Powered By Kitlog Pro v2.0
MARTIN'S WEB SITE
RV-12 iS
All
Work Logs Found:
141
Category Work Time:
1336 Hours
Date
Hours
Work Log Summary
Details
08-10-2019
16.00
Flaperon and landing light
Details
08-03-2019
16.00
Wings, Lights, Flaperons
Details
07-27-2019
13.00
Wing tips and lights
Details
07-13-2019
16.00
Wing Skin rivetting
Details
06-29-2019
50.00
Wing skins
Details
06-22-2019
50.00
Wing skin riveting
Details
06-08-2019
25.00
Wing wiring
Details
06-08-2019
25.00
Wing skeletons
Details
06-01-2019
43.00
Wing skeleton
Details
05-25-2019
31.00
Wing skeleton
Details
05-18-2019
23.00
Wing Ribs
Details
05-11-2019
23.00
Wing Spars
Details
05-11-2019
23.00
Rear spar
Details
05-04-2019
50.00
Wings
Details
04-27-2019
40.00
Tail Cone
Details
04-20-2019
15.00
Tail Cone
Details
04-13-2019
46.00
Tail Cone
Details
04-06-2019
50.00
Tail Cone
Details
03-30-2019
42.00
Stabilator
Details
03-23-2019
18.00
Stabilator
Details
03-16-2019
18.00
Stabilator
Details
03-09-2019
46.00
Stabilator
Details
03-02-2019
39.00
Anti Servo Tabs
Details
02-23-2019
40.00
Rudder
Details
02-16-2019
17.00
Vertical Stabilizer Skin riveting
Details
02-16-2019
17.00
Rudder
Details
02-09-2019
40.00
Vertical Stabilizer
Details
02-02-2019
32.00
Student Orientation & Vertical Stabilizer
Details
01-12-2019
4.00
Details
01-05-2019
8.00
Inventoried Empenage Kit
Details
11-24-2010
3.00
Clean RH Fuel Tank Skin
Details
11-23-2010
4.00
RH Fuel Tank Skin Preparation
Details
11-22-2010
4.00
RH Fuel Tank Skin Preparation
Details
05-04-2009
3.00
Fitting Leading Edges
Details
05-02-2009
6.00
Fitting the Leading Edges
Details
04-03-2009
2.00
Match Drilling L Bottom Skins
Details
03-26-2009
4.00
Fitting Main Skins
Details
03-23-2009
4.00
Fitting L Wing Main Skins
Details
03-22-2009
4.00
Fitting Main Skins
Details
03-20-2009
4.00
Fitting Wing Walk Doubler
Details
03-18-2009
4.00
Fitting Wing Walk Doubler & Skins
Details
03-17-2009
4.00
Fitting Wing Walk Doubler & Skins
Details
03-16-2009
4.00
Fitting Wing Skins to the Skeleton
Details
03-15-2009
3.00
Fitting Primed/Sealed Ribs to Left Wing.
Details
03-14-2009
4.00
Assembling the L Wing Skeleton
Details
03-13-2009
3.00
Assembling the L Wing Skeleton
Details
01-28-2009
4.00
Preparation Rear Wing Spar
Details
01-26-2009
4.00
Preparation Maind Spar
Details
01-24-2009
4.00
Preparing Main Spars
Details
01-24-2009
4.00
Preparing Main Spar
Details
01-23-2009
4.00
Preparing Main Spar
Details
01-22-2009
5.00
Machine Countersink Fuel Tank Atch Platenuts
Details
01-21-2009
5.00
Machine Countersink Fuel Tank Atch Platenuts
Details
01-07-2009
4.00
Fabricate Tie-Down Assembly
Details
01-05-2009
4.00
Aileron Pushrods
Details
01-04-2009
3.00
Aileron Push Rods
Details
08-23-2008
8.00
AMT Airframe Practical Test
Details
08-22-2008
4.00
AMT Airframe Oral Examination
Details
08-20-2008
1.00
AMT Airframe Knowledge Test
Details
07-14-2008
1.00
AMT General Knowledge Test
Details
06-05-2008
4.00
Assembling Rear Spar
Details
06-04-2008
4.00
Leading Edge/Fuel Tank Jig
Details
06-01-2008
4.00
Tweaking Wing Jigs to Allow Wing Skinning
Details
05-31-2008
5.00
Preparing Fuel Tank Ribs
Details
05-26-2008
4.00
Preparing Fuel Tank Ribs
Details
05-24-2008
6.00
Preparing Fuel Tank Ribs
Details
05-22-2008
4.00
Preparing Fuel Tank Ribs
Details
05-20-2008
4.00
Preparing Fuel Tank Ribs
Details
05-19-2008
4.00
Preparing Leading Edge Ribs
Details
05-17-2008
4.00
Preparing Leading Edge Ribs
Details
05-16-2008
4.00
Preparing Leading Edge Ribs
Details
05-15-2008
4.00
Preparing Ribs
Details
05-14-2008
4.00
Preparing Ribs
Details
05-12-2008
4.00
Preparing Ribs
Details
05-11-2008
6.00
Preparing Ribs
Details
05-10-2008
4.00
Prepare Ribs
Details
05-09-2008
4.00
Preparing Ribs
Details
05-08-2008
4.00
Preparing Ribs
Details
05-07-2008
4.00
Preparing Ribs
Details
05-06-2008
5.00
Preparing the Wing Jigs
Details
05-05-2008
5.00
Building Trim Tab
Details
04-22-2008
4.00
Building Trim Tab
Details
04-07-2008
4.00
Building Trim Tab
Details
04-06-2008
4.00
Building Trim Tab
Details
04-05-2008
6.00
Riveting L/R Elevators
Details
03-29-2008
4.00
Riveting L/R Elevators
Details
03-28-2008
3.00
Riveting L/R Elevators
Details
03-25-2008
3.00
Dimple Elevator Skins and Understructure
Details
03-24-2008
3.00
Bend E-701-L Tab
Details
03-21-2008
4.00
Preparation L/R Elevators
Details
03-20-2008
3.00
Preparing L/R Elevators
Details
03-19-2008
5.00
Preparing L/R Elevators
Details
03-18-2008
3.00
Preparing L/R Elevators
Details
03-17-2008
5.00
Preparing L/R Elevators
Details
03-15-2008
6.00
Preparing Left Elevator
Details
03-13-2008
6.00
Preparing Right Elevator
Details
03-01-2008
6.00
Preparing Right Elevator
Details
02-23-2008
6.00
Riveting Stiffeners R/L Elevator Skins
Details
02-15-2008
4.00
Finish building Rudder Assembly.
Details
02-13-2008
5.00
Rolling Rudder Leading Edges
Details
02-12-2008
5.00
Riveting Rudder
Details
02-11-2008
5.00
Riveting Rudder and Installing Static Wick Rivnuts
Details
02-10-2008
3.00
Prime/Seal Stiffeners E-L/R and Reinforcement Plat
Details
02-09-2008
6.00
Elevator Parts Preparation
Details
01-31-2008
2.00
Static Discharger Installation
Details
01-30-2008
2.50
Preparing R Elevator:
Details
01-29-2008
3.00
Installing Stiffeners
Details
01-28-2008
4.00
Preparing Elevator Skins and Stiffeners
Details
01-26-2008
5.00
Preparing the Elevator Skins
Details
01-24-2008
3.00
Triming Elevator Stiffeners
Details
01-21-2008
4.00
Riveting Horizontal Stabilizer and Vertical Stabil
Details
01-19-2008
5.00
Riveting the Horizontal Stabilizer
Details
01-17-2008
3.00
Install K1100-8 Nut Plates in Horizontal Stabilize
Details
01-13-2008
3.00
Install K1100-8 Nut Plates
Details
01-11-2008
3.00
Install K1100-8 Nut Plates
Details
01-10-2008
4.00
Assembly of Vertical Stabilizer
Details
01-09-2008
5.00
Finishing the Vertical Stabilizer
Details
01-08-2008
5.00
Finishing the Vertical Stabilizer
Details
01-07-2008
5.00
Riveting the Vertial Stabilizer
Details
01-02-2008
1.00
Riveting HS Skins to Skeleton
Details
01-01-2008
1.00
Riveting HS Skins to Skeleton
Details
12-31-2007
5.00
Riveting L/R Horizontal Stabilizer
Details
12-30-2007
6.00
Riveting the Horizontal Stabilizer
Details
12-29-2007
5.00
Riveting HS-707R to HS-801PPR
Details
12-28-2007
2.00
Finished Riveting HS-707L to HS-801PPL
Details
12-27-2007
5.00
Cleko HS-707L
Details
12-26-2007
5.00
Riveting the Horizontal Stabilizer
Details
12-25-2007
5.00
Rivet HS Rear Spar
Details
12-23-2007
5.00
Prepare Rudder Skeleton with EkoEtch
Details
12-22-2007
1.00
Clean Rudder Skeleton Parts with EkoClean
Details
12-10-2007
6.00
Building the Rudder Skeleton
Details
12-08-2007
5.00
Building the Rudder Skeleten
Details
12-06-2007
4.00
Building the Rudder Skeleton
Details
11-26-2007
4.00
Rivet Stiffeners to Rudder Skin
Details
11-25-2007
5.00
Prime Empennage Parts/Rivet Stiffeners
Details
11-24-2007
8.00
Prime Empennage Parts
Details
11-20-2007
8.00
Prepare Parts for Primer/Sealer
Details
11-16-2007
6.00
Prepare parts for Primer/Sealer
Details
11-15-2007
2.00
B-17 Ferry Flight to LAL
Details
11-10-2007
4.00
Prime Stiffeners and Inside Rudder Skin
Details
11-08-2007
1.50
Preparing Rudder Stiffeners
Details
SITE NAVIGATION
Contact Builder
RV-12 Home
RV-12 iS Home
Category
# Logs
# Hours
All
141
1354
Empennage
72
728
Flight Controls
2
7
Fuel Tanks
3
29
Miscellaneous
3
44
None
4
14
Static Discharge Sys
3
9
Wings
54
523
Copyright © 2001-2025 Matronics. All Rights Reserved.