KitLog pro

Powered By Kitlog Pro v2.0

Michael Heit Excalibur Build
Work Logs Found: 45
Category Work Time: 188 Hours
 Date
Hours
Work Log Summary

Details

 01-11-2009
2.00
Inventory of fuselage kit
Details
       

 01-11-2009
5.00
Arrival & unpacking of fuselage
Details
       

 09-30-2008
1.00
When friends come calling ....
Details
       

 09-30-2008
1.00
Building Wings part 7

 09-30-2008
1.00
Building wings part 6
Details
       

 09-30-2008
5.00
Building wings part 5
Details
       

 09-29-2008
4.00
Building wings part 4
Details
     

 09-28-2008
2.50
Building wings part 3
Details
       

 09-27-2008
3.00
Building wings part 2
Details
       

 09-26-2008
1.00
Arrival of wing kit part 1
Details
       

 09-19-2008
0.50
Calibration of Irons.
Details
       

 09-19-2008
2.50
CALIBRATION OF IRONS FOR COVERING
Details
       

 09-19-2008
0.50
Calibrating Irons with Digital Thermometer
Details
       

 09-04-2008
1.00
Elevator Assembly
Details
       

 09-04-2008
1.00
Assemble elevator hinges
Details
       

 09-01-2008
3.00
Assemble Elevators
Details
       

 08-29-2008
2.00
Inventory Tail Kit
Details
       

 03-11-2006
4.00
INSTALL SIDE BUSS PANEL
Details
       

 03-11-2006
4.00
FABRICATE & INSTALL SIDE PANEL
Details
       

 03-04-2006
8.00
Engine electrical
Details
       

 02-25-2006
5.00
MOVE TO NEW SHOP
Details
       

 12-26-2005
2.00
Install Engine Harness Connectors
Details
       

 12-26-2005
1.00
Install electrical harness standoff
Details
       

 12-26-2005
8.00
Install CHT / EGT Connectors
Details
       

 12-21-2005
6.50
INSTALL ELT / EGT WIRING / PITOT TUBE
Details
       

 12-20-2005
1.00
Rear control stick mod
Details
       

 12-20-2005
12.50
Install cockpit heater system
Details
       

 12-20-2005
1.00
Fabricate rear seat bracket
Details
       

 12-19-2005
5.50
Cockpit Heater System
Details
       

 12-08-2005
12.50
Complete Instrument Panel Work
Details
       

 12-06-2005
12.50
Install Windscreen
Details
       

 12-05-2005
12.50
Modify rear control stick
Details
       

 12-03-2005
8.00
FABRICATE REAR DECK PLATE
Details
       

 12-02-2005
2.50
Fabricate access door trim brackets
Details
       

 12-02-2005
8.00
Build Access Doors
Details
       

 11-22-2005
4.50
Modify Airframe
Details
       

 11-10-2005
6.50
Complete Cannon Plug Installation
Details
       

 11-09-2005
5.50
Install Cannon Plugs
Details
       

 11-09-2005
10.50
Completed panel wiring
Details
       

 11-08-2005
2.00
Part Six Wiring of Instrument Panel
Details
       

 11-07-2005
1.00
Part Two Wiring of Instrument Panel
Details
       

 11-07-2005
1.00
Part Three Wiring of Instrument Panel
Details
       

 11-07-2005
3.50
Part One Wiring of Instrument Panel
Details
       

 11-07-2005
1.00
Part Four Wiring of Instrument Panel
Details
       

 11-07-2005
1.50
Part Five Wiring of Instrument Panel
Details
       










Copyright © 2001-2025 Matronics. All Rights Reserved.