KitLog pro

Powered By Kitlog Pro v2.0

Tim and Darren Aussie Web Site
Work Logs Found: 184
Category Work Time: 1500 Hours
 Date
Hours
Work Log Summary

Details

 05-16-2010
1.00
Final paint
Details
       

 05-15-2010
1.00
Final paint
Details
       

 05-15-2010
1.00
Final paint
       

 05-15-2010
1.00
Final paint
       

 05-15-2010
1.00
Final paint
       

 05-15-2010
1.00
Final paint
       

 05-15-2010
1.00
Final paint
       

 05-15-2010
1.00
Final paint
       

 02-13-2010
1.00
Our first flight
Details
       

 02-06-2010
1.00
First Flight
Details
       

 12-19-2009
2.00
Washing the aircraft
Details
       

 12-19-2009
1.00
Run ups
Details
       

 12-19-2009
4.00
Pictures of rear seating area
Details
       

 12-19-2009
2.00
Fitting closure covers
Details
       

 12-19-2009
4.00
Finishing the front area
Details
       

 12-19-2009
1.00
Covers fitted at the rear
Details
       

 12-16-2009
4.00
Rear seat completion
Details
       

 12-16-2009
4.00
Final installation in the front
Details
       

 12-12-2009
1.00
Signage fitted
Details
       

 12-12-2009
16.00
Install of the front window
Details
       

 12-12-2009
1.00
Extend the breather hose
Details
     

 12-05-2009
2.00
Tie off leads
Details
       

 11-21-2009
16.00
Start motor
Details
       

 10-31-2009
60.00
Avionics installation
Details
       

 10-24-2009
12.00
Prop installation
Details
       

 10-17-2009
20.00
Installing the flexible baffling
Details
       

 10-10-2009
30.00
Avionic wiring
Details
       

 10-03-2009
12.00
Final install engine items
Details
       

 10-03-2009
10.00
Exhaust installation
Details
       

 09-30-2009
36.00
Panel wiring
Details
       

 09-27-2009
30.00
Panel installation
Details
       

 09-27-2009
12.00
Clamping hoses
Details
       

 08-16-2009
30.00
Fitting of upper & lower cowling
Details
       

 08-15-2009
4.00
Installing air intake tubes
Details
       

 08-15-2009
4.00
Baffling air exit
Details
       

 08-08-2009
16.00
Baffling installation cont
Details
       

 08-01-2009
4.00
Oil cooler
Details
       

 08-01-2009
2.00
Exhaust temperature
Details
     

 08-01-2009
15.00
Baffling
Details
       

 07-04-2009
6.00
Fitting carpet
Details
       

 07-04-2009
6.00
Fitting battery and external power supply
Details
       

 07-04-2009
2.00
Central computer system
Details
       

 06-25-2009
12.00
Installation of the cowling
Details
       

 06-25-2009
2.00
Fix front lights
Details
       

 06-25-2009
16.00
Fitting roof lining
Details
       

 06-18-2009
2.00
Correct tension on cables
Details
       

 06-13-2009
4.00
Seat installation
Details
       

 06-09-2009
3.00
Fabric on the windscreen glare sheild
Details
       

 06-06-2009
20.00
Preparing and installing windows
Details
       

 06-06-2009
10.00
Panel installation
Details
       

 06-06-2009
6.00
Installing air vents
Details
       

 06-06-2009
6.00
Battery mount and position
Details
       

 06-06-2009
6.00
Base for auto pilot
Details
       

 05-30-2009
4.00
Pitot Tube installation
Details
     

 05-30-2009
5.00
Installation of top console
Details
     

 05-30-2009
5.00
Exhaust installation
Details
       

 05-28-2009
2.00
Gap between wing and fuselage
Details
       

 05-16-2009
16.00
Installing pans & boards
Details
       

 05-16-2009
16.00
Installation of rear cover
Details
       

 05-16-2009
10.00
Fabricating and installing the front fairing
Details
       

 05-16-2009
4.00
Electric Fuel Pump
Details
       

 05-09-2009
5.00
Installing heater system
Details
       

 05-09-2009
4.00
Installing fuel parts for the system
Details
       

 05-09-2009
20.00
Fabricating and installing wing tips
Details
       

 04-29-2009
8.00
Replace brake fluid
Details
     

 04-25-2009
8.00
Oil cooler supplied and installed
Details
       

 04-25-2009
4.00
Installing the strobe power pack
Details
       

 04-25-2009
8.00
Installation of fuel caps
Details
       

 04-25-2009
4.00
Front wheel fairing
Details
     

 04-25-2009
16.00
Avionic wiring
Details
       

 04-18-2009
10.00
Installing wing tip lights and cut out for counter
Details
       

 04-18-2009
8.00
Install the aileron counterweights
Details
       

 04-18-2009
20.00
Cross over cable guides
Details
       

 04-18-2009
2.00
Clsoing wing tips and new hanger picture
Details
       

 04-04-2009
6.00
Install motor
Details
       

 11-22-2008
12.00
Re - Fit Aileron and rudder
Details
       

 11-15-2008
12.00
Cove skin installation
Details
       

 10-26-2008
15.00
Fitting seat belt brackets...finished rear seat
Details
       

 10-19-2008
8.00
Fitting the back seat
Details
       

 10-18-2008
10.00
Side laminates
Details
       

 10-18-2008
12.00
Rear seat installation
Details
       

 10-01-2008
10.00
Fitting the lower hatch half to upper half
Details
       

 09-30-2008
16.00
Wing-Fold Hatch mounting flanges
Details
       

 09-30-2008
2.00
Added fixture bolt and nut to counter weight eleva
Details
       

 09-23-2008
8.00
Seam the wingtip fairing halves together
Details
       

 09-23-2008
16.00
Cove skins installation
Details
       

 09-17-2008
4.00
Install fuel tank sump drains
Details
       

 09-10-2008
4.00
Fuel tank vent line installation at wingtip
Details
       

 09-06-2008
8.00
Install wings on the fuselage
Details
       

 09-01-2008
4.00
Connect the fuel tank vents and
Details
       

 08-14-2008
20.00
Rivett the upper wing skins
Details
       

 08-07-2008
6.00
Doors: Latches. dogs,
Details
       

 08-01-2008
20.00
Door installation: Install seal, secure door, inst
Details
       

 07-13-2008
6.00
Install fuel floats to tanks
Details
       

 07-06-2008
70.00
Rivett the upper wing skins
Details
       

 07-05-2008
10.00
Cleco the upper surface hat section stiffeners to
Details
       

 06-30-2008
30.00
Final Wing Assembly
Details
       

 06-02-2008
10.00
Wires in order and checking inside the wing
Details
       

 06-02-2008
4.00
Strakes flanges to the fuselage and rudder fairing
Details
       

 06-02-2008
30.00
Fixing strakes to fuselage
Details
       

 05-13-2008
30.00
Making and fixing fairings to strut
Details
       

 05-13-2008
1.00
Laminate the strut
Details
     

 05-13-2008
5.00
Install the outboard bracket/wheel fairing
Details
       

 05-13-2008
1.00
Bond the foam together
Details
     

 05-12-2008
16.00
Fuselage fairing installation
Details
       

 05-12-2008
20.00
Fasten the firwall assembly to the fuselage
Details
       

 04-12-2008
20.00
Fit the firewall to the fusealge and drill the tab
Details
       

 04-12-2008
10.00
Fabricate the firewall components
Details
       

 04-12-2008
2.00
Fabricate and install the instrument panel angle
Details
     

 03-23-2008
6.00
Mount nose wheel assembly
Details
       

 03-23-2008
2.00
Main gear leg installation - support and level fus
Details
     

 03-23-2008
8.00
Intall the brake mounting flanges
Details
       

 03-23-2008
6.00
Install vent and fuel line in tanks and pumps.
Details
       

 03-23-2008
4.00
Install the pitot tube and line
Details
     

 03-23-2008
10.00
Install the brake torque plate and wheel pants and
Details
       

 03-23-2008
8.00
Insert and position the gear legs
Details
       

 03-23-2008
6.00
Fit the fuel lines and install fuel line brackets
Details
       

 03-23-2008
10.00
Drill the inspection hole doublers
Details
       

 03-23-2008
4.00
Drill and bolt main gear legs
Details
       

 03-22-2008
6.00
Position, drill and rivett the transfer pump mount
Details
     

 03-04-2008
4.00
Mount nose wheel fork to the strut axle
Details
       

 02-25-2008
6.00
Test fit main fuel tanks
Details
       

 02-25-2008
2.00
Install flap deployment and retraction cable
Details
       

 02-25-2008
6.00
Install aileron pushrod
Details
       

 02-25-2008
4.00
Cable guides and pin cable retainers
Details
     

 02-25-2008
2.00
Apply anti - chafe tape to the fuel tank bays
Details
     

 02-25-2008
4.00
Aileron travel stop and set deflection
Details
       

 02-25-2008
12.00
Aileron control cables
Details
       

 02-04-2008
6.00
Set the Dihedral angle of the wings
Details
       

 02-04-2008
12.00
Mounting wings to the fuselage
Details
       

 02-04-2008
8.00
Mount the flap to the flap tracks and install push
Details
       

 02-04-2008
2.00
Mount the ailerons
Details
       

 02-04-2008
4.00
Installing the jig and trimming the outboard end s
Details
       

 02-04-2008
6.00
Install aileron trim
Details
       

 01-25-2008
12.00
Installing elevator trim
Details
       

 01-17-2008
2.00
Starting to look like a plane
Details
       

 01-17-2008
6.00
Install the elevator control cables
Details
       

 01-17-2008
6.00
Install rudder and rudder cables
Details
       

 01-17-2008
6.00
Fabricate the elevator pushrod
Details
       

 01-09-2008
6.00
Rudder control cables
Details
       

 01-09-2008
1.00
Preparing struts
Details
     

 01-09-2008
4.00
Pedals
Details
     

 01-09-2008
6.00
Install the aft fuselage struts
Details
       

 01-09-2008
4.00
Install pulleys - lower aft, Centre flap, lower ou
Details
     

 01-09-2008
10.00
Install bulk head and cut inspection hole
Details
       

 01-09-2008
8.00
Fabricate and install bulkhead "A" pulleys
Details
       

 12-18-2007
4.00
Install the lower forward and centre pulleys
Details
     

 12-18-2007
2.00
Install the lower aft ailleron pulleys
Details
     

 12-18-2007
18.00
Install the forward pulleys
Details
       

 12-13-2007
6.00
Install the Horizontal Stabilizer Forward bracket
Details
       

 12-13-2007
4.00
Install the bulkhead E
Details
     

 12-13-2007
5.00
Forward Shearweb
Details
     

 12-13-2007
4.00
Assemble the flap handle
Details
       

 12-13-2007
6.00
Assemble the elevator/aileron control
Details
       

 12-06-2007
4.00
Trim, position and drill elevator bellcrank bracke
Details
     

 12-06-2007
2.00
Mount the rudder controls
Details
       

 12-06-2007
4.00
Laminate the aft attach flange
Details
     

 12-06-2007
12.00
Install the forward Shell attach fittings
Details
       

 12-06-2007
2.00
Install stop plate pads
Details
     

 12-06-2007
4.00
Fabricate and install the elevator control stop
Details
       

 12-06-2007
2.00
Drill the elevator bellcrank assembly
Details
     

 11-29-2007
6.00
Install the forward shell attach fittings
Details
       

 11-29-2007
4.00
Fabricate the rudder stop plate
Details
     

 11-22-2007
2.00
Rivet the vertical Fin Spar
Details
       

 11-22-2007
1.00
Rivet the upper rudder hinge nutplates to vert sp
     

 11-22-2007
4.00
Mark and drill the vertical fin rivet holes
Details
       

 11-22-2007
4.00
Install the vertical fin spar
Details
       

 11-22-2007
4.00
Finish the trailing edges of the fin
Details
       

 11-17-2007
1.00
Sand the tops of the vertical fin shells
Details
     

 11-17-2007
4.00
Position and drill the upper shell attach fitting
Details
       

 11-17-2007
4.00
Position and drill the lower shell and aft shell a
Details
       

 11-17-2007
1.00
Position and drill nutplates for the upper hinge
Details
     

 11-17-2007
2.00
Mount the lower rudder hinge on the rudder yoke
Details
       

 11-17-2007
2.00
Join the upper hinge halves
Details
       

 11-17-2007
1.00
Drill the lower rudder hinge mounting holes in the
Details
       

 11-17-2007
1.00
Drill Index holes through flnges of the vertical s
Details
     

 11-17-2007
1.00
Centre the rudder between the fin shells
Details
       

 11-17-2007
1.00
"Hang" the rudder assembly from the tops of the ve
Details
     

 11-16-2007
18.00
Fabricate the aft shell attach fittings
Details
       

 11-11-2007
4.00
Fabricate the lower shell attach fittings
Details
       

 11-10-2007
2.00
Install wing pivots
Details
       

 11-07-2007
4.00
Fabricate the upper shell attach fittings
Details
       

 11-03-2007
20.00
Making bench tops
Details
       

 11-01-2007
8.00
Fuselage Framework
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.