Powered By Kitlog Pro v2.0
Daniels Web Site
Zodiac 601 XL
All
Work Logs Found:
68
Category Work Time:
321 Hours
Date
Hours
Work Log Summary
Details
10-27-2009
1.00
Riveting the aft end sides
Details
10-27-2009
9.00
Getting ready to button up the aft end .
Details
10-11-2009
12.00
Get back to work
Details
03-18-2009
2.00
Firewall Rivets
Details
03-17-2009
5.00
Tail Rivets
Details
03-08-2009
1.00
Spar placement
Details
03-08-2009
3.00
Cabin Skins
Details
02-07-2009
4.00
Setup Fuselage on new jig.
Details
09-07-2008
7.00
Firewall and Cockpit Floor
09-07-2008
1.00
A couple photos of the Fuselage
09-01-2008
2.60
1.9 hours in a Champ & .7 in the Cub of all Cubs
Details
08-31-2008
16.00
Aft Section in Jig.
Details
08-23-2008
8.00
Aft Section - Bottom Skin
Details
08-16-2008
4.00
Aft Section
06-07-2008
4.00
Moving Operation Out of the Basement and Into the
04-24-2008
1.00
Ordered the Fuselage Kit
Details
01-20-2008
5.00
Pitot Tube installation & Wing Tip
Details
01-19-2008
4.00
Finishing up the bottom of the wing.
Details
01-13-2008
6.00
Wiring and fitting the Tank
Details
01-13-2008
2.00
Pitot Tube Tubing and Wiring
Details
01-12-2008
6.00
Fuel Sender
Details
01-06-2008
0.00
The Christmas Bucket - Wing Locker
01-06-2008
0.00
Christmas Bucket - Fuel Tank.
Details
01-06-2008
0.00
Christmas Bucket - Drilling the fuel cap hole
Details
01-06-2008
20.00
Christmas 2007 Holiday Bucket of time and activity
Details
12-09-2007
3.50
Wing Locker Cut Out in Top Skin
Details
12-09-2007
1.50
Flaps and Aileron
Details
12-08-2007
6.00
Top wing work
Details
12-07-2007
4.00
Finish up the bottom of the wing
Details
12-01-2007
4.00
Bottom of wing work
11-30-2007
4.00
Bottom of Wing Work
Details
11-13-2007
1.00
Positioning the Bottom Skin
Details
11-13-2007
1.25
Final level of Spar and Channel - RH Wing
Details
11-11-2007
5.00
Top skin drilled. Bottom skin next.
Details
11-10-2007
4.50
Positon the top skin and drill.
Details
11-09-2007
3.50
Locker Compartment
Details
11-04-2007
5.00
Debur and paint Right Wing
Details
11-03-2007
10.00
WIng Ribs/Spar/Channel
Details
11-02-2007
2.00
Lay out the spar/rib/channel
10-28-2007
4.00
Drilled the Spar and Rear Ribs
10-27-2007
2.00
Rib Stiffners on RR #1,2,3 & 4
Details
10-14-2007
6.00
The Wings, Let the games begin
Details
10-14-2007
0.25
A couple more photos of wing stuff
Details
10-13-2007
4.50
Finished up the Ailerons.
Details
10-12-2007
3.00
Aileron Construction
Details
10-07-2007
3.00
Finish the Flaps and Start the Aileron
Details
10-06-2007
4.00
Flapping around the basement
Details
10-05-2007
3.00
Just a little flap over the Flaps
Details
10-04-2007
3.00
Replace Elevator Hinge
Details
10-03-2007
2.00
Wing Kit Inventory
Details
09-27-2007
3.00
Pick up the Wing Kit
Details
08-08-2007
1.00
Set Up of ProLog
Details
07-15-2007
4.00
Horizontal Stab Fiberglass Tips
Details
07-03-2007
1.00
Ordered the Wing Kit
07-01-2007
0.25
Trim Tab Photos
07-01-2007
10.00
Elevator Assembly
06-24-2007
50.00
Horiz Stab Skeleton.
06-18-2007
2.75
Horiz Stab.
Details
06-17-2007
0.75
Horizontal Stab - Putzing around.
Details
06-15-2007
1.00
Horiz Stab - Spar
Details
06-10-2007
4.00
Assembly Table
Details
06-09-2007
5.00
Work for Wood.
Details
06-08-2007
0.25
Possitle I-Joist for Table - Free!
Details
05-12-2007
1.00
Ops!
Details
05-10-2007
12.00
Rudder Construction
Details
05-09-2007
10.00
Drive to Mexico, MO
Details
04-30-2007
0.25
Workshop Registration
Details
04-19-2007
1.00
Zenith Zodiac 601 XL Plans
Details
SITE NAVIGATION
Contact Builder
Zodiac 601 XL Home
Category
# Logs
# Hours
All
68
321
Empennage
11
91
Flying
1
3
Fuselage
15
78
Miscellaneous
2
2
Shop Supplies
1
0
Tools
2
9
Wings
36
138
Copyright © 2001-2024 Matronics. All Rights Reserved.