KitLog pro

Powered By Kitlog Pro v2.0

Carl Bells RV7A N947CB
Work Logs Found: 524
Category Work Time: 2393 Hours
 Date
Hours
Work Log Summary

Details

 10-18-2010
20.00
Exterior Paint - Advanced Aircraft Painting
Details
       

 06-14-2010
5.00
Phase 1 Test Flying
Details
       

 06-07-2010
3.00
First Flight
Details
       

 05-23-2010
1.00
The plane in now ready to fly
Details
       

 05-23-2010
3.00
N947CB gets Airworthiness Certification
Details
       

 05-22-2010
5.00
Weight and Balance
Details
       

 05-20-2010
2.00
Starting the engine
Details
       

 05-12-2010
7.00
Re-installation of the interior
Details
       

 05-10-2010
6.00
Canopy latch
Details
       

 05-09-2010
0.00
Project status of N947CB as of May 2010
Details
       

 05-09-2010
0.00
Project Pictures
Details
       

 05-08-2010
0.00
More Pictures of the project
Details
       

 05-05-2010
4.00
Wing root farings
Details
     

 05-04-2010
1.50
Screwed on wing tip and light lens
Details
     

 05-04-2010
3.00
Installing the seat belts
Details
       

 05-04-2010
1.00
ELT - batteries and hookup
Details
       

 05-03-2010
1.00
Temporary N number until painting
Details
       

 05-03-2010
3.00
Installing the flaps
Details
       

 05-03-2010
2.50
Bleeding the brakes
Details
       

 04-27-2010
6.00
Closing up the interior
Details
       

 04-24-2010
5.00
Installing the ailerons and aileron trim
Details
       

 04-24-2010
3.50
Installing brake lines and Pitot line connection
Details
       

 04-22-2010
5.00
Wiring the right wing tip and Nav antennea
Details
       

 04-21-2010
4.00
Wing tip wiring
Details
       

 04-20-2010
3.00
Completing the wing installation
Details
       

 04-19-2010
4.00
Installing the NAS wing bolts
Details
       

 04-18-2010
6.00
Attaching the right wing
Details
       

 04-17-2010
6.00
Wiring the left wing
Details
       

 04-16-2010
1.00
Replacing the spinner screws
Details
       

 04-12-2010
5.00
Adding heat shielding to the cowl
Details
       

 04-11-2010
2.00
Canopy Handles
Details
       

 04-09-2010
7.00
Finishing the canopy and installing
Details
       

 04-07-2010
4.00
Canopy skirt riveting
Details
       

 04-06-2010
5.00
Windscreen finishing
Details
       

 04-04-2010
4.50
Windscreen finishing
Details
       

 04-03-2010
4.00
Windscreen finishing
Details
       

 03-30-2010
9.00
Filling the windscreen fairing and adding layers
Details
       

 03-27-2010
8.00
Sanding the windscreen fairing
Details
       

 03-26-2010
4.00
Windscreen frame trimming
Details
       

 03-25-2010
6.00
Fiberglass windscreen layups
Details
       

 03-23-2010
5.00
Taping the windscreen
Details
       

 03-20-2010
2.00
Bonding the windscreen - continued
Details
       

 03-19-2010
4.00
Bonding the wind sheild
Details
       

 03-18-2010
2.00
Gasket for panel access hatches
Details
       

 03-14-2010
4.00
Preparing wind sheild for bonding
Details
       

 03-13-2010
3.00
Putting a smooth fillet in the Sika/frame joint
Details
       

 03-12-2010
5.00
Painting the canopy frame with Sika 209D
Details
       

 03-09-2010
4.00
Finishing, priming and painting canopy skirts
Details
       

 03-08-2010
4.00
Finishing the canopy skirt fairing
Details
       

 03-07-2010
3.00
Priming and painting panel brow
Details
       

 03-06-2010
2.50
Preparation for painting the panel brow
Details
       

 03-06-2010
5.00
More canopy bonding preparation
       

 03-05-2010
5.00
Drilling & countersinking the rear skirt
Details
       

 03-01-2010
4.50
Canopy skirt trimming and fittimg
Details
       

 02-28-2010
5.00
Canopy skirt fiberglass lay-up
Details
       

 02-27-2010
4.50
Canopy skirt mould
Details
       

 02-26-2010
4.50
Canopy rear skirt
Details
       

 02-25-2010
5.00
Canopy skirts
Details
       

 02-14-2010
7.00
Canopy skirts
Details
       

 02-08-2010
5.00
More fitting and trimming the windscreen
Details
       

 02-03-2010
5.00
Canopy - Cutting the windscreen
Details
       

 02-02-2010
1.00
Panel lighting
Details
       

 02-01-2010
3.00
Canopy final construction
Details
       

 01-29-2010
5.00
Mounting the panel edge padding and lights
Details
       

 01-27-2010
6.00
Riviting the forward skin Part 2
Details
       

 01-26-2010
5.00
Riveting the forward skin
Details
       

 01-25-2010
5.00
Preparation for forward fuselage skin
Details
       

 01-20-2010
6.00
Seaking off the fuel tanks and senders
Details
       

 01-08-2010
2.50
Installing the Classic Aero Interior
Details
       

 01-07-2010
5.00
Installing the Classic Aero Interior
Details
       

 01-06-2010
5.00
Installing the Classic Aero Interior
Details
       

 01-04-2010
2.00
Installing the Classic Aero interior
Details
       

 01-03-2010
3.00
Installing the Classic Aero Interior
Details
       

 12-31-2009
3.00
Fitting the Upolstery and Side Panels
Details
       

 12-30-2009
2.50
Cleaning up loose ends
Details
       

 12-22-2009
3.50
Programming the TruTrak Autopilot
       

 12-19-2009
4.50
Preparing the instrument panel skin for assembly
Details
       

 12-17-2009
50.00
Avionics Programming and checkout
Details
       

 12-16-2009
4.00
Programming the Grand Rapids Sport 8.4
Details
       

 12-14-2009
5.00
Rudder pedal to firewall brake lines
Details
       

 12-11-2009
4.00
Brake line adjustments to fit in fairings
Details
       

 12-10-2009
5.00
Hooking up the elevator push tube
Details
       

 12-10-2009
3.00
Better rudder push pull bar #2
Details
       

 12-09-2009
5.00
Better rudder push-pull
Details
       

 12-08-2009
2.00
Mounting the propeller part 2
Details
       

 12-07-2009
2.00
Mounting the popeller
Details
       

 12-04-2009
2.00
Preparing to mount the propeller
Details
       

 12-04-2009
4.00
Mounting the elevators and hooking up the trim
Details
       

 12-02-2009
4.00
Forward fuselage skin painting
Details
       

 12-01-2009
3.00
Aileron Trim Inspecction Plate
Details
       

 11-18-2009
5.00
Fiberglass Finishing and a Visit from Georgia
Details
       

 11-16-2009
4.00
Final coat of primer
Details
       

 11-10-2009
9.00
Adding glass layup on wing tip stiffener
Details
       

 11-09-2009
5.00
Sanding primer
Details
       

 11-07-2009
5.00
Priming more parts
Details
       

 11-06-2009
6.00
Spraying the first 2 coats of PPG K38 High build p
Details
       

 11-04-2009
6.00
Wing tip filling and sanding
Details
       

 11-02-2009
6.50
Sanding the epoxy shell coat
Details
       

 10-30-2009
5.00
Sanding the shelled fibergalss parts
Details
       

 10-29-2009
5.00
Shelling the wheel fairings and tail fairing
Details
       

 10-28-2009
5.00
Shelling the cowl and filling the tail fairing
Details
       

 10-26-2009
5.00
Final filling of major flaws in the fiberglass
Details
     

 10-25-2009
4.00
More fiberglass fun
Details
       

 10-23-2009
3.50
Making the new hinge pin covers
       

 10-21-2009
4.00
Gear leg fairing sanding and filling
Details
       

 10-16-2009
3.00
New hinge pin cover material
Details
       

 10-14-2009
5.50
Filling and sanding the cowl
Details
       

 10-12-2009
5.50
Cowl hinge pin covers
Details
       

 10-09-2009
5.00
Adding platenuts to the fuslage for the leg cuffs
Details
       

 10-07-2009
2.00
USB Cable to GRT panel for software loads
Details
       

 10-06-2009
2.00
Coating the cowl with epoxy
Details
       

 10-05-2009
7.00
Filling, adding glass cloth and sanding
Details
       

 09-08-2009
5.50
Wheel fairings detail work
Details
       

 09-04-2009
5.00
Wheel Fairings
Details
       

 09-02-2009
6.00
Wheel Fairing Layups
Details
       

 08-31-2009
6.00
Wheel Fairings
Details
       

 08-28-2009
6.00
Wheel Fairings
Details
       

 08-27-2009
6.00
Wheel fairing layups and platenuts
Details
       

 08-25-2009
5.50
Right side well fairings
Details
       

 08-21-2009
6.00
Nose wheel and gear fairing
Details
       

 08-19-2009
5.00
Nose wheel fairings
Details
       

 08-17-2009
2.50
Installing the new Matco axel
Details
       

 08-17-2009
4.00
Adding the Fairings Etc & Nose wheel Fairing
Details
       

 08-14-2009
6.00
Wheels Fairings Part 2
Details
       

 08-13-2009
3.00
Wheel Fairings Part 1
Details
       

 08-12-2009
3.00
Left Gear Leg Fairing Part 5 do over
Details
       

 08-11-2009
4.00
Left Gear Leg Fairings Part 4
Details
       

 08-07-2009
4.00
Left Gear Leg Fairings Part 3
Details
       

 08-05-2009
5.00
Left Gear Leg Fairing Part 2
Details
       

 08-03-2009
6.00
Left Gear Leg Fairing Part 1
Details
       

 08-01-2009
5.00
Finishing the firewall insulation
Details
       

 08-01-2009
1.50
Connector for trim indicators
Details
       

 07-31-2009
2.00
Firewall soundproofing and insulation
Details
       

 07-31-2009
2.00
Firewall Insulation
Details
       

 07-30-2009
2.00
Bogert Tow Bar
Details
       

 07-29-2009
3.50
Panel Hatches
Details
       

 07-29-2009
3.00
Panel Hatches
Details
     

 07-27-2009
7.00
Forward Fuselage Skin
Details
       

 07-24-2009
2.00
Wiring is finally done
Details
       

 07-24-2009
2.00
Mounting the GRT and G696
Details
       

 07-24-2009
2.00
Installing the right panel instruments for check o
Details
       

 07-22-2009
2.00
Organizing the wires Part 2
Details
       

 07-22-2009
3.00
Organizing the wires
Details
       

 07-22-2009
1.00
Organizing the stick wiring
Details
     

 07-20-2009
4.00
Wiring Sensors
Details
       

 07-19-2009
1.00
Painting Design
Details
       

 07-17-2009
6.00
Firing up the GRT EFIS & EM Sensors
Details
       

 07-15-2009
5.00
Trim indicator light mounting
Details
       

 07-13-2009
5.00
Right side wing light wiring
Details
       

 07-10-2009
5.00
Stick connector wiring
Details
       

 07-08-2009
9.00
More Wiring
Details
       

 07-07-2009
1.00
Checking out the Upolstery
Details
       

 07-03-2009
6.00
More wiring - Wing lights
Details
       

 07-01-2009
6.00
Completing the switch bank wiring
Details
       

 06-29-2009
6.00
Lighting wiring - Schematic Dwg 003 & 005
Details
       

 06-28-2009
3.00
Switch Plates and Sheilded Strobe cables
Details
       

 06-28-2009
2.00
Engraved switch plate
Details
       

 06-26-2009
8.00
Power for the stobes & Diodes for the Contactors
Details
       

 06-24-2009
4.00
Installing the pitot sensor cable and indicators
Details
       

 06-22-2009
5.00
Connecting the Trutrak Pitch & ARINC
Details
       

 06-19-2009
3.00
Wiring the panel light to the dimmer and test
Details
       

 06-18-2009
3.00
Installing the Tru Trak Digifight IIVSVG harness
Details
       

 06-16-2009
5.00
Routing the Magnetomter and installing the map li
Details
       

 06-12-2009
6.00
Dimmer and radio power wiring
Details
       

 06-10-2009
2.00
Temporary mounting right side switches
Details
       

 06-10-2009
5.00
Dual dimmer mounting
Details
       

 06-08-2009
4.00
Wiring the head set jacks
Details
       

 06-05-2009
5.00
Fabrication of headset jacks
Details
       

 06-03-2009
8.00
Installing the magnetometer in the wing tip
Details
       

 06-01-2009
5.00
Fuel pump wiring
Details
       

 05-29-2009
5.00
Wiring the master switch
Details
     

 05-29-2009
5.00
Wiring the ignition, magnetos, and OV/LV Module
Details
       

 05-27-2009
6.00
Wiring the clock, G meter and GPS antennas
Details
       

 05-22-2009
5.00
Hold down ring storage bracket
Details
       

 05-20-2009
4.00
Installing the sniffle valve
Details
       

 05-19-2009
4.00
Alternator final install and wiring
Details
       

 05-15-2009
5.00
Wiring the Over Voltage/Under Voltage module
Details
       

 05-13-2009
6.00
Mounting the TruTrak Autopilot Servos and Turn and
Details
       

 05-11-2009
4.00
Mounting GPS Ant, ARINC, OVP & Current Limiter
Details
       

 05-08-2009
6.00
Mounting the GPS antennas
Details
       

 04-27-2009
4.00
Panel Assembly
Details
     

 04-26-2009
2.00
Finishing off the radio stack cover panel
Details
       

 04-25-2009
3.00
Rear mounting of the radio stack
Details
       

 04-25-2009
3.00
Mounting the radio stack
Details
       

 04-18-2009
5.00
Wiring stuff
Details
       

 04-17-2009
4.00
Wiring up the Main and Endurance Bus
Details
       

 04-17-2009
2.00
Emergency Locater Transmitter
Details
       

 04-15-2009
6.00
Installing the Black Box (ok the Orange Box)
Details
       

 04-13-2009
4.00
Cleaning up loose ends
Details
       

 04-10-2009
7.00
Installing static and pitot lines
Details
       

 04-08-2009
6.00
Installing the Magnetometer
Details
       

 04-06-2009
3.00
Communications Antenna
Details
       

 04-03-2009
3.00
Cowl Finishing
Details
       

 03-30-2009
5.00
Installing the GRT AFIS
Details
       

 03-28-2009
4.00
Cowl oil door installation and large pin hole fill
Details
       

 03-27-2009
3.00
Completing fabrication of oil door in cowl
Details
       

 03-26-2009
5.00
Installing the GPS and XM Weather platform mounts
Details
       

 03-26-2009
6.00
GPS and XM Weather antenna mounting brackets
Details
       

 03-23-2009
5.00
Fiberglass work
Details
       

 03-23-2009
4.00
Alternate Air
Details
       

 03-20-2009
5.00
Panel Assembly
Details
       

 03-18-2009
4.00
Panel Painting
Details
       

 03-13-2009
5.00
Inlet rubber cowl gasket
Details
       

 03-11-2009
5.00
Brake lines to wheels
Details
       

 03-11-2009
1.00
Adding a finish to the intake airbox
Details
     

 03-06-2009
5.00
Instrument panel construction
Details
       

 03-03-2009
0.10
Moving to the new hanger
Details
       

 02-25-2009
3.00
Installing the Communications Radio Antenna
Details
       

 02-24-2009
2.00
Main and endurance bus fuse
Details
       

 02-24-2009
2.00
Installing the Transponder Antenna
Details
       

 02-20-2009
4.00
More panel work
Details
       

 02-19-2009
6.00
Mounting the Experimental Air Panel
Details
       

 02-19-2009
1.00
More panel pictures
Details
       

 02-16-2009
5.00
Wiring the EIS
Details
       

 02-13-2009
3.00
Wiring the EIS
Details
       

 02-12-2009
3.00
Cleaning up some loose ends
Details
       

 02-11-2009
4.00
Wiring the fuel pump and fuel flow sensor
Details
       

 02-09-2009
7.00
Flap positioning system controller
Details
       

 02-08-2009
4.00
Outside temperature sensor
Details
       

 02-07-2009
4.00
Manifold plumbing and pressure box
Details
       

 02-06-2009
5.00
Fuel flow mounting and plumbing
Details
       

 01-28-2009
4.00
Lycoming FP plug and Manifold Pressure box
Details
       

 01-28-2009
5.00
Engine Systems and Wiring
Details
       

 01-24-2009
5.00
Oil cooler and oil breather completion
Details
       

 01-19-2009
4.00
Shortening Magneto Wires & Mounting
Details
       

 01-12-2009
6.00
Riveting the Bottom wing skins
Details
       

 01-07-2009
4.00
Baffles
Details
       

 01-05-2009
6.00
Baffle Mounting and Engine Wiring
Details
       

 12-30-2008
5.00
Spinner area baffle seals
Details
       

 12-20-2008
2.00
New Panel Design for the new Garmin 696
Details
       

 12-20-2008
1.00
More panels added after a review by GRT users grou
Details
       

 12-19-2008
6.00
Riveting on the baffle seals
Details
       

 12-15-2008
5.00
Cowl Baffle
Details
       

 12-10-2008
4.00
Alternator and Magneto cooling tubes
Details
       

 12-08-2008
5.00
Installing the baffle rubber seals
Details
       

 12-06-2008
2.00
Baffle bottom retaining rods
Details
       

 12-05-2008
4.50
Alternate air and induction mounts
Details
       

 12-03-2008
5.00
Riveting the bottom wing skins
Details
       

 12-01-2008
4.00
Alternate Air
Details
       

 11-25-2008
4.00
Heat inlet and riveting the front baffles
Details
       

 11-18-2008
6.00
Horizontal Injection Induction System
Details
       

 11-14-2008
6.00
More baffle work
Details
       

 11-12-2008
6.00
Mounting the cowl hinges
Details
       

 11-10-2008
5.00
Modifications to air induction
Details
       

 11-05-2008
7.00
Horizontal Injection Induction System
Details
       

 11-03-2008
6.00
Baffles
Details
       

 11-02-2008
4.00
Baffles
Details
       

 10-31-2008
6.00
Baffles
Details
       

 10-29-2008
6.00
Oil cooler installation
Details
       

 10-27-2008
6.00
Baffles
Details
       

 10-26-2008
5.00
Internal hinge pin removal system
Details
       

 10-24-2008
5.00
Oil dip stick door
Details
       

 10-22-2008
5.00
Countersinking cowl and move heater duct
Details
       

 10-20-2008
4.00
Cowl attachment fixtures
Details
       

 10-20-2008
3.00
Assembly of bottom cowl bracket
Details
       

 10-19-2008
4.00
Bottom cowl support
Details
       

 10-17-2008
6.00
Cowl Installation
Details
       

 10-07-2008
7.00
Cowl Installation
Details
       

 10-05-2008
4.00
Cowl Installation
Details
       

 10-03-2008
5.00
Cowl Installation
Details
       

 10-01-2008
7.00
Cowl installation
Details
       

 09-29-2008
2.00
Engine Stuff
Details
       

 09-29-2008
2.00
Cowl Installation
Details
       

 09-29-2008
3.00
Air Oil Separator
       

 09-24-2008
4.00
Engine Stuff
Details
       

 09-19-2008
3.00
More panel stuff
Details
       

 09-17-2008
6.00
Installing the big wires
Details
       

 09-15-2008
1.50
Panel stuff
Details
       

 09-15-2008
4.00
Cutting main sub-panel for instruments and EFIS
Details
       

 09-13-2008
3.00
Painting the instrument panel frame
Details
       

 09-12-2008
5.00
Cutting sub-panel pieces and powdercoating
Details
     

 09-10-2008
0.50
Spinner
Details
     

 09-10-2008
6.00
Firewall forward stuff
Details
       

 09-08-2008
5.00
Mixture control
Details
       

 09-06-2008
3.00
Throttle Linkage
Details
       

 09-05-2008
4.00
Making a throttle cable braket that works
Details
       

 09-04-2008
4.00
Fuel System and heat muff
Details
       

 09-03-2008
4.00
Installing the Vetterman exhaust system
Details
       

 09-02-2008
5.00
Installing the vetterman exhaust system
Details
       

 08-30-2008
3.00
Mounting the engine
       

 08-29-2008
3.00
Mounting the engine
Details
       

 08-29-2008
1.00
Current AFS panel plan
Details
     

 08-28-2008
2.00
Firewall preparation - Oil breather tube clamp
Details
     

 08-27-2008
6.00
Alternate air cable
Details
       

 08-25-2008
4.00
Firewall and wiring preparation
Details
       

 08-24-2008
2.00
Manifold modifications
Details
     

 08-23-2008
0.50
Paint Scheme #5 "Black Bird"
Details
       

 08-23-2008
1.00
Paint Scheme #4 "Blue Bird"
       

 08-22-2008
4.00
Preparation for hanging the engine
Details
       

 08-22-2008
2.00
Drill axels for cotter pins, adjust nose wheel
Details
       

 08-20-2008
6.50
Mounting the landing gear
Details
       

 08-18-2008
2.00
Top canopy slide rail
Details
       

 08-18-2008
4.00
Install the forward panel frame work
Details
       

 08-15-2008
7.00
Canopy lock blocks
Details
       

 08-08-2008
5.50
Bonding the canopy to the frame
Details
       

 08-08-2008
1.00
Bonding the canopy to the frame
Details
       

 08-06-2008
5.00
Canopy gluing prepartion
Details
       

 08-04-2008
5.00
Canopy spacers for gluing with SikeFlex
Details
       

 07-31-2008
2.00
More canopy fitting
Details
       

 07-31-2008
3.00
More canopy fitting
Details
       

 07-30-2008
5.00
Preparing canopy for bonding canopy to the frame
Details
       

 07-29-2008
3.00
Cutting the canopy
Details
       

 07-28-2008
34.00
Cutting the canopy
Details
       

 07-26-2008
3.00
Canopy preparation for the "Big Cut"
Details
       

 07-25-2008
3.00
Canopy frame preparation for plexiglass canopy
Details
       

 07-22-2008
2.00
Engine delivery
Details
     

 07-21-2008
2.00
Landing gear
Details
       

 07-18-2008
5.00
Wheel assembly & wheel pant bracket fabrication
Details
       

 07-16-2008
5.00
Landing gear assembly
Details
       

 07-14-2008
6.00
Riveting in the baggage floor and seat pan
Details
       

 07-11-2008
5.00
Installation of throttle cable
Details
       

 07-09-2008
3.00
GPS and XM weather antennae mounts
Details
       

 07-09-2008
2.00
Bus bar conecting the master relay to the starter
Details
       

 07-08-2008
5.00
Cabin heater control cable
Details
       

 07-07-2008
5.00
Master relay and solenoid mounting
Details
       

 07-06-2008
4.00
Move the gas line for the IO 360 M1B
Details
       

 06-21-2008
0.50
Paint scheme # 3
Details
       

 06-20-2008
6.00
Firewall forward kit inventory and cabin heat valv
Details
       

 06-18-2008
6.00
Bottom stabilizer filler plate
Details
     

 06-16-2008
7.00
Fuse panel
Details
       

 06-13-2008
4.00
Steps
Details
       

 06-11-2008
4.00
Final mounting of rudder pedals and control cables
Details
       

 06-10-2008
6.00
Panel construction
Details
       

 06-09-2008
4.00
Last of the brake work until the wheels go on
Details
       

 06-09-2008
4.00
Even more brake lines work
Details
       

 06-06-2008
6.00
More brake work-running central brake lines
Details
       

 06-04-2008
2.00
Pump to firewall fuel line
Details
       

 06-04-2008
3.00
More brake line stuff
Details
       

 06-04-2008
1.00
Checking the fit of the tunnel cover
Details
       

 06-02-2008
6.00
Brake lines
Details
       

 05-30-2008
4.00
Firewall stuff
Details
       

 05-28-2008
3.00
Nose wheel
Details
       

 05-27-2008
4.00
Finishing the tank to pump fuel lines
Details
       

 05-23-2008
3.00
Spraying the interior parts with DuPont Imron
Details
       

 05-23-2008
3.00
Priming interior parts
Details
       

 05-21-2008
6.00
Final installation of the contol sticks
Details
       

 05-20-2008
2.00
More paint design experimentation
Details
       

 05-19-2008
6.00
Main fuel line and vent lines
Details
       

 05-19-2008
2.00
Final install of fuel vent lines
Details
       

 05-16-2008
5.00
Final mounting of HS stabilizer & rollover frame
Details
       

 05-14-2008
3.00
Painting the interior with Dupont VariPrime
Details
       

 05-14-2008
4.00
Painting the Interior with Dupont Imron
Details
       

 05-14-2008
1.00
Final coat of Imron on the interior
Details
       

 05-12-2008
6.00
More taping and Akzo priming under the the seats a
Details
       

 05-08-2008
6.00
Cleaning and taping the interior
Details
       

 05-06-2008
3.00
Assist handles
Details
       

 05-05-2008
2.00
Special way to add a nut plate without more holes
Details
       

 05-05-2008
4.00
Painting interior panels
Details
       

 05-03-2008
0.20
Propeller
Details
       

 05-02-2008
5.00
Emmpenage fairing
Details
       

 04-30-2008
3.00
Mounting aileron and elevator trim indicators
Details
       

 04-30-2008
5.00
Firewall F-6122-1 and F-601K-1
Details
       

 04-25-2008
3.00
Sandblasting steps and priming
Details
       

 04-23-2008
6.00
More canopy frame manipulation
Details
       

 04-21-2008
6.00
WIng gap attach platenuts
Details
       

 04-16-2008
6.00
FIlling pin holes and finishing the panel
Details
       

 04-14-2008
5.00
Canopy frame manipulation
Details
       

 04-04-2008
4.00
Preliminary fit of the canopy frame
Details
       

 04-03-2008
2.00
Pushtubes and canopy slide rails
Details
       

 04-02-2008
6.00
Ataching the canopy rollover frame
Details
       

 03-31-2008
5.00
Installing the canopy rollover frame
Details
       

 03-30-2008
3.00
Wing tip supports
Details
       

 03-28-2008
4.00
Riveting the forward turtle deck skin
Details
       

 03-26-2008
5.00
Riveting the forward turtle deck skin
Details
       

 03-24-2008
7.00
Wing root fairings
Details
       

 03-21-2008
6.00
Motor mount installation & Wiring
Details
       

 03-19-2008
5.00
Odd jobs
Details
       

 03-16-2008
1.00
Paint scheme # 2
Details
       

 03-14-2008
5.00
More hand brakes work
Details
       

 03-12-2008
5.00
Hand brakes
Details
       

 03-12-2008
2.00
Finishing kit inventory
Details
       

 03-10-2008
6.00
Fuel line vents
Details
       

 03-08-2008
2.00
Finishing kit arrives
Details
       

 03-07-2008
9.00
High pressure fuel injection pump
Details
       

 03-03-2008
5.00
Defroster and cooling fans
Details
       

 03-01-2008
3.00
Re-making the tunnel cover (See 10/24/07)
Details
       

 02-27-2008
5.00
Getting the ailerons in plane
Details
       

 02-25-2008
4.00
More work on the push tubes and ailerons
Details
       

 02-22-2008
6.00
Mounting ailerons and adjusting push tubes.
Details
       

 02-21-2008
2.00
Match drilling fuselage to wing skin
Details
       

 02-20-2008
5.00
Flap installation
Details
       

 02-18-2008
3.00
Flap linkage installation
Details
       

 02-18-2008
2.00
Final installation of fuselage-tank mount
Details
       

 02-17-2008
1.50
Drilling and attaching the tank to fuselage bracke
Details
     

 02-16-2008
2.00
Drilling the rear spar attach to set incidence
       

 02-15-2008
4.00
Setting the wing incidence and sweep
Details
       

 02-14-2008
2.00
Wing insertion
Details
       

 02-13-2008
3.00
Wing preparation for wing holddown mounting
Details
       

 02-07-2008
5.30
Riveting the forward fuselage & panel ribs
Details
       

 02-06-2008
1.00
Vent screen
Details
       

 02-04-2008
2.50
Priming fuselage parts
Details
       

 02-04-2008
3.50
Fuel line and vent line work
Details
       

 02-02-2008
3.00
Fuselage fuel vent fitting
Details
       

 02-01-2008
3.00
Wing drift pins
Details
     

 02-01-2008
3.00
Nut plates for the baggage compartment
Details
       

 01-31-2008
5.00
Painting Ideas - Scheme # 1
Details
       

 01-30-2008
5.00
Final forward top fuselage skin preparation
Details
       

 01-28-2008
5.50
Final Fitting of Fuselage top & wiring
Details
       

 01-25-2008
5.00
Fuel tank sender and pick up
Details
       

 01-25-2008
3.00
Fiberglass empenage fairing
Details
       

 01-21-2008
5.00
Details and Pro-Seal
Details
       

 01-18-2008
4.00
Installing Archer VOR antenna in right wing tip
Details
       

 01-16-2008
3.00
Mounting air vents
Details
       

 01-16-2008
1.30
Avery Tools static vent port
Details
       

 01-14-2008
5.00
Hatch in baggage floor & final riveting of F-705
Details
       

 01-12-2008
7.00
Fuel tank to fuslage attachment bracket
Details
       

 01-09-2008
3.00
Empenage intersection fairing
Details
       

 01-09-2008
3.00
Aileron trim hookup
Details
       

 12-31-2007
5.00
Trimming the rear wing spars
Details
       

 12-31-2007
2.00
Fuel sender modifications
Details
       

 12-22-2007
4.00
Seat belt cable guides
Details
       

 12-21-2007
6.00
Mounting the brake pedals
Details
       

 12-19-2007
2.00
Static port installion
Details
       

 12-19-2007
3.00
Mounted the CH stick grips &
Details
     

 12-17-2007
3.00
Rudder cable and elevator contol hook up
Details
       

 12-17-2007
3.00
Mounting vents in panel
Details
       

 12-13-2007
5.00
Air conditioning
Details
       

 12-12-2007
7.00
Rudder cable installation
Details
       

 12-11-2007
3.00
Rudder stops
Details
       

 12-11-2007
3.00
Rudder cable guides
Details
       

 12-10-2007
4.00
Attachment of vertical stabilizer, rudder and stab
Details
       

 12-09-2007
4.00
Preperation for attaching the vertical stabilizer
Details
       

 12-07-2007
5.00
Vertical Stabilizer attach parts
Details
       

 12-05-2007
5.00
Mounting the Horizontal Stab
Details
       

 12-03-2007
3.00
Strobe mounting
Details
       

 12-03-2007
4.00
Adding compartment for ELT
Details
       

 11-30-2007
4.50
Installing the left step
Details
       

 11-28-2007
7.00
Installing the right step
Details
       

 11-26-2007
6.00
Adding the panel inserts
Details
       

 11-23-2007
4.00
More final fitting of the panel and brackets
Details
       

 11-21-2007
7.00
Fitting and shaping the CIP panel & attachement
Details
       

 11-19-2007
8.00
Mounting the Composit Instrument Panel (CPI)
Details
       

 11-16-2007
8.00
Building the Laird Owens Panel
Details
       

 11-14-2007
6.00
Aileron electric trim build and install
Details
       

 11-12-2007
6.50
Building and mounting the battery box
Details
       

 11-09-2007
7.50
Forward control cover & fuel tank selector
Details
       

 11-07-2007
7.00
Installing landing gear mounts
Details
       

 11-02-2007
7.00
Installing landing gear mounts
Details
       

 10-31-2007
7.00
Elevator push tubes
Details
       

 10-28-2007
9.50
Seat back safety and flap alignment fix
Details
       

 10-28-2007
4.00
Mounting the handbarkes
Details
     

 10-27-2007
4.00
Push-pull control for the rudder
Details
       

 10-26-2007
7.50
Control stick assembly
Details
       

 10-24-2007
6.50
Fabrication of tunnel cover and cabin cover
Details
       

 10-20-2007
4.00
Installing flap motor frame and skins
Details
     

 10-17-2007
6.00
Electric Flap Installation
Details
       

 10-15-2007
8.00
Rivet seatbacks and cleanup work
Details
     

 10-12-2007
6.50
Wing bottom dimpling & priming seat parts
Details
       

 10-10-2007
6.00
Empenage Tips
Details
       

 10-08-2007
7.00
Push-pull rudder system
Details
       

 10-05-2007
6.00
Building upper forward fuselage
Details
       

 10-03-2007
7.00
Fitting the turtle deck false ribs & front skin
Details
       

 10-01-2007
6.00
Framing forward Fuselage and fitting aft skin
Details
       

 09-28-2007
7.00
Miscellaneous stuff
Details
       

 09-27-2007
5.50
Designing and building push-pull rudder system
Details
     

 09-26-2007
6.00
Seat Backs
Details
     

 09-26-2007
6.50
Elevator belcrank
Details
     

 09-21-2007
5.00
Building the second seat back
Details
       

 09-20-2007
8.00
Building seat backs
Details
       

 09-19-2007
3.00
Rudder tips
Details
     

 09-18-2007
6.00
Brake Pedal Build
Details
       

 09-17-2007
8.00
Mounting the rudder peddles
Details
       

 09-16-2007
4.00
Attaching horizontal stab tips and filling
Details
     

 09-14-2007
6.00
Installing wing wire conduit
Details
       

 09-12-2007
6.00
Nutplates
Details
       

 09-10-2007
6.00
Installing Pitot tube
Details
       

 09-09-2007
4.00
Installing TruTrak servo mounts and the Pitot tube
Details
       

 09-07-2007
8.00
Painted wing parts and finished right wing tip
Details
     

 09-05-2007
8.00
Finishing wing tip and drilling bottom skin
Details
       

 09-03-2007
4.00
Right wing tip installation
Details
       

 09-02-2007
7.00
Finishing the left flap installation
Details
       

 09-01-2007
6.00
Left flap installation
Details
     

 09-01-2007
3.00
Filling in aroung the elevator tips
Details
       

 08-31-2007
7.00
RIght flap installation
Details
       

 08-29-2007
7.00
Main aileron push tubes & Started mounting flaps
Details
       

 08-28-2007
5.00
Working on wing tip lights
Details
       

 08-27-2007
6.50
Installing the ailerons and push rod to bell crank
       

 08-22-2007
6.00
Installing aileron brace and bell crank
Details
       

 08-21-2007
3.00
Riviting the aileron hinges to the wing
Details
       

 08-20-2007
5.00
Drilling and fitting the aileron hinges, bellcrank
Details
       

 08-19-2007
2.00
Fabrication & priming the aileron hinges and brace
Details
       

 08-17-2007
3.00
Fabrication of the Flap & Aileron
Details
       

 08-16-2007
7.00
Building the wing tip lights.
Details
       

 08-15-2007
6.00
Building aileron hinges
Details
       

 08-12-2007
8.00
Hoizontal Stab TIps
Details
       

 08-11-2007
2.00
Drilling Elevator Horn
Details
       

 08-09-2007
6.50
Installing Empennage tips
Details
       

 08-08-2007
6.00
Building & installing the electric trim servo
Details
       

 08-02-2007
7.00
Installing the right flap & started left flap
Details
       

 07-20-2007
4.00
Delivery of kit and unpacking the truck
Details
       

 07-18-2007
6.00
Working on left elevator and trim tab
Details
       

 07-14-2007
2.00
Trim tab servo mount
Details
     

 07-14-2007
6.00
Hinging the elevator and working the trim tab
Details
       

 07-11-2007
3.00
Rolling the left elevator leading edge
Details
     

 07-10-2007
8.00
Left elevator trim tab
Details
       

 07-09-2007
4.00
Rolling rudder leading edge and
Details
       

 07-08-2007
5.00
Left Elevator Stuff
Details
       

 07-07-2007
5.00
Rolling the right elevator leading edge
Details
       

 07-06-2007
7.00
Right elevator assembly
Details
       

 07-05-2007
7.00
Finish riviting the rudder
Details
       

 07-04-2007
7.00
Building the left elevator & primimg parts
Details
       

 07-02-2007
6.00
Building the right elevator
Details
       

 06-27-2007
7.30
Bending the elevator trailing edge
Details
       

 06-25-2007
7.00
Riviting the horizontal stabilizer
Details
       

 06-21-2007
4.50
Back riviting rudder skins
Details
       

 06-20-2007
6.00
Priming parts and building the rudder spar
Details
       

 06-19-2007
4.00
Alumiprep and Alodine day for the emenage parts
Details
       

 06-18-2007
0.00
Build fuselage stands
Details
       

 06-15-2007
0.00
Finish Work Bench and Build shelves
Details
     

 06-14-2007
0.00
Set up Shop in hanger, build workbench
Details
     

 06-14-2007
6.00
Fabricating Elevator Parts
Details
       

 06-12-2007
6.50
Right Elevator Stiffeners
Details
       

 06-10-2007
7.00
Rudder Work
Details
       

 06-06-2007
8.00
Horizontal Stab Priming
Details
       

 06-05-2007
7.00
Rudder Build
Details
       

 06-03-2007
6.00
Vertical Stabilizer
Details
       

 05-31-2007
7.00
Grunt work all day
Details
       

 05-30-2007
4.00
Final fit of all the HS parts
Details
       

 05-29-2007
6.00
Front HS Spar-Preliminary Rib & Skin Fit up
Details
       

 05-27-2007
6.00
Rear Spar Fabrication HS 603 PP
Details
       

 05-26-2007
6.00
HS 609 PP Fabrication
Details
       

 05-25-2007
2.00
Shaping Hoizontal Front Span Angles HS 714 & HS 71
Details
       

 05-24-2007
3.00
Empenage Kit Delivery & Inventory
Details
       

 05-14-2007
1.00
Ordered Empennage Kit from Vans Aircraft
Details