Date
|
Hours
|
Work Log Summary
|
Details
|
10-18-2010
|
20.00
|
Exterior Paint - Advanced Aircraft Painting
|
Details
|
|
|
06-14-2010
|
5.00
|
Phase 1 Test Flying
|
Details
|
|
|
06-07-2010
|
3.00
|
First Flight
|
Details
|
|
|
05-23-2010
|
1.00
|
The plane in now ready to fly
|
Details
|
|
|
05-23-2010
|
3.00
|
N947CB gets Airworthiness Certification
|
Details
|
|
|
05-22-2010
|
5.00
|
Weight and Balance
|
Details
|
|
|
05-20-2010
|
2.00
|
Starting the engine
|
Details
|
|
|
05-12-2010
|
7.00
|
Re-installation of the interior
|
Details
|
|
|
05-10-2010
|
6.00
|
Canopy latch
|
Details
|
|
|
05-09-2010
|
0.00
|
Project status of N947CB as of May 2010
|
Details
|
|
|
05-09-2010
|
0.00
|
Project Pictures
|
Details
|
|
|
05-08-2010
|
0.00
|
More Pictures of the project
|
Details
|
|
|
05-05-2010
|
4.00
|
Wing root farings
|
Details
|
|
|
05-04-2010
|
1.50
|
Screwed on wing tip and light lens
|
Details
|
|
|
05-04-2010
|
3.00
|
Installing the seat belts
|
Details
|
|
|
05-04-2010
|
1.00
|
ELT - batteries and hookup
|
Details
|
|
|
05-03-2010
|
1.00
|
Temporary N number until painting
|
Details
|
|
|
05-03-2010
|
3.00
|
Installing the flaps
|
Details
|
|
|
05-03-2010
|
2.50
|
Bleeding the brakes
|
Details
|
|
|
04-27-2010
|
6.00
|
Closing up the interior
|
Details
|
|
|
04-24-2010
|
5.00
|
Installing the ailerons and aileron trim
|
Details
|
|
|
04-24-2010
|
3.50
|
Installing brake lines and Pitot line connection
|
Details
|
|
|
04-22-2010
|
5.00
|
Wiring the right wing tip and Nav antennea
|
Details
|
|
|
04-21-2010
|
4.00
|
Wing tip wiring
|
Details
|
|
|
04-20-2010
|
3.00
|
Completing the wing installation
|
Details
|
|
|
04-19-2010
|
4.00
|
Installing the NAS wing bolts
|
Details
|
|
|
04-18-2010
|
6.00
|
Attaching the right wing
|
Details
|
|
|
04-17-2010
|
6.00
|
Wiring the left wing
|
Details
|
|
|
04-16-2010
|
1.00
|
Replacing the spinner screws
|
Details
|
|
|
04-12-2010
|
5.00
|
Adding heat shielding to the cowl
|
Details
|
|
|
04-11-2010
|
2.00
|
Canopy Handles
|
Details
|
|
|
04-09-2010
|
7.00
|
Finishing the canopy and installing
|
Details
|
|
|
04-07-2010
|
4.00
|
Canopy skirt riveting
|
Details
|
|
|
04-06-2010
|
5.00
|
Windscreen finishing
|
Details
|
|
|
04-04-2010
|
4.50
|
Windscreen finishing
|
Details
|
|
|
04-03-2010
|
4.00
|
Windscreen finishing
|
Details
|
|
|
03-30-2010
|
9.00
|
Filling the windscreen fairing and adding layers
|
Details
|
|
|
03-27-2010
|
8.00
|
Sanding the windscreen fairing
|
Details
|
|
|
03-26-2010
|
4.00
|
Windscreen frame trimming
|
Details
|
|
|
03-25-2010
|
6.00
|
Fiberglass windscreen layups
|
Details
|
|
|
03-23-2010
|
5.00
|
Taping the windscreen
|
Details
|
|
|
03-20-2010
|
2.00
|
Bonding the windscreen - continued
|
Details
|
|
|
03-19-2010
|
4.00
|
Bonding the wind sheild
|
Details
|
|
|
03-18-2010
|
2.00
|
Gasket for panel access hatches
|
Details
|
|
|
03-14-2010
|
4.00
|
Preparing wind sheild for bonding
|
Details
|
|
|
03-13-2010
|
3.00
|
Putting a smooth fillet in the Sika/frame joint
|
Details
|
|
|
03-12-2010
|
5.00
|
Painting the canopy frame with Sika 209D
|
Details
|
|
|
03-09-2010
|
4.00
|
Finishing, priming and painting canopy skirts
|
Details
|
|
|
03-08-2010
|
4.00
|
Finishing the canopy skirt fairing
|
Details
|
|
|
03-07-2010
|
3.00
|
Priming and painting panel brow
|
Details
|
|
|
03-06-2010
|
2.50
|
Preparation for painting the panel brow
|
Details
|
|
|
03-06-2010
|
5.00
|
More canopy bonding preparation
|
|
|
|
03-05-2010
|
5.00
|
Drilling & countersinking the rear skirt
|
Details
|
|
|
03-01-2010
|
4.50
|
Canopy skirt trimming and fittimg
|
Details
|
|
|
02-28-2010
|
5.00
|
Canopy skirt fiberglass lay-up
|
Details
|
|
|
02-27-2010
|
4.50
|
Canopy skirt mould
|
Details
|
|
|
02-26-2010
|
4.50
|
Canopy rear skirt
|
Details
|
|
|
02-25-2010
|
5.00
|
Canopy skirts
|
Details
|
|
|
02-14-2010
|
7.00
|
Canopy skirts
|
Details
|
|
|
02-08-2010
|
5.00
|
More fitting and trimming the windscreen
|
Details
|
|
|
02-03-2010
|
5.00
|
Canopy - Cutting the windscreen
|
Details
|
|
|
02-02-2010
|
1.00
|
Panel lighting
|
Details
|
|
|
02-01-2010
|
3.00
|
Canopy final construction
|
Details
|
|
|
01-29-2010
|
5.00
|
Mounting the panel edge padding and lights
|
Details
|
|
|
01-27-2010
|
6.00
|
Riviting the forward skin Part 2
|
Details
|
|
|
01-26-2010
|
5.00
|
Riveting the forward skin
|
Details
|
|
|
01-25-2010
|
5.00
|
Preparation for forward fuselage skin
|
Details
|
|
|
01-20-2010
|
6.00
|
Seaking off the fuel tanks and senders
|
Details
|
|
|
01-08-2010
|
2.50
|
Installing the Classic Aero Interior
|
Details
|
|
|
01-07-2010
|
5.00
|
Installing the Classic Aero Interior
|
Details
|
|
|
01-06-2010
|
5.00
|
Installing the Classic Aero Interior
|
Details
|
|
|
01-04-2010
|
2.00
|
Installing the Classic Aero interior
|
Details
|
|
|
01-03-2010
|
3.00
|
Installing the Classic Aero Interior
|
Details
|
|
|
12-31-2009
|
3.00
|
Fitting the Upolstery and Side Panels
|
Details
|
|
|
12-30-2009
|
2.50
|
Cleaning up loose ends
|
Details
|
|
|
12-22-2009
|
3.50
|
Programming the TruTrak Autopilot
|
|
|
|
12-19-2009
|
4.50
|
Preparing the instrument panel skin for assembly
|
Details
|
|
|
12-17-2009
|
50.00
|
Avionics Programming and checkout
|
Details
|
|
|
12-16-2009
|
4.00
|
Programming the Grand Rapids Sport 8.4
|
Details
|
|
|
12-14-2009
|
5.00
|
Rudder pedal to firewall brake lines
|
Details
|
|
|
12-11-2009
|
4.00
|
Brake line adjustments to fit in fairings
|
Details
|
|
|
12-10-2009
|
5.00
|
Hooking up the elevator push tube
|
Details
|
|
|
12-10-2009
|
3.00
|
Better rudder push pull bar #2
|
Details
|
|
|
12-09-2009
|
5.00
|
Better rudder push-pull
|
Details
|
|
|
12-08-2009
|
2.00
|
Mounting the propeller part 2
|
Details
|
|
|
12-07-2009
|
2.00
|
Mounting the popeller
|
Details
|
|
|
12-04-2009
|
2.00
|
Preparing to mount the propeller
|
Details
|
|
|
12-04-2009
|
4.00
|
Mounting the elevators and hooking up the trim
|
Details
|
|
|
12-02-2009
|
4.00
|
Forward fuselage skin painting
|
Details
|
|
|
12-01-2009
|
3.00
|
Aileron Trim Inspecction Plate
|
Details
|
|
|
11-18-2009
|
5.00
|
Fiberglass Finishing and a Visit from Georgia
|
Details
|
|
|
11-16-2009
|
4.00
|
Final coat of primer
|
Details
|
|
|
11-10-2009
|
9.00
|
Adding glass layup on wing tip stiffener
|
Details
|
|
|
11-09-2009
|
5.00
|
Sanding primer
|
Details
|
|
|
11-07-2009
|
5.00
|
Priming more parts
|
Details
|
|
|
11-06-2009
|
6.00
|
Spraying the first 2 coats of PPG K38 High build p
|
Details
|
|
|
11-04-2009
|
6.00
|
Wing tip filling and sanding
|
Details
|
|
|
11-02-2009
|
6.50
|
Sanding the epoxy shell coat
|
Details
|
|
|
10-30-2009
|
5.00
|
Sanding the shelled fibergalss parts
|
Details
|
|
|
10-29-2009
|
5.00
|
Shelling the wheel fairings and tail fairing
|
Details
|
|
|
10-28-2009
|
5.00
|
Shelling the cowl and filling the tail fairing
|
Details
|
|
|
10-26-2009
|
5.00
|
Final filling of major flaws in the fiberglass
|
Details
|
|
|
10-25-2009
|
4.00
|
More fiberglass fun
|
Details
|
|
|
10-23-2009
|
3.50
|
Making the new hinge pin covers
|
|
|
|
10-21-2009
|
4.00
|
Gear leg fairing sanding and filling
|
Details
|
|
|
10-16-2009
|
3.00
|
New hinge pin cover material
|
Details
|
|
|
10-14-2009
|
5.50
|
Filling and sanding the cowl
|
Details
|
|
|
10-12-2009
|
5.50
|
Cowl hinge pin covers
|
Details
|
|
|
10-09-2009
|
5.00
|
Adding platenuts to the fuslage for the leg cuffs
|
Details
|
|
|
10-07-2009
|
2.00
|
USB Cable to GRT panel for software loads
|
Details
|
|
|
10-06-2009
|
2.00
|
Coating the cowl with epoxy
|
Details
|
|
|
10-05-2009
|
7.00
|
Filling, adding glass cloth and sanding
|
Details
|
|
|
09-08-2009
|
5.50
|
Wheel fairings detail work
|
Details
|
|
|
09-04-2009
|
5.00
|
Wheel Fairings
|
Details
|
|
|
09-02-2009
|
6.00
|
Wheel Fairing Layups
|
Details
|
|
|
08-31-2009
|
6.00
|
Wheel Fairings
|
Details
|
|
|
08-28-2009
|
6.00
|
Wheel Fairings
|
Details
|
|
|
08-27-2009
|
6.00
|
Wheel fairing layups and platenuts
|
Details
|
|
|
08-25-2009
|
5.50
|
Right side well fairings
|
Details
|
|
|
08-21-2009
|
6.00
|
Nose wheel and gear fairing
|
Details
|
|
|
08-19-2009
|
5.00
|
Nose wheel fairings
|
Details
|
|
|
08-17-2009
|
2.50
|
Installing the new Matco axel
|
Details
|
|
|
08-17-2009
|
4.00
|
Adding the Fairings Etc & Nose wheel Fairing
|
Details
|
|
|
08-14-2009
|
6.00
|
Wheels Fairings Part 2
|
Details
|
|
|
08-13-2009
|
3.00
|
Wheel Fairings Part 1
|
Details
|
|
|
08-12-2009
|
3.00
|
Left Gear Leg Fairing Part 5 do over
|
Details
|
|
|
08-11-2009
|
4.00
|
Left Gear Leg Fairings Part 4
|
Details
|
|
|
08-07-2009
|
4.00
|
Left Gear Leg Fairings Part 3
|
Details
|
|
|
08-05-2009
|
5.00
|
Left Gear Leg Fairing Part 2
|
Details
|
|
|
08-03-2009
|
6.00
|
Left Gear Leg Fairing Part 1
|
Details
|
|
|
08-01-2009
|
5.00
|
Finishing the firewall insulation
|
Details
|
|
|
08-01-2009
|
1.50
|
Connector for trim indicators
|
Details
|
|
|
07-31-2009
|
2.00
|
Firewall soundproofing and insulation
|
Details
|
|
|
07-31-2009
|
2.00
|
Firewall Insulation
|
Details
|
|
|
07-30-2009
|
2.00
|
Bogert Tow Bar
|
Details
|
|
|
07-29-2009
|
3.50
|
Panel Hatches
|
Details
|
|
|
07-29-2009
|
3.00
|
Panel Hatches
|
Details
|
|
|
07-27-2009
|
7.00
|
Forward Fuselage Skin
|
Details
|
|
|
07-24-2009
|
2.00
|
Wiring is finally done
|
Details
|
|
|
07-24-2009
|
2.00
|
Mounting the GRT and G696
|
Details
|
|
|
07-24-2009
|
2.00
|
Installing the right panel instruments for check o
|
Details
|
|
|
07-22-2009
|
2.00
|
Organizing the wires Part 2
|
Details
|
|
|
07-22-2009
|
3.00
|
Organizing the wires
|
Details
|
|
|
07-22-2009
|
1.00
|
Organizing the stick wiring
|
Details
|
|
|
07-20-2009
|
4.00
|
Wiring Sensors
|
Details
|
|
|
07-19-2009
|
1.00
|
Painting Design
|
Details
|
|
|
07-17-2009
|
6.00
|
Firing up the GRT EFIS & EM Sensors
|
Details
|
|
|
07-15-2009
|
5.00
|
Trim indicator light mounting
|
Details
|
|
|
07-13-2009
|
5.00
|
Right side wing light wiring
|
Details
|
|
|
07-10-2009
|
5.00
|
Stick connector wiring
|
Details
|
|
|
07-08-2009
|
9.00
|
More Wiring
|
Details
|
|
|
07-07-2009
|
1.00
|
Checking out the Upolstery
|
Details
|
|
|
07-03-2009
|
6.00
|
More wiring - Wing lights
|
Details
|
|
|
07-01-2009
|
6.00
|
Completing the switch bank wiring
|
Details
|
|
|
06-29-2009
|
6.00
|
Lighting wiring - Schematic Dwg 003 & 005
|
Details
|
|
|
06-28-2009
|
3.00
|
Switch Plates and Sheilded Strobe cables
|
Details
|
|
|
06-28-2009
|
2.00
|
Engraved switch plate
|
Details
|
|
|
06-26-2009
|
8.00
|
Power for the stobes & Diodes for the Contactors
|
Details
|
|
|
06-24-2009
|
4.00
|
Installing the pitot sensor cable and indicators
|
Details
|
|
|
06-22-2009
|
5.00
|
Connecting the Trutrak Pitch & ARINC
|
Details
|
|
|
06-19-2009
|
3.00
|
Wiring the panel light to the dimmer and test
|
Details
|
|
|
06-18-2009
|
3.00
|
Installing the Tru Trak Digifight IIVSVG harness
|
Details
|
|
|
06-16-2009
|
5.00
|
Routing the Magnetomter and installing the map li
|
Details
|
|
|
06-12-2009
|
6.00
|
Dimmer and radio power wiring
|
Details
|
|
|
06-10-2009
|
2.00
|
Temporary mounting right side switches
|
Details
|
|
|
06-10-2009
|
5.00
|
Dual dimmer mounting
|
Details
|
|
|
06-08-2009
|
4.00
|
Wiring the head set jacks
|
Details
|
|
|
06-05-2009
|
5.00
|
Fabrication of headset jacks
|
Details
|
|
|
06-03-2009
|
8.00
|
Installing the magnetometer in the wing tip
|
Details
|
|
|
06-01-2009
|
5.00
|
Fuel pump wiring
|
Details
|
|
|
05-29-2009
|
5.00
|
Wiring the master switch
|
Details
|
|
|
05-29-2009
|
5.00
|
Wiring the ignition, magnetos, and OV/LV Module
|
Details
|
|
|
05-27-2009
|
6.00
|
Wiring the clock, G meter and GPS antennas
|
Details
|
|
|
05-22-2009
|
5.00
|
Hold down ring storage bracket
|
Details
|
|
|
05-20-2009
|
4.00
|
Installing the sniffle valve
|
Details
|
|
|
05-19-2009
|
4.00
|
Alternator final install and wiring
|
Details
|
|
|
05-15-2009
|
5.00
|
Wiring the Over Voltage/Under Voltage module
|
Details
|
|
|
05-13-2009
|
6.00
|
Mounting the TruTrak Autopilot Servos and Turn and
|
Details
|
|
|
05-11-2009
|
4.00
|
Mounting GPS Ant, ARINC, OVP & Current Limiter
|
Details
|
|
|
05-08-2009
|
6.00
|
Mounting the GPS antennas
|
Details
|
|
|
04-27-2009
|
4.00
|
Panel Assembly
|
Details
|
|
|
04-26-2009
|
2.00
|
Finishing off the radio stack cover panel
|
Details
|
|
|
04-25-2009
|
3.00
|
Rear mounting of the radio stack
|
Details
|
|
|
04-25-2009
|
3.00
|
Mounting the radio stack
|
Details
|
|
|
04-18-2009
|
5.00
|
Wiring stuff
|
Details
|
|
|
04-17-2009
|
4.00
|
Wiring up the Main and Endurance Bus
|
Details
|
|
|
04-17-2009
|
2.00
|
Emergency Locater Transmitter
|
Details
|
|
|
04-15-2009
|
6.00
|
Installing the Black Box (ok the Orange Box)
|
Details
|
|
|
04-13-2009
|
4.00
|
Cleaning up loose ends
|
Details
|
|
|
04-10-2009
|
7.00
|
Installing static and pitot lines
|
Details
|
|
|
04-08-2009
|
6.00
|
Installing the Magnetometer
|
Details
|
|
|
04-06-2009
|
3.00
|
Communications Antenna
|
Details
|
|
|
04-03-2009
|
3.00
|
Cowl Finishing
|
Details
|
|
|
03-30-2009
|
5.00
|
Installing the GRT AFIS
|
Details
|
|
|
03-28-2009
|
4.00
|
Cowl oil door installation and large pin hole fill
|
Details
|
|
|
03-27-2009
|
3.00
|
Completing fabrication of oil door in cowl
|
Details
|
|
|
03-26-2009
|
5.00
|
Installing the GPS and XM Weather platform mounts
|
Details
|
|
|
03-26-2009
|
6.00
|
GPS and XM Weather antenna mounting brackets
|
Details
|
|
|
03-23-2009
|
5.00
|
Fiberglass work
|
Details
|
|
|
03-23-2009
|
4.00
|
Alternate Air
|
Details
|
|
|
03-20-2009
|
5.00
|
Panel Assembly
|
Details
|
|
|
03-18-2009
|
4.00
|
Panel Painting
|
Details
|
|
|
03-13-2009
|
5.00
|
Inlet rubber cowl gasket
|
Details
|
|
|
03-11-2009
|
5.00
|
Brake lines to wheels
|
Details
|
|
|
03-11-2009
|
1.00
|
Adding a finish to the intake airbox
|
Details
|
|
|
03-06-2009
|
5.00
|
Instrument panel construction
|
Details
|
|
|
03-03-2009
|
0.10
|
Moving to the new hanger
|
Details
|
|
|
02-25-2009
|
3.00
|
Installing the Communications Radio Antenna
|
Details
|
|
|
02-24-2009
|
2.00
|
Main and endurance bus fuse
|
Details
|
|
|
02-24-2009
|
2.00
|
Installing the Transponder Antenna
|
Details
|
|
|
02-20-2009
|
4.00
|
More panel work
|
Details
|
|
|
02-19-2009
|
6.00
|
Mounting the Experimental Air Panel
|
Details
|
|
|
02-19-2009
|
1.00
|
More panel pictures
|
Details
|
|
|
02-16-2009
|
5.00
|
Wiring the EIS
|
Details
|
|
|
02-13-2009
|
3.00
|
Wiring the EIS
|
Details
|
|
|
02-12-2009
|
3.00
|
Cleaning up some loose ends
|
Details
|
|
|
02-11-2009
|
4.00
|
Wiring the fuel pump and fuel flow sensor
|
Details
|
|
|
02-09-2009
|
7.00
|
Flap positioning system controller
|
Details
|
|
|
02-08-2009
|
4.00
|
Outside temperature sensor
|
Details
|
|
|
02-07-2009
|
4.00
|
Manifold plumbing and pressure box
|
Details
|
|
|
02-06-2009
|
5.00
|
Fuel flow mounting and plumbing
|
Details
|
|
|
01-28-2009
|
4.00
|
Lycoming FP plug and Manifold Pressure box
|
Details
|
|
|
01-28-2009
|
5.00
|
Engine Systems and Wiring
|
Details
|
|
|
01-24-2009
|
5.00
|
Oil cooler and oil breather completion
|
Details
|
|
|
01-19-2009
|
4.00
|
Shortening Magneto Wires & Mounting
|
Details
|
|
|
01-12-2009
|
6.00
|
Riveting the Bottom wing skins
|
Details
|
|
|
01-07-2009
|
4.00
|
Baffles
|
Details
|
|
|
01-05-2009
|
6.00
|
Baffle Mounting and Engine Wiring
|
Details
|
|
|
12-30-2008
|
5.00
|
Spinner area baffle seals
|
Details
|
|
|
12-20-2008
|
2.00
|
New Panel Design for the new Garmin 696
|
Details
|
|
|
12-20-2008
|
1.00
|
More panels added after a review by GRT users grou
|
Details
|
|
|
12-19-2008
|
6.00
|
Riveting on the baffle seals
|
Details
|
|
|
12-15-2008
|
5.00
|
Cowl Baffle
|
Details
|
|
|
12-10-2008
|
4.00
|
Alternator and Magneto cooling tubes
|
Details
|
|
|
12-08-2008
|
5.00
|
Installing the baffle rubber seals
|
Details
|
|
|
12-06-2008
|
2.00
|
Baffle bottom retaining rods
|
Details
|
|
|
12-05-2008
|
4.50
|
Alternate air and induction mounts
|
Details
|
|
|
12-03-2008
|
5.00
|
Riveting the bottom wing skins
|
Details
|
|
|
12-01-2008
|
4.00
|
Alternate Air
|
Details
|
|
|
11-25-2008
|
4.00
|
Heat inlet and riveting the front baffles
|
Details
|
|
|
11-18-2008
|
6.00
|
Horizontal Injection Induction System
|
Details
|
|
|
11-14-2008
|
6.00
|
More baffle work
|
Details
|
|
|
11-12-2008
|
6.00
|
Mounting the cowl hinges
|
Details
|
|
|
11-10-2008
|
5.00
|
Modifications to air induction
|
Details
|
|
|
11-05-2008
|
7.00
|
Horizontal Injection Induction System
|
Details
|
|
|
11-03-2008
|
6.00
|
Baffles
|
Details
|
|
|
11-02-2008
|
4.00
|
Baffles
|
Details
|
|
|
10-31-2008
|
6.00
|
Baffles
|
Details
|
|
|
10-29-2008
|
6.00
|
Oil cooler installation
|
Details
|
|
|
10-27-2008
|
6.00
|
Baffles
|
Details
|
|
|
10-26-2008
|
5.00
|
Internal hinge pin removal system
|
Details
|
|
|
10-24-2008
|
5.00
|
Oil dip stick door
|
Details
|
|
|
10-22-2008
|
5.00
|
Countersinking cowl and move heater duct
|
Details
|
|
|
10-20-2008
|
4.00
|
Cowl attachment fixtures
|
Details
|
|
|
10-20-2008
|
3.00
|
Assembly of bottom cowl bracket
|
Details
|
|
|
10-19-2008
|
4.00
|
Bottom cowl support
|
Details
|
|
|
10-17-2008
|
6.00
|
Cowl Installation
|
Details
|
|
|
10-07-2008
|
7.00
|
Cowl Installation
|
Details
|
|
|
10-05-2008
|
4.00
|
Cowl Installation
|
Details
|
|
|
10-03-2008
|
5.00
|
Cowl Installation
|
Details
|
|
|
10-01-2008
|
7.00
|
Cowl installation
|
Details
|
|
|
09-29-2008
|
2.00
|
Engine Stuff
|
Details
|
|
|
09-29-2008
|
2.00
|
Cowl Installation
|
Details
|
|
|
09-29-2008
|
3.00
|
Air Oil Separator
|
|
|
|
09-24-2008
|
4.00
|
Engine Stuff
|
Details
|
|
|
09-19-2008
|
3.00
|
More panel stuff
|
Details
|
|
|
09-17-2008
|
6.00
|
Installing the big wires
|
Details
|
|
|
09-15-2008
|
1.50
|
Panel stuff
|
Details
|
|
|
09-15-2008
|
4.00
|
Cutting main sub-panel for instruments and EFIS
|
Details
|
|
|
09-13-2008
|
3.00
|
Painting the instrument panel frame
|
Details
|
|
|
09-12-2008
|
5.00
|
Cutting sub-panel pieces and powdercoating
|
Details
|
|
|
09-10-2008
|
0.50
|
Spinner
|
Details
|
|
|
09-10-2008
|
6.00
|
Firewall forward stuff
|
Details
|
|
|
09-08-2008
|
5.00
|
Mixture control
|
Details
|
|
|
09-06-2008
|
3.00
|
Throttle Linkage
|
Details
|
|
|
09-05-2008
|
4.00
|
Making a throttle cable braket that works
|
Details
|
|
|
09-04-2008
|
4.00
|
Fuel System and heat muff
|
Details
|
|
|
09-03-2008
|
4.00
|
Installing the Vetterman exhaust system
|
Details
|
|
|
09-02-2008
|
5.00
|
Installing the vetterman exhaust system
|
Details
|
|
|
08-30-2008
|
3.00
|
Mounting the engine
|
|
|
|
08-29-2008
|
3.00
|
Mounting the engine
|
Details
|
|
|
08-29-2008
|
1.00
|
Current AFS panel plan
|
Details
|
|
|
08-28-2008
|
2.00
|
Firewall preparation - Oil breather tube clamp
|
Details
|
|
|
08-27-2008
|
6.00
|
Alternate air cable
|
Details
|
|
|
08-25-2008
|
4.00
|
Firewall and wiring preparation
|
Details
|
|
|
08-24-2008
|
2.00
|
Manifold modifications
|
Details
|
|
|
08-23-2008
|
0.50
|
Paint Scheme #5 "Black Bird"
|
Details
|
|
|
08-23-2008
|
1.00
|
Paint Scheme #4 "Blue Bird"
|
|
|
|
08-22-2008
|
4.00
|
Preparation for hanging the engine
|
Details
|
|
|
08-22-2008
|
2.00
|
Drill axels for cotter pins, adjust nose wheel
|
Details
|
|
|
08-20-2008
|
6.50
|
Mounting the landing gear
|
Details
|
|
|
08-18-2008
|
2.00
|
Top canopy slide rail
|
Details
|
|
|
08-18-2008
|
4.00
|
Install the forward panel frame work
|
Details
|
|
|
08-15-2008
|
7.00
|
Canopy lock blocks
|
Details
|
|
|
08-08-2008
|
5.50
|
Bonding the canopy to the frame
|
Details
|
|
|
08-08-2008
|
1.00
|
Bonding the canopy to the frame
|
Details
|
|
|
08-06-2008
|
5.00
|
Canopy gluing prepartion
|
Details
|
|
|
08-04-2008
|
5.00
|
Canopy spacers for gluing with SikeFlex
|
Details
|
|
|
07-31-2008
|
2.00
|
More canopy fitting
|
Details
|
|
|
07-31-2008
|
3.00
|
More canopy fitting
|
Details
|
|
|
07-30-2008
|
5.00
|
Preparing canopy for bonding canopy to the frame
|
Details
|
|
|
07-29-2008
|
3.00
|
Cutting the canopy
|
Details
|
|
|
07-28-2008
|
34.00
|
Cutting the canopy
|
Details
|
|
|
07-26-2008
|
3.00
|
Canopy preparation for the "Big Cut"
|
Details
|
|
|
07-25-2008
|
3.00
|
Canopy frame preparation for plexiglass canopy
|
Details
|
|
|
07-22-2008
|
2.00
|
Engine delivery
|
Details
|
|
|
07-21-2008
|
2.00
|
Landing gear
|
Details
|
|
|
07-18-2008
|
5.00
|
Wheel assembly & wheel pant bracket fabrication
|
Details
|
|
|
07-16-2008
|
5.00
|
Landing gear assembly
|
Details
|
|
|
07-14-2008
|
6.00
|
Riveting in the baggage floor and seat pan
|
Details
|
|
|
07-11-2008
|
5.00
|
Installation of throttle cable
|
Details
|
|
|
07-09-2008
|
3.00
|
GPS and XM weather antennae mounts
|
Details
|
|
|
07-09-2008
|
2.00
|
Bus bar conecting the master relay to the starter
|
Details
|
|
|
07-08-2008
|
5.00
|
Cabin heater control cable
|
Details
|
|
|
07-07-2008
|
5.00
|
Master relay and solenoid mounting
|
Details
|
|
|
07-06-2008
|
4.00
|
Move the gas line for the IO 360 M1B
|
Details
|
|
|
06-21-2008
|
0.50
|
Paint scheme # 3
|
Details
|
|
|
06-20-2008
|
6.00
|
Firewall forward kit inventory and cabin heat valv
|
Details
|
|
|
06-18-2008
|
6.00
|
Bottom stabilizer filler plate
|
Details
|
|
|
06-16-2008
|
7.00
|
Fuse panel
|
Details
|
|
|
06-13-2008
|
4.00
|
Steps
|
Details
|
|
|
06-11-2008
|
4.00
|
Final mounting of rudder pedals and control cables
|
Details
|
|
|
06-10-2008
|
6.00
|
Panel construction
|
Details
|
|
|
06-09-2008
|
4.00
|
Last of the brake work until the wheels go on
|
Details
|
|
|
06-09-2008
|
4.00
|
Even more brake lines work
|
Details
|
|
|
06-06-2008
|
6.00
|
More brake work-running central brake lines
|
Details
|
|
|
06-04-2008
|
2.00
|
Pump to firewall fuel line
|
Details
|
|
|
06-04-2008
|
3.00
|
More brake line stuff
|
Details
|
|
|
06-04-2008
|
1.00
|
Checking the fit of the tunnel cover
|
Details
|
|
|
06-02-2008
|
6.00
|
Brake lines
|
Details
|
|
|
05-30-2008
|
4.00
|
Firewall stuff
|
Details
|
|
|
05-28-2008
|
3.00
|
Nose wheel
|
Details
|
|
|
05-27-2008
|
4.00
|
Finishing the tank to pump fuel lines
|
Details
|
|
|
05-23-2008
|
3.00
|
Spraying the interior parts with DuPont Imron
|
Details
|
|
|
05-23-2008
|
3.00
|
Priming interior parts
|
Details
|
|
|
05-21-2008
|
6.00
|
Final installation of the contol sticks
|
Details
|
|
|
05-20-2008
|
2.00
|
More paint design experimentation
|
Details
|
|
|
05-19-2008
|
6.00
|
Main fuel line and vent lines
|
Details
|
|
|
05-19-2008
|
2.00
|
Final install of fuel vent lines
|
Details
|
|
|
05-16-2008
|
5.00
|
Final mounting of HS stabilizer & rollover frame
|
Details
|
|
|
05-14-2008
|
3.00
|
Painting the interior with Dupont VariPrime
|
Details
|
|
|
05-14-2008
|
4.00
|
Painting the Interior with Dupont Imron
|
Details
|
|
|
05-14-2008
|
1.00
|
Final coat of Imron on the interior
|
Details
|
|
|
05-12-2008
|
6.00
|
More taping and Akzo priming under the the seats a
|
Details
|
|
|
05-08-2008
|
6.00
|
Cleaning and taping the interior
|
Details
|
|
|
05-06-2008
|
3.00
|
Assist handles
|
Details
|
|
|
05-05-2008
|
2.00
|
Special way to add a nut plate without more holes
|
Details
|
|
|
05-05-2008
|
4.00
|
Painting interior panels
|
Details
|
|
|
05-03-2008
|
0.20
|
Propeller
|
Details
|
|
|
05-02-2008
|
5.00
|
Emmpenage fairing
|
Details
|
|
|
04-30-2008
|
3.00
|
Mounting aileron and elevator trim indicators
|
Details
|
|
|
04-30-2008
|
5.00
|
Firewall F-6122-1 and F-601K-1
|
Details
|
|
|
04-25-2008
|
3.00
|
Sandblasting steps and priming
|
Details
|
|
|
04-23-2008
|
6.00
|
More canopy frame manipulation
|
Details
|
|
|
04-21-2008
|
6.00
|
WIng gap attach platenuts
|
Details
|
|
|
04-16-2008
|
6.00
|
FIlling pin holes and finishing the panel
|
Details
|
|
|
04-14-2008
|
5.00
|
Canopy frame manipulation
|
Details
|
|
|
04-04-2008
|
4.00
|
Preliminary fit of the canopy frame
|
Details
|
|
|
04-03-2008
|
2.00
|
Pushtubes and canopy slide rails
|
Details
|
|
|
04-02-2008
|
6.00
|
Ataching the canopy rollover frame
|
Details
|
|
|
03-31-2008
|
5.00
|
Installing the canopy rollover frame
|
Details
|
|
|
03-30-2008
|
3.00
|
Wing tip supports
|
Details
|
|
|
03-28-2008
|
4.00
|
Riveting the forward turtle deck skin
|
Details
|
|
|
03-26-2008
|
5.00
|
Riveting the forward turtle deck skin
|
Details
|
|
|
03-24-2008
|
7.00
|
Wing root fairings
|
Details
|
|
|
03-21-2008
|
6.00
|
Motor mount installation & Wiring
|
Details
|
|
|
03-19-2008
|
5.00
|
Odd jobs
|
Details
|
|
|
03-16-2008
|
1.00
|
Paint scheme # 2
|
Details
|
|
|
03-14-2008
|
5.00
|
More hand brakes work
|
Details
|
|
|
03-12-2008
|
5.00
|
Hand brakes
|
Details
|
|
|
03-12-2008
|
2.00
|
Finishing kit inventory
|
Details
|
|
|
03-10-2008
|
6.00
|
Fuel line vents
|
Details
|
|
|
03-08-2008
|
2.00
|
Finishing kit arrives
|
Details
|
|
|
03-07-2008
|
9.00
|
High pressure fuel injection pump
|
Details
|
|
|
03-03-2008
|
5.00
|
Defroster and cooling fans
|
Details
|
|
|
03-01-2008
|
3.00
|
Re-making the tunnel cover (See 10/24/07)
|
Details
|
|
|
02-27-2008
|
5.00
|
Getting the ailerons in plane
|
Details
|
|
|
02-25-2008
|
4.00
|
More work on the push tubes and ailerons
|
Details
|
|
|
02-22-2008
|
6.00
|
Mounting ailerons and adjusting push tubes.
|
Details
|
|
|
02-21-2008
|
2.00
|
Match drilling fuselage to wing skin
|
Details
|
|
|
02-20-2008
|
5.00
|
Flap installation
|
Details
|
|
|
02-18-2008
|
3.00
|
Flap linkage installation
|
Details
|
|
|
02-18-2008
|
2.00
|
Final installation of fuselage-tank mount
|
Details
|
|
|
02-17-2008
|
1.50
|
Drilling and attaching the tank to fuselage bracke
|
Details
|
|
|
02-16-2008
|
2.00
|
Drilling the rear spar attach to set incidence
|
|
|
|
02-15-2008
|
4.00
|
Setting the wing incidence and sweep
|
Details
|
|
|
02-14-2008
|
2.00
|
Wing insertion
|
Details
|
|
|
02-13-2008
|
3.00
|
Wing preparation for wing holddown mounting
|
Details
|
|
|
02-07-2008
|
5.30
|
Riveting the forward fuselage & panel ribs
|
Details
|
|
|
02-06-2008
|
1.00
|
Vent screen
|
Details
|
|
|
02-04-2008
|
2.50
|
Priming fuselage parts
|
Details
|
|
|
02-04-2008
|
3.50
|
Fuel line and vent line work
|
Details
|
|
|
02-02-2008
|
3.00
|
Fuselage fuel vent fitting
|
Details
|
|
|
02-01-2008
|
3.00
|
Wing drift pins
|
Details
|
|
|
02-01-2008
|
3.00
|
Nut plates for the baggage compartment
|
Details
|
|
|
01-31-2008
|
5.00
|
Painting Ideas - Scheme # 1
|
Details
|
|
|
01-30-2008
|
5.00
|
Final forward top fuselage skin preparation
|
Details
|
|
|
01-28-2008
|
5.50
|
Final Fitting of Fuselage top & wiring
|
Details
|
|
|
01-25-2008
|
5.00
|
Fuel tank sender and pick up
|
Details
|
|
|
01-25-2008
|
3.00
|
Fiberglass empenage fairing
|
Details
|
|
|
01-21-2008
|
5.00
|
Details and Pro-Seal
|
Details
|
|
|
01-18-2008
|
4.00
|
Installing Archer VOR antenna in right wing tip
|
Details
|
|
|
01-16-2008
|
3.00
|
Mounting air vents
|
Details
|
|
|
01-16-2008
|
1.30
|
Avery Tools static vent port
|
Details
|
|
|
01-14-2008
|
5.00
|
Hatch in baggage floor & final riveting of F-705
|
Details
|
|
|
01-12-2008
|
7.00
|
Fuel tank to fuslage attachment bracket
|
Details
|
|
|
01-09-2008
|
3.00
|
Empenage intersection fairing
|
Details
|
|
|
01-09-2008
|
3.00
|
Aileron trim hookup
|
Details
|
|
|
12-31-2007
|
5.00
|
Trimming the rear wing spars
|
Details
|
|
|
12-31-2007
|
2.00
|
Fuel sender modifications
|
Details
|
|
|
12-22-2007
|
4.00
|
Seat belt cable guides
|
Details
|
|
|
12-21-2007
|
6.00
|
Mounting the brake pedals
|
Details
|
|
|
12-19-2007
|
2.00
|
Static port installion
|
Details
|
|
|
12-19-2007
|
3.00
|
Mounted the CH stick grips &
|
Details
|
|
|
12-17-2007
|
3.00
|
Rudder cable and elevator contol hook up
|
Details
|
|
|
12-17-2007
|
3.00
|
Mounting vents in panel
|
Details
|
|
|
12-13-2007
|
5.00
|
Air conditioning
|
Details
|
|
|
12-12-2007
|
7.00
|
Rudder cable installation
|
Details
|
|
|
12-11-2007
|
3.00
|
Rudder stops
|
Details
|
|
|
12-11-2007
|
3.00
|
Rudder cable guides
|
Details
|
|
|
12-10-2007
|
4.00
|
Attachment of vertical stabilizer, rudder and stab
|
Details
|
|
|
12-09-2007
|
4.00
|
Preperation for attaching the vertical stabilizer
|
Details
|
|
|
12-07-2007
|
5.00
|
Vertical Stabilizer attach parts
|
Details
|
|
|
12-05-2007
|
5.00
|
Mounting the Horizontal Stab
|
Details
|
|
|
12-03-2007
|
3.00
|
Strobe mounting
|
Details
|
|
|
12-03-2007
|
4.00
|
Adding compartment for ELT
|
Details
|
|
|
11-30-2007
|
4.50
|
Installing the left step
|
Details
|
|
|
11-28-2007
|
7.00
|
Installing the right step
|
Details
|
|
|
11-26-2007
|
6.00
|
Adding the panel inserts
|
Details
|
|
|
11-23-2007
|
4.00
|
More final fitting of the panel and brackets
|
Details
|
|
|
11-21-2007
|
7.00
|
Fitting and shaping the CIP panel & attachement
|
Details
|
|
|
11-19-2007
|
8.00
|
Mounting the Composit Instrument Panel (CPI)
|
Details
|
|
|
11-16-2007
|
8.00
|
Building the Laird Owens Panel
|
Details
|
|
|
11-14-2007
|
6.00
|
Aileron electric trim build and install
|
Details
|
|
|
11-12-2007
|
6.50
|
Building and mounting the battery box
|
Details
|
|
|
11-09-2007
|
7.50
|
Forward control cover & fuel tank selector
|
Details
|
|
|
11-07-2007
|
7.00
|
Installing landing gear mounts
|
Details
|
|
|
11-02-2007
|
7.00
|
Installing landing gear mounts
|
Details
|
|
|
10-31-2007
|
7.00
|
Elevator push tubes
|
Details
|
|
|
10-28-2007
|
9.50
|
Seat back safety and flap alignment fix
|
Details
|
|
|
10-28-2007
|
4.00
|
Mounting the handbarkes
|
Details
|
|
|
10-27-2007
|
4.00
|
Push-pull control for the rudder
|
Details
|
|
|
10-26-2007
|
7.50
|
Control stick assembly
|
Details
|
|
|
10-24-2007
|
6.50
|
Fabrication of tunnel cover and cabin cover
|
Details
|
|
|
10-20-2007
|
4.00
|
Installing flap motor frame and skins
|
Details
|
|
|
10-17-2007
|
6.00
|
Electric Flap Installation
|
Details
|
|
|
10-15-2007
|
8.00
|
Rivet seatbacks and cleanup work
|
Details
|
|
|
10-12-2007
|
6.50
|
Wing bottom dimpling & priming seat parts
|
Details
|
|
|
10-10-2007
|
6.00
|
Empenage Tips
|
Details
|
|
|
10-08-2007
|
7.00
|
Push-pull rudder system
|
Details
|
|
|
10-05-2007
|
6.00
|
Building upper forward fuselage
|
Details
|
|
|
10-03-2007
|
7.00
|
Fitting the turtle deck false ribs & front skin
|
Details
|
|
|
10-01-2007
|
6.00
|
Framing forward Fuselage and fitting aft skin
|
Details
|
|
|
09-28-2007
|
7.00
|
Miscellaneous stuff
|
Details
|
|
|
09-27-2007
|
5.50
|
Designing and building push-pull rudder system
|
Details
|
|
|
09-26-2007
|
6.00
|
Seat Backs
|
Details
|
|
|
09-26-2007
|
6.50
|
Elevator belcrank
|
Details
|
|
|
09-21-2007
|
5.00
|
Building the second seat back
|
Details
|
|
|
09-20-2007
|
8.00
|
Building seat backs
|
Details
|
|
|
09-19-2007
|
3.00
|
Rudder tips
|
Details
|
|
|
09-18-2007
|
6.00
|
Brake Pedal Build
|
Details
|
|
|
09-17-2007
|
8.00
|
Mounting the rudder peddles
|
Details
|
|
|
09-16-2007
|
4.00
|
Attaching horizontal stab tips and filling
|
Details
|
|
|
09-14-2007
|
6.00
|
Installing wing wire conduit
|
Details
|
|
|
09-12-2007
|
6.00
|
Nutplates
|
Details
|
|
|
09-10-2007
|
6.00
|
Installing Pitot tube
|
Details
|
|
|
09-09-2007
|
4.00
|
Installing TruTrak servo mounts and the Pitot tube
|
Details
|
|
|
09-07-2007
|
8.00
|
Painted wing parts and finished right wing tip
|
Details
|
|
|
09-05-2007
|
8.00
|
Finishing wing tip and drilling bottom skin
|
Details
|
|
|
09-03-2007
|
4.00
|
Right wing tip installation
|
Details
|
|
|
09-02-2007
|
7.00
|
Finishing the left flap installation
|
Details
|
|
|
09-01-2007
|
6.00
|
Left flap installation
|
Details
|
|
|
09-01-2007
|
3.00
|
Filling in aroung the elevator tips
|
Details
|
|
|
08-31-2007
|
7.00
|
RIght flap installation
|
Details
|
|
|
08-29-2007
|
7.00
|
Main aileron push tubes & Started mounting flaps
|
Details
|
|
|
08-28-2007
|
5.00
|
Working on wing tip lights
|
Details
|
|
|
08-27-2007
|
6.50
|
Installing the ailerons and push rod to bell crank
|
|
|
|
08-22-2007
|
6.00
|
Installing aileron brace and bell crank
|
Details
|
|
|
08-21-2007
|
3.00
|
Riviting the aileron hinges to the wing
|
Details
|
|
|
08-20-2007
|
5.00
|
Drilling and fitting the aileron hinges, bellcrank
|
Details
|
|
|
08-19-2007
|
2.00
|
Fabrication & priming the aileron hinges and brace
|
Details
|
|
|
08-17-2007
|
3.00
|
Fabrication of the Flap & Aileron
|
Details
|
|
|
08-16-2007
|
7.00
|
Building the wing tip lights.
|
Details
|
|
|
08-15-2007
|
6.00
|
Building aileron hinges
|
Details
|
|
|
08-12-2007
|
8.00
|
Hoizontal Stab TIps
|
Details
|
|
|
08-11-2007
|
2.00
|
Drilling Elevator Horn
|
Details
|
|
|
08-09-2007
|
6.50
|
Installing Empennage tips
|
Details
|
|
|
08-08-2007
|
6.00
|
Building & installing the electric trim servo
|
Details
|
|
|
08-02-2007
|
7.00
|
Installing the right flap & started left flap
|
Details
|
|
|
07-20-2007
|
4.00
|
Delivery of kit and unpacking the truck
|
Details
|
|
|
07-18-2007
|
6.00
|
Working on left elevator and trim tab
|
Details
|
|
|
07-14-2007
|
2.00
|
Trim tab servo mount
|
Details
|
|
|
07-14-2007
|
6.00
|
Hinging the elevator and working the trim tab
|
Details
|
|
|
07-11-2007
|
3.00
|
Rolling the left elevator leading edge
|
Details
|
|
|
07-10-2007
|
8.00
|
Left elevator trim tab
|
Details
|
|
|
07-09-2007
|
4.00
|
Rolling rudder leading edge and
|
Details
|
|
|
07-08-2007
|
5.00
|
Left Elevator Stuff
|
Details
|
|
|
07-07-2007
|
5.00
|
Rolling the right elevator leading edge
|
Details
|
|
|
07-06-2007
|
7.00
|
Right elevator assembly
|
Details
|
|
|
07-05-2007
|
7.00
|
Finish riviting the rudder
|
Details
|
|
|
07-04-2007
|
7.00
|
Building the left elevator & primimg parts
|
Details
|
|
|
07-02-2007
|
6.00
|
Building the right elevator
|
Details
|
|
|
06-27-2007
|
7.30
|
Bending the elevator trailing edge
|
Details
|
|
|
06-25-2007
|
7.00
|
Riviting the horizontal stabilizer
|
Details
|
|
|
06-21-2007
|
4.50
|
Back riviting rudder skins
|
Details
|
|
|
06-20-2007
|
6.00
|
Priming parts and building the rudder spar
|
Details
|
|
|
06-19-2007
|
4.00
|
Alumiprep and Alodine day for the emenage parts
|
Details
|
|
|
06-18-2007
|
0.00
|
Build fuselage stands
|
Details
|
|
|
06-15-2007
|
0.00
|
Finish Work Bench and Build shelves
|
Details
|
|
|
06-14-2007
|
0.00
|
Set up Shop in hanger, build workbench
|
Details
|
|
|
06-14-2007
|
6.00
|
Fabricating Elevator Parts
|
Details
|
|
|
06-12-2007
|
6.50
|
Right Elevator Stiffeners
|
Details
|
|
|
06-10-2007
|
7.00
|
Rudder Work
|
Details
|
|
|
06-06-2007
|
8.00
|
Horizontal Stab Priming
|
Details
|
|
|
06-05-2007
|
7.00
|
Rudder Build
|
Details
|
|
|
06-03-2007
|
6.00
|
Vertical Stabilizer
|
Details
|
|
|
05-31-2007
|
7.00
|
Grunt work all day
|
Details
|
|
|
05-30-2007
|
4.00
|
Final fit of all the HS parts
|
Details
|
|
|
05-29-2007
|
6.00
|
Front HS Spar-Preliminary Rib & Skin Fit up
|
Details
|
|
|
05-27-2007
|
6.00
|
Rear Spar Fabrication HS 603 PP
|
Details
|
|
|
05-26-2007
|
6.00
|
HS 609 PP Fabrication
|
Details
|
|
|
05-25-2007
|
2.00
|
Shaping Hoizontal Front Span Angles HS 714 & HS 71
|
Details
|
|
|
05-24-2007
|
3.00
|
Empenage Kit Delivery & Inventory
|
Details
|
|
|
05-14-2007
|
1.00
|
Ordered Empennage Kit from Vans Aircraft
|
Details
|
|