|
03-17-2013
|
0.00
|
door seal install continued
|
|
|
|
02-11-2013
|
0.00
|
spinner gap after shimming mount out with 1 flat w
|
|
|
|
02-11-2013
|
0.00
|
Offending Airwolf parts that caused engine failur
|
|
|
|
02-11-2013
|
3.25
|
finish punch list to restart Phase 1 test flying
|
Details
|
  |
|
02-11-2013
|
1.00
|
check brake fluid level - top off
|
Details
|
|
|
02-11-2013
|
1.00
|
add spacer to see if shake goes away
|
Details
|
|
|
02-10-2013
|
1.00
|
test circuits over Carlisle Airport, N94
|
Details
|
|
|
02-10-2013
|
1.00
|
reconnect fuel drain hose...what a bear.
|
Details
|
|
|
02-10-2013
|
1.00
|
ground run and start test flight over N94 airport
|
|
|
|
02-10-2013
|
1.00
|
Back home at Capital City, KCXY
|
|
|
|
02-09-2013
|
4.25
|
safety baffle, mount prop, torque, safety, spinner
|
Details
|
|
|
02-09-2013
|
4.25
|
ready for ground run tomorrow
|
|
|
|
02-04-2013
|
5.00
|
exhaust, cht, egt, wiring Day 3
|
Details
|
|
|
02-04-2013
|
4.75
|
baffling Day 3
|
|
|
|
02-03-2013
|
3.50
|
results of today's engine work - day 2
|
|
|
|
02-03-2013
|
4.00
|
continue hanging engine - reconnect things
|
Details
|
|
|
02-02-2013
|
4.00
|
Receive & rehang rebuit engine
|
Details
|
|
|
02-02-2013
|
4.00
|
continue engine re-install
|
Details
|
|
|
10-27-2012
|
2.50
|
belly antenna; replace B battery
|
Details
|
|
|
10-20-2012
|
5.25
|
cowl, aileron hinges, B battery
|
Details
|
  |
|
10-17-2012
|
0.00
|
fair in cowling front edge; reattach spinner backi
|
Details
|
|
|
10-17-2012
|
0.00
|
cowl inlet measurements
|
|
|
|
10-17-2012
|
4.00
|
continue work on cowl inlets
|
Details
|
|
|
10-14-2012
|
4.50
|
ground plane strips to belly; continue cowl inlet
|
|
  |
|
10-08-2012
|
4.00
|
sand & shape cowl inlets; coat #2 of Super-fill
|
Details
|
|
|
09-23-2012
|
2.00
|
prep and add super-fill antenna ground plane
|
Details
|
 |
|
09-23-2012
|
2.50
|
bodywork cowl inlets
|
Details
|
|
|
09-17-2012
|
4.25
|
modify cowl inlets
|
Details
|
|
|
09-17-2012
|
3.75
|
1 BID to COM belly antenna copper strips
|
Details
|
|
|
09-05-2012
|
2.00
|
3 BID to opposite cowl inlet halves
|
|
|
|
09-03-2012
|
2.00
|
3 BID to half of cowling inlets
|
Details
|
|
|
08-27-2012
|
3.00
|
WLS primer to rest of parts/fuselage
|
Details
|
|
|
08-27-2012
|
5.75
|
WLS primer to interior
|
Details
|
|
|
08-27-2012
|
0.75
|
pull back plate off prior to prop flush
|
Details
|
|
|
08-27-2012
|
2.25
|
begin work to modify cowl inlets
|
Details
|
|
|
08-20-2012
|
4.00
|
work on adding COM 2 to belly & misc.
|
Details
|
|
|
08-20-2012
|
3.00
|
mount bolts. trim door flange, skybolt 4 nose gear
|
Details
|
|
|
08-06-2012
|
6.00
|
work on plane while engine is rebuilt
|
Details
|
|
|
07-30-2012
|
6.50
|
crate up engine to ship back to Barrett
|
Details
|
|
|
07-29-2012
|
11.00
|
pull engine at N94...to KCXY to crate
|
|
|
|
07-25-2012
|
1.29
|
Flight #10, engine failure, emergency landing
|
Details
|
|
|
07-16-2012
|
5.50
|
Flt test #9 and squawks - flt = 2.57 hours T=12.76
|
Details
|
|
|
07-09-2012
|
2.50
|
Misc. squawks
|
Details
|
|
|
07-04-2012
|
5.00
|
Flt #8 and clear squawks; misc. maintenance
|
Details
|
  |
|
07-02-2012
|
2.75
|
Flight test #7
|
Details
|
  |
|
07-02-2012
|
5.00
|
clear squawks for flight 7 & misc
|
|
|
|
06-18-2012
|
1.75
|
replace static line; work on MG wheel pants covers
|
Details
|
|
|
06-18-2012
|
3.00
|
Misc avionics settings & troubleshooting
|
Details
|
  |
|
06-17-2012
|
4.00
|
test flight #6 and fix squawks
|
Details
|
|
|
06-17-2012
|
2.25
|
misc. - try new cover - recowl
|
Details
|
|
|
06-04-2012
|
2.50
|
troubleshoot XM WX not working
|
Details
|
|
|
06-04-2012
|
0.75
|
re-rig left aileron
|
Details
|
|
|
06-04-2012
|
0.25
|
dampener hose to oil filter
|
Details
|
|
|
06-04-2012
|
0.25
|
booger end of threads in ram air to prevent? nuts
|
|
|
|
06-04-2012
|
1.00
|
AP settings, test AP on ground, turn target ON
|
Details
|
|
|
06-03-2012
|
1.00
|
aileron trim modification
|
Details
|
|
|
06-03-2012
|
3.75
|
#5 long run AOO-PSB-SEG-KCXY; debrief run
|
Details
|
|
|
05-24-2012
|
2.00
|
try to get XM wx to work; install LED noselight
|
Details
|
|
|
05-21-2012
|
0.25
|
trim exhaust pipes to natural body line
|
Details
|
|
|
05-21-2012
|
0.25
|
sand lower cowl flange from spinner rub
|
|
 |
|
05-21-2012
|
0.75
|
install bracket for taxi light
|
|
|
|
05-21-2012
|
0.75
|
gascolator
|
|
|
|
05-21-2012
|
1.50
|
fab shim washers for engine mount
|
Details
|
|
|
05-21-2012
|
1.25
|
cowlings back on and misc.
|
|
  |
|
05-21-2012
|
1.00
|
attempt XM weather activation
|
Details
|
|
|
05-21-2012
|
1.25
|
activate XM weather
|
Details
|
|
|
05-20-2012
|
1.50
|
troubleshoot oil leak
|
Details
|
|
|
05-20-2012
|
2.00
|
repair stripped screw and mount nav/strobe lights
|
Details
|
|
|
05-20-2012
|
1.50
|
misc.
|
Details
|
  |
|
05-20-2012
|
1.50
|
Flt #4....returned to CXY with OVERVOLTAGE alarrm
|
Details
|
|
|
05-20-2012
|
0.50
|
add temp. weatherstrip to front door
|
Details
|
|
|
05-14-2012
|
6.25
|
wing tip lights
|
Details
|
|
|
05-14-2012
|
2.50
|
troubleshoot and resolve alternator issues
|
Details
|
|
|
05-13-2012
|
5.50
|
Test flight #3 and clear squawks - no pics
|
Details
|
  |
|
05-12-2012
|
5.75
|
GP first flight; clear squawks
|
Details
|
|
|
05-09-2012
|
1.50
|
wire up Sunray Plus LED wing tip lights
|
Details
|
|
|
05-09-2012
|
1.00
|
seats and interior panels back in
|
Details
|
 |
|
05-07-2012
|
1.50
|
WLS to floor, flaps and nose fairing
|
Details
|
|
|
05-07-2012
|
0.25
|
update AFS 3500 to v 8.6.22
|
Details
|
|
|
05-07-2012
|
0.25
|
set up VP for wig wag of recog lights and taxi lig
|
Details
|
|
|
05-07-2012
|
4.25
|
pull wires for recognition wing tip lights
|
Details
|
|
|
05-07-2012
|
2.00
|
make pattern for R side light bulkhead
|
Details
|
|
|
04-22-2012
|
2.00
|
grease hub with AS 5
|
Details
|
  |
|
04-19-2012
|
2.00
|
prep for 1st solo flight - NOGO
|
Details
|
|
|
04-17-2012
|
1.25
|
install nose fairing and cowling
|
Details
|
|
|
04-17-2012
|
0.75
|
fool with AFS tanks, and VP device settings
|
Details
|
|
|
04-16-2012
|
1.00
|
micro upper fuselage joggles - both sides
|
Details
|
|
|
04-16-2012
|
2.50
|
install wheel pants to main gear
|
Details
|
|
|
04-16-2012
|
1.75
|
install nose pant
|
Details
|
|
|
04-16-2012
|
0.75
|
grease prop hub with AS 5; spinner back on
|
|
  |
|
04-16-2012
|
2.50
|
correct items from inspection & test flight
|
Details
|
|
|
04-15-2012
|
0.00
|
The characters
|
Details
|
|
|
04-15-2012
|
6.00
|
FIRST FLIGHT
|
Details
|
|
|
04-14-2012
|
4.75
|
get ready for test flight tomorrow
|
Details
|
|
|
04-02-2012
|
1.75
|
sand lower cowl; 3 BID thin spot
|
Details
|
  |
|
04-02-2012
|
1.75
|
modify nose strut fairing
|
Details
|
|
|
04-02-2012
|
1.75
|
add'l nose fairing; re-install seats & panels; RTV
|
Details
|
|
|
04-01-2012
|
2.50
|
update checklist; begin editing AFS checklist file
|
|
  |
|
03-31-2012
|
2.00
|
seats & panels out; misc. fine tune items
|
Details
|
|
|
03-31-2012
|
1.25
|
core out aft panel; flox to lower panel flange
|
Details
|
|
|
03-26-2012
|
0.75
|
re-charge nose strut
|
Details
|
  |
|
03-26-2012
|
1.00
|
misc. shop and sort cup full of misc hardware back
|
|
  |
|
03-26-2012
|
1.25
|
install clips to hold tow bar
|
Details
|
|
|
03-26-2012
|
1.25
|
AFS W&B and Maint. schedule files
|
Details
|
  |
|
03-26-2012
|
1.75
|
AFS & VP alarms; reset guage ranges for Fuel PSI a
|
Details
|
|
|
03-25-2012
|
1.00
|
test parking brake; engine run
|
Details
|
  |
|
03-25-2012
|
1.50
|
pitot reconnected
|
Details
|
 |
|
03-25-2012
|
0.00
|
COWLING INSTALL PROCEDURE
|
Details
|
  |
|
03-25-2012
|
2.00
|
cowling back on; check gap; record install procedu
|
Details
|
|
|
03-24-2012
|
1.50
|
trouble shoot pitot line issue
|
Details
|
|
|
03-24-2012
|
0.75
|
AFS system updates and backup settings to SD & com
|
Details
|
  |
|
03-24-2012
|
3.00
|
.DAR visit & inspection
|
Details
|
|
|
03-23-2012
|
4.25
|
pitot-static-encoder-altimeter test
|
Details
|
|
|
03-19-2012
|
1.00
|
work on AFS W&B, and Haubert with pitot/static
|
Details
|
  |
|
03-19-2012
|
1.00
|
wipe down entire plane and clean up - prep for DAR
|
|
  |
|
03-19-2012
|
2.50
|
re-install parking brake and re-bleed system
|
|
|
|
03-19-2012
|
0.25
|
install SS tie down rings...nice!
|
Details
|
|
|
03-19-2012
|
1.50
|
blow off aircraft; WLS primer to flaps/ailerons/ti
|
Details
|
|
|
03-19-2012
|
2.25
|
AFS map & sys cards; study HS vent holes
|
Details
|
  |
|
03-19-2012
|
1.00
|
|
Details
|
|
|
03-12-2012
|
3.75
|
Weight and Balance day
|
Details
|
|
|
03-12-2012
|
2.25
|
various small tasks for rest of a beautiful day
|
Details
|
|
|
03-12-2012
|
0.00
|
add'l w&b pics
|
|
|
|
03-11-2012
|
1.25
|
VP set up and misc
|
Details
|
  |
|
03-11-2012
|
0.25
|
tape bottom wing fairing; check engine bolts
|
Details
|
  |
|
03-11-2012
|
0.00
|
placard door seal switch
|
Details
|
 |
|
03-11-2012
|
3.25
|
drain fuel, paint/install glareshield
|
Details
|
  |
|
03-11-2012
|
1.25
|
cowling on, wheel pants in position
|
Details
|
|
|
03-03-2012
|
5.25
|
misc. tasks; condition inspection
|
Details
|
  |
|
02-25-2012
|
0.50
|
VP engine gauge settings to match AFS settings
|
Details
|
  |
|
02-25-2012
|
1.00
|
Rosen visors in and misc shop
|
Details
|
|
|
02-25-2012
|
0.50
|
note some epoxy "melting"
|
Details
|
|
|
02-25-2012
|
0.50
|
mount registration card; compass card
|
|
|
|
02-25-2012
|
1.00
|
mark lower cowling rub; check engine bolts
|
Details
|
|
|
02-25-2012
|
0.50
|
installed 3 tie down rings
|
|
 |
|
02-25-2012
|
0.50
|
install step
|
Details
|
|
|
02-25-2012
|
0.75
|
grind & sand lower cowling for spinner rub
|
|
|
|
02-25-2012
|
0.50
|
clean windows with Sumner 210 from ACS
|
Details
|
  |
|
02-25-2012
|
0.75
|
access panels on
|
Details
|
|
|
02-25-2012
|
0.00
|
3 view pics for DAR inspection
|
|
|
|
02-24-2012
|
1.50
|
prep and mail paperwork to Ron Jones, DAR
|
Details
|
  |
|
02-21-2012
|
1.50
|
document AD compliance for 8130-6 form
|
Details
|
|
|
02-20-2012
|
2.75
|
run engine and misc.
|
Details
|
 |
|
02-20-2012
|
0.75
|
rear seats in; velcro'd; and clean up hangar
|
|
|
|
02-20-2012
|
1.75
|
modify fuel tunnel
|
|
|
|
02-20-2012
|
2.00
|
modify and redo/install seats and forward interior
|
Details
|
 |
|
02-20-2012
|
0.25
|
leading edge tape to wing root gap
|
Details
|
|
|
02-13-2012
|
0.75
|
review staged parts; clean up; clean tape off of s
|
|
  |
|
02-13-2012
|
0.00
|
INTERIOR PANEL INSTALL ORDER
|
Details
|
  |
|
02-13-2012
|
1.75
|
interior close-outs; seat belts; seats in
|
|
|
|
02-13-2012
|
1.75
|
add'l interior close-outs
|
|
|
|
02-13-2012
|
1.75
|
add'l interior close-outs
|
|
|
|
02-13-2012
|
1.75
|
add'l interior close-outs
|
|
|
|
02-12-2012
|
0.75
|
VP FOB, backup; AFS oil temp and rpm bug
|
|
  |
|
02-12-2012
|
1.25
|
start installing all panels for inspection
|
|
|
|
02-12-2012
|
0.75
|
sand, prep & prime delrin door guide area
|
|
|
|
02-12-2012
|
0.25
|
add a washer to each aft bolt in nose strut, -5s
|
Details
|
 |
|
02-11-2012
|
0.75
|
VP device settings
|
Details
|
  |
|
02-11-2012
|
0.75
|
sand s/f on flaps; still have a few pinholes
|
|
 |
|
02-11-2012
|
0.75
|
prep, mask & paint nose strut
|
Details
|
|
|
02-11-2012
|
2.50
|
fit & trim left side interior panels
|
Details
|
|
|
02-11-2012
|
0.50
|
|
|
  |
|
01-30-2012
|
0.25
|
velcro door strap & registration packet
|
Details
|
|
|
01-30-2012
|
0.25
|
temporarily placard AOA, static, oil capacity
|
|
|
|
01-30-2012
|
0.75
|
talk to John Reider & reinstall wing tip lights
|
|
  |
|
01-30-2012
|
1.00
|
safety rudder turnbuckles
|
Details
|
  |
|
01-30-2012
|
0.50
|
pressurize nose strut; ~300#...1.5" extension
|
Details
|
  |
|
01-30-2012
|
2.75
|
install front lap & shoulder belts; clean door han
|
|
|
|
01-30-2012
|
0.00
|
ELT info for file
|
Details
|
|
|
01-30-2012
|
1.50
|
adj door pin, prep and flox in
|
|
|
|
01-30-2012
|
0.00
|
add'l seat belt installation pics
|
|
|
|
01-29-2012
|
1.00
|
true up aft end of top cowl;reinstall cowlings
|
|
|
|
01-29-2012
|
0.50
|
temp. bolt L front seat in
|
|
  |
|
01-29-2012
|
0.75
|
run engine and misc clean up
|
Details
|
  |
|
01-29-2012
|
2.00
|
reinstall ELT and test
|
Details
|
|
|
01-29-2012
|
1.00
|
loctite all jam nuts within fuselage
|
Details
|
  |
|
01-29-2012
|
0.75
|
install spinner
|
|
|
|
01-28-2012
|
1.25
|
troubleshoot/remedy L fuel probe not reading
|
Details
|
  |
|
01-28-2012
|
1.00
|
troubleshoot OAT; rewire molex in wing tip
|
Details
|
  |
|
01-28-2012
|
1.00
|
re-install ADI after warranty work by TruTrak; rec
|
|
  |
|
01-28-2012
|
1.50
|
finish up Reiff preheater system install
|
Details
|
|
|
01-28-2012
|
0.75
|
finish installing overhead console with SS cap scr
|
|
  |
|
01-28-2012
|
3.25
|
bond preheat to oil pan; safety cylinder bands
|
Details
|
|
|
01-23-2012
|
2.25
|
continue fuel tank calibration
|
Details
|
|
|
01-22-2012
|
3.75
|
Reiff preheat system
|
|
|
|
01-22-2012
|
1.25
|
calibrate R fuel tank
|
Details
|
|
|
01-21-2012
|
2.00
|
work on Reiff preheat cylinder bands
|
|
|
|
01-21-2012
|
1.00
|
pull tip lighst for painting; record prop info
|
Details
|
|
|
12-26-2011
|
4.00
|
fix pitch servo wiring; test brakes & misc
|
Details
|
|
|
12-24-2011
|
0.50
|
use old Maggie leash for door pull down strap
|
Details
|
|
|
12-24-2011
|
0.25
|
Measure oil pan for heater
|
Details
|
|
|
12-24-2011
|
4.25
|
level and micro bubble level in; drain fuel; measu
|
Details
|
|
|
12-24-2011
|
0.00
|
add'l pics...bubble level micro'd in; nose strut
|
|
|
|
12-24-2011
|
0.50
|
add fuel placards; add "EXPERIMENTAL" to door
|
Details
|
|
|
12-19-2011
|
0.00
|
prep and WLS primer to MG paant access panel
|
Details
|
 |
|
12-19-2011
|
3.25
|
prep & prime cowling and wheel pants
|
Details
|
|
|
12-18-2011
|
3.00
|
remove forms, sand, apply s/f #2
|
|
|
|
12-18-2011
|
0.25
|
paint o/h console and screws....blue; close match
|
Details
|
|
|
12-18-2011
|
1.50
|
back to hangar..work on set-ups and trim problem
|
Details
|
  |
|
12-17-2011
|
1.50
|
run engine; inadvertant taxi!!!
|
Details
|
  |
|
12-17-2011
|
3.00
|
grind/sand lower cowling flange
|
|
|
|
12-17-2011
|
0.25
|
epoxy to top of aft seat parts
|
Details
|
 |
|
12-17-2011
|
0.00
|
build forms for bodywork to top cowling
|
|
|
|
12-12-2011
|
1.00
|
troubleshoot ADI
|
Details
|
|
|
12-12-2011
|
0.50
|
test ELT voltage; only .61 volts
|
Details
|
|
|
12-12-2011
|
2.00
|
research ELT and trim issues
|
|
  |
|
12-12-2011
|
2.25
|
AFS setup; trim troubleshoot; pics of VP & AFS set
|
Details
|
  |
|
12-11-2011
|
3.75
|
solve magnetometer wiring issue; calibrate magneto
|
Details
|
|
|
12-11-2011
|
1.00
|
set up VP switches; reload s/w export and import
|
Details
|
  |
|
12-11-2011
|
0.25
|
reverse door strut again
|
Details
|
 |
|
12-11-2011
|
0.50
|
plan map light switch and drill hole in OH console
|
|
|
|
12-11-2011
|
0.25
|
attempt ELT test at top of the hour - no go
|
|
  |
|
12-05-2011
|
0.75
|
work on VP set-up
|
Details
|
|
|
12-05-2011
|
0.25
|
work on door strut
|
Details
|
 |
|
12-05-2011
|
1.00
|
work on AFS set-up
|
Details
|
  |
|
12-05-2011
|
0.50
|
start OH console panels; drill
|
|
|
|
12-05-2011
|
0.75
|
run engine with cowling on; temps good
|
|
  |
|
12-05-2011
|
0.00
|
right side top cowl pics
|
Details
|
|
|
12-05-2011
|
1.25
|
pull ELT door; work on adding 2nd map light circui
|
Details
|
  |
|
12-05-2011
|
2.25
|
more map light work
|
Details
|
  |
|
12-05-2011
|
2.00
|
fit, trim & mark top cowling > adding new flange;
|
|
|
|
12-05-2011
|
1.00
|
attach eyeball vents to OH console panels
|
|
|
|
12-05-2011
|
1.25
|
adels to brake line & install left armrest
|
|
|
|
11-30-2011
|
0.50
|
micro flange... low spots and weave
|
|
 |
|
11-30-2011
|
1.50
|
micro armrest edges and hard points
|
|
 |
|
11-30-2011
|
2.00
|
2 BID to top cowling foam
|
|
|
|
11-26-2011
|
0.50
|
trim front door jamb
|
Details
|
|
|
11-26-2011
|
2.50
|
replace strut; remove parking brake and re-bleed;
|
Details
|
|
|
11-26-2011
|
0.00
|
foam applied for cowl flange rebuild
|
|
 |
|
11-26-2011
|
1.50
|
fit and trim top cowl; super glaue foam on for lay
|
Details
|
|
|
11-13-2011
|
1.75
|
trim top cowl; cut flange off
|
Details
|
|
|
11-13-2011
|
2.75
|
fit cowlng, trim seals, mark for cowl adjustment
|
Details
|
|
|
11-07-2011
|
1.25
|
super-fill R wing tip gap; s/f pinholes in flap bo
|
|
|
|
11-07-2011
|
1.25
|
install speed brake covers
|
Details
|
|
|
11-07-2011
|
0.50
|
finish up R wing tip & misc shop
|
|
 |
|
11-07-2011
|
2.50
|
fabricate left armrest
|
Details
|
|
|
11-07-2011
|
2.25
|
apply N numbers
|
Details
|
|
|
10-31-2011
|
1.50
|
trim engine hoses; plan L armrest
|
Details
|
  |
|
10-31-2011
|
1.75
|
replace R strobe; install wing tips
|
Details
|
 |
|
10-31-2011
|
1.25
|
re-safety prop and engine mount bolts
|
Details
|
  |
|
10-31-2011
|
1.75
|
pull outside; sand flaps....looking good
|
Details
|
|
|
10-31-2011
|
1.00
|
install baggage door bolts and seal
|
|
|
|
10-31-2011
|
0.50
|
begin install of lower cowling
|
Details
|
|
|
10-31-2011
|
0.00
|
baffling trimming needed
|
Details
|
|
|
10-24-2011
|
1.50
|
Super-fill pass #4 to both flaps - inboard side
|
Details
|
  |
|
10-24-2011
|
1.50
|
misc tasks to finish up day
|
Details
|
  |
|
10-24-2011
|
1.00
|
install front door lock and door access cover
|
Details
|
  |
|
10-24-2011
|
0.50
|
install 14oz Halon fire extinguisher under and fro
|
|
|
|
10-18-2011
|
6.50
|
prep for and start engine
|
Details
|
 |
|
10-17-2011
|
1.25
|
work off Duncan's squawks
|
Details
|
  |
|
10-17-2011
|
0.50
|
scrape foam blobs off all surfaces...ready to sand
|
|
  |
|
10-17-2011
|
0.75
|
2nd pass super-fill to flaps
|
|
|
|
10-16-2011
|
4.50
|
finish bleeding brakes
|
Details
|
  |
|
10-16-2011
|
2.50
|
body work root of flaps at wing fairing
|
Details
|
|
|
10-03-2011
|
1.50
|
trim flaps; finish hardware; position sensor; VP s
|
Details
|
|
|
10-03-2011
|
1.51
|
EFIS mount; glareshield; defroster
|
Details
|
  |
|
10-03-2011
|
3.25
|
attempt to bleed brakes
|
Details
|
  |
|
10-03-2011
|
1.50
|
Add'l flap work
|
Details
|
|
|
10-02-2011
|
1.25
|
rig left aileron
|
Details
|
|
|
10-02-2011
|
1.25
|
rig ailerons - right side
|
Details
|
|
|
10-02-2011
|
2.50
|
modify flap push rods and rig
|
Details
|
|
|
10-02-2011
|
2.50
|
flap rods and rigging
|
Details
|
|
|
09-21-2011
|
0.50
|
tighten and torque aileron and flaps bolts
|
|
  |
|
09-21-2011
|
2.50
|
Plan B for defroster & glare shield
|
Details
|
|
|
09-21-2011
|
0.75
|
more flap rigging
|
Details
|
|
|
09-21-2011
|
0.75
|
misc shop and try to clean foam mess: no joy
|
|
  |
|
09-21-2011
|
0.75
|
flap rods and flap rigging
|
|
|
|
09-17-2011
|
3.50
|
work on aileron tubes and rigging
|
Details
|
|
|
09-17-2011
|
2.75
|
hang flaps and begin rigging
|
Details
|
|
|
09-17-2011
|
0.00
|
alieron over-length
|
|
|
|
09-11-2011
|
2.00
|
ailerons
|
Details
|
  |
|
09-05-2011
|
2.50
|
re-install RS fuel quick drain
|
Details
|
  |
|
09-05-2011
|
0.75
|
install aft seats belts
|
Details
|
|
|
09-05-2011
|
0.50
|
aileron controls; right side
|
|
|
|
09-05-2011
|
0.50
|
2 BID to 2nd side of nose pant
|
|
  |
|
09-04-2011
|
1.50
|
slosh wings
|
Details
|
|
|
09-04-2011
|
3.00
|
hang right wing
|
Details
|
|
|
09-04-2011
|
0.00
|
final wing hanging pics
|
Details
|
|
|
09-04-2011
|
0.00
|
add'l wing hanging pics
|
|
|
|
09-04-2011
|
13.50
|
add'l pics
|
Details
|
|
|
09-03-2011
|
4.75
|
get ready for wings; 2 BID nose pant
|
Details
|
|
|
08-29-2011
|
0.50
|
run spark plug wires RS
|
|
|
|
08-29-2011
|
0.25
|
pull out defroster; sand prep for flox in
|
|
  |
|
08-29-2011
|
0.75
|
prep & epoxy front floor boards
|
|
  |
|
08-29-2011
|
0.50
|
LS spark plug wires
|
|
|
|
08-29-2011
|
2.00
|
flox washers into nose pant
|
Details
|
 |
|
08-28-2011
|
0.75
|
work on nose gear repair
|
Details
|
|
|
08-28-2011
|
1.50
|
prep and epoxy prepreg areas
|
Details
|
|
|
08-28-2011
|
0.50
|
PLUG VACUUM HOLE COOLING HOLE
|
Details
|
|
|
08-28-2011
|
2.00
|
fool with defroster install...tight
|
|
  |
|
08-28-2011
|
0.25
|
add silicone spacer to oil filter
|
Details
|
 |
|
08-28-2011
|
1.00
|
add conduit tubing to batt leads; attach covers
|
|
|
|
08-27-2011
|
0.50
|
thread rudder stop bolt; fool with GPS
|
Details
|
 |
|
08-27-2011
|
0.50
|
installed SS tie straps in place of safety wire
|
Details
|
  |
|
08-27-2011
|
1.50
|
install 72" prop cable and secure
|
|
|
|
08-27-2011
|
0.00
|
GPS' acquired today; tested radios too
|
Details
|
|
|
08-27-2011
|
0.50
|
assembled and test AeroKart tug
|
Details
|
 |
|
08-27-2011
|
0.00
|
add'l prop cable pics
|
|
|
|
08-27-2011
|
1.50
|
|
Details
|
|
|
08-15-2011
|
0.50
|
torque main legs and safety wire
|
Details
|
|
|
08-15-2011
|
0.75
|
start elev trim tab/servo install
|
Details
|
  |
|
08-15-2011
|
0.50
|
safety prop and baffle shroud bolts
|
|
|
|
08-15-2011
|
1.75
|
route charger wires to baggage area
|
|
|
|
08-15-2011
|
1.00
|
prep and epoxy top cowling
|
Details
|
|
|
08-15-2011
|
1.50
|
prep and epoxy inside of lower cowling
|
Details
|
 |
|
08-15-2011
|
0.50
|
change descicant plugs; sweep hangar
|
|
  |
|
08-14-2011
|
1.25
|
re-install prop
|
Details
|
|
|
08-14-2011
|
3.00
|
install baffle seal
|
Details
|
|
|
08-14-2011
|
1.00
|
FWF...virtually done... a few punch list items
|
Details
|
|
|
08-14-2011
|
1.00
|
FWF continued
|
Details
|
|
|
08-14-2011
|
1.75
|
firewall forward continued
|
Details
|
|
|
08-08-2011
|
3.00
|
prop cable;gascolator, exhaust; drain lines; heate
|
|
|
|
08-08-2011
|
3.00
|
continue on FW connections
|
Details
|
|
|
08-07-2011
|
1.00
|
move cowling and rest of parts to airport
|
Details
|
  |
|
08-01-2011
|
0.00
|
shot a coat of rattle can primer for now
|
|
|
|
08-01-2011
|
0.50
|
finish repairs to HS, VS and rudder LE
|
|
|
|
08-01-2011
|
5.50
|
exhaust work and more wiring, hoses, etc.
|
Details
|
|
|
07-31-2011
|
1.50
|
work on rear hoses,cables, wires and left side
|
|
|
|
07-31-2011
|
0.00
|
super-fill HS, VS & rudder LE
|
|
|
|
07-31-2011
|
1.00
|
repair HS, VS and rudder
|
Details
|
|
|
07-31-2011
|
0.00
|
ram air....adjust and modify spacer
|
Details
|
|
|
07-31-2011
|
1.50
|
ram air
|
|
|
|
07-31-2011
|
1.50
|
left side wiring
|
|
|
|
07-31-2011
|
1.00
|
finish connecting throttle cable clamp
|
Details
|
|
|
07-30-2011
|
3.25
|
work on wiring, hoses, etc.; moslty right side
|
Details
|
|
|
07-30-2011
|
1.75
|
the fun continues...throttle cable
|
Details
|
  |
|
07-30-2011
|
1.00
|
repair moving damage; rufferr LE too
|
Details
|
|
|
07-30-2011
|
1.25
|
fool with prop cable
|
Details
|
|
|
07-30-2011
|
0.50
|
connect oil filter hoses; safety wire
|
Details
|
|
|
07-30-2011
|
0.00
|
add'l prop cable pics
|
|
|
|
07-28-2011
|
2.00
|
Re-install rudder bellcrank
|
Details
|
 |
|
07-28-2011
|
1.25
|
re-attach both control sticks; used new AN4-25 bol
|
Details
|
|
|
07-28-2011
|
1.50
|
elevator bolts - install and tighten; apply torque
|
Details
|
|
|
07-28-2011
|
0.25
|
began work on controls and wiring in engine compar
|
Details
|
  |
|
07-25-2011
|
4.00
|
hang rudder
|
Details
|
|
|
07-25-2011
|
1.00
|
hang elevators. Need to tighten up some bolts
|
Details
|
  |
|
07-25-2011
|
0.50
|
clean up gook on windows; fridge from Duncan
|
Details
|
  |
|
07-24-2011
|
5.50
|
rehang engine
|
Details
|
|
|
07-24-2011
|
0.00
|
re-install nose gear and nose wheel
|
Details
|
|
|
07-23-2011
|
3.75
|
work at airport a bit...hot!
|
Details
|
  |
|
07-18-2011
|
0.00
|
only damage from the move; left HS horn
|
Details
|
|
|
07-18-2011
|
5.50
|
move wings to airport; set up shop
|
|
|
|
07-18-2011
|
2.50
|
lift fuselage up and install main gear
|
|
|
|
07-17-2011
|
8.25
|
move fusleage to KCXY
|
Details
|
 |
|
07-17-2011
|
2.00
|
load up wings - wrong way
|
Details
|
|
|
07-16-2011
|
0.00
|
ready to go to airport in the morning
|
|
|
|
07-16-2011
|
0.00
|
add'l load up pics
|
|
|
|
07-16-2011
|
0.00
|
|
|
|
|
07-11-2011
|
2.75
|
sand, tape & micro window fillets
|
|
|
|
07-11-2011
|
1.50
|
sand down ELT door to fit
|
Details
|
|
|
07-11-2011
|
0.00
|
add'l fillet prep
|
|
|
|
07-10-2011
|
9.50
|
tape-grind-sand-prep-s/f window fillets
|
Details
|
|
|
07-10-2011
|
0.00
|
super-fill window fillets - add'l pics
|
|
|
|
07-10-2011
|
0.00
|
manuevering tail through door
|
|
|
|
07-10-2011
|
0.50
|
load up some parts to take to KCXY; misc shop
|
Details
|
  |
|
07-10-2011
|
2.50
|
build new dolly set-up; test
|
|
|
|
07-10-2011
|
0.00
|
add'l manuevering fuselage pics
|
|
|
|
07-10-2011
|
0.00
|
add'l maneuvering pics
|
|
|
|
07-10-2011
|
1.50
|
10"heels on...attempt moving around garage
|
Details
|
|
|
07-09-2011
|
0.00
|
add'l pics
|
|
|
|
07-04-2011
|
0.75
|
visor mounts; fit and tap 1 hole
|
Details
|
|
|
07-04-2011
|
1.50
|
repl all a/p servo bolts with drilled bolts
|
Details
|
|
|
07-04-2011
|
2.50
|
paint defroster; pull window paper
|
Details
|
|
|
07-04-2011
|
1.25
|
install & wire map lights
|
Details
|
|
|
07-04-2011
|
1.25
|
door seal pump wiring
|
|
|
|
07-04-2011
|
0.00
|
behind panel shots thru windshield
|
|
|
|
07-04-2011
|
1.00
|
B batt leads; vacuum fusleage; count screws
|
Details
|
  |
|
07-04-2011
|
0.00
|
add'l door seal pump pics
|
|
|
|
07-04-2011
|
0.00
|
|
|
|
|
07-04-2011
|
0.00
|
|
Details
|
|
|
07-03-2011
|
0.50
|
misc shop
|
Details
|
  |
|
06-17-2011
|
3.25
|
pinhole hunting; sand-prep-super-fill
|
Details
|
 |
|
06-13-2011
|
5.75
|
sand, s/f, vac, prep & WLS primer
|
|
|
|
06-13-2011
|
1.00
|
research and figure sniffle valve install; misc sh
|
|
  |
|
06-13-2011
|
1.25
|
install tip lights & molex connectors
|
|
|
|
06-13-2011
|
0.50
|
GTX 330 transponder not booting again
|
Details
|
  |
|
06-12-2011
|
1.75
|
vac, prep. & superfill fuselage low grain/spots
|
|
  |
|
06-12-2011
|
2.50
|
sand fuselage and HS in prep for another WLS prime
|
|
|
|
06-12-2011
|
1.00
|
s/f fillet to inside door jamb
|
|
|
|
06-12-2011
|
0.00
|
leveling marks - add'l pics
|
Details
|
|
|
06-12-2011
|
0.50
|
level & install permanent leveling marks
|
Details
|
|
|
06-12-2011
|
0.75
|
fool with transponder again
|
Details
|
|
|
06-12-2011
|
0.75
|
door strut back on & misc
|
Details
|
|
|
06-12-2011
|
0.00
|
add'l leveling mark pics
|
Details
|
|
|
06-05-2011
|
3.00
|
WLS primer to fuselage, VS and HS root
|
|
|
|
06-05-2011
|
1.50
|
re-install 24v door seal pump
|
Details
|
|
|
06-05-2011
|
0.00
|
fit lock to door and check tab
|
Details
|
|
|
06-05-2011
|
0.75
|
fab lock tab for front door
|
Details
|
|
|
06-05-2011
|
0.00
|
ELT coax installed
|
|
|
|
06-05-2011
|
0.00
|
door pump cont'd
|
Details
|
|
|
06-05-2011
|
1.50
|
clean up wiring in aft fuselage; ELT antenna
|
|
|
|
06-05-2011
|
2.00
|
Add'l primer pics; Ned Smith visited
|
Details
|
|
|
06-04-2011
|
1.75
|
sand all of fuse, VS and HS....vacuum..ready for W
|
Details
|
  |
|
06-04-2011
|
2.50
|
Ron & Debbie Perry visit and tour
|
|
  |
|
06-04-2011
|
0.25
|
fool with ELT....working? need to review manual
|
|
  |
|
06-04-2011
|
3.25
|
ELT and aux battery wiring/troubleshooting
|
Details
|
|
|
06-04-2011
|
0.75
|
add extra screw to elev inspection plate, 8-32 riv
|
Details
|
  |
|
06-04-2011
|
1.00
|
add 1K resistor to aux sense line
|
Details
|
 |
|
06-03-2011
|
3.25
|
sand fuse and door jamb
|
Details
|
  |
|
05-22-2011
|
2.00
|
work on ELT install
|
Details
|
 |
|
05-22-2011
|
1.00
|
troubleshoot aux sense circuit
|
Details
|
  |
|
05-22-2011
|
1.00
|
hysol/flox aileron stops to fuse wall
|
|
|
|
05-22-2011
|
1.50
|
figure out & fab aileron stops
|
Details
|
|
|
05-22-2011
|
0.75
|
another pass of super-fill
|
Details
|
|
|
05-22-2011
|
0.50
|
|
|
  |
|
05-16-2011
|
1.50
|
troubleshoot AUX battery not showing on VP
|
Details
|
|
|
05-16-2011
|
0.75
|
pop baggage locks, sand, fit, good!
|
|
|
|
05-16-2011
|
0.00
|
baggage locks cont'd
|
|
|
|
05-16-2011
|
4.50
|
add'l prep and bodywork
|
Details
|
|
|
05-15-2011
|
3.25
|
trim baggage blocks; sand; work on inside door jam
|
|
|
|
05-15-2011
|
1.75
|
trace & rewire battery and contactor circuits
|
Details
|
|
|
05-15-2011
|
2.00
|
sand, prep, vac. door hinge; fuselage elev plate a
|
|
|
|
05-15-2011
|
0.25
|
misc super-fill of fuselage; hinge area; baggage
|
|
  |
|
05-14-2011
|
1.00
|
misc and make up ELT GPS power lead
|
|
 |
|
05-14-2011
|
1.50
|
door hinge release; 3 BID delrin baggage blocks
|
|
|
|
05-09-2011
|
1.50
|
super-fill #3 to fuselage joggle
|
Details
|
  |
|
05-09-2011
|
1.75
|
more baggage door work - flox in delrin blocks, et
|
Details
|
|
|
05-09-2011
|
1.25
|
baggage door locks
|
Details
|
|
|
02-07-2011
|
0.00
|
underside view of install skybolts
|
|
 |
|
02-07-2011
|
2.25
|
oil drain door - skybolts
|
Details
|
|
|
02-07-2011
|
0.75
|
lift fuselage top up on horses
|
Details
|
|
|
02-07-2011
|
3.25
|
fit & trim actual side panels
|
Details
|
 |
|
02-07-2011
|
2.50
|
final trim,rig, apply 2 BID flanges
|
Details
|
|
|
02-07-2011
|
1.25
|
do last panel- front right side
|
Details
|
|
|
02-07-2011
|
0.75
|
2nd 4 BID to oil drain door
|
|
 |
|
02-07-2011
|
0.75
|
2 BID flange on aft seat cover
|
|
|
|
02-05-2011
|
0.75
|
split forward cover into 2 pieces
|
Details
|
|
|
02-05-2011
|
2.00
|
replan oil drain door
|
Details
|
|
|
02-05-2011
|
0.50
|
misc shop
|
|
  |
|
02-05-2011
|
1.50
|
make cover for brake lines
|
Details
|
|
|
02-05-2011
|
0.75
|
cut oil drain door
|
Details
|
|
|
02-05-2011
|
1.25
|
2 BID side panel extensions
|
Details
|
 |
|
02-04-2011
|
0.75
|
plan out oil drain access door ala Bill H
|
Details
|
|
|
02-04-2011
|
0.50
|
misc shop stuff
|
|
  |
|
02-04-2011
|
4.50
|
interior side panels
|
Details
|
|
|
01-31-2011
|
0.75
|
trim & sand rest of micro'd parts
|
|
|
|
01-31-2011
|
1.25
|
retighten fuel hoses
|
Details
|
|
|
01-31-2011
|
0.75
|
grind and sand co-pilot stick opening
|
Details
|
|
|
01-31-2011
|
2.00
|
check hardware all elev rod ends; set jam nuts
|
Details
|
|
|
01-31-2011
|
0.75
|
aileron servo rod - bent threaded portion
|
Details
|
|
|
01-30-2011
|
0.75
|
trim out o/h vent fairing
|
|
|
|
01-30-2011
|
0.25
|
re-locate music jack
|
Details
|
|
|
01-30-2011
|
0.75
|
pop off o/h vent fairing lay-up; clean
|
|
|
|
01-30-2011
|
1.75
|
micro vertical hat rack
|
Details
|
 |
|
01-30-2011
|
1.00
|
micro top of vert hat rack; soften epoxy and reloa
|
Details
|
  |
|
01-30-2011
|
1.25
|
micro copilot stick cut out; seat belt slo
|
Details
|
|
|
01-30-2011
|
0.75
|
AN3-6 bolts and castle nuts to crossover tube
|
Details
|
  |
|
01-29-2011
|
0.75
|
wing spar cover
|
Details
|
|
|
01-29-2011
|
1.75
|
vent fairing to aft o/h console
|
Details
|
|
|
01-29-2011
|
0.25
|
get pics & measurements on inertia reel for 2 buil
|
Details
|
  |
|
01-29-2011
|
1.00
|
decore and micro edges - various pieces
|
|
 |
|
01-24-2011
|
0.75
|
wire up rudder trim servo; 6 pin mini molex
|
|
|
|
01-24-2011
|
0.50
|
trim baggage bracket layups; drill #12 hole for ha
|
Details
|
|
|
01-24-2011
|
1.00
|
rudder travel set up
|
Details
|
|
|
01-24-2011
|
0.50
|
release tape vent area at hat rack for layup
|
Details
|
  |
|
01-24-2011
|
1.50
|
re-install rudder bellcrank; adj. rod lengths to g
|
Details
|
|
|
01-24-2011
|
0.00
|
left rudder cable
|
|
|
|
01-24-2011
|
2.50
|
fit and swage on rudder cables
|
|
|
|
01-24-2011
|
0.00
|
check swages to acceptable tolerance
|
Details
|
|
|
01-24-2011
|
0.50
|
add 3 BID to inside faces of baggage door brackets
|
|
  |
|
01-23-2011
|
1.00
|
set baggage brackets and 3 BID outsides
|
|
|
|
01-23-2011
|
0.50
|
re-attached pitch servo and check travel and clear
|
|
|
|
01-23-2011
|
0.00
|
pitch servo pics
|
Details
|
|
|
01-23-2011
|
0.75
|
misc shop and prep rudder bellcrank
|
|
  |
|
01-23-2011
|
0.75
|
micro edges of hat rack and elev TT cover
|
|
 |
|
01-23-2011
|
1.50
|
make baggage brackets; trim joggle
|
Details
|
|
|
01-23-2011
|
0.75
|
figure, measure and cut aft seat belt access hole
|
|
  |
|
01-23-2011
|
1.00
|
elev. rigging; cut co-pilot stick hole
|
Details
|
|
|
01-17-2011
|
2.00
|
wire elevator trim servo
|
Details
|
|
|
01-17-2011
|
1.25
|
vertical hat rack
|
Details
|
|
|
01-17-2011
|
0.50
|
trim rudder horn and top of VS for clearance
|
|
  |
|
01-17-2011
|
0.00
|
trial fit elevator tubes continued
|
|
|
|
01-17-2011
|
0.75
|
horizontal part of hat rack
|
Details
|
|
|
01-17-2011
|
0.00
|
horizontal hat rack installed
|
|
 |
|
01-17-2011
|
0.50
|
fit elev torque tube cover; grind to fit
|
|
  |
|
01-17-2011
|
1.75
|
elev. on, install tubes; test rigging
|
|
|
|
01-17-2011
|
0.50
|
aft seat back latches
|
|
|
|
01-17-2011
|
0.00
|
|
|
 |
|
01-16-2011
|
0.25
|
modified cable nut to heat on/off valve
|
|
|
|
01-16-2011
|
0.75
|
mark, drill and grind 6 BID hat rack flange
|
|
|
|
01-16-2011
|
0.50
|
hardpoints to vertical hat rack
|
|
 |
|
01-16-2011
|
0.50
|
fool with missing parts for baggage door
|
Details
|
  |
|
01-16-2011
|
1.50
|
fit & drill aft seat latches; do hardpoints
|
Details
|
 |
|
01-16-2011
|
0.50
|
file shoulders down on cable nuts
|
Details
|
|
|
01-16-2011
|
2.75
|
fab hat rack bottom; 4 BID flange
|
Details
|
|
|
01-16-2011
|
1.25
|
bond 6 BID flange for hat rack to fuselage top
|
|
|
|
01-15-2011
|
0.25
|
wire 2 batteries in series; attach 24v battery min
|
Details
|
 |
|
01-15-2011
|
1.50
|
prep vertical hat rack for bonding
|
Details
|
|
|
01-15-2011
|
1.50
|
plan and make template for hat rack vertical
|
|
 |
|
01-15-2011
|
0.00
|
ordered these cable nuts for parking brake and hea
|
Details
|
|
|
01-15-2011
|
1.25
|
micro aft seat bottom; grind baggage pads
|
Details
|
 |
|
01-15-2011
|
0.75
|
cable nut installs
|
Details
|
|
|
12-27-2010
|
2.25
|
wire connectors at rudder-VS gap
|
Details
|
|
|
12-27-2010
|
0.50
|
seat bottom off - check flox release
|
Details
|
|
|
12-27-2010
|
1.25
|
prep phenolic pad, flox and 2 BID
|
|
|
|
12-27-2010
|
2.25
|
3 BID aft seat stiffener; plan seat latches & mark
|
|
|
|
12-26-2010
|
3.00
|
wire up flap motor and switches; grind seat cleara
|
|
|
|
12-26-2010
|
0.75
|
super-fill #1 to elevator horns; prep & s/f o/h co
|
Details
|
|
|
12-26-2010
|
1.75
|
sand seat back square & bond stiffener on
|
|
|
|
12-26-2010
|
0.00
|
re-install flap motor
|
|
|
|
12-26-2010
|
0.75
|
grind seat clearance holes; flox release aft seat
|
Details
|
|
|
12-23-2010
|
0.50
|
sand elev. weight flox area; prep for bodywork
|
|
  |
|
12-23-2010
|
0.75
|
run strobe & nav light wires through rudder
|
Details
|
|
|
12-23-2010
|
2.00
|
plan and fit POS12 flap position sensor
|
|
|
|
12-23-2010
|
1.50
|
more install of flap position sensor
|
|
|
|
12-23-2010
|
0.00
|
micro another edge of seat back and stiffener
|
|
 |
|
12-23-2010
|
1.75
|
flox release was not good...will redo; grind and m
|
Details
|
|
|
12-23-2010
|
0.00
|
final flap sensor install
|
|
|
|
12-20-2010
|
0.00
|
right side elev balancing
|
|
|
|
12-20-2010
|
0.00
|
left elevator balancing
|
Details
|
|
|
12-20-2010
|
1.25
|
grind sand VS cuff for rudder clearance
|
Details
|
|
|
12-20-2010
|
1.25
|
flox release aft seat botton; hard point; fill hol
|
|
 |
|
12-20-2010
|
2.50
|
final work on balancing elevators
|
Details
|
|
|
12-20-2010
|
2.50
|
cut seat back stiffener and seat back; prep; micro
|
|
|
|
12-19-2010
|
1.50
|
reverse rudder cables; turnbuckles to rear
|
Details
|
  |
|
12-19-2010
|
0.50
|
reroute elev trim cable; label all tail wires
|
Details
|
  |
|
12-19-2010
|
1.25
|
more drilling right elev.; balance
|
|
|
|
12-19-2010
|
0.75
|
misc work on rudder and parts
|
|
  |
|
12-19-2010
|
0.50
|
left side holes and weight required
|
|
|
|
12-19-2010
|
1.00
|
flox holes
|
Details
|
|
|
12-19-2010
|
1.25
|
add'l pics of right elevator
|
Details
|
|
|
12-15-2010
|
1.00
|
set up jig to balance elevators separately
|
Details
|
|
|
12-15-2010
|
1.25
|
ream out 1/2" holes to 5/8"; drill more holes
|
|
|
|
12-15-2010
|
1.25
|
final trim to fit of both elevators
|
Details
|
|
|
12-15-2010
|
1.25
|
drilled 6 holes to 5/8" on right side
|
|
|
|
12-13-2010
|
3.00
|
prep door frame for 2 BID to console
|
|
|
|
12-13-2010
|
0.25
|
hang rudder; make trimming marks for travel
|
|
|
|
12-13-2010
|
3.00
|
drill out excess elevator weight
|
Details
|
|
|
12-13-2010
|
0.50
|
add rivnut to repair right elev insp plate
|
Details
|
|
|
12-13-2010
|
0.00
|
add 2 BID to bond o/h console to door frame
|
Details
|
|
|
12-12-2010
|
1.50
|
work on elevator rigging; seems like too much weig
|
|
|
|
12-12-2010
|
0.25
|
trim off VS for rudder fit
|
|
|
|
12-12-2010
|
1.25
|
sand and prep o/h for flox; primer coat #4
|
|
  |
|
12-12-2010
|
1.75
|
primer #2 to o/h; wire ties and flex hose
|
|
|
|
12-12-2010
|
1.00
|
Phil helped hang elevators; will work on rigging
|
Details
|
  |
|
12-12-2010
|
1.50
|
flox in o/h console
|
|
|
|
12-12-2010
|
0.00
|
add'l floxing in pics
|
|
|
|
12-12-2010
|
0.50
|
2 coats of clear coat to o/h console
|
|
  |
|
12-11-2010
|
0.75
|
sand o/h console and primer coat #1
|
|
 |
|
12-11-2010
|
1.00
|
redo rest of BNCs
|
Details
|
  |
|
12-11-2010
|
0.25
|
redo elev inspection plate repair
|
|
  |
|
12-11-2010
|
0.50
|
primer #2 to o/h console; adels and ties to panel
|
|
 |
|
12-06-2010
|
1.25
|
tygon tube for conduit for door seal pump wires
|
|
|
|
12-06-2010
|
1.00
|
super-fill #2 to o/h console; s/f #1 to defroster
|
|
  |
|
12-06-2010
|
0.25
|
start repair of nutplate on right elev inspection
|
Details
|
 |
|
12-06-2010
|
2.50
|
sand & trim o/h console; cut to fit
|
|
|
|
12-06-2010
|
0.00
|
long view of rudder pedals with all brake hardware
|
|
 |
|
12-06-2010
|
1.00
|
finish up brake cylinder hardware
|
Details
|
|
|
12-05-2010
|
1.00
|
super-fill holes in o/h console
|
|
 |
|
12-05-2010
|
0.75
|
sand and prep defroster for super-fill
|
|
 |
|
12-05-2010
|
1.50
|
re-do BNCs on RG400; install GPS TNC
|
Details
|
|
|
12-05-2010
|
2.75
|
parking brake bracket and finish fresh air ducting
|
Details
|
  |
|
12-05-2010
|
0.75
|
molex connector to fuel pump; cooling hose
|
Details
|
  |
|
12-04-2010
|
0.00
|
test fit o/h console
|
|
|
|
12-04-2010
|
1.75
|
flox parking brake bracket
|
Details
|
|
|
12-04-2010
|
1.50
|
finish fresh air hose adel clamps; flip fuse
|
Details
|
|
|
12-04-2010
|
1.75
|
clamp up heat scat tubing
|
Details
|
|
|
12-01-2010
|
1.00
|
work on figuring out parking brake cable connectio
|
Details
|
|
|
12-01-2010
|
2.00
|
panel wiring and connections, continued...
|
Details
|
|
|
12-01-2010
|
0.00
|
Matco parking valve diagram
|
Details
|
|
|
11-30-2010
|
2.00
|
run heat-defrost mix cable
|
|
|
|
11-30-2010
|
0.50
|
misc. shop...had to clean up some!
|
|
  |
|
11-30-2010
|
2.00
|
heat system
|
|
|
|
11-30-2010
|
0.00
|
heat and defrost valves
|
Details
|
|
|
11-30-2010
|
1.25
|
finish strobe power supply install
|
Details
|
|
|
11-28-2010
|
0.50
|
heat tube work; tee's, grind hole to aft seat
|
|
  |
|
11-28-2010
|
0.50
|
finish molex connector for magnetometer
|
Details
|
|
|
11-28-2010
|
0.50
|
COM 1 antenna BNC to by-pass jack
|
|
|
|
11-27-2010
|
4.00
|
engineer and run fresh air and heat lines
|
Details
|
|
|
11-26-2010
|
0.25
|
spray fabricated heat-defrost mix bracket
|
|
|
|
11-26-2010
|
0.50
|
micro flange in fresh air T
|
|
|
|
11-26-2010
|
1.50
|
fresh air system; make T 2 1/4" to 1 3/4"
|
|
|
|
11-26-2010
|
3.00
|
com/nav wire BNC connectors
|
Details
|
|
|
11-26-2010
|
1.25
|
add 2 BID to make T adapter
|
|
|
|
11-21-2010
|
1.50
|
work on heat-defrost-fresh air layout
|
|
|
|
11-21-2010
|
1.00
|
ELT GPS to pin 6 of ADI
|
Details
|
|
|
11-21-2010
|
1.25
|
clean epoxy pump; put new 11/10 epoxy in
|
Details
|
  |
|
11-08-2010
|
0.50
|
prep & flox seat strips
|
Details
|
 |
|
11-08-2010
|
2.50
|
panel wiring; P2 and P3 headset circuits
|
Details
|
|
|
11-08-2010
|
2.75
|
heat/defrost system
|
Details
|
|
|
11-08-2010
|
1.00
|
cut off defroster; touch up holes
|
|
|
|
11-07-2010
|
1.00
|
flox defroster close out and 1.5" tube for hose
|
|
|
|
11-07-2010
|
2.75
|
bond R armrest; prep and measure for BIDs
|
|
  |
|
11-07-2010
|
1.50
|
add 2 BID tapes to top and bottom of all arm rests
|
|
|
|
11-06-2010
|
3.75
|
heater-defrost-glare shield
|
Details
|
|
|
11-01-2010
|
2.00
|
wire P-5; trim circuits
|
Details
|
|
|
11-01-2010
|
2.00
|
prep & bond both aft armrests
|
Details
|
|
|
10-31-2010
|
0.75
|
undo aft seat belt gusset
|
Details
|
|
|
10-31-2010
|
0.75
|
top on to measure for arm rests
|
|
|
|
10-31-2010
|
0.00
|
not much room in glareshield area!
|
|
|
|
10-31-2010
|
3.50
|
fit armrests; cut & micro; ready for bonding
|
|
|
|
10-31-2010
|
1.75
|
fit and measure for armrests
|
Details
|
  |
|
10-31-2010
|
0.75
|
add handles to fuse to aid in handling
|
|
|
|
10-30-2010
|
2.00
|
add aft seat belt gusset; attach handles
|
Details
|
|
|
10-25-2010
|
6.50
|
crimp connectors on P-1 power plug
|
Details
|
|
|
10-24-2010
|
1.00
|
test fit seats; think through how to finish
|
|
|
|
10-24-2010
|
1.00
|
switched out -6 adels for -8; pitot line
|
Details
|
  |
|
10-24-2010
|
2.00
|
grounds to ground block; ground strap
|
|
|
|
10-24-2010
|
2.00
|
ground terminations; add 3 click bonds
|
|
|
|
10-24-2010
|
0.00
|
add'l seat pics; aft seat angle
|
Details
|
|
|
10-18-2010
|
3.00
|
sand and super-fill #4
|
|
  |
|
10-18-2010
|
0.75
|
run AOA lines
|
Details
|
|
|
10-18-2010
|
0.50
|
run 20G shielded for P-leads to magnetos
|
|
  |
|
10-18-2010
|
1.75
|
pitot static lines
|
Details
|
 |
|
10-18-2010
|
0.75
|
move pitot fitting to left wing root; run line in
|
|
|
|
10-18-2010
|
0.75
|
fit and micro ELT access door
|
Details
|
|
|
10-04-2010
|
2.00
|
tighten all panel brackets; ground VP control unit
|
Details
|
|
|
10-04-2010
|
1.25
|
run static line and COM 2 antenna cable
|
Details
|
 |
|
10-04-2010
|
1.25
|
RUN PITOT LINE
|
Details
|
|
|
10-04-2010
|
0.75
|
run AOA lines out right wing
|
|
  |
|
10-04-2010
|
1.75
|
fix pitot flange; rough install pitot tube
|
Details
|
|
|
10-03-2010
|
1.75
|
work on running static & pitot lines
|
Details
|
  |
|
10-03-2010
|
2.75
|
sand and prep for super-fill #3; groove elev plate
|
|
  |
|
10-03-2010
|
0.50
|
repair elev trim tab; new foam, add super-fill
|
|
 |
|
10-03-2010
|
0.75
|
prep for 2 BID for static port
|
Details
|
 |
|
10-03-2010
|
1.00
|
grind for elev weldment plate cover
|
Details
|
|
|
10-03-2010
|
0.50
|
Garmin SL30 service bulletin
|
Details
|
 |
|
10-03-2010
|
1.50
|
fit & trim elevator to VS
|
Details
|
|
|
09-27-2010
|
3.00
|
sand super-fill #2
|
|
|
|
09-27-2010
|
2.25
|
sand SF #2; prep for pass #3
|
|
|
|
09-27-2010
|
0.75
|
rough trim both elevators
|
|
|
|
09-27-2010
|
1.00
|
release tape weldment plates; fair in with super-f
|
|
 |
|
09-27-2010
|
1.00
|
flox in FU1 static port
|
|
|
|
09-27-2010
|
1.75
|
figure out static port and pull parts; bend pitot
|
Details
|
|
|
09-20-2010
|
2.25
|
prep and super-fill #1 to VS joints
|
|
|
|
09-20-2010
|
1.25
|
grind and sand excess Hysol from TE
|
|
  |
|
09-20-2010
|
1.00
|
fit foam and BID top close out on VS
|
Details
|
 |
|
09-20-2010
|
1.75
|
fit elev. and mark for initial trim
|
Details
|
|
|
09-20-2010
|
1.75
|
add 2 BID to inside joggles
|
Details
|
|
|
09-19-2010
|
3.25
|
add 2 BID to bottom HS to fuselage joint
|
Details
|
|
|
09-13-2010
|
0.00
|
add'l pics
|
|
|
|
09-13-2010
|
5.25
|
add BIDS to fuselage and VS and HS
|
Details
|
|
|
09-12-2010
|
1.00
|
misc shop; cut BIDS for VS-HS; clean up
|
|
  |
|
09-12-2010
|
2.00
|
final VS fit; prep
|
Details
|
|
|
09-12-2010
|
3.00
|
bond VS left side
|
Details
|
|
|
09-12-2010
|
1.00
|
attached 3" SCAT vent hose
|
Details
|
|
|
09-12-2010
|
1.00
|
3 BID to inside VS-HS on right side
|
|
 |
|
09-11-2010
|
2.00
|
reroute and secure wires in VS
|
Details
|
|
|
09-11-2010
|
0.75
|
re-level magnetometer
|
Details
|
 |
|
09-11-2010
|
1.00
|
install rudder bellcrank and cables
|
|
|
|
09-11-2010
|
0.00
|
add'l pic...wires out rear
|
|
 |
|
09-06-2010
|
1.50
|
work on wiring fwd of panel
|
|
  |
|
09-06-2010
|
0.00
|
right side VS bonded on
|
|
|
|
09-06-2010
|
1.50
|
manifold pressure wiring/plumbing
|
|
|
|
09-06-2010
|
1.50
|
finish crimps; wire ground block
|
|
|
|
09-06-2010
|
4.00
|
final prep for VS bonding and bond
|
Details
|
|
|
09-06-2010
|
0.00
|
add'l pics VS right side bonding
|
|
|
|
09-05-2010
|
1.00
|
VS fit and drill al clecos
|
|
|
|
09-05-2010
|
1.00
|
test fit & align; check plumb with laser; drill al
|
Details
|
|
|
09-05-2010
|
0.50
|
secure tail wires before bonding VS
|
|
 |
|
09-05-2010
|
1.00
|
cut, drill and rivit rod ends on final elev. P/P t
|
Details
|
 |
|
09-04-2010
|
2.50
|
lower fuse and level; give tour to Sonex guy...Ran
|
|
  |
|
09-04-2010
|
2.00
|
fit elev.; trim; measure last elev. push tube
|
Details
|
|
|
09-04-2010
|
0.00
|
check elevator travel
|
Details
|
|
|
09-04-2010
|
0.00
|
check elevator travel
|
|
|
|
08-30-2010
|
5.25
|
work on battery area connections prior to VS close
|
|
|
|
08-30-2010
|
2.00
|
fit elev tubes; fit VS; research
|
Details
|
|
|
08-30-2010
|
0.00
|
add'l wiring pics
|
|
|
|
08-29-2010
|
0.50
|
right side squeeze out
|
Details
|
|
|
08-29-2010
|
1.00
|
measure aft seats and install ground strap
|
Details
|
 |
|
08-29-2010
|
2.50
|
load engine on trailer and strap down
|
Details
|
  |
|
08-29-2010
|
2.50
|
Horiz Stab bonded in!!!!
|
Details
|
|
|
08-29-2010
|
2.50
|
final fit, check and adjustment before bonding
|
|
|
|
08-29-2010
|
0.00
|
add'l pics for reference
|
|
|
|
08-16-2010
|
1.25
|
rotate fuse and level; install rotissirie
|
|
|
|
08-16-2010
|
4.50
|
prep/remove engine; rotate fuselage
|
Details
|
|
|
08-16-2010
|
0.00
|
level fuselage
|
|
|
|
08-16-2010
|
1.75
|
dry run; mount HS and level with laser
|
Details
|
|
|
08-15-2010
|
1.50
|
starter grid wiring; crimp terminals
|
Details
|
|
|
08-15-2010
|
1.00
|
start hanging wires on firewall behind panel
|
|
  |
|
08-15-2010
|
0.00
|
remote oil hoses
|
Details
|
|
|
08-15-2010
|
0.00
|
re-locate alt air cable- too short the way it was
|
|
|
|
08-15-2010
|
1.75
|
mini molex for fuel flow & rpm; wire pressure sens
|
|
|
|
08-15-2010
|
0.00
|
install parking break cable to panel
|
Details
|
|
|
08-15-2010
|
0.75
|
figure nose wheel air; fire sleeve fuel flow cube
|
|
 |
|
08-15-2010
|
2.00
|
fabricate & install remote oil hoses
|
Details
|
|
|
08-15-2010
|
2.00
|
did all the #2,#8 terminals I had rings for
|
Details
|
|
|
08-15-2010
|
5.00
|
Alt air, heat and oil cooler cables installed
|
|
|
|
08-09-2010
|
7.50
|
wiring; adels; install TPM cables
|
Details
|
|
|
08-08-2010
|
7.75
|
engine sensor wiring
|
Details
|
|
|
08-08-2010
|
0.00
|
add'l pics- rpm sensor
|
Details
|
|
|
08-02-2010
|
2.50
|
rought run CHT-EGT wires; install probes
|
Details
|
|
|
08-02-2010
|
0.75
|
redo about half of click bonds from yesterday
|
Details
|
  |
|
08-02-2010
|
1.00
|
install nose wheel and pant
|
Details
|
|
|
08-02-2010
|
1.00
|
figure big wire rings needed; add grommets to batt
|
Details
|
|
|
08-02-2010
|
0.50
|
cut & grind add'l clearance for batt cover with gr
|
|
|
|
08-01-2010
|
4.00
|
run wires
|
Details
|
|
|
08-01-2010
|
2.50
|
run power wires and plan clamp locations
|
Details
|
|
|
08-01-2010
|
1.00
|
flip starter power grid over; better wire access
|
|
|
|
08-01-2010
|
2.00
|
design and fab ELT shelf; micro on behind batterie
|
Details
|
|
|
08-01-2010
|
2.50
|
ad click bonds for tie wraps and adel clamps
|
|
|
|
08-01-2010
|
1.50
|
2 BID ELT shelf; grommet in baffle for alt wire
|
Details
|
|
|
07-19-2010
|
5.00
|
plan and run conduits and grommets
|
Details
|
|
|
07-19-2010
|
2.25
|
micro in couplings and elbows and conduits
|
Details
|
|
|
07-18-2010
|
2.75
|
wiring for flaps, landing light
|
Details
|
|
|
07-18-2010
|
1.75
|
run COM2, transponder and ELT cables; bond in COM2
|
Details
|
|
|
07-18-2010
|
0.50
|
repin castelated nuts for both front seats
|
|
|
|
07-18-2010
|
0.25
|
install OAT probe to lower right wing tip
|
|
|
|
07-17-2010
|
1.50
|
fool with diplexer placement; bolt in
|
Details
|
 |
|
07-17-2010
|
0.50
|
connect 12v for probes to 24-12 converter
|
|
|
|
07-17-2010
|
1.00
|
added adel clamp to wig ribs
|
|
|
|
07-06-2010
|
1.00
|
run RG400 for nav in RW; COM1 to vertical stab; Na
|
|
  |
|
07-06-2010
|
1.00
|
drill panel for headset jacks; drill rear seat bac
|
|
|
|
07-06-2010
|
1.00
|
click bond studs on wing for fuel probe signal con
|
Details
|
 |
|
07-05-2010
|
1.10
|
reverse headset cable pin assignments; drill rear
|
Details
|
|
|
07-05-2010
|
1.10
|
plan and mark out new jack locations on panel
|
Details
|
|
|
07-05-2010
|
1.10
|
install roll servo and rough run cable
|
Details
|
|
|
07-05-2010
|
1.10
|
install pitch servo and cable; back to orig. longe
|
|
|
|
07-05-2010
|
1.10
|
install and level magnetometer
|
Details
|
 |
|
06-28-2010
|
2.75
|
wire in capacitance to voltage adapter from Dynon
|
Details
|
|
|
06-28-2010
|
4.00
|
continue wiring; fab landing light attachment; chn
|
Details
|
|
|
06-27-2010
|
4.50
|
run fat wires; install LS-1A voltage regulator
|
Details
|
|
|
06-27-2010
|
0.10
|
flip VR so terminals are facing down; per B&C and
|
Details
|
|
|
06-14-2010
|
1.25
|
redesign power grid; modify; install to R battery
|
|
|
|
06-14-2010
|
1.25
|
install power grid to battery box
|
|
|
|
06-14-2010
|
1.25
|
install oil and fuel pressure sensors with WDG-26
|
Details
|
|
|
06-14-2010
|
1.00
|
install ground lug to click bond studs
|
Details
|
|
|
06-14-2010
|
1.25
|
fabricate phenolic pad for voltage regulators
|
Details
|
 |
|
06-13-2010
|
0.50
|
remove 37 pin double connector-room for voltage re
|
|
|
|
06-13-2010
|
1.75
|
mount manifold pressure sensor; move ARINC; place
|
Details
|
 |
|
05-24-2010
|
28.00
|
Ground & dual flight training in Redmond OR in N40
|
Details
|
 |
|
05-19-2010
|
4.00
|
do consolidated wiring diagram
|
|
  |
|
05-17-2010
|
6.75
|
continue to run wires
|
|
|
|
05-17-2010
|
0.10
|
add'l wiring pics
|
|
|
|
05-16-2010
|
1.50
|
position oil and fuel pressure sensors on firewall
|
Details
|
  |
|
05-16-2010
|
0.00
|
move dimmer 7/8" fwd to give clearance for VP swit
|
|
|
|
05-16-2010
|
1.50
|
install GPS shelves
|
|
|
|
05-16-2010
|
5.25
|
begin wiring
|
Details
|
|
|
05-16-2010
|
0.00
|
add'l GPS pics
|
|
|
|
05-16-2010
|
0.50
|
add adel clamp to mixture bracket for oil pressure
|
Details
|
 |
|
05-10-2010
|
1.25
|
VP switch panel clearance issue
|
Details
|
|
|
05-10-2010
|
1.25
|
set click bond studs on EFIS units for GPS shelves
|
|
|
|
05-10-2010
|
1.00
|
sand main gear fairings and prep for add'l super-f
|
|
  |
|
05-10-2010
|
1.25
|
install nutplates to left side avionics rail
|
|
 |
|
05-10-2010
|
1.25
|
design and fabricate shelf for 4 GPS/XM antennae
|
Details
|
 |
|
05-09-2010
|
7.00
|
design avionics shelves; fabricate and install
|
Details
|
|
|
05-08-2010
|
1.00
|
hang panel
|
Details
|
|
|
05-08-2010
|
2.00
|
design, fabricate and drill 3 braces
|
|
|
|
05-08-2010
|
1.25
|
braces for throttle quadrant area
|
Details
|
|
|
05-08-2010
|
1.00
|
add'l panel hangings pics
|
|
|
|
05-03-2010
|
0.75
|
super-fill main fairings; 2 BID mag. shelf
|
|
|
|
05-03-2010
|
2.00
|
sand and prep main gear fairings
|
|
  |
|
05-03-2010
|
2.00
|
prep and WLS nose fairing; wingtips; o/h console
|
Details
|
  |
|
05-03-2010
|
1.00
|
add holes to magnetomter shelf and micro in
|
Details
|
|
|
05-02-2010
|
1.25
|
work on avionics shelf layout; micro aft of magnet
|
|
  |
|
05-01-2010
|
1.50
|
super fill to nose gear and wingtips again; flox i
|
|
|
|
05-01-2010
|
1.50
|
sand wingtips, nose and main fairings
|
|
  |
|
05-01-2010
|
1.25
|
sand seat belt floxing; add micro pads to mag. she
|
|
|
|
05-01-2010
|
1.75
|
design and rough up shelf for magnetometer
|
|
|
|
04-26-2010
|
2.25
|
work up list of devices, locations, wire specs
|
|
  |
|
04-26-2010
|
1.50
|
servo pads; drill 7/8" holes for harness cable; cl
|
Details
|
|
|
04-26-2010
|
1.25
|
plan avionics box shelves; make template
|
Details
|
|
|
04-26-2010
|
1.50
|
cowl parts upstairs; fuse dolly, clean up
|
|
 |
|
04-25-2010
|
1.00
|
study and research firewall fwd.; pressure sensors
|
|
  |
|
04-25-2010
|
5.00
|
sand and prep cowl and nose fairing; WLS #2
|
|
|
|
04-25-2010
|
1.00
|
add 2 BID to AP servo phenolic blocks
|
|
 |
|
04-24-2010
|
1.00
|
misc shop and drill 1/8" vent hole in nose pant
|
|
  |
|
04-21-2010
|
5.00
|
panel
|
Details
|
|
|
04-19-2010
|
1.75
|
super-fill pin holes on cowls, mostly on top cowl
|
|
  |
|
04-19-2010
|
3.25
|
prep and flox servo mounting pads in AN3-5A
|
Details
|
|
|
04-19-2010
|
3.00
|
modify pitch servo arm; fabricate mounting pads
|
|
|
|
04-18-2010
|
1.00
|
work on placing AP servos
|
Details
|
|
|
04-18-2010
|
0.50
|
tap nose gear fork; open up pant hole and counters
|
|
|
|
04-18-2010
|
5.00
|
sand cowl and nose fairing, prep, WLS #2
|
|
  |
|
04-18-2010
|
3.00
|
prep cowl, WLS primer #1
|
|
|
|
04-18-2010
|
4.00
|
inventory panel; work on rough wiring diagram
|
Details
|
|
|
04-18-2010
|
0.50
|
drill hole for nose gear attachment
|
|
|
|
04-18-2010
|
1.50
|
2 BID gear fairing bulkhead
|
|
  |
|
04-12-2010
|
1.50
|
sand cowls and nose wheel fairing again
|
|
  |
|
04-12-2010
|
4.50
|
nose gear fit and fabrication
|
Details
|
|
|
04-12-2010
|
0.00
|
fabricate aft bulkhead for nose pant
|
|
|
|
04-12-2010
|
0.25
|
change desicant plugs in al cylinders
|
|
  |
|
04-12-2010
|
0.00
|
aft bulkhead and fork spacers
|
|
|
|
04-11-2010
|
1.25
|
super-fill cowl and nose leg fairing #2+
|
|
  |
|
04-11-2010
|
0.00
|
super-fill applied to cowl seams
|
|
|
|
04-11-2010
|
3.50
|
sand cowl seams after super-fill
|
|
|
|
04-11-2010
|
1.50
|
prop off; jack up to work on nose pant
|
|
|
|
04-11-2010
|
3.00
|
fit for cowling seams
|
|
|
|
04-11-2010
|
1.00
|
drill 3" hole in nose pant; open up bottom opening
|
|
|
|
04-11-2010
|
0.75
|
|
|
|
|
03-28-2010
|
1.00
|
mark & measure a/p servos; measure for harness
|
Details
|
|
|
03-28-2010
|
0.75
|
grind and sand fuselage/cowling joggle
|
|
  |
|
03-28-2010
|
1.75
|
fit and trim oil door; sand cowlings again
|
Details
|
|
|
03-28-2010
|
2.75
|
bodywork cowling and nose gear fairing
|
Details
|
|
|
03-15-2010
|
0.00
|
seat belts holes
|
Details
|
|
|
03-15-2010
|
5.50
|
sand cowl halves; super-fill #2
|
Details
|
|
|
03-15-2010
|
0.50
|
figure interior panel measurements so I can order
|
Details
|
  |
|
03-15-2010
|
2.75
|
figure front seat belts and drill holes
|
Details
|
|
|
03-14-2010
|
1.75
|
Super-fill #1 to both cowl halves
|
|
|
|
03-14-2010
|
2.75
|
prep cowl halves for fill
|
|
|
|
03-14-2010
|
2.00
|
micro bottom of cowl spinner flange
|
Details
|
|
|
03-14-2010
|
3.00
|
fit & trim lower cowl spinner flange
|
Details
|
|
|
03-08-2010
|
1.00
|
trim nose gear to length; add 6 1000-6 nutplates
|
Details
|
|
|
03-08-2010
|
2.00
|
trim and refit cowl
|
Details
|
|
|
03-08-2010
|
1.00
|
additional pics - skybolts installed
|
|
|
|
03-08-2010
|
2.50
|
add .2" micro to front lower cowl spinner flange
|
Details
|
|
|
03-07-2010
|
1.50
|
skybolts to aft nose gear fairing
|
Details
|
|
|
03-07-2010
|
1.75
|
shape foam and add 1 BID, peel ply
|
|
 |
|
03-07-2010
|
1.50
|
scarf clark foam to left side of cowl
|
Details
|
|
|
03-07-2010
|
0.50
|
retack foam pieces
|
|
|
|
03-07-2010
|
1.50
|
decore and super fill oil door and opening
|
|
|
|
03-07-2010
|
1.00
|
add nutplates to nose inlet
|
Details
|
 |
|
03-07-2010
|
0.00
|
|
|
|
|
02-22-2010
|
2.75
|
rest of cowl skybolts; nutplate for inlets
|
|
|
|
02-22-2010
|
2.00
|
fit nose fairing to lower cowling
|
|
|
|
02-22-2010
|
2.00
|
fit and align nose gear fairing
|
Details
|
|
|
02-22-2010
|
0.00
|
add'l pics.. skybolts to nose fairing
|
|
|
|
02-21-2010
|
3.00
|
skybolt installation continued
|
|
|
|
02-21-2010
|
3.25
|
install skybolts for cowling
|
Details
|
|
|
02-21-2010
|
3.00
|
install rest of skybolts including studs
|
Details
|
|
|
02-21-2010
|
1.00
|
fit and trim nose gear fairing
|
Details
|
 |
|
02-15-2010
|
1.50
|
make jig for Skybolts; fool with rivets
|
Details
|
  |
|
02-15-2010
|
3.00
|
drill rivet holes and enlarge pilot to 15/32
|
Details
|
|
|
02-15-2010
|
1.50
|
cut and grind access in fuse double joggle
|
Details
|
|
|
02-15-2010
|
0.00
|
Add'l Skybolt drilling pics
|
|
|
|
02-15-2010
|
1.00
|
1 BID over rivets for oil access door
|
|
 |
|
02-14-2010
|
0.10
|
spinner alignment issue
|
Details
|
|
|
02-14-2010
|
2.00
|
oil door; decore for hinge and cut; rivet hinges o
|
Details
|
|
|
02-14-2010
|
2.50
|
fit cowling;layout holes for skybolts; drill & cle
|
Details
|
|
|
02-14-2010
|
1.75
|
cut and rivet in Hartwell hinge for oil door
|
Details
|
|
|
02-13-2010
|
3.25
|
decore for oil door latch; 4 BID flange
|
|
|
|
02-05-2010
|
0.00
|
pics of top gap fuse to fuse joggle; flange width
|
Details
|
|
|
02-05-2010
|
0.50
|
cut oil access door; add 4 BID
|
|
  |
|
02-05-2010
|
6.50
|
continue cowl fitting and cutting
|
Details
|
|
|
02-05-2010
|
0.00
|
add'l pics
|
Details
|
|
|
02-05-2010
|
0.00
|
|
|
|
|
02-04-2010
|
5.00
|
fit upper & lower cowling; 1st pass trimming
|
Details
|
|
|
01-31-2010
|
0.00
|
set strut to limits
|
|
|
|
01-31-2010
|
7.50
|
relocate fuselage to hang engine
|
Details
|
|
|
01-31-2010
|
0.00
|
nose strut installation continued
|
Details
|
|
|
01-31-2010
|
0.00
|
mount nose wheel to forward fork
|
|
|
|
01-31-2010
|
1.00
|
misc shop clean up and reorg.
|
|
  |
|
01-31-2010
|
0.50
|
misc shop
|
|
  |
|
01-31-2010
|
0.00
|
level fuselage in prep to mount nose strut
|
|
|
|
01-31-2010
|
1.00
|
layout cowl cuts
|
Details
|
|
|
01-31-2010
|
0.00
|
hang engine in order to fit cowl
|
|
|
|
01-31-2010
|
0.00
|
drill and install nutplates
|
|
|
|
01-31-2010
|
1.00
|
assemble nose wheel/tire; research nose strut
|
Details
|
|
|
01-31-2010
|
7.75
|
assemble nose strut and mount
|
Details
|
|
|
01-25-2010
|
1.25
|
sand, prep & sup-fil one side of each gear leg
|
|
  |
|
01-25-2010
|
0.00
|
prime all wing access panels
|
|
 |
|
01-25-2010
|
4.50
|
final sand, prep and prime fuse sides
|
Details
|
|
|
01-24-2010
|
1.25
|
super-fill wing tip tops prep to re-do WLS
|
Details
|
|
|
01-24-2010
|
1.00
|
sand right fuselage; super-fil #3
|
|
  |
|
01-24-2010
|
2.75
|
sand fuse sides; prep and apply super-fil
|
|
  |
|
01-24-2010
|
2.00
|
rivet 12 nutplates to each opening
|
Details
|
|
|
01-24-2010
|
0.25
|
micro small dimple in aft R fuselage
|
|
|
|
01-24-2010
|
1.25
|
flip fuse; misc shop
|
|
  |
|
01-24-2010
|
1.00
|
cut overhead console access; trim up air scoop hol
|
|
|
|
01-24-2010
|
1.00
|
2 BID inside of NACA scoop flange
|
Details
|
|
|
01-24-2010
|
1.00
|
|
Details
|
|
|
01-18-2010
|
2.50
|
WLS primer to fuselage bottom; 2 coats
|
Details
|
|
|
01-18-2010
|
0.50
|
put stuff away, clean up a bit, etc.
|
|
  |
|
01-18-2010
|
0.00
|
flox in air inlet to console
|
Details
|
|
|
01-18-2010
|
2.50
|
final sand of fuselage bottom & prep for WLS prime
|
|
  |
|
01-18-2010
|
1.50
|
fabricate air inlet for console; flox in place
|
|
 |
|
01-17-2010
|
1.25
|
WLS primer to tops of ailerons & elevators
|
|
  |
|
01-17-2010
|
3.25
|
sand fuse bottom; trim flap cover flange repair
|
Details
|
|
|
01-17-2010
|
1.25
|
prep & S/F #3 fuselage bottom
|
|
  |
|
01-17-2010
|
1.50
|
design & fabricate fresh air vent tube from o/h co
|
Details
|
|
|
01-16-2010
|
1.50
|
WLS # 2 bottom of ailerons & elevators
|
|
 |
|
01-16-2010
|
0.50
|
rebond left flap cover flange with flox
|
|
  |
|
01-16-2010
|
1.75
|
prep and S/F #2 to fuselage bottom
|
|
  |
|
01-16-2010
|
1.50
|
prep ailerons and elevators for WLS #2
|
|
  |
|
01-16-2010
|
0.75
|
clean out epoxy pump; resin side had some crystali
|
|
  |
|
01-11-2010
|
0.75
|
stow right wing
|
Details
|
|
|
01-11-2010
|
2.75
|
sand fuse bottom
|
Details
|
|
|
01-11-2010
|
2.00
|
fit & trim access covers; vac. fuselage
|
|
|
|
01-11-2010
|
2.00
|
fairing access covers; fit, fix and trim
|
Details
|
|
|
12-26-2009
|
1.50
|
WLS primer coat #3 to top R wing
|
|
  |
|
12-26-2009
|
1.50
|
Vac. fuse and R wing; prep wing for WLS #3
|
|
  |
|
12-26-2009
|
1.25
|
super-fil pass #1 to fuselage bottom
|
|
|
|
12-26-2009
|
1.25
|
seats off, roll fuse; fit flap,aileron,tip
|
Details
|
|
|
12-26-2009
|
0.75
|
sand and prep top right wing for WLS coat #3 (doub
|
|
  |
|
12-26-2009
|
1.25
|
sand & prep fuse bottom for super-fil #1
|
|
  |
|
12-26-2009
|
1.00
|
clean up step bracket and re-do aft air vent drain
|
|
|
|
12-26-2009
|
0.10
|
aileron to wing tip alignment - right wing
|
|
|
|
12-21-2009
|
0.50
|
trim elev torque tube cover
|
|
  |
|
12-21-2009
|
1.00
|
fit & trim elev tube access holes in aft seat flan
|
|
|
|
12-21-2009
|
4.50
|
final sand/prep and apply 2 coats WLS primer; top
|
Details
|
 |
|
12-21-2009
|
1.00
|
decore and micro elev holes in aft seat flange
|
|
|
|
12-20-2009
|
0.50
|
re-plumb compressoer fittings to get out of way
|
|
|
|
12-20-2009
|
1.50
|
prep top right wing for super-fill #1
|
|
 |
|
12-14-2009
|
2.25
|
prep top right wing; micro release wing tip
|
|
|
|
12-14-2009
|
2.00
|
drill holes and add 10-32 rivnuts to torque tube c
|
Details
|
|
|
12-14-2009
|
0.75
|
cut 4 BID fir elev. cover
|
Details
|
  |
|
12-14-2009
|
1.75
|
4 BID to elev. torque tube cover
|
|
|
|
12-13-2009
|
2.00
|
WLS #2 bottom right wing
|
Details
|
 |
|
12-13-2009
|
2.00
|
sand and prep bottom RW for WLS #2
|
|
  |
|
12-13-2009
|
0.50
|
prep & micro fwd edge of elev. TT cover
|
|
 |
|
12-07-2009
|
1.25
|
WLS primer bottom RW
|
Details
|
|
|
12-07-2009
|
2.75
|
sand & prep bottom RW; s/f #4
|
|
  |
|
12-07-2009
|
7.00
|
HF compressor died; to Lowes for new
|
Details
|
|
|
12-07-2009
|
1.50
|
get fittings, install, adjust new compressor
|
|
  |
|
12-07-2009
|
1.75
|
flox in parking brake valve; 2 BID
|
|
|
|
12-07-2009
|
1.75
|
finish sand and prep bottom RW
|
|
  |
|
12-07-2009
|
1.00
|
final sand bottom right wing
|
Details
|
  |
|
12-07-2009
|
1.00
|
figure brake fittings and connect brake lines
|
Details
|
|
|
12-07-2009
|
1.25
|
fabricate top elev tube cover
|
|
|
|
12-07-2009
|
2.50
|
design/fit elev. torque tube cover
|
Details
|
|
|
12-07-2009
|
0.00
|
add'l parking brake pics
|
|
|
|
11-29-2009
|
1.00
|
design and fit parking brake
|
Details
|
|
|
11-29-2009
|
3.00
|
body work
|
Details
|
|
|
11-29-2009
|
1.25
|
2 BID aft seat flange - aft side
|
Details
|
|
|
11-28-2009
|
1.00
|
riv-nuts for top part of hinge
|
Details
|
|
|
11-28-2009
|
1.75
|
fit/release tape access panels
|
Details
|
 |
|
11-28-2009
|
1.25
|
drill and rivit aft seat hinge
|
Details
|
|
|
11-22-2009
|
3.50
|
sand bottom right wing, and misc grinding, etc
|
Details
|
  |
|
11-14-2009
|
1.00
|
super-fil #1 to bottom right wing
|
|
|
|
11-14-2009
|
2.25
|
sand right bottom wing; fairing, flap pocket
|
Details
|
|
|
11-14-2009
|
1.50
|
6 BID flange for folding seat back
|
Details
|
 |
|
11-09-2009
|
0.50
|
stow l wing and position right wing
|
Details
|
|
|
11-09-2009
|
1.75
|
sand bottom right wing
|
Details
|
|
|
11-09-2009
|
0.75
|
replace descicant; seal all openings
|
|
  |
|
11-09-2009
|
1.50
|
micro LE and flap pocket of right wing (bottom)
|
|
|
|
11-09-2009
|
1.50
|
bond in lower seat back, 2 BID flange/fuselage
|
|
|
|
11-09-2009
|
0.75
|
alignment issues with left wing???
|
Details
|
|
|
11-09-2009
|
0.10
|
|
|
|
|
11-02-2009
|
2.00
|
sand & prep top left wing
|
Details
|
|
|
11-02-2009
|
0.50
|
figure parking brake; dev. parts needed list
|
|
  |
|
11-02-2009
|
1.00
|
continue on aft seat back geometry
|
|
|
|
11-02-2009
|
1.25
|
bond in aft seat flanges with flox
|
|
|
|
11-02-2009
|
1.50
|
2 coats WLS primer on top left wing
|
Details
|
 |
|
11-01-2009
|
1.75
|
prep 3 BID and 4 BID for at seat
|
Details
|
|
|
11-01-2009
|
0.75
|
DC4 filter, descicant plugs, misc
|
|
  |
|
11-01-2009
|
1.25
|
3 BID front of seat back flange and flip L wing ov
|
|
 |
|
10-26-2009
|
2.50
|
sand left lower wing for "fuzzies"
|
Details
|
 |
|
10-26-2009
|
2.75
|
fabricate and prep at seat flanges, etc
|
Details
|
|
|
10-26-2009
|
2.00
|
apply 18 BID to fwd seatbelt gusset
|
Details
|
 |
|
10-18-2009
|
3.00
|
forward seat belt gusset
|
Details
|
|
|
10-18-2009
|
3.00
|
figure/design rear saet flange
|
Details
|
|
|
10-18-2009
|
1.00
|
cut 4 sets of 9 BID for fwd gusset-seat belt
|
|
  |
|
10-17-2009
|
6.25
|
final prep left lwr wing; 2 coats WLS primer
|
Details
|
|
|
10-10-2009
|
4.50
|
sand and super-fil bottom of left wing
|
Details
|
  |
|
10-05-2009
|
2.75
|
trim aileron fairing, sand bottom left wing
|
|
|
|
10-05-2009
|
1.25
|
super-fill #2, bottom left wing
|
|
|
|
10-05-2009
|
1.50
|
sand r fuse, s/f #4
|
|
  |
|
10-05-2009
|
1.00
|
prep releases for access panels and tips
|
|
|
|
10-04-2009
|
1.00
|
sand VS; prep for final body work; WLS if nice wx?
|
|
  |
|
10-04-2009
|
2.75
|
prep for 2 BID flap to aileron on left wing
|
|
|
|
10-04-2009
|
2.50
|
flip left wing, sand, grind prep add super-fil
|
Details
|
|
|
09-28-2009
|
2.75
|
sand right fuselage; s/f #2
|
|
  |
|
09-28-2009
|
1.25
|
break out brake cover release; sand LT wing; add'l
|
Details
|
|
|
09-27-2009
|
0.75
|
super-fill top left wing; pass #1
|
|
 |
|
09-27-2009
|
1.25
|
sand R fuselage and super-fill
|
|
 |
|
09-27-2009
|
1.25
|
S/F #2 TL wing; s/f speed brake pocket
|
|
|
|
09-27-2009
|
1.00
|
release tape speed brake pocket LT wing
|
Details
|
|
|
09-27-2009
|
1.75
|
prep top left wing for repairs and s/f
|
|
|
|
09-27-2009
|
2.00
|
micro release left wing tip
|
Details
|
|
|
09-27-2009
|
2.50
|
clean up tip release; prep top left wing
|
Details
|
 |
|
09-27-2009
|
1.00
|
add 2 BID to LE L wing, and 3 BID to flap control
|
Details
|
|
|
09-27-2009
|
1.00
|
ad add'l RG400 for potential NAV antenna in tail
|
Details
|
|
|
09-20-2009
|
1.50
|
spray flaps and wingtips with WLS primer
|
Details
|
|
|
09-20-2009
|
3.00
|
set up hanging wire; prep flaps and wing tips
|
Details
|
  |
|
09-20-2009
|
2.00
|
make template; figure out oil hose routing - measu
|
Details
|
  |
|
09-20-2009
|
0.50
|
cut about .25" off of oil stud to accept Airwolf a
|
Details
|
|
|
09-07-2009
|
1.25
|
re-arrange shop, move fuse, lay left wing flat
|
Details
|
|
|
09-07-2009
|
1.00
|
intalled remote oil filter on firewall
|
Details
|
|
|
09-07-2009
|
0.10
|
install Saf-Air quick oil drain
|
Details
|
|
|
09-07-2009
|
3.50
|
install quick oil drain, begin Airwolf remote oil
|
Details
|
|
|
09-07-2009
|
1.50
|
decore and add phenolic for remote oil filter
|
|
|
|
08-30-2009
|
0.75
|
sand left fuselage again
|
|
|
|
08-30-2009
|
1.50
|
sand flaps and tips...ready, but need Wonder-fil
|
Details
|
|
|
08-30-2009
|
2.00
|
sand and prep right side of fuse for micro
|
|
|
|
08-30-2009
|
2.00
|
place and drill hole for tail tie down ring
|
Details
|
|
|
08-30-2009
|
0.25
|
grind out i/s of naca vent
|
|
 |
|
08-17-2009
|
3.50
|
sand fuselage - round #2
|
Details
|
|
|
08-17-2009
|
2.50
|
sand flaps and wing tips again
|
Details
|
 |
|
08-16-2009
|
2.00
|
sanded and Super-filled left side of fuselage...mo
|
Details
|
|
|
08-16-2009
|
2.50
|
sand flaps and apply Super-fil coat #2
|
Details
|
  |
|
08-10-2009
|
1.25
|
Super-fill to top of both flaps; surface is actual
|
|
 |
|
08-10-2009
|
3.50
|
sand bottom side of both flaps
|
Details
|
  |
|
08-10-2009
|
0.10
|
rechecked HS to cradle; e-mailed pics to Lancair
|
Details
|
|
|
08-10-2009
|
0.50
|
recheck fit of HS to cradle per ? to Justin last w
|
|
  |
|
08-10-2009
|
0.50
|
grind excess micro from NACA scoop
|
Details
|
|
|
08-10-2009
|
0.10
|
add'l HS to cradle pics for Lancair
|
Details
|
|
|
08-09-2009
|
8.00
|
transport engine & prop to Perry County Airplane F
|
Details
|
|
|
08-09-2009
|
0.10
|
snap shots of mags and alt. for Aerotronics
|
|
|
|
08-09-2009
|
0.10
|
set engine on dolley for now..may rig engine stand
|
|
 |
|
08-03-2009
|
3.50
|
sand wing tips and add 2nd coat of Super-fil
|
Details
|
|
|
08-03-2009
|
2.00
|
sand tips and add 2nd coat of Super-fil
|
|
 |
|
08-03-2009
|
1.00
|
Decore & micro NACA scoop; pull clecos
|
|
 |
|
08-02-2009
|
0.50
|
replaced RG58 coax in VS with RG400
|
Details
|
 |
|
08-02-2009
|
0.10
|
place NACA scoop on left side of fuselage
|
Details
|
|
|
08-02-2009
|
0.50
|
lool through box that shipped with engine
|
Details
|
  |
|
08-02-2009
|
1.50
|
fit 1:1 panel #2, figure front headset jack positi
|
Details
|
|
|
08-02-2009
|
0.50
|
figure out where to put NACA fresh air scoop
|
Details
|
|
|
08-02-2009
|
2.75
|
|
Details
|
|
|
07-26-2009
|
0.50
|
apply Super-fil to wing tips before leaving for OS
|
|
  |
|
07-20-2009
|
2.00
|
shoot primer on HS
|
Details
|
|
|
07-20-2009
|
1.50
|
sand both wingtips, prep for Super-fill; misc clea
|
|
 |
|
07-20-2009
|
0.75
|
micro floor boards, 2nd pass
|
|
|
|
07-19-2009
|
1.25
|
sand, prep and micro wing tips
|
|
|
|
07-19-2009
|
2.50
|
sand HS bottom, wonder-fil, prep
|
Details
|
 |
|
07-19-2009
|
1.25
|
hang primed parts upstairs in the loft (aka Chris'
|
Details
|
|
|
07-19-2009
|
1.00
|
flipped tileboard at layup table around; gen'l cle
|
|
|
|
07-18-2009
|
2.50
|
sand top of HS; superfill botom of HS
|
|
  |
|
07-13-2009
|
0.10
|
WLS part #'s info
|
Details
|
|
|
07-13-2009
|
9.50
|
sand and prep for 1st shot of primer
|
Details
|
|
|
07-12-2009
|
1.75
|
test fit 1:1 panel print out
|
Details
|
|
|
07-12-2009
|
5.00
|
sand, prep, add super-fil
|
Details
|
|
|
07-12-2009
|
2.25
|
Sand & prep top of HS; add Super-fil to top
|
|
 |
|
07-12-2009
|
0.10
|
panel pics #3
|
|
|
|
07-12-2009
|
0.10
|
more panel fitting pics
|
|
|
|
07-12-2009
|
0.50
|
drill battery box holes;
|
|
|
|
07-12-2009
|
0.75
|
2 BID FS185 to fuselage
|
|
|
|
07-06-2009
|
3.75
|
sand rudder & elev. trim tabs; move wings to new c
|
Details
|
|
|
07-06-2009
|
2.00
|
sand HS top; micro 1st pass HS top
|
Details
|
|
|
07-06-2009
|
1.75
|
prep elev and rudder with 150 grit; add Super-Fil
|
|
 |
|
07-06-2009
|
0.50
|
misc shop & clean up
|
|
  |
|
07-06-2009
|
1.50
|
fabricated battery box hardpoints & shims
|
Details
|
|
|
06-28-2009
|
3.50
|
sand elevators; add Super-Fil to top face
|
Details
|
|
|
06-28-2009
|
0.25
|
reserach Service Bulletin for rounding of HS edges
|
Details
|
  |
|
06-28-2009
|
1.25
|
modify battery boxes for 2 Odyssey PC680 batteries
|
Details
|
|
|
06-28-2009
|
1.00
|
micro 2nd face of top rudder pocket....misc shop
|
|
|
|
06-28-2009
|
1.75
|
Assemble shop crane; misc shop
|
Details
|
|
|
06-28-2009
|
0.00
|
additional battery box pics
|
|
 |
|
06-08-2009
|
1.25
|
sand top right elevator 1st pass; torque right sid
|
Details
|
  |
|
06-08-2009
|
2.25
|
sand top left elevator; fix stripped AN4-6A bolt
|
Details
|
|
|
06-08-2009
|
1.00
|
sand rudder micro and top right elevator
|
|
|
|
06-08-2009
|
1.00
|
reseach and plan battery and power grid placement
|
Details
|
  |
|
06-08-2009
|
1.50
|
micro top of rudder wieght area; add 2nd pass micr
|
Details
|
|
|
06-01-2009
|
4.75
|
sand micro'd elevators; micro other side
|
|
|
|
06-01-2009
|
0.50
|
micro TE of rudder trim tab
|
|
 |
|
05-31-2009
|
2.75
|
sand, prep and micro elevators
|
Details
|
|
|
05-31-2009
|
1.50
|
sand elevators and prep for 1st micro
|
Details
|
|
|
05-31-2009
|
0.50
|
rebuild wing stands
|
Details
|
|
|
05-31-2009
|
1.00
|
misc. shop, cleanup, reorg., etc
|
|
  |
|
05-30-2009
|
1.00
|
take off fuselage top on rotisserie
|
Details
|
|
|
05-30-2009
|
1.00
|
rebuild wing stands so both wings face the same wa
|
|
  |
|
05-30-2009
|
1.50
|
prep and add Loehle Wonder-fil to bottom of HS
|
Details
|
 |
|
05-30-2009
|
1.50
|
grind out BID at elev. stop phenolic for clearance
|
|
 |
|
05-30-2009
|
1.50
|
fit elevators to HS; sand micro'd ends to get prop
|
|
|
|
05-30-2009
|
1.25
|
final fit of elevator to HS; shop clean up
|
|
|
|
05-11-2009
|
2.00
|
mount rotisserie with Phil's help
|
Details
|
|
|
05-11-2009
|
0.50
|
micro left end of HS....cabin method
|
|
 |
|
05-11-2009
|
1.50
|
grind trim tab; begin sanding LS of rudder
|
|
|
|
05-11-2009
|
2.00
|
fit rotisserie and cut floorboards for bolt access
|
|
|
|
05-11-2009
|
2.00
|
build wing cradle stand
|
Details
|
|
|
05-10-2009
|
0.50
|
micro right end of HS
|
|
|
|
05-10-2009
|
7.00
|
drove to VA - Bill Harrelson to pick up rotisserie
|
Details
|
|
|
05-10-2009
|
2.50
|
Begin set up of rotisserie
|
|
  |
|
05-04-2009
|
2.00
|
shape clark foam for LE of rudder trim tab
|
Details
|
|
|
05-04-2009
|
1.50
|
prep and micro LS rudder; bond trim tab fairing
|
|
|
|
05-04-2009
|
1.50
|
misc. including figuring firewall connectors
|
Details
|
|
|
05-04-2009
|
0.10
|
called out screws too long; will use shorter ones
|
Details
|
|
|
05-04-2009
|
2.50
|
and micro on right side of rudder (appled yesterda
|
|
 |
|
05-04-2009
|
0.10
|
1 BID and peel ply LE foam on trim tab
|
|
|
|
05-03-2009
|
1.75
|
trim and fit and trim and fit rudder trim tab
|
|
|
|
05-03-2009
|
2.00
|
sand and prep rudder, micro right side
|
Details
|
|
|
05-03-2009
|
0.50
|
research various issues
|
|
  |
|
05-03-2009
|
1.00
|
prep and micro short half of elevator pockets
|
Details
|
|
|
05-03-2009
|
1.00
|
check travel...have 35 degress each way
|
Details
|
|
|
05-03-2009
|
0.50
|
add Clark foam for LE of trim tab
|
Details
|
 |
|
05-03-2009
|
0.10
|
2 - 32 pin firewall connectors
|
Details
|
|
|
04-23-2009
|
0.10
|
Sun N Fun report Panel and VP200
|
Details
|
  |
|
04-23-2009
|
1.00
|
Sun N Fun 2009 Engine & Panel, etc.
|
Details
|
|
|
04-23-2009
|
0.10
|
more engine pics
|
|
|
|
04-23-2009
|
0.10
|
final engine pics
|
|
|
|
04-12-2009
|
1.00
|
trim rudder trim fairing to shape; sand botton of
|
|
  |
|
04-12-2009
|
0.50
|
research 740 and 720 black cables; measure all cab
|
Details
|
|
|
04-12-2009
|
0.50
|
remove panel; pack up to take to SNF for Aerotroni
|
|
  |
|
04-12-2009
|
1.00
|
prep rudder LE close-out
|
|
  |
|
04-12-2009
|
0.10
|
measurements for panel shop
|
|
|
|
04-12-2009
|
1.00
|
instrument panel fit #2
|
|
|
|
04-12-2009
|
0.75
|
install 2 nutplates to 4 BID bracket on each side
|
|
|
|
04-12-2009
|
1.00
|
fit instrument panel
|
Details
|
|
|
04-12-2009
|
0.50
|
1 BID to right side; misc. shop
|
|
 |
|
04-12-2009
|
0.50
|
1 BID to left side of rudder LE close-out
|
|
|
|
04-11-2009
|
0.75
|
pul parts for panel install.
|
|
  |
|
04-11-2009
|
1.50
|
prep rudder; 1 BID on close-out
|
Details
|
|
|
04-11-2009
|
1.00
|
pop use top; fit panel bank
|
|
|
|
04-11-2009
|
0.10
|
my faithful helper, Maggie... on the job!
|
|
|
|
04-11-2009
|
1.00
|
fit fuselage
|
Details
|
|
|
04-11-2009
|
1.00
|
fit & trim panel to fuselage; 2 screws each side t
|
|
|
|
04-11-2009
|
2.00
|
after adding 4 BID for flanges
|
|
|
|
04-05-2009
|
1.50
|
Sand bottom of Horiz. Stab - continued
|
Details
|
  |
|
04-05-2009
|
0.10
|
rudder LE close-out
|
|
|
|
04-05-2009
|
1.00
|
make add'l fairing #3, add micro to bottom of HS
|
|
  |
|
04-05-2009
|
1.50
|
grind and prep rudder trim tab pocket
|
Details
|
|
|
04-05-2009
|
1.25
|
flox in rudder leading edge close-out
|
Details
|
|
|
04-04-2009
|
1.75
|
trim and prep rudder; remove clecos; release tape
|
Details
|
|
|
04-04-2009
|
0.50
|
split rudder LE close-out
|
Details
|
 |
|
04-04-2009
|
1.00
|
remove peel ply from rudder, pop fairing copy #1;
|
Details
|
|
|
04-04-2009
|
2.25
|
begin sanding of bottom of Horiz. Stab
|
Details
|
 |
|
04-04-2009
|
1.50
|
add 2 BIDs to rudder edges, form extra fairing #1
|
|
|
|
03-29-2009
|
0.50
|
shop clean up
|
|
  |
|
03-29-2009
|
2.00
|
prep and close rudder
|
Details
|
|
|
03-29-2009
|
2.25
|
micro bottom of Horiz. Stab.
|
Details
|
|
|
03-29-2009
|
0.50
|
decide on what to do with with middle rudder hinge
|
Details
|
|
|
03-29-2009
|
0.50
|
adjust Palladin 3 layer stripping tool
|
Details
|
|
|
03-29-2009
|
0.00
|
|
|
|
|
03-22-2009
|
1.25
|
trim VS with longboard; cut hole for conduit to ru
|
|
|
|
03-22-2009
|
0.20
|
noticed middle rudder hinge end is crooked
|
Details
|
|
|
03-22-2009
|
0.10
|
enlarge inside rudder holes; grind 6 BID on bellcr
|
Details
|
 |
|
03-22-2009
|
2.00
|
clay balls to check VS skin fit; check rudder trav
|
Details
|
  |
|
03-22-2009
|
1.75
|
check VS angle, enlarge rudder holes
|
Details
|
|
|
03-09-2009
|
2.00
|
sand HS, HSm back on re-check level and incidence
|
Details
|
|
|
03-09-2009
|
0.50
|
pop bellcrank bolt off; redrill hole
|
Details
|
  |
|
03-09-2009
|
1.25
|
drill rudder tube holes
|
Details
|
  |
|
03-09-2009
|
1.25
|
drill holes for rudder tubes-fit
|
Details
|
|
|
03-08-2009
|
1.75
|
trim & sand VS, clean up fwd VS spar
|
|
  |
|
03-08-2009
|
1.50
|
sand and prep rudder skins
|
Details
|
 |
|
03-08-2009
|
0.50
|
reserach and order crimper and stripper
|
Details
|
  |
|
03-08-2009
|
1.00
|
re-set incidence for HS
|
Details
|
|
|
03-08-2009
|
0.75
|
HS off; fab 2 - .082 shims; bond to HS cradle with
|
|
 |
|
03-08-2009
|
0.10
|
add'l pics after figuring shim needed
|
|
|
|
03-08-2009
|
1.00
|
2 BID to NACA scoop and to LE cut-out to HS
|
|
|
|
03-07-2009
|
0.75
|
install 4 click bond tie wraps fasteners; 2nd grom
|
|
|
|
03-07-2009
|
0.50
|
flox in air scoop/ fwd VS spar
|
|
 |
|
03-07-2009
|
1.50
|
add grommets; figure out BNC connection - add end
|
|
 |
|
03-07-2009
|
0.50
|
add ends to rudder tubes; remove VS and mark for p
|
|
 |
|
02-23-2009
|
0.75
|
stern post; grind seam and clean up hinge holes, t
|
|
  |
|
02-23-2009
|
1.25
|
sand, prep, and flox in extra weight 535 grams + f
|
Details
|
|
|
02-23-2009
|
1.00
|
pop tailight mount off and raise .18"
|
Details
|
|
|
02-23-2009
|
0.50
|
ended up using the hinges from VS
|
Details
|
|
|
02-23-2009
|
0.50
|
continue to balance rudder
|
|
|
|
02-23-2009
|
0.50
|
1st attempt at jig to balance rudder
|
|
|
|
02-22-2009
|
0.25
|
trim VS to marks
|
|
|
|
02-22-2009
|
0.50
|
test fit taillight...need to grind screw heads; mo
|
Details
|
  |
|
02-22-2009
|
2.50
|
fit, trim rudder and vertical stab
|
Details
|
|
|
02-22-2009
|
0.75
|
fit HS, right and left VS
|
Details
|
|
|
02-22-2009
|
2.50
|
continue fitting/grinding VS and rudder
|
Details
|
|
|
02-22-2009
|
0.50
|
|
|
|
|
02-21-2009
|
1.25
|
grind out elev hole; grind/trim bellcrank platfrom
|
Details
|
|
|
02-16-2009
|
0.75
|
rought cut rudder pushrods, flox rod ends; figure
|
Details
|
  |
|
02-16-2009
|
2.25
|
grind, sand and prep bellcrank platform; add 6 BID
|
|
|
|
02-16-2009
|
1.25
|
figure and grind hole for elevator push rod to VS
|
Details
|
|
|
02-16-2009
|
0.50
|
cut elev tube to rough length; clean up rudder bel
|
Details
|
 |
|
02-16-2009
|
1.00
|
add rivnuts and install lower rudder hinge
|
Details
|
|
|
02-15-2009
|
1.00
|
rudder bellcrank
|
|
|
|
02-15-2009
|
0.10
|
GHP working the VS
|
|
 |
|
02-15-2009
|
1.25
|
flox in rudder platform
|
|
|
|
02-15-2009
|
1.00
|
flox in rudder mount and flox NACA drains
|
|
|
|
02-15-2009
|
1.50
|
fit rudder to VS; continued
|
|
|
|
02-15-2009
|
1.25
|
fit and trim rudder to VS
|
Details
|
|
|
02-15-2009
|
1.00
|
cut and fit phenolic for rudder mechanism
|
Details
|
|
|
02-15-2009
|
1.25
|
continue fitting and trimming VS to rudder
|
Details
|
|
|
02-14-2009
|
1.50
|
trim stern post and grind hinge access areas
|
|
|
|
02-14-2009
|
1.25
|
misc. shop and cut left rudder after measure, meas
|
|
  |
|
02-14-2009
|
1.25
|
fit stern post, trim, trim , trim...
|
Details
|
|
|
02-14-2009
|
1.25
|
fit and trim stern post of rudder
|
|
|
|
02-14-2009
|
0.25
|
begin planning/measuring for rudder mount
|
|
  |
|
02-09-2009
|
2.00
|
repair insp. cover nutplate; close out trim tab
|
Details
|
 |
|
02-09-2009
|
1.50
|
more pictures... close out rudder trim tab
|
|
|
|
02-09-2009
|
1.00
|
fit fwd plaenum; grind main air hole and drain hol
|
|
  |
|
02-09-2009
|
1.00
|
cut out trim tab, cleco air plenum, micro trim tab
|
|
|
|
02-09-2009
|
1.50
|
cleco rudders, check plumb, trim taillight; close
|
|
|
|
02-08-2009
|
2.00
|
rudder trim tab
|
Details
|
|
|
02-08-2009
|
1.25
|
rudder trim tab
|
Details
|
|
|
02-01-2009
|
0.25
|
remove peel ply from VS and grind/trim rudder pock
|
|
  |
|
02-01-2009
|
2.00
|
drill for elev. weldment inspection panel
|
|
|
|
02-01-2009
|
2.25
|
1 ah shit (see pic), install all 14 nutplates
|
Details
|
 |
|
01-31-2009
|
0.50
|
pocket for extra weight if needed
|
Details
|
|
|
01-31-2009
|
0.50
|
misc shop and pull parts
|
|
  |
|
01-31-2009
|
2.50
|
fit vertical stabilizer
|
Details
|
|
|
01-31-2009
|
1.25
|
fit tailight and rudder weight in right side of VS
|
Details
|
|
|
01-31-2009
|
1.00
|
elevator weldment inspection plates
|
Details
|
|
|
01-31-2009
|
1.50
|
bond rudder weight and tail light bracket
|
Details
|
|
|
01-31-2009
|
1.00
|
bond in VHF COM antenna
|
Details
|
|
|
01-30-2009
|
1.00
|
misc. rudder
|
Details
|
|
|
01-30-2009
|
1.00
|
level & plumb fuse.
|
Details
|
|
|
01-30-2009
|
1.50
|
figure trim tab; prep and apply close out and spar
|
|
|
|
01-30-2009
|
0.75
|
fabricate and epoxy 2 add'l shims on left HS cradl
|
|
  |
|
01-30-2009
|
1.50
|
design and install conduit for servo and aft light
|
|
 |
|
01-25-2009
|
1.00
|
put fuselage top on; cleco and bolt
|
Details
|
|
|
01-25-2009
|
1.50
|
pre-fit VS
|
Details
|
|
|
01-25-2009
|
1.00
|
Plan antenna; refit HS, add 2 shims to right side
|
Details
|
|
|
01-25-2009
|
1.00
|
mark rudder trim tab, cut hinges; add 4 BID
|
|
  |
|
01-25-2009
|
1.50
|
install rudder trim servo and access panel
|
Details
|
 |
|
01-25-2009
|
1.75
|
fit VS; cut rudder off; add NACA scoop
|
|
|
|
01-25-2009
|
0.75
|
add'l pics
|
|
 |
|
01-24-2009
|
0.50
|
trim fuel tunnel; rivnut fuel selector
|
Details
|
 |
|
01-24-2009
|
1.00
|
prep & epoxy shims for stab cradle
|
Details
|
|
|
01-24-2009
|
2.50
|
fuel tunnel and floorboards
|
Details
|
|
|
01-24-2009
|
0.50
|
add ad'l micro to floorbaord transition
|
|
  |
|
01-18-2009
|
0.10
|
stab fitting - cont'd
|
|
|
|
01-18-2009
|
2.00
|
level fuse, trim supports
|
Details
|
|
|
01-18-2009
|
2.50
|
fit stabilizer; measure, measure, measure
|
Details
|
|
|
01-18-2009
|
0.10
|
final pics of stab set-up
|
Details
|
|
|
01-18-2009
|
0.75
|
fabricate 4 BIDS for fuel hose tunnel
|
|
 |
|
01-18-2009
|
1.00
|
cradle interference with elev. stops
|
Details
|
|
|
01-18-2009
|
1.00
|
3 BID release for fuel tunnel cover
|
Details
|
|
|
01-17-2009
|
0.50
|
install replacement seat slider mechanisms
|
Details
|
|
|
12-28-2008
|
3.50
|
turn fuse; stow left wing; clean shop; fill pump
|
Details
|
|
|
12-28-2008
|
1.00
|
prep floor, release tape for tunnel flange
|
Details
|
 |
|
12-28-2008
|
1.00
|
add vinyl hose to cushion fuel lines through holes
|
|
|
|
12-27-2008
|
2.50
|
trim fuse supports; lower wing
|
Details
|
  |
|
12-27-2008
|
0.50
|
research selector issue on line and in Lancair "go
|
|
  |
|
12-27-2008
|
1.25
|
fit/trim fuel line tunne; study selector attachmen
|
Details
|
|
|
12-27-2008
|
1.00
|
add 2 BID to vertical floorboard supports
|
|
|
|
12-27-2008
|
1.25
|
2 BID top of fuel line tunnel
|
Details
|
 |
|
12-26-2008
|
1.00
|
Trim & prep fuel line tunnel and vert. capstrip
|
|
  |
|
12-26-2008
|
0.25
|
cut lay-ups for vertical floor supports
|
Details
|
 |
|
12-26-2008
|
1.50
|
cleco and bond vertical floorboard supports
|
Details
|
 |
|
12-26-2008
|
1.00
|
add 2 BID to inside of fuel line tunnel
|
Details
|
 |
|
12-22-2008
|
1.75
|
trim fuel line tunnel , fabricate
|
Details
|
|
|
12-22-2008
|
1.25
|
trim aft seat & flanges; grind seat belt holes
|
|
|
|
12-22-2008
|
1.00
|
drill holes & add nutplates for seat
|
|
  |
|
12-22-2008
|
0.50
|
cut inside and outside BIDs for top; misc. shop
|
|
  |
|
12-22-2008
|
1.00
|
1 BID to vertical support capstrip
|
|
 |
|
12-21-2008
|
0.10
|
will need a micro release and micro build up
|
Details
|
|
|
12-21-2008
|
1.75
|
fabricate vertical supports for under floorboards
|
Details
|
|
|
12-21-2008
|
2.00
|
design forward floorboards, cut template
|
|
|
|
12-21-2008
|
2.50
|
design & fabricate fuel line tunnel
|
Details
|
|
|
12-21-2008
|
0.75
|
cut pre peg and fit floorboards
|
|
|
|
12-20-2008
|
1.00
|
micro and 2 BID aft seat flange support
|
|
 |
|
12-20-2008
|
0.10
|
make support for flange; drill seat belt bolt hole
|
|
|
|
12-20-2008
|
1.00
|
figure out floorboards, begin template
|
Details
|
  |
|
12-20-2008
|
1.25
|
aft seat flange support
|
Details
|
 |
|
12-20-2008
|
2.00
|
add'l 4 BID on aft seat bottom
|
Details
|
|
|
12-15-2008
|
0.10
|
ordered IO-550 reman engine from Continental
|
Details
|
  |
|
12-14-2008
|
1.00
|
seat rail template and drill holes in fuse flanges
|
|
 |
|
12-14-2008
|
1.00
|
fit seats, mess with corrosion
|
Details
|
|
|
12-14-2008
|
1.75
|
3 BID to bottom of aft seat bottom
|
|
|
|
12-13-2008
|
2.50
|
trim, prep and bond seat bottom
|
Details
|
|
|
12-13-2008
|
0.50
|
research aft seat flanges....manual is fucked up
|
|
  |
|
12-13-2008
|
1.00
|
epoxy build up strips to spar flange, misc.
|
|
 |
|
12-13-2008
|
1.00
|
cut aft seat bottom and fit
|
|
|
|
12-13-2008
|
2.75
|
aft seat flange - top
|
Details
|
|
|
12-13-2008
|
0.50
|
add 2 BID to errant cut on seat bottom
|
|
 |
|
12-07-2008
|
0.75
|
research gusset removal and seat placement
|
Details
|
  |
|
12-07-2008
|
0.50
|
pull seats parts
|
|
  |
|
12-07-2008
|
0.50
|
prep bulkhead flange to bond strips next week
|
|
  |
|
12-07-2008
|
0.50
|
general, long overdue, shop cleanup
|
|
  |
|
12-07-2008
|
2.00
|
assemble front seats
|
|
|
|
12-07-2008
|
0.25
|
alternate method for seat release
|
Details
|
|
|
12-07-2008
|
1.25
|
aileron bulkhead mistake
|
Details
|
|
|
12-06-2008
|
2.75
|
micro and 2 BID both close out panels
|
|
|
|
12-06-2008
|
1.50
|
finish step and left aileron push rod
|
Details
|
  |
|
12-06-2008
|
2.50
|
fabricate shear close out and aileron close out
|
|
|
|
11-30-2008
|
1.00
|
work on finishing fuel system lines
|
Details
|
|
|
11-30-2008
|
0.50
|
left wing back on
|
Details
|
|
|
11-30-2008
|
1.00
|
fuel hoses
|
Details
|
 |
|
11-30-2008
|
0.50
|
drill hole in step sleeve and make flox shoulder
|
|
|
|
11-23-2008
|
1.50
|
step work
|
Details
|
  |
|
11-23-2008
|
2.50
|
micro prepeg panel 1 of 3 in place
|
|
|
|
11-23-2008
|
1.75
|
micro panels 2 and 3; add 2 BIDs
|
|
|
|
11-23-2008
|
2.00
|
measure for step and cut holes
|
Details
|
|
|
11-23-2008
|
2.00
|
flox step sleeve in place
|
|
|
|
11-23-2008
|
1.00
|
fabricate step panels 2 and 3
|
|
 |
|
11-23-2008
|
0.50
|
add 6 click-bond studs to hold fuel lines
|
Details
|
|
|
11-17-2008
|
1.50
|
more fuel system work
|
|
|
|
11-17-2008
|
0.50
|
level fuse; prep for step installation
|
|
  |
|
11-17-2008
|
1.50
|
finish fuel hoses and fittings
|
|
|
|
11-17-2008
|
1.25
|
bulkhead fitting to gascolator
|
Details
|
|
|
11-15-2008
|
4.00
|
micro belly, access panels, repair leg fairing
|
Details
|
|
|
11-02-2008
|
0.50
|
flox pre-preg in trailing edge of right wing tip
|
|
 |
|
10-27-2008
|
4.00
|
fit & cut wing tip lights
|
Details
|
|
|
10-26-2008
|
1.00
|
install nutplates for light mount
|
|
|
|
10-26-2008
|
1.00
|
grind out mount for strobe and nav lights
|
Details
|
|
|
10-26-2008
|
1.50
|
fit, trim, fit wing tip light mount and lense
|
|
|
|
10-25-2008
|
1.00
|
install nutplates for right wing tip
|
|
  |
|
10-25-2008
|
0.75
|
flox in brass fittings to each NACA scoop
|
|
|
|
10-25-2008
|
0.50
|
figure out new plan for fuel vent
|
Details
|
|
|
10-25-2008
|
0.50
|
drill holes for R tip nutplates
|
|
  |
|
10-25-2008
|
1.00
|
drill hole for vent in NACA scoop in each wing tip
|
|
|
|
10-25-2008
|
0.25
|
cut off AN fittings for fuel vent in wing
|
|
|
|
10-25-2008
|
0.50
|
begin trimming light brackets
|
|
  |
|
10-20-2008
|
1.00
|
install nutplates for access panels
|
|
 |
|
10-20-2008
|
2.25
|
finish fuel and flap access panels
|
Details
|
 |
|
10-19-2008
|
2.00
|
release tape panels and add 4 BID for flange
|
|
|
|
10-19-2008
|
1.75
|
prep and 2 BID left wing end for tip
|
|
 |
|
10-19-2008
|
0.25
|
fool with fuel vent thinking some more
|
|
 |
|
10-19-2008
|
0.50
|
cut fuel and flap access panels
|
|
|
|
10-19-2008
|
0.50
|
cut fuel and flap access panels
|
|
 |
|
10-19-2008
|
0.50
|
cut fuel and flap access panels
|
|
|
|
09-28-2008
|
0.10
|
pics from 9/28 and prior
|
Details
|
|
|
09-28-2008
|
0.10
|
pics from 9/28
|
|
|
|
09-28-2008
|
9.50
|
bodywork fuselage, wing tips, fuel access panels
|
Details
|
|
|
09-28-2008
|
0.10
|
|
Details
|
 |
|
09-15-2008
|
0.50
|
trim left and right wing tips with longboard
|
Details
|
|
|
09-15-2008
|
2.25
|
sand and apply 2nd pass of micro on fairings
|
|
|
|
09-15-2008
|
1.00
|
remove wheel pants and trim - no pics
|
|
  |
|
09-15-2008
|
1.25
|
add'l and final fitting of aileron into wing pocke
|
Details
|
 |
|
09-14-2008
|
1.75
|
micro bottom of fuselage & wing/leg fairings
|
Details
|
|
|
09-14-2008
|
2.25
|
fit left aileron
|
Details
|
|
|
09-14-2008
|
1.00
|
decore, prep and 2 BID left top wing skin core
|
|
|
|
09-14-2008
|
2.00
|
decore right side top skin; prep and 2 BID
|
Details
|
|
|
09-13-2008
|
2.50
|
sand lower wing and leg fairings; prep for 1st bod
|
|
  |
|
09-07-2008
|
1.00
|
sand repaired
|
Details
|
|
|
09-07-2008
|
0.50
|
organize new bolt and nut, etc trays, label
|
|
  |
|
09-07-2008
|
1.25
|
fit left aileron with weights attached
|
Details
|
 |
|
09-07-2008
|
1.50
|
dril and attach lead aileron weights
|
Details
|
|
|
09-07-2008
|
2.25
|
apply 2 BID to TE of both leg fairings
|
|
|
|
09-07-2008
|
1.50
|
add add'l 2 BID to right wing fairing over foam
|
|
 |
|
08-25-2008
|
0.75
|
whoops...hole forward and s/b aft
|
Details
|
|
|
08-25-2008
|
1.75
|
trim and fit fairings; add access holes
|
Details
|
|
|
08-25-2008
|
1.00
|
shape foam to build out right wing fairing
|
Details
|
|
|
08-25-2008
|
0.75
|
flox foam to right fairing to build up gap
|
|
 |
|
08-24-2008
|
0.10
|
close up after balancing
|
|
|
|
08-24-2008
|
0.50
|
clean shop and think through foam for fairing
|
|
  |
|
08-24-2008
|
1.25
|
BIDs to right side fairing
|
Details
|
 |
|
08-24-2008
|
2.00
|
balance ailerons; mark for holes
|
Details
|
|
|
08-24-2008
|
3.00
|
add BIDS to wing fairings
|
Details
|
|
|
08-23-2008
|
3.00
|
pull access panels and prep wing fairings
|
Details
|
|
|
08-18-2008
|
3.50
|
trim upper fairing access panels
|
Details
|
|
|
08-17-2008
|
1.50
|
nutplates to top panel; countersink
|
Details
|
|
|
08-17-2008
|
1.50
|
flox left side; used temp. screws to get a good al
|
|
|
|
08-17-2008
|
2.75
|
add nutplates to left fairing, flox
|
Details
|
|
|
08-10-2008
|
1.00
|
right side...
|
|
 |
|
08-10-2008
|
1.50
|
prepare right side fuselage inner panel cover
|
|
  |
|
08-10-2008
|
2.00
|
jig for panel; release tape top accerss panel
|
|
|
|
08-10-2008
|
1.50
|
fit and trim inside fuse fairings
|
|
|
|
08-09-2008
|
0.75
|
turn threads on perma-grit countersink
|
Details
|
|
|
08-09-2008
|
1.00
|
flox both outside fusleage fairings in place
|
|
|
|
08-09-2008
|
0.20
|
fix threads in both axles....mainly left.
|
Details
|
 |
|
08-09-2008
|
0.75
|
fit and trim both outside fuselage fairings
|
|
|
|
08-09-2008
|
0.25
|
fairing interferes with fuel access panel
|
Details
|
|
|
08-03-2008
|
1.00
|
Prepare to flip fuselage over
|
Details
|
|
|
08-03-2008
|
0.10
|
Flipped over
|
|
|
|
08-03-2008
|
0.75
|
fit gear to fuselage fairings
|
|
|
|
08-03-2008
|
1.00
|
fit fairing...mark for trimming
|
Details
|
|
|
08-03-2008
|
0.75
|
cleco gear-fuselage fairing in place
|
|
|
|
08-03-2008
|
0.10
|
both sides marked and cleco'd - will trim cut next
|
|
 |
|
07-27-2008
|
1.50
|
run lines and connect Russell fittings
|
|
|
|
07-27-2008
|
1.50
|
route stainless steel supply and return lines
|
|
|
|
07-27-2008
|
1.00
|
new hoses and fittings
|
Details
|
|
|
07-27-2008
|
0.50
|
mount fuel pump bracket
|
|
|
|
07-27-2008
|
1.00
|
micro all new openings
|
|
|
|
07-27-2008
|
0.75
|
grind holes to fuel selector
|
|
 |
|
07-27-2008
|
0.25
|
add fittings to fuel selector
|
Details
|
 |
|
07-27-2008
|
1.00
|
|
Details
|
|
|
07-21-2008
|
0.75
|
trim wheel pants and trim excess flox on build-up
|
|
  |
|
07-21-2008
|
1.00
|
pull step parts and study manual
|
|
  |
|
07-21-2008
|
0.25
|
pull off aileron controls in prep for flipping fus
|
|
  |
|
07-21-2008
|
1.50
|
prep & micro both wing fairings in prep for 2 BID
|
|
|
|
07-21-2008
|
0.75
|
grind fwd right buildup in prep to add material
|
Details
|
|
|
07-21-2008
|
0.50
|
countersink wheel pant holes
|
|
  |
|
07-21-2008
|
1.50
|
add nutplates to all wheel pant brackets
|
|
|
|
07-21-2008
|
0.25
|
add 2 BID to fuel selector pad, right side
|
|
  |
|
07-21-2008
|
0.10
|
|
Details
|
|
|
07-20-2008
|
0.75
|
redo right side forward flox realese
|
Details
|
  |
|
07-20-2008
|
0.50
|
install fuel selector to pad
|
|
|
|
07-20-2008
|
0.75
|
flox release to forward brackets
|
Details
|
 |
|
07-20-2008
|
0.50
|
dril holes into aft wheel pant bracket
|
|
|
|
07-19-2008
|
0.10
|
took time out to knock off a ground hog
|
|
|
|
07-19-2008
|
3.00
|
flox release on aft brackets on both sides
|
Details
|
|
|
07-19-2008
|
1.00
|
add nutplates for leg fairing to wheel pant
|
Details
|
|
|
07-14-2008
|
0.50
|
micro and add 2 BID to base for fuel selector
|
|
 |
|
07-14-2008
|
2.00
|
messed up fuel selector base...re-did
|
Details
|
|
|
07-14-2008
|
0.25
|
further documenting fuel system mis-specification
|
Details
|
|
|
07-14-2008
|
4.00
|
fit both wheel pants to leg fairing...lots of fit
|
Details
|
|
|
07-14-2008
|
1.50
|
finished up securing wall cut-out to accomodate bo
|
Details
|
  |
|
07-14-2008
|
0.10
|
|
|
 |
|
07-14-2008
|
0.10
|
|
|
|
|
07-13-2008
|
2.50
|
pull fuel system parts and try to figure out manua
|
Details
|
 |
|
07-13-2008
|
1.50
|
prepare mounting plate for fuel selector
|
Details
|
|
|
07-13-2008
|
0.50
|
info on fuel return line and fittings
|
Details
|
|
|
06-29-2008
|
5.00
|
rearrange shop; cut hole in garage wall
|
Details
|
|
|
06-29-2008
|
0.10
|
opening framed up
|
|
|
|
06-29-2008
|
0.50
|
crawl under fuselage..verify BIDs, remove peel-ply
|
|
  |
|
06-23-2008
|
0.50
|
slide left gear fairing on left main after removin
|
|
|
|
06-23-2008
|
1.00
|
more fit, grind, fit, grind left wheel pant to lef
|
|
|
|
06-23-2008
|
0.50
|
install and 2 BID washer inside left pant
|
|
  |
|
06-23-2008
|
2.00
|
fit, drill, fit right pant
|
|
|
|
06-23-2008
|
1.50
|
fit, drill, fit left wheel pant
|
Details
|
|
|
06-23-2008
|
1.00
|
drill, countersink and add nutplates to all pant b
|
|
|
|
06-23-2008
|
0.50
|
add washer & 2 BID to right pant
|
|
|
|
06-22-2008
|
1.50
|
prep aileron for balance
|
Details
|
 |
|
06-22-2008
|
2.00
|
KCXY pilot gang came up for a tour
|
Details
|
  |
|
06-22-2008
|
1.00
|
grind groove and try to balance right aileron
|
Details
|
|
|
06-22-2008
|
1.50
|
attemtp left aileron balance (cont'd)
|
Details
|
|
|
06-21-2008
|
1.25
|
try to fish servo wires through aileron
|
Details
|
 |
|
06-21-2008
|
0.50
|
super-glue conduit in
|
Details
|
|
|
06-21-2008
|
0.25
|
sand micro on left wing fairing
|
Details
|
  |
|
06-21-2008
|
0.10
|
had a visitor today...3 foot black snake
|
Details
|
|
|
06-21-2008
|
1.25
|
flatten all 14 lead rods for aileron balancing
|
Details
|
  |
|
06-21-2008
|
0.50
|
fit and trim roll servo to hole in aileron
|
|
  |
|
06-15-2008
|
1.00
|
trim access panels
|
|
|
|
06-15-2008
|
1.50
|
research and prep for aileron balancing
|
Details
|
|
|
06-15-2008
|
1.50
|
micro release both wheel pants...not hard, but tim
|
|
|
|
06-15-2008
|
0.75
|
install nutplates on right wheel pant
|
|
|
|
06-15-2008
|
0.75
|
improvised pliers for squeezing rivets
|
Details
|
|
|
06-15-2008
|
0.50
|
flox right leg fairing; used a bit more flox this
|
|
 |
|
06-15-2008
|
1.00
|
fit and trim access panel to right wheel pant
|
Details
|
|
|
06-13-2008
|
1.25
|
prep, fit and figure contour of leg fairing
|
|
|
|
06-13-2008
|
0.50
|
misc shop; received BO'd nose gear strut...looks g
|
Details
|
  |
|
06-13-2008
|
1.25
|
install 6 nutplates on left wheel pant
|
Details
|
  |
|
06-13-2008
|
1.75
|
flox left left fairing after a lot of trial and fi
|
Details
|
|
|
06-13-2008
|
1.75
|
finish brake lines; insulate, tie-strap
|
|
|
|
06-13-2008
|
1.00
|
finish brake lines
|
Details
|
|
|
06-13-2008
|
1.50
|
cut and trim brake access panel to both wheel pant
|
|
|
|
06-09-2008
|
2.00
|
repair left wing fairing damaged removing wing las
|
Details
|
|
|
06-09-2008
|
2.50
|
fabricated and installed alum. brake lines
|
Details
|
|
|
06-09-2008
|
0.50
|
clean up shop and put lots of tools away
|
|
  |
|
06-09-2008
|
1.00
|
brakes hoses all run
|
|
|
|
06-08-2008
|
0.10
|
width at front of tire 102 1/8"....56"+ at center
|
|
 |
|
06-08-2008
|
1.00
|
set up toe in jig and measure, measure, measure
|
|
|
|
06-08-2008
|
0.50
|
pull rest of brake parts and review manual
|
|
  |
|
06-08-2008
|
1.00
|
more jig work
|
Details
|
|
|
06-08-2008
|
2.50
|
install brake calipers on each wheel
|
|
|
|
06-08-2008
|
0.75
|
drill 4 - 1/4" holes in gear legs after setting pr
|
Details
|
  |
|
06-08-2008
|
0.50
|
braided hoses installed to pilot side pedals
|
Details
|
|
|
06-08-2008
|
0.50
|
|
|
  |
|
06-08-2008
|
0.50
|
|
|
|
|
06-08-2008
|
0.50
|
|
|
  |
|
06-08-2008
|
0.50
|
|
Details
|
|
|
06-02-2008
|
0.10
|
torqued wheel bolts
|
Details
|
 |
|
06-02-2008
|
0.25
|
safety wiring brake bracket AN5 drilled head bolts
|
Details
|
|
|
06-02-2008
|
1.00
|
remove left wing and position fuselage higher to m
|
Details
|
  |
|
06-02-2008
|
0.10
|
my faithful helper, Maggie
|
|
|
|
06-02-2008
|
1.00
|
move rudder pedals forward .7 inch
|
Details
|
|
|
06-02-2008
|
1.00
|
Mounted gear legs to fuselage
|
Details
|
|
|
06-02-2008
|
0.25
|
Is this "cant" on the camber correct?
|
Details
|
|
|
06-02-2008
|
0.50
|
installed flap motor
|
Details
|
|
|
06-02-2008
|
0.25
|
gear legs ready to mount
|
Details
|
 |
|
06-02-2008
|
0.10
|
Cleveland brake calipers
|
|
 |
|
06-02-2008
|
5.00
|
assemble main gear wheels, mount tires; attach axl
|
Details
|
|
|
06-02-2008
|
0.10
|
aft views with gear on
|
|
|
|
05-19-2008
|
0.50
|
test fit right main gear fairing
|
Details
|
  |
|
05-19-2008
|
0.50
|
review quote and lead time from Performance Engine
|
Details
|
  |
|
05-19-2008
|
0.75
|
figure out and fabricate center shim
|
|
|
|
05-19-2008
|
1.75
|
drill and pot bolts for flap motor; add 2 BID on f
|
|
|
|
05-19-2008
|
1.50
|
build rudder pedals; too much paint on tubes
|
|
|
|
05-19-2008
|
1.00
|
both tubes bolted in place
|
Details
|
 |
|
05-19-2008
|
1.00
|
aft (right) pedal tube clamped in place
|
Details
|
|
|
05-18-2008
|
2.25
|
trim fairings, build flap control rods; drill fwd
|
|
|
|
05-18-2008
|
1.00
|
torque flap tube and support bolts
|
Details
|
 |
|
05-18-2008
|
2.50
|
recut inside BIDS (measured right and cut wrong fo
|
|
  |
|
05-18-2008
|
1.50
|
install delrin flap stops
|
Details
|
|
|
05-18-2008
|
0.50
|
finish up AC, rehang lights. etc.
|
|
  |
|
05-18-2008
|
0.10
|
drill forward spar hole to correct size; both side
|
|
 |
|
05-18-2008
|
0.50
|
decore and micro fuse supports that were opened up
|
|
|
|
05-17-2008
|
8.00
|
install A/C
|
Details
|
|
|
05-12-2008
|
0.75
|
general clean-up; fill epoxy pump; clean table; pu
|
|
  |
|
05-12-2008
|
1.50
|
flap controls
|
Details
|
 |
|
05-12-2008
|
0.50
|
figure out manuals and plan fo attack
|
Details
|
  |
|
05-12-2008
|
0.10
|
drawings instead of patterns of the manual calls f
|
|
|
|
05-12-2008
|
0.10
|
cut all BIDS for both sides at once
|
|
 |
|
05-12-2008
|
2.50
|
add 16 BID to right side of aft seat support
|
|
 |
|
05-12-2008
|
1.50
|
ad micro due to large gap between right seat suppo
|
|
|
|
05-11-2008
|
1.00
|
more hole alignment
|
|
|
|
05-11-2008
|
1.00
|
install supports and guides - 4 of them
|
Details
|
|
|
05-11-2008
|
2.00
|
Flap torque tube
|
|
|
|
05-11-2008
|
2.00
|
enlarge hole to 1 1/2"
|
|
|
|
05-11-2008
|
1.00
|
assemble flap torque tube
|
Details
|
|
|
05-11-2008
|
1.25
|
align holes
|
Details
|
|
|
05-11-2008
|
1.25
|
|
|
|
|
05-10-2008
|
1.50
|
add 2 BID to left wing fairing; plan flap controls
|
Details
|
  |
|
04-28-2008
|
1.75
|
reposition wing and fuselage; cut glas for remaini
|
|
 |
|
04-28-2008
|
2.00
|
fit and trim top fairing and rib
|
Details
|
  |
|
04-28-2008
|
2.50
|
bond top fairing; flox on fairing/fuselage and mic
|
Details
|
|
|
04-28-2008
|
2.00
|
apply BIDs to fairing rib and web; 10 BIDs in tota
|
Details
|
|
|
04-27-2008
|
1.00
|
pull flap parts while waiting for micro to set up
|
|
  |
|
04-27-2008
|
2.50
|
micro wing left rib, trim add phenolic and final 2
|
|
|
|
04-27-2008
|
1.75
|
bond left fairing rib/web to bottom fairing and fu
|
|
|
|
04-26-2008
|
0.75
|
measure I/B aileron tube, rivet rod end
|
Details
|
  |
|
04-26-2008
|
1.75
|
Fit and trim fairing rib to left side; add 2 BID t
|
Details
|
  |
|
04-26-2008
|
1.00
|
finish running HVAC ducts downstairs
|
Details
|
  |
|
04-21-2008
|
0.25
|
full garb - working on fairing rib
|
Details
|
 |
|
04-21-2008
|
1.00
|
cleco left fairing in prep for bonding
|
Details
|
 |
|
04-21-2008
|
3.00
|
build and fit and fit and fit templates for web an
|
Details
|
 |
|
04-21-2008
|
1.00
|
bond left bottom wing fairing with flox
|
|
|
|
04-21-2008
|
2.00
|
add webs to rib - micro
|
|
|
|
04-07-2008
|
1.00
|
trim cover
|
Details
|
|
|
04-07-2008
|
0.25
|
Not in the manual, but..........
|
Details
|
|
|
04-07-2008
|
2.25
|
measure and build aileron tubes for left wing
|
Details
|
  |
|
04-07-2008
|
0.75
|
install nutplates with rivets - 6 places
|
Details
|
|
|
04-07-2008
|
2.75
|
fit & trim left side wing fairings, cleco in
|
Details
|
|
|
04-06-2008
|
1.00
|
pull parts for left wing aileron controls; begin f
|
|
  |
|
04-06-2008
|
0.50
|
misc. shop stuff
|
|
  |
|
04-06-2008
|
2.00
|
install elev. tunnel top
|
Details
|
|
|
04-06-2008
|
2.00
|
fit, align and cleco top left wing fairing
|
Details
|
|
|
04-06-2008
|
2.00
|
fabricate top for elevator pushrod tube cover
|
Details
|
  |
|
04-05-2008
|
1.50
|
pot in left elevator torque tube enclosure
|
|
|
|
04-05-2008
|
2.00
|
Installed new air compressor
|
Details
|
|
|
04-05-2008
|
1.50
|
install left side flap brackets; hang flap
|
Details
|
|
|
04-05-2008
|
1.50
|
add 2 BIDs all around and micro'd cored out top
|
|
  |
|
03-30-2008
|
7.00
|
Elevator tube cover
|
Details
|
|
|
03-30-2008
|
1.50
|
clean up and misc.
|
Details
|
  |
|
03-29-2008
|
0.50
|
trim clearance holes for elevator pushtubes
|
|
  |
|
03-29-2008
|
2.00
|
moved parts around...right to left
|
Details
|
|
|
03-29-2008
|
2.00
|
measure and fabricate elevator torque tube to idle
|
|
|
|
03-29-2008
|
1.00
|
make pattern for elevator tube enclosure
|
|
|
|
03-29-2008
|
1.50
|
fabricate access panel in right fairing
|
|
|
|
03-29-2008
|
2.00
|
complete elevator push tube and inboard aileron pu
|
|
  |
|
03-29-2008
|
0.10
|
Another shot of left wing now mated to fuselage
|
|
 |
|
03-28-2008
|
0.10
|
only 1 spot to enlarge - Right side
|
Details
|
 |
|
03-28-2008
|
1.00
|
installed elevator push tubes
|
|
|
|
03-28-2008
|
1.00
|
install elevator torque tube
|
Details
|
|
|
03-28-2008
|
2.00
|
fairing access panel and BIDs
|
Details
|
|
|
03-28-2008
|
1.75
|
fabricate elevator push tubes
|
|
|
|
03-28-2008
|
2.00
|
cut bulkhead supports for elevator pushtubes
|
Details
|
|
|
03-23-2008
|
6.00
|
bond wing fairing web and ribs
|
Details
|
|
|
03-23-2008
|
0.50
|
add phenolic for flap control; add 4 BID over top
|
|
|
|
03-22-2008
|
0.75
|
rivet elevator idler
|
|
|
|
03-22-2008
|
3.75
|
rib and webs for right wing fairing
|
Details
|
|
|
03-22-2008
|
1.00
|
research elevator controls and build elev. idler
|
Details
|
|
|
03-22-2008
|
1.00
|
prep fairing - will bond in tomorrow
|
Details
|
|
|
03-22-2008
|
0.50
|
install elevator idler assembly aft of FS 185 in f
|
Details
|
|
|
03-10-2008
|
2.00
|
make templates for fairing ribs and webs - right s
|
|
|
|
03-10-2008
|
2.00
|
fitted parts to fuselage
|
|
|
|
03-10-2008
|
1.00
|
finish inboard portion of aileron push tubes
|
|
|
|
03-10-2008
|
1.50
|
de-core ribs and webs
|
|
|
|
03-10-2008
|
2.00
|
cut pre-peg
|
|
|
|
03-09-2008
|
4.00
|
prep and install right side wing fairings
|
|
|
|
03-09-2008
|
0.50
|
outboard aileron tube; ready to drill
|
|
 |
|
03-09-2008
|
1.00
|
Lynn and I removed right wing to access push tubes
|
|
 |
|
03-09-2008
|
1.00
|
fabricate outboard aileron tube, right side
|
|
|
|
03-09-2008
|
1.50
|
fabricate interior aileron bellcrank tubes
|
|
 |
|
03-08-2008
|
1.00
|
made another pass at fitting right wing fairing
|
|
|
|
03-08-2008
|
0.10
|
installed control sticks to aileron torque tube
|
Details
|
|
|
03-08-2008
|
2.00
|
install flap brackets
|
Details
|
|
|
03-08-2008
|
3.00
|
hang right alieron
|
Details
|
|
|
03-08-2008
|
1.00
|
fabricate outboard aileron push tubes
|
|
|
|
03-08-2008
|
1.00
|
aileron bellcrank in wing after push rod installat
|
|
|
|
02-25-2008
|
1.50
|
trim lines for 1st pass cutting fairings
|
Details
|
|
|
02-25-2008
|
2.00
|
test fitting top and bottom wing fairing - right s
|
|
|
|
02-25-2008
|
1.00
|
Remove incorrect 4080 part-manual wrong
|
Details
|
|
|
02-25-2008
|
2.00
|
re-install correct fwd aileron support #1105
|
Details
|
|
|
02-25-2008
|
0.50
|
added end to long aileron push tube; drilled holes
|
|
  |
|
02-24-2008
|
2.50
|
re-engineer forward support #4080
|
Details
|
|
|
02-24-2008
|
1.50
|
Grind areas for aileron clearance
|
Details
|
|
|
02-24-2008
|
2.00
|
epoxy/micro forward supports
|
Details
|
|
|
02-24-2008
|
2.00
|
drill access holes for aileron pushrods
|
Details
|
|
|
02-23-2008
|
0.20
|
leveled up fuselage with right wing on
|
Details
|
|
|
02-23-2008
|
0.50
|
Lay out holes for aileron tube
|
Details
|
 |
|
02-23-2008
|
6.50
|
install aileron forward supports
|
Details
|
|
|
02-17-2008
|
2.00
|
hang left wing, mate right wing
|
Details
|
|
|
02-17-2008
|
5.50
|
apply 9 BIDs for aft seat belt
|
|
|
|
02-17-2008
|
1.00
|
apply 5 BID to both aileron front supports
|
|
|
|
02-16-2008
|
1.50
|
set up epoxy pump; level fuse
|
Details
|
|
|
02-16-2008
|
1.00
|
floxed in hard points for aft seat belt
|
Details
|
 |
|
02-16-2008
|
0.50
|
|
Details
|
|
|
02-15-2008
|
3.50
|
Sorted aileron control parts; worked on Fwd ailero
|
Details
|
|
|
02-15-2008
|
1.50
|
Cut out core for aft seat points hard points
|
|
|
|
02-15-2008
|
1.00
|
cut all BIDs for aileron support and seat belt har
|
Details
|
 |
|
02-10-2008
|
4.00
|
Organized and stored parts
|
Details
|
|
|
02-10-2008
|
0.50
|
Laid out hard points for aft seats belts, cut phen
|
Details
|
  |
|
02-09-2008
|
5.00
|
Moved kit from Capital City to Porter's Ridge
|
Details
|
|
|
02-05-2008
|
1.00
|
Unload trailer from Partain - finally
|
Details
|
|
|
02-05-2008
|
0.50
|
Most of the kit in the hangar...wings set on horse
|
|
|
|
01-25-2008
|
0.10
|
Kit finally picked up
|
Details
|
  |
|
01-06-2008
|
0.10
|
this will be my building home
|
Details
|
|
|
01-06-2008
|
3.00
|
finish up getting workshop ready
|
Details
|
|
|
01-05-2008
|
3.00
|
Build Fuse cradles and misc. workshop - while wait
|
Details
|
|
|
12-30-2007
|
8.00
|
Finsh set up of shop
|
Details
|
  |
|
12-23-2007
|
3.00
|
continue set up of shop; build engine stand to tur
|
Details
|
  |
|
12-21-2007
|
1.00
|
Ready to BID inside of windows - 2 BID
|
|
|
|
12-21-2007
|
1.00
|
prep elevator; enlarge acces to bolts stab/elevato
|
|
|
|
12-21-2007
|
6.00
|
fitting and setting elevator
|
|
|
|
12-21-2007
|
0.10
|
Bob Carter's favorite place - Timber Inn, Route 97
|
Details
|
 |
|
12-21-2007
|
1.00
|
add phenolic block for up and down elevator travel
|
|
|
|
12-21-2007
|
1.00
|
add phelonic block for elevator stops
|
|
|
|
12-21-2007
|
6.00
|
add 2 BID around all windows
|
|
 |
|
12-20-2007
|
3.00
|
work on wing tips until top fuselage can be lifted
|
Details
|
|
|
12-20-2007
|
0.10
|
scope out dimensions for fusleage cradle that will
|
Details
|
|
|
12-20-2007
|
0.10
|
pix after door bond
|
Details
|
|
|
12-20-2007
|
0.10
|
more after bonding door pics
|
|
|
|
12-20-2007
|
2.00
|
finish up elevator BIDs
|
|
|
|
12-20-2007
|
3.00
|
bond in door
|
|
 |
|
12-19-2007
|
3.00
|
Micro around windows add 4" wide 4 BID around wind
|
Details
|
|
|
12-19-2007
|
4.00
|
fit door frame and door
|
Details
|
|
|
12-19-2007
|
0.50
|
door seal pump motor
|
Details
|
|
|
12-19-2007
|
0.50
|
Door is fitted,ready to prep and add BIDs
|
Details
|
|
|
12-18-2007
|
1.00
|
prep windshield for bonding
|
Details
|
|
|
12-18-2007
|
4.00
|
bond in windows and windshield
|
Details
|
|
|
12-18-2007
|
2.50
|
apply 2 BID to leading edge of Horiz Stab
|
Details
|
|
|
12-18-2007
|
2.00
|
add 2 BID to elevators' leading edges
|
|
|
|
12-17-2007
|
2.00
|
Trim right side of upper fuselage
|
Details
|
|
|
12-17-2007
|
1.00
|
Stabilizer ready for final 2 BID
|
Details
|
 |
|
12-17-2007
|
2.00
|
Screwed up window application
|
Details
|
|
|
12-17-2007
|
1.00
|
Sand and prep fuselage for bonding of windows & w/
|
Details
|
|
|
12-17-2007
|
1.00
|
Resulting fix to elevator
|
Details
|
|
|
12-17-2007
|
1.00
|
repair some bubbles in in LW flap trailing edge.
|
Details
|
|
|
12-17-2007
|
2.00
|
Prep 2nd set of windows for bonding
|
Details
|
 |
|
12-17-2007
|
0.10
|
Fuselage mated after trimming right side to acheiv
|
Details
|
 |
|
12-17-2007
|
0.50
|
|
Details
|
  |
|
12-16-2007
|
0.10
|
Old Columbia plant in Bend OR, now ownes by Cessna
|
Details
|
|
|
12-14-2007
|
80.00
|
Working assitant during builder assist at Lancair
|
|
  |
|
12-14-2007
|
1.00
|
Sand window openings; add 45 degree bias
|
|
  |
|
12-14-2007
|
2.00
|
prep and close Horizibtal Stabilator
|
|
|
|
12-14-2007
|
4.00
|
Left elevator mistake
|
Details
|
|
|
12-14-2007
|
4.00
|
add micro fillet to trailing edges; add 2 bid
|
|
|
|
12-13-2007
|
2.00
|
pressure test fuel tanks in RW
|
Details
|
|
|
12-13-2007
|
2.00
|
Prep stab for closing tomorrow
|
Details
|
 |
|
12-13-2007
|
1.00
|
Prep and square window openings
|
Details
|
|
|
12-13-2007
|
2.00
|
Prep and close elevators
|
|
|
|
12-13-2007
|
2.00
|
Close elevators
|
|
|
|
12-12-2007
|
8.00
|
prep Horiz Stab and elevators
|
|
|
|
12-12-2007
|
6.00
|
Prep and close right wing
|
|
|
|
12-12-2007
|
0.50
|
moving fuselage over from prep shop to main build
|
|
|
|
12-12-2007
|
0.10
|
more scenery pics
|
|
|
|
12-12-2007
|
0.10
|
more pics - Madras
|
|
|
|
12-12-2007
|
1.50
|
demo flight in N407L
|
Details
|
|
|
12-11-2007
|
4.00
|
prep RW - top
|
Details
|
|
|
12-11-2007
|
4.00
|
prep RW - bottom skin, COM antenna & AOA detail
|
Details
|
|
|
12-11-2007
|
1.00
|
Inventory parts with Tory
|
Details
|
  |
|
12-11-2007
|
7.00
|
close out Left wing
|
Details
|
|
|
12-10-2007
|
14.00
|
Day #1 Builder Assist - Left wing
|
Details
|
|
|
12-10-2007
|
2.00
|
Day #1 - Sanded skin, spars, and caps for Stab
|
Details
|
  |
|
12-07-2007
|
2.00
|
add 2 BID to LW joggle
|
|
 |
|
08-14-2007
|
1.00
|
ES Kit ordered
|
Details
|
|