Powered By Kitlog Pro v2.0
Barts Web Site
RV-10
All
Work Logs Found:
55
Category Work Time:
291 Hours
Date
Hours
Work Log Summary
Details
10-20-2010
1.00
Wings
10-19-2010
1.00
Putting the wings on
10-18-2010
1.00
The cowling is fitting nicely
10-17-2010
1.00
Final assembly of the panel
05-15-2010
1.00
Fitting the engine
05-14-2010
1.00
Installing the magnometer in the wing
05-13-2010
1.00
Finishing the wings
08-26-2009
1.00
Fitting the doors
05-25-2009
1.00
Configuration of the Garmin 900X
05-10-2009
1.00
This starts to look OK
05-08-2009
1.00
more wiring
05-06-2009
1.00
Wires
05-05-2009
1.00
Miscellaneous
05-04-2009
1.00
Just some things
05-03-2009
1.00
Taillight
Details
05-02-2009
1.00
Altering the wheel bearing
Details
05-01-2009
1.00
Starting work on the wings
12-03-2008
1.00
Dreaming away
12-02-2008
1.00
It starts to look like an Aircraft
12-01-2008
1.00
The interior is getting there
11-26-2008
1.00
Installing the empanage fairings
11-25-2008
1.00
The tailcone is on and the floor is getting ready
11-21-2008
1.00
Getting the tailcone on
11-20-2008
1.00
The fuselage coming along
09-30-2008
10.00
The rudder and brake panels
Details
09-30-2008
10.00
Sound proofing the floor panels
Details
08-20-2008
10.00
miscellaneous
07-23-2008
10.00
Tailcone rivetted
05-31-2008
1.00
Hanging the engine to a mounting frame
Details
05-30-2008
10.00
Rivetting the Horizontal Stabilizer
Details
05-16-2008
10.00
finishing the elevators
Details
03-25-2008
1.00
Making some space
Details
03-24-2008
1.00
A lot of stuff
Details
03-23-2008
1.00
The bulk shipment has arrived
Details
03-08-2008
10.00
rivetting the rear spar
03-02-2008
10.00
Tail
Details
01-27-2008
1.00
Our anual South African retreat
Details
01-22-2008
10.00
Starting the first fuselage part
01-16-2008
10.00
Making the parts for increased levels
01-10-2008
10.00
Match drilling and spraypaint the parts
01-08-2008
10.00
We can change course
Details
01-02-2008
10.00
Sealing the trailing edge of the rudder
Details
12-26-2007
5.00
Riveting the rudder
12-24-2007
10.00
Final assembly after priming
12-22-2007
10.00
Bucking and alignment bar for trailing edge
12-20-2007
10.00
Assembling the spar and matching the skin
Details
12-19-2007
10.00
Finalizing
12-15-2007
10.00
Match drilling rudder
12-15-2007
10.00
Dimpling
12-10-2007
10.00
filing, deburring, sanding
Details
12-08-2007
10.00
Drilling first holes
Details
11-30-2007
10.00
The shop almost ready
Details
11-26-2007
2.00
The Empenage kit has arrived
Details
11-20-2007
10.00
More building
Details
11-09-2007
25.00
Building the craddle for PH-USN
Details
SITE NAVIGATION
Contact Builder
RV-10 Home
Category
# Logs
# Hours
All
55
291
Avionics
1
1
Building the worksho
4
55
Elevator
3
30
Empennage
3
4
Engine
1
1
Fuselage
9
36
General
4
13
Holiday
1
1
Horizontal Stabilize
3
30
Landing gear
1
1
Miscellaneous
5
5
Rudder
6
55
Tailcone
2
20
Vertical Stabilizer
3
30
Wings
4
4
Wiring
5
5
Copyright © 2001-2024 Matronics. All Rights Reserved.