Date
|
Hours
|
Work Log Summary
|
Details
|
05-13-2005
|
8.00
|
Drilled wing tips for lites
|
Details
|
|
|
04-08-2005
|
2.00
|
Clecoed bottom skin onto Left wing
|
Details
|
|
|
04-07-2005
|
6.00
|
Ran conduit/wires/pitot line
|
Details
|
|
|
04-04-2005
|
2.00
|
Set Aileron neutral pos
|
Details
|
|
|
04-02-2005
|
5.00
|
Installed Rt Flap brackets / aileron
|
Details
|
|
|
04-01-2005
|
4.00
|
Finished Rt Aileron
|
Details
|
|
|
03-31-2005
|
3.00
|
Started Rt Aileron
|
Details
|
|
|
03-11-2005
|
3.00
|
Made Aileron push rods
|
Details
|
|
|
03-10-2005
|
3.00
|
Left aileron Bell Crank
|
Details
|
|
|
03-08-2005
|
4.00
|
Left Aileron/Flap fairings
|
Details
|
|
|
03-07-2005
|
4.00
|
Finishing Left flap brackets
|
Details
|
|
|
03-06-2005
|
4.00
|
Completed Left Flap
|
Details
|
|
|
03-05-2005
|
5.00
|
Finished Left Flap
|
Details
|
|
|
03-04-2005
|
4.00
|
More flaps
|
Details
|
|
|
03-03-2005
|
4.00
|
Started final assy of both Flaps
|
Details
|
|
|
03-02-2005
|
5.00
|
Work on RT & Lt Flaps
|
Details
|
|
|
02-28-2005
|
2.00
|
Dimpled Rt LE Nose skin, Rt Flap Ribs
|
Details
|
|
|
02-26-2005
|
6.00
|
Rt Flap
|
Details
|
|
|
02-25-2005
|
10.00
|
Flaps
|
Details
|
|
|
02-24-2005
|
6.00
|
Started back on Ailerons/Flaps
|
Details
|
|
|
11-14-2004
|
30.00
|
Finished New Electrical system
|
Details
|
|
|
10-24-2004
|
20.00
|
Redo Electrical system
|
Details
|
|
|
09-26-2004
|
12.00
|
More misc punch list
|
Details
|
|
|
09-12-2004
|
12.00
|
Misc Punch list
|
Details
|
|
|
08-22-2004
|
12.00
|
Rivet Top Rear Fuselage skins
|
Details
|
|
|
08-08-2004
|
20.00
|
Finishing the Frame
|
Details
|
|
|
07-25-2004
|
12.00
|
Fitting canopy frame to fus/cabin frm
|
Details
|
|
|
06-27-2004
|
16.00
|
Preparing canopy frame
|
Details
|
|
|
06-13-2004
|
10.00
|
Installing aft canopy latch
|
Details
|
|
|
06-06-2004
|
8.00
|
Installing Side Handle
|
Details
|
|
|
05-23-2004
|
14.00
|
Installing Canopy Release
|
Details
|
|
|
05-09-2004
|
10.00
|
Drillinjg Canopy hinge blocks to ribs
|
Details
|
|
|
04-18-2004
|
18.00
|
Punch List, much misc
|
Details
|
|
|
04-04-2004
|
9.00
|
Battery Bracket/Starter/Master Relay
|
Details
|
|
|
03-14-2004
|
20.00
|
Electrical wiring harness plus extra
|
Details
|
|
|
03-07-2004
|
14.00
|
Disassemble and painting interior
|
Details
|
|
|
02-22-2004
|
12.00
|
Installing Front deck
|
Details
|
|
|
02-14-2004
|
12.00
|
Installing front deck
|
Details
|
|
|
02-11-2004
|
10.00
|
Installing the cabin frame
|
Details
|
|
|
02-02-2004
|
8.00
|
Constructing Cabin Frame
|
Details
|
|
|
01-24-2004
|
6.00
|
Fitting the rudder
|
Details
|
|
|
01-20-2004
|
8.00
|
Fitting Vertical stabilizer
|
Details
|
|
|
01-14-2004
|
6.00
|
Installed elevator push rod
|
Details
|
|
|
01-12-2004
|
6.00
|
Fitting Horizontal stabilizer
|
Details
|
|
|
01-04-2004
|
4.00
|
Drilled Elevator Horns
|
Details
|
|
|
12-03-2003
|
10.00
|
Install rudder/brake pedal assy/lines
|
Details
|
|
|
12-01-2003
|
12.00
|
Install fuel, brake and vent lines
|
Details
|
|
|
11-20-2003
|
6.00
|
Mount Landing gear legs
|
Details
|
|
|
11-14-2003
|
1.00
|
Rivet seat/baggage BH brkts
|
Details
|
|
|
11-11-2003
|
4.00
|
Installed forward floor/flap assy
|
Details
|
|
|
11-09-2003
|
4.00
|
Install and rivet floor skins
|
Details
|
|
|
11-08-2003
|
7.00
|
riveted Rt seatassy, steps assys
|
Details
|
|
|
11-07-2003
|
5.00
|
Deburr, prime parts, rivet left seat
|
Details
|
|
|
11-06-2003
|
7.00
|
rivet 904 BH, install steps
|
Details
|
|
|
10-15-2003
|
22.00
|
catch up, flap assy, tunnel cover assy
|
Details
|
|
|
09-29-2003
|
6.00
|
drilled top skins, drilled bagg. blkhds
|
Details
|
|
|
09-22-2003
|
6.00
|
install steps, top skins, F656 gussets
|
Details
|
|
|
09-18-2003
|
5.00
|
Rivet aft deck, side rails/gussets
|
Details
|
|
|
09-16-2003
|
12.00
|
Riveted forward side skins
|
Details
|
|
|
09-10-2003
|
5.00
|
Dimple side skins, rivet rear fus
|
Details
|
|
|
09-06-2003
|
6.00
|
duburred and dimpled....
|
Details
|
|
|
08-18-2003
|
4.00
|
Finish firewall, cut misc holes in skin
|
Details
|
|
|
08-17-2003
|
5.00
|
disassy, prerivet, start rivet firewall
|
Details
|
|
|
08-16-2003
|
6.00
|
drilled R side, drill floor stiffeners
|
Details
|
|
|
08-15-2003
|
3.00
|
drilled lots of holes
|
Details
|
|
|
08-14-2003
|
5.00
|
mounted rear side bagg. panels/ribs
|
Details
|
|
|
08-13-2003
|
6.00
|
Finished rudder pedal assy
|
Details
|
|
|
08-09-2003
|
4.00
|
Rt Gear web assy, rudder pedels
|
Details
|
|
|
08-08-2003
|
8.00
|
stiffeners,brackets,gussets
|
Details
|
|
|
07-22-2003
|
5.00
|
Installed Firewall assy
|
Details
|
|
|
07-21-2003
|
5.00
|
Drilled longerons
|
Details
|
|
|
07-20-2003
|
4.00
|
Joined center fuselage to rear fus
|
Details
|
|
|
07-19-2003
|
4.00
|
finished longerons, aft deck, F721B's
|
Details
|
|
|
07-15-2003
|
5.00
|
Finish rivets on Ctr bottom skin, longrn
|
Details
|
|
|
07-14-2003
|
6.00
|
Rivet center fuselage assy
|
Details
|
|
|
07-13-2003
|
6.00
|
Deburr, dimple prime center fus assy
|
Details
|
|
|
07-10-2003
|
4.00
|
finished long,aft deck, F721B
|
Details
|
|
|
07-08-2003
|
4.00
|
riveted Rt side of fuselage
|
Details
|
|
|
07-07-2003
|
6.00
|
Assembled rear fuselage assy
|
Details
|
|
|
07-06-2003
|
6.00
|
Deburred, dimpled, primed skins
|
Details
|
|
|
07-05-2003
|
20.00
|
Assembled aft Fus assy, disasemble
|
Details
|
|
|
06-24-2003
|
24.00
|
Assembled Center Fuselage
|
Details
|
|
|
06-18-2003
|
24.00
|
Completed all Bulkheads
|
Details
|
|
|
06-16-2003
|
6.00
|
lots more holes, drilled floor stiffener
|
Details
|
|
|
06-14-2003
|
12.00
|
Assembled Firewall assy
|
Details
|
|
|
06-08-2003
|
10.00
|
Inventory Fuselage, prep shop
|
Details
|
|
|
05-11-2003
|
10.00
|
rivet right wing
|
Details
|
|
|
05-04-2003
|
12.00
|
prep right wing for riveting
|
Details
|
|
|
04-27-2003
|
12.00
|
Assembled, prep, Rt Aileron
|
Details
|
|
|
04-20-2003
|
3.00
|
Rivet spar for Flap
|
Details
|
|
|
04-19-2003
|
6.00
|
Finish Tank
|
Details
|
|
|
04-13-2003
|
3.00
|
Install vent line, parts on ind rib etc
|
Details
|
|
|
04-12-2003
|
4.00
|
More riveting and black stuff
|
Details
|
|
|
04-08-2003
|
5.00
|
Started Black stuff on Tank (Sealing)
|
Details
|
|
|
04-07-2003
|
8.00
|
Finish prep on Tank, ready to seal
|
Details
|
|
|
04-01-2003
|
3.00
|
Prep tank, platenuts on T912 and ring
|
Details
|
|
|
03-31-2003
|
3.00
|
Mount Tank, drill all holes
|
Details
|
|
|
03-30-2003
|
6.00
|
Riveted LE, start on Tank
|
Details
|
|
|
03-24-2003
|
6.00
|
cleco top skins & Leading Edge
|
Details
|
|
|
03-10-2003
|
5.00
|
Riveted ribs to main and rear spar
|
Details
|
|
|
03-03-2003
|
4.00
|
Finished Rt Wing skeleton, ass rt LE
|
Details
|
|
|
03-02-2003
|
6.00
|
Started Right Wing!!!!!
|
Details
|
|
|
02-25-2003
|
1.00
|
Ordered Fuselage!!!!
|
Details
|
|
|
02-18-2003
|
2.00
|
Assembled skeleton of Rt Flap
|
Details
|
|
|
02-17-2003
|
2.00
|
Dimpled wrong side on bottom skin.......
|
Details
|
|
|
02-11-2003
|
2.00
|
Deburred, primed Left Flap
|
Details
|
|
|
02-10-2003
|
4.00
|
Assembled left Flap
|
Details
|
|
|
02-04-2003
|
4.00
|
Fought the trailing edge of the Aileron
|
Details
|
|
|
02-03-2003
|
6.00
|
Assebled and riveted Aileron
|
Details
|
|
|
02-02-2003
|
5.00
|
deburr, dimple, prime skeleton
|
Details
|
|
|
02-01-2003
|
5.00
|
mounted stiffeners/primed
|
Details
|
|
|
01-27-2003
|
18.00
|
Top skins DONE! Start Aileron
|
Details
|
|
|
01-26-2003
|
6.00
|
Install/rivet LE, Temp Install tank
|
Details
|
|
|
01-25-2003
|
5.00
|
Assemble and rivet Leading Edge
|
Details
|
|
|
01-24-2003
|
8.00
|
Deburred, dimpled, and dimpled
|
Details
|
|
|
01-23-2003
|
5.00
|
Drilled and drilled skins
|
Details
|
|
|
01-22-2003
|
8.00
|
Riveted baffle and mounted Tank
|
Details
|
|
|
01-21-2003
|
1.50
|
Mount access plate, touch-up
|
Details
|
|
|
01-20-2003
|
6.00
|
Finished riveting & sealing tank w/o baf
|
Details
|
|
|
01-19-2003
|
6.00
|
Assembled tank, sealed ribs
|
Details
|
|
|
01-14-2003
|
4.00
|
sealed gas cap, stiffeners, drain
|
Details
|
|
|
01-13-2003
|
1.00
|
Flared Vent tube, dimpled ribs
|
Details
|
|
|
01-12-2003
|
6.00
|
Finished prep on tank, dimpled skin
|
Details
|
|
|
01-07-2003
|
4.00
|
Prepare access plate and tank rib
|
Details
|
|
|
01-06-2003
|
6.00
|
Rewired work bench/assembled drill press
|
Details
|
|
|
01-05-2003
|
5.00
|
fabricated T905, capacitive sender unit
|
Details
|
|
|
12-31-2002
|
5.50
|
drilling and more deburring on tank
|
Details
|
|
|
11-26-2002
|
4.00
|
Mounted tank on spar, drilled brackets
|
Details
|
|
|
11-24-2002
|
10.00
|
Assemble tank and mount on spar
|
Details
|
|
|
10-29-2002
|
3.00
|
Assembled and mounted front leading edge
|
Details
|
|
|
10-22-2002
|
5.00
|
Mount doubled plate, in & outboard skins
|
Details
|
|
|
10-21-2002
|
12.50
|
Drilled deburred spars and wing ribs
|
Details
|
|
|
10-14-2002
|
9.00
|
finish L FWD spar, began L REAR spar
|
Details
|
|
|
10-13-2002
|
13.00
|
L FWD spar nut plates, tie downs
|
Details
|
|
|
10-08-2002
|
3.00
|
inventory wing kit
|
Details
|
|
|
09-15-2002
|
7.00
|
finished L elevator assembly
|
Details
|
|
|
09-09-2002
|
6.00
|
riveted spar on L elev
|
Details
|
|
|
09-02-2002
|
10.00
|
finished rudder, started L elevator
|
Details
|
|
|
09-01-2002
|
8.00
|
finished replacement skin, rudder frame
|
Details
|
|
|
08-31-2002
|
2.00
|
drilled replacement elevator skin
|
Details
|
|
|
08-27-2002
|
1.00
|
Riveted R elevator frame
|
Details
|
|
|
08-26-2002
|
7.00
|
riveted L and part of R elev frame
|
Details
|
|
|
08-25-2002
|
3.00
|
assy L Elevator frame
|
Details
|
|
|
08-20-2002
|
4.00
|
Prepped and primed
|
Details
|
|
|
07-30-2002
|
1.00
|
EAA Advisor inspected current work
|
|
|
|
07-30-2002
|
4.00
|
dimpled remaining skins
|
Details
|
|
|
06-09-2002
|
3.00
|
dimpled all elevator and rudder parts
|
Details
|
|
|
06-08-2002
|
10.00
|
assembled, drilled and deburred elevator
|
Details
|
|
|
05-29-2002
|
4.50
|
made stiffiners for L and R elevators
|
Details
|
|
|
05-28-2002
|
10.00
|
Drill all rudder parts
|
Details
|
|
|
05-26-2002
|
17.00
|
Rivet L HS and top spar
|
Details
|
|
|
05-25-2002
|
3.00
|
Made stiffeners for Rudder
|
Details
|
|
|
05-21-2002
|
10.00
|
rivet R HS
|
Details
|
|
|
05-20-2002
|
10.00
|
dimpled HS and primed
|
Details
|
|
|
05-19-2002
|
9.00
|
deburred L and R HS
|
Details
|
|
|
05-19-2002
|
11.00
|
Began VS
|
Details
|
|
|
05-15-2002
|
5.00
|
Finished R HS and L HS
|
Details
|
|
|
05-14-2002
|
10.00
|
Right HS assembly
|
Details
|
|
|
05-08-2002
|
2.00
|
Went to Van's to get more clekos
|
Details
|
|
|
05-08-2002
|
12.00
|
Shop set up
|
Details
|
|
|
05-07-2002
|
4.00
|
Inventory of kit, making of brackets
|
Details
|
|