KitLog pro

Powered By Kitlog Pro v2.0

Barts Web Site
Work Logs Found: 55
Category Work Time: 291 Hours
 Date
Hours
Work Log Summary

Details

 10-20-2010
1.00
Wings
       

 10-19-2010
1.00
Putting the wings on
       

 10-18-2010
1.00
The cowling is fitting nicely
       

 10-17-2010
1.00
Final assembly of the panel
       

 05-15-2010
1.00
Fitting the engine
       

 05-14-2010
1.00
Installing the magnometer in the wing
       

 05-13-2010
1.00
Finishing the wings
       

 08-26-2009
1.00
Fitting the doors
       

 05-25-2009
1.00
Configuration of the Garmin 900X
       

 05-10-2009
1.00
This starts to look OK
       

 05-08-2009
1.00
more wiring
       

 05-06-2009
1.00
Wires
       

 05-05-2009
1.00
Miscellaneous
       

 05-04-2009
1.00
Just some things
       

 05-03-2009
1.00
Taillight
Details
       

 05-02-2009
1.00
Altering the wheel bearing
Details
       

 05-01-2009
1.00
Starting work on the wings
       

 12-03-2008
1.00
Dreaming away
       

 12-02-2008
1.00
It starts to look like an Aircraft
       

 12-01-2008
1.00
The interior is getting there
       

 11-26-2008
1.00
Installing the empanage fairings
       

 11-25-2008
1.00
The tailcone is on and the floor is getting ready
       

 11-21-2008
1.00
Getting the tailcone on
       

 11-20-2008
1.00
The fuselage coming along
       

 09-30-2008
10.00
The rudder and brake panels
Details
       

 09-30-2008
10.00
Sound proofing the floor panels
Details
       

 08-20-2008
10.00
miscellaneous
       

 07-23-2008
10.00
Tailcone rivetted
       

 05-31-2008
1.00
Hanging the engine to a mounting frame
Details
       

 05-30-2008
10.00
Rivetting the Horizontal Stabilizer
Details
       

 05-16-2008
10.00
finishing the elevators
Details
       

 03-25-2008
1.00
Making some space
Details
       

 03-24-2008
1.00
A lot of stuff
Details
       

 03-23-2008
1.00
The bulk shipment has arrived
Details
       

 03-08-2008
10.00
rivetting the rear spar
       

 03-02-2008
10.00
Tail
Details
       

 01-27-2008
1.00
Our anual South African retreat
Details
       

 01-22-2008
10.00
Starting the first fuselage part
       

 01-16-2008
10.00
Making the parts for increased levels
       

 01-10-2008
10.00
Match drilling and spraypaint the parts
       

 01-08-2008
10.00
We can change course
Details
       

 01-02-2008
10.00
Sealing the trailing edge of the rudder
Details
       

 12-26-2007
5.00
Riveting the rudder
       

 12-24-2007
10.00
Final assembly after priming
       

 12-22-2007
10.00
Bucking and alignment bar for trailing edge
       

 12-20-2007
10.00
Assembling the spar and matching the skin
Details
       

 12-19-2007
10.00
Finalizing
       

 12-15-2007
10.00
Match drilling rudder
       

 12-15-2007
10.00
Dimpling
       

 12-10-2007
10.00
filing, deburring, sanding
Details
       

 12-08-2007
10.00
Drilling first holes
Details
       

 11-30-2007
10.00
The shop almost ready
Details
       

 11-26-2007
2.00
The Empenage kit has arrived
Details
       

 11-20-2007
10.00
More building
Details
       

 11-09-2007
25.00
Building the craddle for PH-USN
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.