Date
|
Hours
|
Work Log Summary
|
Details
|
01-27-2008
|
2.50
|
Complete leading edge install. Begin tank install
|
Details
|
|
|
01-26-2008
|
2.50
|
Continue rib rivet - leading edge
|
Details
|
|
|
01-20-2008
|
2.50
|
Begin riveting of the leading edge
|
Details
|
|
|
01-09-2008
|
2.00
|
Complete leading edge, cleco in place
|
Details
|
|
|
01-06-2008
|
1.00
|
Inspect and correct a few things
|
Details
|
|
|
01-05-2008
|
2.50
|
Prime skins and stringers
|
Details
|
|
|
01-01-2008
|
2.00
|
Leading edge riveting continues
|
Details
|
|
|
12-31-2007
|
2.50
|
begin riveting the leading edge of the right wing
|
Details
|
|
|
12-29-2007
|
2.50
|
Dimple and debur leading edge or right wing
|
Details
|
|
|
12-28-2007
|
2.50
|
Debur, and begin dimple of leading edge
|
Details
|
|
|
12-27-2007
|
2.50
|
Disassemble and begin debur of leading edge
|
Details
|
|
|
12-26-2007
|
2.00
|
Countersink the main spar and complete rear spar p
|
Details
|
|
|
12-25-2007
|
6.50
|
Dimple, debur, and repeat
|
Details
|
|
|
12-24-2007
|
1.50
|
Debur holes on bottom of right wing skeleton
|
Details
|
|
|
12-23-2007
|
4.50
|
Complete wing skin debur and dimple
|
Details
|
|
|
12-22-2007
|
2.50
|
Debur, and dimple outboard, top, wing skin
|
Details
|
|
|
12-21-2007
|
1.50
|
Prep right wing, top, outboard skin
|
Details
|
|
|
12-20-2007
|
2.50
|
Debur, dimple right, bottom. outboard skin
|
Details
|
|
|
12-19-2007
|
2.00
|
Debur, and dimple inboard, bot skin
|
Details
|
|
|
12-17-2007
|
1.00
|
Close up inboard bulkhead on right tank
|
Details
|
|
|
12-16-2007
|
3.50
|
Install right tank bulkhead
|
Details
|
|
|
12-08-2007
|
1.50
|
Inboard bulkhead rib - right tank
|
Details
|
|
|
11-25-2007
|
1.50
|
Test install tank fittings
|
Details
|
|
|
11-24-2007
|
3.00
|
Install next 4 ribs on tank
|
Details
|
|
|
11-14-2007
|
3.00
|
Install outboard 2 ribs on right wing tank
|
Details
|
|
|
11-11-2007
|
1.50
|
Attach fuel filler, rib prep
|
Details
|
|
|
10-26-2007
|
4.50
|
Tank prep, attack stiffners, fuel drain
|
Details
|
|
|
10-25-2007
|
1.50
|
Dimpling, T-915 fabrication
|
Details
|
|
|
10-24-2007
|
1.25
|
Dimpling right tank skins
|
Details
|
|
|
10-13-2007
|
2.00
|
Debur right wing skins
|
Details
|
|
|
10-10-2007
|
1.50
|
Debur and dimple right tank ribs
|
Details
|
|
|
10-01-2007
|
1.50
|
Right wing tank prep
|
Details
|
|
|
09-30-2007
|
3.00
|
Right tank attachment fit/drill
|
Details
|
|
|
09-29-2007
|
1.50
|
Fit t910 to outboard rib on right wing
|
Details
|
|
|
09-27-2007
|
1.80
|
t905, t910
|
Details
|
|
|
09-24-2007
|
1.00
|
t905 completion
|
Details
|
|
|
09-23-2007
|
2.00
|
t905 fabrication
|
Details
|
|
|
08-26-2007
|
1.00
|
Final check for right wing twist
|
Details
|
|
|
08-25-2007
|
4.50
|
Right tank
|
Details
|
|
|
08-24-2007
|
3.50
|
Install right tank ribs.
|
Details
|
|
|
08-23-2007
|
1.00
|
Check tank ribs - do some reading
|
Details
|
|
|
08-22-2007
|
7.50
|
Attach leading edge to right wing, put skin on rig
|
Details
|
|
|
08-21-2007
|
2.00
|
Put skin on the leading edge of right wing
|
Details
|
|
|
08-19-2007
|
1.50
|
Build leading edge jig
|
Details
|
|
|
08-13-2007
|
2.50
|
Match drilled right wing bttom skins
|
Details
|
|
|
08-12-2007
|
1.50
|
Complete fit of skins to bottom of the right wing
|
Details
|
|
|
08-05-2007
|
2.50
|
Fit bottom skins to right wing
|
Details
|
|
|
08-02-2007
|
1.20
|
Completed fit of right wing stringer
|
Details
|
|
|
08-01-2007
|
0.75
|
Begin fitting spanwise stringers to right wing
|
Details
|
|
|
07-29-2007
|
7.50
|
Fit top main skins to wing
|
Details
|
|
|
07-26-2007
|
6.50
|
Right Wing - Front/Rear Spar to Ribs
|
Details
|
|
|
07-16-2007
|
1.00
|
Attach rib 9-10 to spar
|
Details
|
|
|
07-10-2007
|
1.50
|
Attach ribs 7-8 to the right spar
|
Details
|
|
|
07-08-2007
|
2.50
|
Attach ribs 1-6 to right spar
|
Details
|
|
|
07-01-2007
|
6.50
|
Clean and prime ribs
|
Details
|
|
|
05-28-2007
|
2.00
|
Wing rib prep
|
Details
|
|
|
05-14-2007
|
1.50
|
Wing Rib prep
|
Details
|
|
|
05-13-2007
|
2.00
|
Debur ribs
|
|
|
|
05-05-2007
|
1.00
|
Attach ribs to right spar, drill, debur spars
|
|
|
|
05-03-2007
|
1.00
|
Attach ribs to left spar, match drill
|
|
|
|
05-01-2007
|
0.00
|
Build wing cradle
|
|
|
|
04-22-2007
|
5.00
|
Flute, debur ribs
|
|
|
|
04-21-2007
|
5.00
|
Flute, debur ribs
|
|
|
|
11-26-2005
|
3.00
|
Flute, debur ribs
|
|
|
|
11-09-2005
|
1.50
|
Flute, debur ribs
|
|
|
|
11-04-2005
|
3.00
|
Finish left main spar - attach tie down
|
|
|
|
11-04-2005
|
1.00
|
Begin to flute, debur ribs
|
|
|
|
10-30-2005
|
2.00
|
Finish lr spar.
|
|
|
|
10-30-2005
|
2.00
|
Fabricate tie down brackets and attach to right sp
|
|
|
|
10-23-2005
|
2.00
|
Remove rivets from lr spar and clean up edges
|
|
|
|
09-25-2005
|
1.00
|
Complete rr spar and re-rivet
|
|
|
|
09-24-2005
|
1.50
|
Remove rovets r.r. spar and clean up edges
|
|
|
|
09-11-2005
|
1.00
|
Rivet Right Rear spar doubler
|
|
|
|
08-19-2005
|
1.00
|
Rivet left rear spar doubler and plates
|
|
|
|
07-10-2005
|
0.30
|
Finish Counter sink rear spar doubler
|
|
|
|
07-04-2005
|
1.50
|
Match Drill, Countersink Rear Spar Doubler
|
|
|
|
06-22-2005
|
1.50
|
Rear Spar doubler plates
|
Details
|
|
|
06-19-2005
|
4.50
|
Wing rear spar prep
|
Details
|
|
|
06-12-2005
|
1.00
|
Complete tank attach platenuts
|
Details
|
|
|
06-11-2005
|
4.00
|
Contersink wing attach platenuts
|
Details
|
|
|
05-14-2005
|
3.50
|
Nutplates, right wing
|
Details
|
|
|
05-07-2005
|
3.00
|
Platenuts, left wing main spar
|
Details
|
|
|
05-01-2005
|
2.50
|
Tank Attach Nutplates - Left wing
|
Details
|
|
|
04-17-2005
|
3.50
|
Complete Counterweight Installation
|
Details
|
|
|
04-10-2005
|
1.50
|
Fit counterbaance on left elevator
|
Details
|
|
|
04-10-2005
|
2.50
|
Continue fitting counterweights
|
Details
|
|
|
04-09-2005
|
3.00
|
Fit elevators
|
Details
|
|
|
03-05-2005
|
6.00
|
Complete trim tab
|
Details
|
|
|
02-21-2005
|
2.50
|
Trim Tab
|
Details
|
|
|
02-21-2005
|
5.00
|
Inventory Wings
|
Details
|
|
|
02-18-2005
|
4.50
|
Elevator trailing edge
|
Details
|
|
|
02-13-2005
|
3.00
|
Left Elevator
|
Details
|
|
|
02-12-2005
|
2.75
|
Left Elevator
|
Details
|
|
|
02-11-2005
|
0.50
|
Left Elevator
|
Details
|
|
|
02-06-2005
|
0.50
|
Left Elevator
|
Details
|
|
|
02-05-2005
|
3.50
|
Assemble left elevator components
|
Details
|
|
|
02-02-2005
|
1.50
|
Clean and prime left elevator components
|
Details
|
|
|
01-29-2005
|
3.50
|
Assemble left elevator
|
Details
|
|
|
01-22-2005
|
2.50
|
Drill/Deburr/Dimple stiffners and skin
|
Details
|
|
|
01-17-2005
|
1.50
|
Build stiffeners for the left elevator
|
Details
|
|
|
01-16-2005
|
3.50
|
Elevator work
|
Details
|
|
|
01-13-2005
|
1.50
|
Rivet right elevator
|
Details
|
|
|
01-12-2005
|
1.50
|
Redimple bottom skin/spar right elevator
|
Details
|
|
|
01-11-2005
|
2.50
|
Remove bottom skin
|
Details
|
|
|
01-06-2005
|
1.50
|
Rivet bottom skin
|
Details
|
|
|
01-05-2005
|
1.50
|
Riveted in counterbalance
|
Details
|
|
|
01-04-2005
|
2.50
|
Rivet elevator skin
|
Details
|
|
|
01-02-2005
|
2.00
|
right elevator assembly
|
Details
|
|
|
12-30-2004
|
1.50
|
Primed stiffners
|
Details
|
|
|
12-30-2004
|
6.50
|
Attached stiffners to skin
|
Details
|
|
|
12-29-2004
|
4.50
|
Stiffners
|
Details
|
|
|
12-28-2004
|
3.50
|
Stiffners on right HS
|
Details
|
|
|
12-27-2004
|
2.00
|
Initial right elevator
|
Details
|
|
|
12-26-2004
|
2.50
|
Completed rudder
|
Details
|
|
|
12-23-2004
|
1.50
|
Installed right elevator stiffener
|
Details
|
|
|
12-22-2004
|
2.00
|
Completed right elevator stiffner prep
|
Details
|
|
|
12-21-2004
|
2.00
|
Left Elevator - Stiffner prep
|
Details
|
|
|
12-20-2004
|
2.50
|
Began left elevator prep
|
Details
|
|
|
12-19-2004
|
2.50
|
Glue rudder trailing edge
|
Details
|
|
|
12-18-2004
|
2.50
|
Completed rudder to spar attach
|
Details
|
|
|
12-16-2004
|
2.50
|
Began riveting of the rudder
|
Details
|
|
|
12-13-2004
|
1.50
|
Rivet counterbalance skin
|
Details
|
|
|
12-10-2004
|
2.00
|
Riveted rudder spar, horn, lower rib
|
Details
|
|
|
12-09-2004
|
2.00
|
Primed rudder parts
|
Details
|
|
|
12-04-2004
|
6.00
|
Rudder skin, dimpling
|
Details
|
|
|
12-03-2004
|
3.00
|
Rudder Spar/Ribs
|
Details
|
|
|
11-27-2004
|
2.50
|
Completed H.S.
|
Details
|
|
|
11-26-2004
|
7.00
|
H.S. Assembly
|
Details
|
|
|
11-24-2004
|
6.50
|
Initial Assembly, Prep
|
Details
|
|
|
11-20-2004
|
8.00
|
Finished left rudder stiffner, start r
|
Details
|
|
|
11-19-2004
|
4.00
|
Started left rudder stiffener
|
Details
|
|
|
11-15-2004
|
1.50
|
Completed front left HS spar
|
Details
|
|
|
11-14-2004
|
1.50
|
Completed internal ribs on H.S
|
Details
|
|
|
11-07-2004
|
5.00
|
Horizontal Stabilizer Assembly
|
Details
|
|
|
10-29-2004
|
1.00
|
Complete vertical stabilizer
|
Details
|
|
|
10-25-2004
|
1.50
|
Riveted portion of VS
|
Details
|
|
|
10-23-2004
|
3.00
|
Completed HS front spar assembly
|
Details
|
|
|
10-21-2004
|
6.00
|
Assemble HS rear spar
|
Details
|
|
|
10-16-2004
|
7.00
|
VS Riveting - front spar
|
Details
|
|
|
10-09-2004
|
8.00
|
Priming H.S.
|
Details
|
|
|
09-21-2004
|
4.00
|
Match drill V.S. Debur, Dimple, Prime
|
Details
|
|
|
09-14-2004
|
1.50
|
Right HS assembly for match drilling
|
Details
|
|
|
09-07-2004
|
2.00
|
match drill righ H.S.
|
Details
|
|
|
09-05-2004
|
5.00
|
V.S. skeleton assembly
|
Details
|
|
|
09-05-2004
|
9.00
|
H.S. prep work - drill, dimple, left HS
|
Details
|
|
|
09-02-2004
|
1.50
|
Match drilled spars/ribs
|
Details
|
|
|
09-01-2004
|
8.00
|
Assemble spar/ribs for H.S.
|
Details
|
|
|
08-24-2004
|
2.00
|
Fabricate attach angles
|
Details
|
|
|
08-23-2004
|
1.00
|
Debur and mark H.S. doublers
|
Details
|
|
|
08-22-2004
|
6.00
|
Unpack/Check and begin work
|
Details
|
|