Date
|
Hours
|
Work Log Summary
|
Details
|
09-21-2008
|
2.50
|
Engine mount attached
|
Details
|
|
|
09-06-2008
|
4.00
|
Main gear axle nut cotter pin
|
Details
|
|
|
08-16-2008
|
15.00
|
Canopy fitting
|
Details
|
|
|
08-09-2008
|
7.00
|
Landing gear wheel/brake assembly
|
Details
|
|
|
06-01-2008
|
3.00
|
Canopy - the BIG cut
|
Details
|
|
|
05-26-2008
|
2.00
|
Canopy second cut
|
Details
|
|
|
05-18-2008
|
1.50
|
Canopy skirt strips
|
|
|
|
05-17-2008
|
2.50
|
Canopy first cut
|
Details
|
|
|
05-15-2008
|
2.00
|
ELT, strobe pack mounts added
|
Details
|
|
|
05-10-2008
|
3.00
|
Leak checked the fuel tanks
|
Details
|
|
|
05-04-2008
|
2.00
|
Copilot control stick restraint
|
Details
|
|
|
04-26-2008
|
16.00
|
Tip-up canopy lift strut mount re-design
|
Details
|
|
|
03-30-2008
|
4.50
|
Wing bellcrank inspection port
|
Details
|
|
|
03-16-2008
|
8.00
|
Canopy tilt-up strut fitting
|
Details
|
|
|
02-24-2008
|
12.00
|
Tip-up canopy framing progress
|
Details
|
|
|
01-20-2008
|
3.50
|
Canopy lock linkage, tip-up frame
|
|
|
|
01-12-2008
|
4.00
|
Canopy external latch
|
Details
|
|
|
01-01-2008
|
6.00
|
Canopy release mechanism fitted
|
Details
|
|
|
12-09-2007
|
1.50
|
Horizontal stabilizer tip additions
|
Details
|
|
|
12-08-2007
|
4.00
|
Autopilot pitch servo installation
|
Details
|
|
|
12-05-2007
|
2.00
|
Finish kit arrives
|
Details
|
|
|
11-23-2007
|
2.50
|
Installed crotch belt anchors
|
Details
|
|
|
11-10-2007
|
4.00
|
Mounted panel eyeball vents
|
Details
|
|
|
11-03-2007
|
3.50
|
Electric aileron trim installation
|
Details
|
|
|
10-27-2007
|
3.00
|
Electric aileron trim assembly
|
Details
|
|
|
10-06-2007
|
4.00
|
Fabricated brake lines
|
Details
|
|
|
09-29-2007
|
7.00
|
Left wing attachment
|
Details
|
|
|
09-02-2007
|
6.00
|
Wing root fairing nutplates added
|
|
|
|
08-26-2007
|
4.00
|
Right fuel tank bracket mounting
|
Details
|
|
|
08-22-2007
|
1.50
|
Right fuel tank vent line formed
|
|
|
|
08-18-2007
|
2.00
|
Right flap pushrod install
|
Details
|
|
|
07-29-2007
|
3.00
|
Set right wing incidence
|
Details
|
|
|
07-22-2007
|
5.00
|
Aligned right wing with fuselage
|
Details
|
|
|
07-15-2007
|
2.00
|
Attached NACA air vent pickups
|
Details
|
|
|
06-23-2007
|
4.00
|
Right wing attached to fuselage
|
Details
|
|
|
06-09-2007
|
7.00
|
Right wing bottom outer panel attached
|
Details
|
|
|
05-20-2007
|
2.50
|
Autopilot roll servo mounted
|
Details
|
|
|
05-12-2007
|
6.00
|
Left wing bottom skin attached
|
Details
|
|
|
04-22-2007
|
1.00
|
Left wing aileron control bracket torqued
|
|
|
|
04-07-2007
|
2.00
|
Left wing wiring
|
Details
|
|
|
03-04-2007
|
1.50
|
Fabricated fuel tank vent lines
|
Details
|
|
|
02-28-2007
|
6.00
|
Fuel line,vent plumbing
|
|
|
|
01-28-2007
|
2.00
|
fuel pump installed
|
|
|
|
01-27-2007
|
1.50
|
Fuel selector assembly
|
|
|
|
01-25-2007
|
1.00
|
Seat harness anchors attached
|
|
|
|
01-24-2007
|
1.50
|
Brake cylinder plumbing
|
|
|
|
01-16-2007
|
3.00
|
Added throttle brackets, rear bulkhead
|
|
|
|
01-13-2007
|
2.00
|
Safety-wired trim tab hinge pin, installed servo
|
|
|
|
12-10-2006
|
5.00
|
Horizontal stab tip fabrication
|
Details
|
|
|
11-30-2006
|
4.00
|
Fabricated and installed rudder stop
|
Details
|
|
|
11-11-2006
|
2.00
|
Ongoing H/V stabilizer mounting work
|
|
|
|
11-10-2006
|
1.00
|
Panel layout mockups
|
Details
|
|
|
10-30-2006
|
2.00
|
Horizontal stabilizer attach
|
|
|
|
10-21-2006
|
4.00
|
Instrument panel framing
|
|
|
|
10-08-2006
|
2.50
|
Forward fuselage trim bracket fabrication
|
Details
|
|
|
10-07-2006
|
3.00
|
Instrument panel trial assembly
|
Details
|
|
|
09-23-2006
|
3.50
|
Top skin and canopy frame added
|
|
|
|
09-10-2006
|
3.00
|
Canopy frame complete
|
|
|
|
09-09-2006
|
3.00
|
Canopy framing, Elevator horn drilling
|
|
|
|
09-07-2006
|
2.00
|
Roll bar construction continues
|
Details
|
|
|
09-05-2006
|
3.00
|
Canopy frame work
|
|
|
|
09-01-2006
|
2.50
|
Canopy frame brackets fabricated
|
|
|
|
08-26-2006
|
4.00
|
Trial wing attachment
|
Details
|
|
|
08-17-2006
|
1.50
|
Temporary landing gear struts built
|
Details
|
|
|
08-16-2006
|
2.00
|
Starboard landing gear mount attached
|
|
|
|
08-15-2006
|
1.50
|
Port landing gear mount attached
|
|
|
|
08-09-2006
|
1.00
|
Match drilled landing gear legs to mount
|
|
|
|
08-06-2006
|
2.00
|
Modified fuselage stand
|
Details
|
|
|
08-06-2006
|
2.00
|
flap motor housing installed
|
|
|
|
08-05-2006
|
2.00
|
flap motor installed
|
|
|
|
08-03-2006
|
3.00
|
Flap linkage installation ongoing
|
|
|
|
07-29-2006
|
3.00
|
Began electric flap installation
|
|
|
|
07-28-2006
|
1.00
|
Right angle drill acquired
|
Details
|
|
|
07-28-2006
|
3.00
|
Fabricated center console
|
|
|
|
07-22-2006
|
3.50
|
Installed baggage compartment floor
|
Details
|
|
|
07-11-2006
|
8.00
|
External Steps Mounted
|
Details
|
|
|
07-08-2006
|
1.50
|
Prepared baggage area floor and sides
|
|
|
|
06-29-2006
|
1.50
|
Fabricated and installed elevator bellcrank
|
|
|
|
06-26-2006
|
5.50
|
Fabricated elevator pushrods
|
Details
|
|
|
06-24-2006
|
1.00
|
Added cutoff saw
|
Details
|
|
|
06-22-2006
|
1.00
|
Brake pedals painted
|
Details
|
|
|
06-20-2006
|
2.00
|
Copilot seatback brace mounted
|
|
|
|
06-18-2006
|
2.00
|
Seatbacks primed
|
|
|
|
06-17-2006
|
5.00
|
Brake pedals mounted, copilot seatback fabricated
|
|
|
|
06-15-2006
|
2.00
|
Rudder pedals mounted
|
|
|
|
06-13-2006
|
1.00
|
Added pilot-side seatback brace
|
Details
|
|
|
06-11-2006
|
6.50
|
Fabricated pilot side seat back
|
Details
|
|
|
06-08-2006
|
1.50
|
Rudder pedal, seat back work
|
Details
|
|
|
06-05-2006
|
1.00
|
Added F-665 to control column
|
|
|
|
06-04-2006
|
2.00
|
Installed control column base
|
|
|
|
06-03-2006
|
1.50
|
Right rudder pedal, F601K fabricated
|
|
|
|
06-02-2006
|
1.50
|
Left rudder pedal fabricated
|
|
|
|
05-31-2006
|
1.00
|
Bracket F-6122-1 added to firewall
|
Details
|
|
|
05-20-2006
|
2.00
|
Landing light installation completed
|
Details
|
|
|
05-19-2006
|
2.00
|
Landing light mount fabricated
|
|
|
|
05-16-2006
|
1.00
|
Landing light work
|
Details
|
|
|
05-14-2006
|
1.00
|
Prepared right wing for landing light installation
|
Details
|
|
|
05-10-2006
|
2.50
|
Fabricated rudder nav/strobe mount
|
Details
|
|
|
05-07-2006
|
3.00
|
WingTip nav light installation
|
Details
|
|
|
05-04-2006
|
1.50
|
Wingtip Lens preparation
|
Details
|
|
|
05-03-2006
|
1.00
|
Wing wiring
|
|
|
|
05-02-2006
|
1.50
|
Right wingtip work
|
Details
|
|
|
04-30-2006
|
2.00
|
Right wingtip preparation
|
Details
|
|
|
04-29-2006
|
3.00
|
Assembled/tested LED nav lights
|
Details
|
|
|
04-28-2006
|
2.00
|
Left wingtip completed
|
Details
|
|
|
04-23-2006
|
2.50
|
Wingtip attachment HW added
|
Details
|
|
|
04-22-2006
|
1.50
|
Left wingtip fitting
|
Details
|
|
|
04-20-2006
|
0.75
|
Wingtip attach preparation
|
Details
|
|
|
04-19-2006
|
1.50
|
Tested strobes, ran pitot line
|
Details
|
|
|
04-18-2006
|
1.00
|
Prepped inspection plates
|
|
|
|
04-17-2006
|
1.00
|
Attached inspection port nutplates
|
|
|
|
04-16-2006
|
2.50
|
Primed wing skins, pitot doubler
|
|
|
|
04-13-2006
|
1.50
|
Pitot mounting progress
|
Details
|
|
|
04-12-2006
|
2.00
|
Pitot mount fabrication
|
Details
|
|
|
04-11-2006
|
2.00
|
Ran wiring conduit in both wings
|
Details
|
|
|
04-09-2006
|
2.00
|
Dimpled remaining skin of both wings
|
|
|
|
04-08-2006
|
1.50
|
Drilled wiring conduit passage thru both wings
|
Details
|
|
|
04-06-2006
|
1.50
|
Deburred R/L wing skins
|
|
|
|
04-05-2006
|
2.00
|
Prepared wing skins
|
Details
|
|
|
04-04-2006
|
1.50
|
Fuel tank pickup/sender mounted
|
Details
|
|
|
03-29-2006
|
1.50
|
Right wing flap mounted
|
|
|
|
03-27-2006
|
1.50
|
Right wing flap hinge prepared
|
|
|
|
03-25-2006
|
1.50
|
Right wing aileron mounted
|
|
|
|
03-22-2006
|
1.50
|
Left wing flap hung
|
|
|
|
03-19-2006
|
2.50
|
Left wing aileron linkage and flap hinge work
|
|
|
|
03-18-2006
|
1.50
|
Left aileron hung
|
|
|
|
03-09-2006
|
1.50
|
Both wings flap braces and aileron fairings rivett
|
Details
|
|
|
03-07-2006
|
1.00
|
Right wing aileron fairing preparation
|
|
|
|
03-06-2006
|
1.00
|
Left wing flap brace assembly
|
Details
|
|
|
03-05-2006
|
1.50
|
Flap brace preparation
|
|
|
|
03-04-2006
|
2.00
|
Left wing aileron brackets mounted
|
Details
|
|
|
03-02-2006
|
1.50
|
Right wing aileron brackets mounted
|
|
|
|
02-27-2006
|
1.50
|
Aileron hinge brackets assembled
|
Details
|
|
|
02-26-2006
|
1.50
|
Primed aileron brackets, control rods
|
|
|
|
02-25-2006
|
1.00
|
Aileron mounting bracket preparation
|
|
|
|
02-23-2006
|
1.00
|
Right bellcrank mounted
|
|
|
|
02-22-2006
|
1.50
|
Aileron control rod fabrication
|
|
|
|
02-19-2006
|
4.00
|
Aileron control rod fabrication
|
Details
|
|
|
02-18-2006
|
2.50
|
QB kit inventory
|
Details
|
|
|
02-16-2006
|
4.00
|
Fuselage stand built
|
Details
|
|
|
02-13-2006
|
3.00
|
QB wings/fuselage delivered
|
Details
|
|
|
02-12-2006
|
3.00
|
Rudder bottom tip fairing added
|
Details
|
|
|
02-11-2006
|
2.00
|
Rudder tip fairing added
|
Details
|
|
|
02-10-2006
|
1.50
|
Carpet, lighting added
|
Details
|
|
|
02-08-2006
|
1.00
|
HSTAB stored
|
|
|
|
02-06-2006
|
2.00
|
Empennage metalwork complete!
|
Details
|
|
|
02-05-2006
|
1.50
|
Elevator, bearing hinges added
|
Details
|
|
|
02-04-2006
|
1.50
|
Elevator, left leading edge rolled
|
Details
|
|
|
02-03-2006
|
2.00
|
Elevator, trim tab assembled
|
|
|
|
02-01-2006
|
1.50
|
Elevator, trim tab priming
|
Details
|
|
|
01-28-2006
|
3.50
|
Elevator, trim tab construction
|
Details
|
|
|
01-27-2006
|
2.50
|
Elevator, left final assembly
|
Details
|
|
|
01-27-2006
|
1.00
|
Elevator, left assembly
|
Details
|
|
|
01-25-2006
|
1.50
|
Elevator, left tab bend
|
Details
|
|
|
01-22-2006
|
4.00
|
Elevator, misc final assembly
|
Details
|
|
|
01-21-2006
|
4.00
|
Ceiling mount fan added to workshop
|
Details
|
|
|
01-19-2006
|
1.00
|
Elevator-right skin rivetted to frame
|
|
|
|
01-18-2006
|
1.00
|
Elevator-right, RTV'd and skin cleco'd on
|
|
|
|
01-15-2006
|
1.00
|
Elevator, left frame rivetted
|
|
|
|
01-14-2006
|
4.00
|
Elevators
|
Details
|
|
|
01-13-2006
|
1.00
|
Elevator, left trial assembly
|
|
|
|
01-12-2006
|
1.00
|
Elevator, right dimple
|
|
|
|
01-11-2006
|
0.50
|
Elevator, right debur
|
|
|
|
01-10-2006
|
1.50
|
Elevator-right, match drill, dimple, debur
|
|
|
|
01-09-2006
|
1.00
|
Elevator-right trial assembly
|
|
|
|
01-08-2006
|
3.00
|
Wing Stand Construction
|
Details
|
|
|
01-07-2006
|
4.00
|
Wing Stand Construction
|
|
|
|
01-05-2006
|
2.00
|
Elevator trailing edges bent
|
Details
|
|
|
01-03-2006
|
1.50
|
Elevator stiffeners back rivetted
|
|
|
|
01-02-2006
|
1.50
|
Rudder trailing edge rivetted
|
Details
|
|
|
01-01-2006
|
2.00
|
Rudder leading edge formed
|
Details
|
|
|
12-31-2005
|
2.00
|
Elevator priming
|
Details
|
|
|
12-30-2005
|
1.00
|
Elevator skins dimpled
|
|
|
|
12-29-2005
|
4.00
|
Rudder assembly
|
Details
|
|
|
12-28-2005
|
3.00
|
Elevator match drilled stiffener to skins
|
|
|
|
12-27-2005
|
3.00
|
Elevator - remaining stiffeners fabricated
|
|
|
|
12-26-2005
|
2.50
|
Elevator stiffeners fabricated
|
|
|
|
12-24-2005
|
2.50
|
Rudder frame priming and initial assembly
|
Details
|
|
|
12-23-2005
|
1.50
|
HSTAB closeout
|
|
|
|
12-19-2005
|
1.00
|
VSTAB closeout
|
Details
|
|
|
12-17-2005
|
1.50
|
Rudder counterweight, trailing edge prep
|
|
|
|
12-16-2005
|
2.00
|
Rudder dimpling
|
Details
|
|
|
12-15-2005
|
1.00
|
Rudder - more deburring
|
|
|
|
12-13-2005
|
1.00
|
Rudder deburring
|
|
|
|
12-11-2005
|
2.50
|
Rudder initial assembly
|
|
|
|
12-09-2005
|
4.50
|
HSTAB essentially complete
|
Details
|
|
|
12-08-2005
|
1.50
|
HSTAB final assembly continues
|
Details
|
|
|
12-07-2005
|
1.00
|
Began HSTAB final assembly
|
|
|
|
12-04-2005
|
2.00
|
Rudder stiffeners rivetted
|
Details
|
|
|
12-03-2005
|
4.00
|
HSTAB skin, Rudder priming
|
Details
|
|
|
12-01-2005
|
1.50
|
Rudder skin deburr, dimpled
|
|
|
|
11-30-2005
|
1.50
|
Rudder stiffener deburring and dimpling
|
Details
|
|
|
11-29-2005
|
3.00
|
Match drilled, deburred rudder stiffeners
|
|
|
|
11-29-2005
|
1.50
|
Flush mounted back rivet plate into workbench
|
Details
|
|
|
11-28-2005
|
1.50
|
Rudder stiffeners fabricated
|
Details
|
|
|
11-21-2005
|
1.50
|
HSTAB frame assembly
|
Details
|
|
|
11-20-2005
|
2.00
|
VSTAB skin rivetted
|
Details
|
|
|
11-18-2005
|
1.50
|
VSTAB final frame assembly
|
Details
|
|
|
11-16-2005
|
1.00
|
VSTAB spar dimpling, HSTAB skin dimpling
|
Details
|
|
|
11-15-2005
|
2.50
|
HSTAB frame priming
|
Details
|
|
|
11-13-2005
|
1.00
|
Skin edge deburring
|
Details
|
|
|
11-11-2005
|
1.50
|
HSTAB skin dimpling
|
Details
|
|
|
11-10-2005
|
1.50
|
HSTAB skin hole deburring
|
Details
|
|
|
11-08-2005
|
1.50
|
HSTAB frame debur
|
|
|
|
11-06-2005
|
2.50
|
HSTAB starboard side trial assembly complete
|
Details
|
|
|
11-05-2005
|
1.00
|
HSTAB port side trial assembly completed
|
|
|
|
11-03-2005
|
1.50
|
HSTAB port side initial framing
|
Details
|
|
|
10-30-2005
|
1.50
|
HSTAB HS-702 front spar modification
|
Details
|
|
|
10-29-2005
|
1.00
|
HSTAB front spar reinforcement forming
|
|
|
|
10-28-2005
|
1.00
|
HSTAB rear spar VA-146 assembly
|
Details
|
|
|
10-27-2005
|
1.50
|
HSTAB rear spar assembly
|
|
|
|
10-23-2005
|
1.50
|
HSTAB HS-609PP preparation
|
Details
|
|
|
10-22-2005
|
2.50
|
VSTAB spar, ribs primed
|
|
|
|
10-19-2005
|
0.75
|
VSTAB skin dimpled
|
|
|
|
10-18-2005
|
0.75
|
VSTAB spar and ribs dimpled
|
|
|
|
10-17-2005
|
1.50
|
VSTAB skin deburred, HSTAB devinyled
|
|
|
|
10-17-2005
|
0.10
|
The burgeoning air tool collection
|
|
|
|
10-16-2005
|
1.50
|
VSTAB debur, film removal
|
Details
|
|
|
10-13-2005
|
0.50
|
VSTAB match drilled
|
|
|
|
10-10-2005
|
1.00
|
Air compressor upgraded
|
Details
|
|
|
10-09-2005
|
3.50
|
VSTAB frame and skin trial assembly
|
|
|
|
10-08-2005
|
1.00
|
VS-808PP priming exercise
|
Details
|
|
|
10-02-2005
|
1.50
|
VS optional lightening holes cut
|
Details
|
|
|
10-02-2005
|
2.00
|
Empennage subkit inventory completed
|
|
|
|
10-01-2005
|
2.00
|
Protective storage added
|
|
|
|
09-27-2005
|
1.00
|
Empennage subkit arrives
|
|
|