KitLog pro

Powered By Kitlog Pro v2.0

Jims Web Site
Work Logs Found: 400
Category Work Time: 1075 Hours
 Date
Hours
Work Log Summary

Details

 07-20-2011
2.00
Sand and prep right HS cap
Details

 07-18-2011
2.00
Cut and fit right HS cap.
Details

 07-09-2011
3.00
Sand and prep left HS cap
Details

 07-05-2011
3.00
Cut and fit left HS cap
Details

 06-29-2011
2.00
Finish left elevator tip
Details

 06-14-2011
2.50
Start left elevator tip
Details

 05-24-2011
2.00
Finish right elevator tip
Details

 05-03-2011
2.50
Start right elevator tip
Details

 05-01-2011
4.00
Mount VS & rudder
Details
       

 04-27-2011
2.00
Finish top cap
Details
       

 04-20-2011
3.00
Cut antenna opening
Details
       

 04-12-2011
2.00
Cut VS top cap
Details

 04-09-2011
4.00
Fabricate antenna mount
Details
       

 04-06-2011
4.00
Begin vertical stabilizer top cap
Details

 04-04-2011
2.00
Finish top rudder cap
Details
     

 04-02-2011
3.00
Begin top rudder cap
Details

 04-01-2011
1.50
Rework lower rudder cap
Details
     

 03-31-2011
1.50
Rudder cap install
Details

 03-28-2011
3.00
Mount lower rudder cap
Details
       

 03-27-2011
2.00
Trim rudder lower cap
Details

 03-20-2011
2.00
Mount trim motor in elevator
Details
       

 03-07-2011
2.00
Cut hole for connector
Details
       

 03-05-2011
1.50
Build pitch trim and autopilot harness
Details
     

 02-24-2011
4.00
Draw wiring diagrams
Details
       

 02-21-2011
2.00
Remove VS and drill for trim wires
Details
       

 02-05-2011
3.50
Fix VS and rudder
Details
       

 01-30-2011
1.50
Mock up VS
Details
       

 01-30-2011
3.00
Install push rods
Details
       

 01-27-2011
1.00
Mount elevators to HS
Details
       

 01-24-2011
1.50
Drill HS to fuselage.
Details
       

 01-20-2011
1.00
Set up horizontal stabilizer
Details

 01-17-2011
1.50
Fabricate fuel vent pipes.
Details
       

 01-09-2011
2.50
Install fuel lines to selector valve
Details
       

 01-06-2011
1.50
Mount fuel tank brackets
Details
       

 12-16-2010
2.50
set flap travel and ailerons
Details
       

 12-06-2010
2.50
Finish flap holes
Details
       

 11-29-2010
2.00
Instal flaps
Details
       

 11-28-2010
3.00
Install ailerons and control rods
Details
       

 11-22-2010
1.50
Install left aileron push tube
Details

 11-18-2010
2.00
Drill lower skin to fuselage holes.
Details
       

 11-15-2010
2.00
Drill rear spar holes
Details
       

 11-08-2010
2.00
Recheck wings and mark rear spar
Details
       

 10-25-2010
2.50
Square wings, ck triangulation, angle of incidence
Details

 10-17-2010
2.50
Install the right wing
Details
       

 10-16-2010
1.50
Mount pitot hose
Details
       

 10-14-2010
2.50
Drill for pitot line through rib and fuselage
Details
       

 10-11-2010
1.00
Mount left wing to fuselage!!
Details
       

 10-10-2010
2.00
Modify pitot line in wing
Details

 10-04-2010
3.00
Unpack lt wing
Details
       

 09-26-2010
3.00
Fab static line clamps and mount
Details
       

 09-23-2010
2.00
Drill holes for statis ports
Details
       

 09-20-2010
3.00
Level fuselage
Details
       

 09-13-2010
0.00
Move tools and parts
Details
       

 09-12-2010
0.00
Move fuselage
Details
       

 08-21-2010
2.00
fab fuel tank brackets
Details
     

 08-15-2010
5.00
fab elevator pushrods
Details
     

 07-16-2010
2.00
fab drift pins for wing assy
Details
     

 07-04-2010
3.00
more rear turtledeck
Details
       

 07-03-2010
3.00
Rear turtledeck work
Details
       

 06-13-2010
3.00
fab rear fuselage control covers
Details
       

 06-11-2010
3.00
Fab control cover
Details
       

 06-08-2010
1.50
Reassemble baggage panels
Details
       

 06-06-2010
3.00
Disassemble baggage panels
Details

 06-04-2010
1.00
Nutplates for flap bushing
Details
       

 05-29-2010
5.00
Begin flap control system
Details
     

 05-23-2010
2.00
Paint floor panels and assemble interior
Details
       

 05-21-2010
3.00
Fab F782D angles and prep F782A covers
Details
       

 05-14-2010
1.00
prep and paint fuel valve cover
Details
       

 05-12-2010
2.00
Prep heater shell
Details
       

 05-09-2010
2.00
prime and assemble seat back two
Details
       

 05-07-2010
2.00
Prime and assemble one seat back.
Details
       

 05-05-2010
2.00
Fab hinges, drill and debur, mock up
Details
       

 05-04-2010
1.50
Fabricate hinges
Details
     

 05-02-2010
1.50
fab top and bottom angle
Details
     

 05-01-2010
4.00
Cut holes in seat back plate
Details
     

 04-30-2010
2.00
Fab hinges
Details

 04-28-2010
1.50
Fab top and bottom angles
Details

 04-27-2010
2.00
Fab seat back angles
Details
     

 04-25-2010
4.00
Rivet hinges to floor and start seat backs
Details
     

 04-24-2010
4.00
Aft seat floors
Details
       

 04-21-2010
3.00
Prep baggage covers
Details
       

 04-18-2010
5.00
Finished the baggage bulkhead
Details
       

 04-17-2010
4.00
Baggage bulkhead
Details
       

 04-13-2010
1.50
Fab F707 angle
Details

 04-11-2010
2.00
Mount the autopilot pitch servo
Details
       

 04-11-2010
6.00
assemble aft skins
Details
       

 04-07-2010
2.00
Rivet F728 vertical rib
Details
       

 04-06-2010
3.00
Shoulder harness mounts, bellcrank fab
Details
       

 04-05-2010
2.50
F695 gussets, misc items
Details
       

 04-04-2010
6.00
fit canopy rails
Details
       

 04-03-2010
6.00
Misc details before back to plans
Details
       

 03-28-2010
6.00
assemble rear fuselage plate
Details
       

 03-27-2010
1.50
Prime spacers
Details
     

 03-26-2010
3.00
fab F-710C/F-711E/F-912D spacers
Details

 03-24-2010
2.00
Drill F-714 bulkhead to rear fuselage
Details
       

 03-22-2010
0.00
Same day, more leveling
Details
       

 03-21-2010
2.00
Level fuselage
Details
       

 03-20-2010
6.00
Fabricate "Landing gear" for fuselage
Details
       

 03-15-2010
0.30
Part 3 More photos right side up
Details
       

 03-14-2010
0.20
Part 2 Rolling of the fuselage, milestone
Details
       

 03-14-2010
2.00
Part 1 Finish the hard rivets and flip the canoe!
Details
       

 03-13-2010
3.50
Rivet fuselage floor
Details
       

 03-09-2010
2.00
Rivet floor stiffiners
Details
       

 03-03-2010
2.00
Rivet firewall
Details
       

 02-23-2010
2.00
more side skin rivets
Details
       

 02-21-2010
2.00
Rivet side skins
Details
       

 02-20-2010
2.00
Begin rivet of center section and side skins
Details
       

 02-14-2010
2.00
join center section to tailcone
Details
       

 02-13-2010
6.00
Center section prep.
Details
       

 02-06-2010
3.00
Prep tailcone
Details
       

 02-03-2010
1.50
Prep 706B bulkhead
Details
       

 02-01-2010
1.50
prep longerons
Details
       

 01-31-2010
4.00
Prep lt side skin
Details
       

 01-30-2010
3.50
Prep right side skin
Details
       

 01-24-2010
3.00
Prep longerons
Details

 01-23-2010
3.00
Prep armrests and bulkheads
Details
       

 01-22-2010
1.00
Drill fuel vent and fuel line through skin.
Details

 01-19-2010
2.00
Debur and dimple forward lower skin.
Details
     

 01-16-2010
4.00
Prep baggage parts
Details
     

 01-10-2010
2.00
Mock up baggage area and drill
Details

 01-09-2010
3.00
Fabricate front floor stiffiners
Details
       

 12-27-2009
2.00
drill pedals to the cockpit.
Details

 12-26-2009
2.00
Assemble pedals
Details
       

 12-25-2009
3.00
Pedal assembly
Details

 12-23-2009
1.00
assembled F9101 plates
Details
       

 12-20-2009
6.00
Drill braces to fuse, drill skin to longerons
Details
       

 12-15-2009
2.00
Fab F996 B and C brackets, mount F9101 to fuse.
Details
       

 12-13-2009
3.00
Drill F684 gussets, drill skin to longerons
Details
     

 12-12-2009
2.50
Fab F684 gussets and drill longerons for bolts
Details
       

 12-11-2009
1.00
Drill clips to longerons
Details

 12-08-2009
1.00
Drill F719 longerons to skin.
Details
       

 12-07-2009
3.00
Fab F917 lower longerons, fab clips
Details

 12-06-2009
1.50
mount F713 aux longerons and drill
Details
       

 12-04-2009
1.00
Final drill firewall to longerons
Details
       

 12-02-2009
3.00
Install bottom ft skin, final position of firewall
Details
       

 12-01-2009
3.00
Fab F-904L straps, mock up firewall
Details
       

 11-28-2009
6.00
Drill the longerons and armrests
Details
       

 11-27-2009
5.00
Install front side skins
Details
       

 11-26-2009
1.00
Mount center section to tailcone
Details
       

 11-22-2009
6.00
install longerons into tailcone
Details
       

 11-21-2009
8.00
Prep floor parts, install 915 ribs, install floor
Details
       

 11-17-2009
2.00
Finish bottom skin
Details
     

 11-15-2009
2.00
Rivet bottom skin to ribs
Details
       

 11-14-2009
2.00
Install control stick, mock up
Details

 11-12-2009
2.00
Install seatbelt crotch strap parts
Details
       

 11-11-2009
4.00
Prime bottom skin, reassemble
Details
       

 11-10-2009
8.00
Prep all parts, debur, dimple, prime
Details
       

 11-03-2009
3.00
Fit the wing bulkheads
Details
       

 11-02-2009
2.00
Fit the corner ribs to the bottom skin
Details
       

 11-01-2009
4.00
Matchdrill bulkheads and bottom skin
Details
     

 10-31-2009
5.00
Install nutplates on ribs and assemble centersecti
Details
       

 10-29-2009
3.00
Modify seat ribs
Details
       

 10-21-2009
2.00
Finish the tailcone!
Details
       

 10-20-2009
2.00
Rivet side skins to stringers
Details
     

 10-19-2009
3.00
Rivet side skins to bottom skin
Details
     

 10-16-2009
2.00
Rivet tailcone and start the bottom of side skins
Details
       

 10-15-2009
2.00
Rivet bulkheads to bottom skin, install side skins
Details
       

 10-14-2009
6.00
Debur and dimple side skins
Details
       

 10-13-2009
4.00
Debur, dimple, prime bottom skin, bulkheads, strin
Details
     

 10-11-2009
1.00
Disassemble fuselage tail
Details

 10-10-2009
4.00
Match drill fuselage tail
Details
       

 10-07-2009
3.00
mock up fuselage tail
Details
       

 10-06-2009
5.00
Mock up rear bulkheads and tailwheel spring
Details
       

 10-01-2009
2.50
Fab J-stringers
Details

 09-29-2009
3.00
Bend longerons
Details
       

 09-15-2009
0.00
F-710 and F-711 bulkhead
Details
       

 09-15-2009
6.00
Bulkhead F-710 and F-711 part 2
Details
       

 09-14-2009
1.00
Bulkhead F-709
Details
     

 09-13-2009
3.50
Bulkheads F-707 and F-708
Details
       

 09-12-2009
7.00
F-706 bulkhead, more
Details
       

 09-12-2009
0.00
F-706 bulkhead
Details
       

 09-11-2009
1.00
Finish the flap bearings
Details
       

 09-10-2009
1.00
Flap bearing block
Details
       

 09-09-2009
3.00
Bulkhead F-705 top channel
Details
       

 09-08-2009
2.50
Rivet doubler for seat belt anchors
Details
       

 09-07-2009
6.00
Fab the top of the F-705 structure
Details

 09-07-2009
4.00
Drill the anchors and prime.
Details
       

 09-02-2009
5.00
Begin the next station F-705
Details

 09-01-2009
3.00
Control column assy
Details
       

 08-30-2009
8.00
Bulkhead brackets
Details
       

 08-29-2009
3.00
Match drill, debur and rivet F904C & D
Details
       

 08-28-2009
1.00
Drill holes for bushings
Details
       

 08-26-2009
2.00
Wing bulkhead mockup
Details

 08-25-2009
3.00
Rivet firewall, done!
Details
       

 08-25-2009
5.00
Dimple firewall, prime, final prep
Details
       

 08-23-2009
7.00
Match drill firewall
Details
       

 08-22-2009
4.00
Mock up firewall
Details
       

 08-21-2009
1.50
Fabricate F-601J brackets
Details
       

 08-19-2009
3.00
Inventory parts
Details
       

 08-18-2009
0.00
Receive fuselage from ABF
Details
       

 06-23-2009
0.00
Order Fuselage
Details

 03-22-2009
0.50
Load wing for transport to hangar
Details
       

 03-16-2009
2.00
Finish transportation crate
Details
       

 03-15-2009
3.00
start crate for wing transport
Details
       

 03-13-2009
1.00
Assemble pitot tube
Details
       

 03-10-2009
2.00
Final rivets on lower skin
Details
       

 03-06-2009
2.00
More rivets on lower skins
Details
       

 03-05-2009
2.00
More lower skin rivets
Details

 03-03-2009
2.00
Rivet lower skins
Details
       

 03-02-2009
2.00
Prep lower outer skin
Details
     

 03-01-2009
2.00
Prep lower inner skin
Details

 03-01-2009
6.00
Install pitot tube, clamps, details, details
Details
       

 02-28-2009
2.00
Plan wiring and pitot lines
Details
       

 02-15-2009
3.00
Flap gap fairings
Details
       

 02-14-2009
2.00
Rivet flap angles to ribs and spar
Details
       

 02-06-2009
2.00
Drill flap angles to brackets
Details

 02-02-2009
1.00
Drill flap brackets to ribs
Details

 02-01-2009
2.00
Rivet aileron brackets to rear spar
Details
       

 01-30-2009
1.50
Rivet skin to rear spar
Details

 01-19-2009
1.00
Rivet stringer in wing
Details
       

 01-18-2009
2.00
Rivet top outer skin
Details
       

 01-11-2009
1.50
Rivet top skins
Details
     

 01-10-2009
2.50
Finish dimple skin and mount to wing.
Details
       

 01-09-2009
1.50
Dimple top skins
Details
     

 01-07-2009
1.00
Finish debur of top skins
Details
     

 01-06-2009
2.00
leak check tank, debur top skins
Details
       

 01-04-2009
3.00
Rivet ribs and skin.
Details
       

 01-03-2009
2.00
Rivet leading edge ribs to spar
Details
       

 01-03-2009
2.00
Assemble landing light
Details
       

 01-02-2009
4.00
Cut landing light hole
Details

 01-01-2009
1.00
Dimple ribs and spar
Details
       

 01-01-2009
3.00
debur and dimple leading edge, rivet assembly.
Details
       

 12-25-2008
2.50
Install pitot tube
Details
       

 12-24-2008
1.00
Pitot tube mounting
Details
       

 12-22-2008
1.00
debur spar and ribs
Details

 12-20-2008
2.50
proseal baffle plate and rivet tank closed
Details
       

 12-11-2008
2.00
Mount vent pipe, fuel pickup, sender
Details
       

 12-03-2008
2.00
Rivet end rib to tank
Details
       

 12-01-2008
3.00
Rivet more ribs to tank
Details
       

 11-30-2008
2.00
Rivet 2 ribs to tank
Details
       

 11-30-2008
3.00
Proseal filler neck, drain, and patch
Details
       

 11-29-2008
5.00
Disassemble for debur, dimple, etc.
Details
       

 11-26-2008
2.00
cur rib for fuel sender
Details
       

 11-25-2008
1.00
Fab T-410 plates
Details
       

 11-23-2008
6.00
Drill fuel tank
Details
       

 11-22-2008
4.00
Assemble the fuel tank
Details
       

 11-15-2008
3.50
Assemble leading edge
Details

 11-14-2008
2.00
Install lower skin and match drill
Details
       

 11-12-2008
3.00
Match drill upper skin
Details

 11-09-2008
2.00
Prep wing walk doubler
Details
       

 11-05-2008
2.00
Rivet ribs to spar
Details

 11-04-2008
3.00
Mount Left spar to stand
Details
       

 10-30-2008
3.00
Container and storage
Details
       

 10-25-2008
4.00
Finished lower skin, Right wing done!!
Details
       

 10-24-2008
1.00
More lower skin riveting
Details
       

 10-21-2008
2.00
Begin riveting lower skins
Details

 10-20-2008
2.50
Landing light wiring
Details
       

 10-19-2008
6.00
Make A/P wiring harness
Details
       

 10-17-2008
4.00
Debur and dimple lower skins
Details
       

 10-15-2008
2.00
Run wires for lights
Details

 10-12-2008
1.50
Install autopilot servo
Details
       

 09-28-2008
6.00
Push rod assy
Details
       

 09-28-2008
0.00
Mount aileron to right wing
Details
       

 09-27-2008
4.00
Finish push rods
Details
       

 09-22-2008
1.00
Mock up aileron push rods.
Details
       

 09-21-2008
2.00
Rivet trailing edge.
Details
       

 09-21-2008
0.50
Install right flap to test fit
Details
       

 09-20-2008
6.00
Rivet main ribs to top skin, rivet bottom skin
Details
       

 09-19-2008
2.00
Rivet top skin, nose skin to spar
Details

 09-16-2008
2.00
Rivet main ribs install skins
Details
     

 09-15-2008
2.00
Rivet nose ribs to spar
Details
       

 09-14-2008
4.00
debur skins and countersink spar
Details
     

 09-13-2008
2.50
Debur and dimple ribs and nose skins
Details
     

 09-12-2008
2.00
Prep nose ribs, right flap
Details
     

 09-09-2008
1.50
rivet trailing edge left flap
Details
       

 09-07-2008
1.00
pop rivet bottom skin to left flap
Details
       

 09-07-2008
3.00
Assemble right flap and match drill
Details

 09-06-2008
3.00
Start on right flap
Details

 09-05-2008
2.00
Rivet bottom skin to spar
Details

 09-03-2008
2.00
Rivet nose and top skin to spar
Details

 09-02-2008
2.00
Assemble nose ribs and plates
Details

 08-31-2008
6.00
Disassemble and debur, etc, etc.
Details
       

 08-30-2008
4.00
Mount skin to spar and drill table
Details
       

 08-30-2008
0.00
More photos from Aug 30
       

 08-29-2008
1.50
Match drill nose ribs to spar
Details
       

 08-26-2008
4.00
Fabricate brackets, prep spars
Details
       

 08-24-2008
2.00
Prep flap ribs, nose ribs & brackets
Details
       

 08-18-2008
3.00
finish Rt aileron
Details
       

 08-17-2008
8.00
match drill Rt aileron
Details
       

 08-16-2008
4.00
Right aileron start
Details
     

 08-13-2008
1.50
Rivet trailing edge
Details
       

 08-12-2008
4.50
assemble left aileron
Details
       

 08-10-2008
3.00
Lt aileron skins
Details
       

 08-09-2008
3.00
match drill left aileron
Details
       

 08-08-2008
3.00
Rivet stiffeners to aileron panels
Details
       

 08-05-2008
3.00
Install flap gap fairings
Details
       

 08-04-2008
1.00
Flap gap fairing prep
Details

 08-03-2008
2.00
Fab A-910 stiffeners
Details
       

 08-03-2008
2.00
Aileron brackets
Details
       

 08-02-2008
3.00
rivet j-stringers
Details
       

 07-26-2008
2.00
Rivet top outer skin
Details

 07-23-2008
2.00
Rivet brackets to flap brackets
Details
       

 07-22-2008
2.00
Rivet Flap brackets to ribs
Details
       

 07-20-2008
5.00
Flap bracket fabrication
Details
     

 07-15-2008
2.00
W-914 & W-915 brackets
Details
       

 07-13-2008
2.00
Aileron brackets
Details
     

 07-12-2008
2.00
Rivet inboard skin
Details
       

 07-08-2008
1.00
Prep Lt W913 & W914
Details
     

 07-07-2008
1.00
Mock up aileron brackets
Details
       

 07-04-2008
2.00
Check tank integrity
Details
       

 06-30-2008
2.00
Rivet leading edge
Details
       

 06-29-2008
2.00
Final assy of landing light
Details
       

 06-28-2008
2.00
Cut landing light back plate
Details

 06-27-2008
2.00
Landing light hole
Details
       

 06-23-2008
2.00
dimple outboard skin
Details
       

 06-22-2008
2.00
dimple inboard skin
Details
       

 06-21-2008
1.00
Dimple doubler
Details
     

 06-20-2008
1.00
Dimple ribs and spar
Details

 06-17-2008
2.00
Debur ribs, spar, countersink spar
Details
     

 06-16-2008
2.00
strip wing & debur 'J' stringers
Details

 06-15-2008
2.50
Rivet Leading edge
Details
       

 06-15-2008
2.00
Dimple leading edge skin & ribs
Details
       

 06-10-2008
1.00
Fab W-919 splice
Details
       

 05-31-2008
4.00
Install tank baffle
Details
       

 05-27-2008
1.50
Proseal vent & pick up fittings
Details
       

 05-26-2008
2.00
Fab vent line and fuel pick up
Details
       

 05-25-2008
2.00
Rivet other and last (for this tank) rib
Details

 05-24-2008
1.00
Rivet end rib
Details

 05-20-2008
2.00
more ribs
Details
       

 05-18-2008
3.00
install ribs into fuel tank
Details
       

 05-17-2008
2.00
rivet stiffners
Details
       

 05-16-2008
0.00
Balance beam
Details
       

 05-13-2008
2.00
Dimple fuel tank skin
Details

 05-11-2008
3.00
nutplates, dimples, and debur
Details
       

 05-10-2008
3.00
Cut the end rib for fuel tank
Details
       

 05-09-2008
1.00
Fab 2 nose stiffiners T-410
Details
     

 05-07-2008
1.00
Fab other bracket
Details

 05-01-2008
2.00
Fab T-905 left bracket
Details
       

 04-29-2008
2.00
Prime 'z' brackets and mount nutplates
Details
       

 04-27-2008
1.50
countersink tank baffle plate
Details

 04-26-2008
3.50
Match drill tank skin
Details
       

 04-25-2008
2.00
mount 'z' brackets to baffle
Details

 04-24-2008
1.00
Fab stiffners and 'z' brackets
Details

 04-23-2008
1.50
Fabricate stiffners for fuel tank
Details
     

 04-20-2008
2.00
Begin fuel tank
Details
     

 04-19-2008
2.00
Match drill leading edge skin
Details
       

 04-18-2008
1.50
leading edge skin and ribs
Details
       

 04-15-2008
2.00
match drill bottom skin
Details

 04-07-2008
2.50
Match drill skin
Details
       

 04-06-2008
5.00
Rivel ribs to spars
Details
       

 04-05-2008
3.00
Debur, lay out rivet callouts
Details
       

 03-31-2008
2.00
Set up ribs and match drill
Details
       

 03-29-2008
2.00
More debur rib holes
Details

 03-28-2008
2.00
Debur center holes of ribs
Details

 03-26-2008
2.00
Debur edges of ribs
Details

 03-25-2008
2.00
Sort ribs
Details

 03-23-2008
5.00
Build left rear spar
Details
       

 03-22-2008
2.00
Assembled right rear spar
Details
       

 03-21-2008
2.00
Begin building rear spar
Details

 03-18-2008
2.00
Fab Right tie down bracket
Details

 03-16-2008
3.00
Mount spar, countersink, rivet nutplates
Details
       

 03-15-2008
4.00
Fab tie down and finish left spar.
Details
       

 03-14-2008
2.00
Rivet nutplates to rt spar
Details
       

 03-11-2008
2.00
Countersink left spar
Details

 03-09-2008
2.00
Set up spar into fixture
Details
     

 02-24-2008
8.00
Mount elev to HS and drill, make weights, finished
Details
       

 02-23-2008
3.00
Back rivet Right elevator, rivet trim tab
Details
       

 02-22-2008
1.00
Fix lt elevator. Received wings today!!!
Details
       

 02-20-2008
1.00
Rivet trailing edge left elevator
Details

 02-19-2008
3.00
Trim tab fabrication
Details

 02-18-2008
2.50
Proseal trailing edges of elevators
Details
       

 02-17-2008
8.00
Rivet left elevator
Details
       

 02-16-2008
2.00
Back rivet upper stiffners, fab bracket.
Details

 02-15-2008
2.00
Dimple all left elevator spar, ribs, skin, trim sp
Details

 02-14-2008
3.00
Match drill and debur left elevator
Details

 02-13-2008
2.00
Assemble left elevator
Details

 02-11-2008
3.50
Rivet skin to spar, rivet skin to ribs
Details
       

 02-07-2008
3.50
Rivet reinforcements to spar, rivet elev. horn, ri
Details
       

 02-03-2008
6.00
Prep spar and ribs, match drill & debur holes
Details
       

 02-02-2008
4.00
Build left and right counter balance arms.
Details
     

 02-01-2008
4.00
Finish dimple left skin, dimple rt skin
Details
       

 01-30-2008
3.00
Mount stiffeners to lt skin
Details
     

 01-29-2008
2.50
Mount stiffeners to skins and match drill
Details

 01-21-2008
4.00
Begin Elevator, cut stiffeners
Details

 01-20-2008
1.00
Mock up fin and rudder
Details
       

 01-20-2008
4.50
Finish Vertical Stabilizer
Details
       

 01-18-2008
10.00
finish rudder
Details
       

 01-15-2008
5.00
Dimple ribs, spar, & skins, assemble rudder frame
Details
       

 01-13-2008
10.00
Rudder frame, match drill assembly
Details
       

 01-12-2008
6.00
Rivet reinforcements to skins
Details
       

 01-11-2008
4.50
Fab more reinforcements
Details
     

 01-09-2008
2.50
Cut & fabricate rudder reinforcements
Details
     

 01-08-2008
3.00
Mock up vertical stab, match drill
Details

 01-07-2008
3.00
Prep ribs, spar, match drill Vertical Fin
Details
       

 01-06-2008
2.00
Rivet rear spar, installed center bearing
Details
       

 01-05-2008
4.00
Rivet skin to main ribs, mount rear spar to HS
Details
       

 01-03-2008
1.50
rivet spar, assemble center bearing, prep vertical
Details
       

 01-02-2008
2.00
Begin rivet skin to spar
Details
     

 12-31-2007
3.00
Rivet nose ribs, main ribs, mock up assy.
Details
       

 12-30-2007
4.00
Dimple skin, rivet spar doublers front and rear
Details
       

 12-29-2007
5.50
Assemble left HS and match drill
Details
       

 12-28-2007
3.00
Dimple skin and countersink spars
Details

 12-27-2007
4.00
Match drill, dimple ribs, make platform for c-fram
Details

 12-26-2007
3.00
Prep HS skin and assemble prep for match drilling
Details
       

 12-25-2007
5.50
Finished spars and ribs
Details
       

 12-24-2007
4.00
Debur main and nose ribs
Details

 12-23-2007
6.00
Front & rear spar
Details
       

 12-22-2007
3.00
Received Kit!
Details
       

 12-14-2007
0.00
Ordered Kit
Details
       

 12-08-2007
0.00
Preparation / area setup
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.