KitLog pro

Powered By Kitlog Pro v2.0

Eds Vans RV-6A/7A Web Site
Work Logs Found: 1115
Category Work Time: 0 Hours
 Date
Hours
Work Log Summary

Details

 01-21-2015
0.00
The Canopy Big Cut 3.
Details
       

 01-20-2015
0.00
The Canopy Big Cut 2.
Details
       

 01-19-2015
0.00
The Canopy Big Cut 1.
Details
       

 01-18-2015
0.00
Forward canopy trimming 5.
Details
       

 01-17-2015
0.00
Forward canopy trimming 4.
Details
       

 01-16-2015
0.00
Forward canopy trimming 3.
Details
       

 01-15-2015
0.00
Forward canopy trimming 2.
Details
       

 01-14-2015
0.00
Forward canopy trimming 1
Details
       

 01-13-2015
0.00
Canopy shaping tools
Details
       

 01-12-2015
0.00
Second trim canopy sides
Details
       

 01-11-2015
0.00
First trim for/aft canopy
Details
       

 01-10-2015
0.00
The canopy
Details
       

 01-09-2015
0.00
Canopy Frame Debur/Counter Sink 5
Details
       

 01-08-2015
0.00
Canopy Frame Debur/Counter Sink 4
Details
       

 01-07-2015
0.00
Canopy Frame Debur/Counter Sink 3
Details
       

 01-06-2015
0.00
Canopy Frame Debur/Counter Sink 2
Details
       

 01-05-2015
0.00
Canopy Frame Debur/Counter Sink 1
Details
       

 01-04-2015
0.00
Drill Canopy Frame Forward Skin Wings
Details
       

 01-03-2015
0.00
Canopy Frame Wedge
Details
       

 01-02-2015
0.00
Canopy Frame Anti Movement Bolt
Details
       

 01-01-2015
0.00
Canopy Frame Enforcement Drilling
Details
       

 08-15-2013
0.00
Milling machine
Details
       

 08-14-2013
0.00
Milling machine
Details
       

 08-13-2013
0.00
Canopy Reinf. Drill F-7128C's to Canopy Frame.
Details
       

 08-12-2013
0.00
Canopy Reinf. Complete Fabrication of F-7128C's
Details
       

 08-11-2013
0.00
Canopy Reinf. Fabricate F-7128C Clasp's
Details
       

 08-10-2013
0.00
Canopy Reinf. Fabricate F-7128C Clasp's
Details
     

 08-09-2013
0.00
Canopy Reinf. More drilling and fitting.
Details
       

 08-08-2013
0.00
Canopy Reinf. Trial fit and drill forward edge.
Details
       

 08-07-2013
0.00
Canopy Reinf. Bend straight flanges.
Details
       

 08-06-2013
0.00
Canopy Reinf. Circular Reinforcement Flanges.
Details
       

 08-05-2013
0.00
Canopy Reinf. Fabricate Stiffening Flange Tool.
Details
       

 08-04-2013
0.00
Canopy Reinf. Canopy Reinforcement Kit.
Details
     

 08-03-2013
0.00
Riveting for/aft canopy decks.
Details
       

 08-02-2013
0.00
Riveting the F-705's.
Details
       

 08-01-2013
0.00
Adjust notch of F-705's for pop rivets.
Details
       

 05-28-2013
0.00
Drill Forward Ball Stud Mounts to Fuselage.
Details
       

 05-27-2013
0.00
Make Plate Nut Plate, mount Aft Ball Stud Mounts
Details
       

 05-26-2013
0.00
Drill Aft Ball Stud Mounts To F-721 Canopy Deck.
Details
       

 05-25-2013
0.00
Fabricate Forward Lift Strut, Ball Stud Mounts. 2.
Details
       

 05-24-2013
0.00
Fabricate Forward Lift Strut, Ball Stud Mounts. 1.
Details
       

 05-23-2013
0.00
Finish Fabrication of Aft Ball Stud Mounts.
Details
       

 05-22-2013
0.00
Fabricate Aft Lift Stru,t Ball Stud Mount.
Details
       

 05-21-2013
0.00
Adjust curve of Wd-725 Canopy Side Frame.
Details
       

 05-20-2013
0.00
Rivet C-613 Splice plate to Wd-725 side frame.
Details
       

 05-19-2013
0.00
Drill C-613 Side Splice Plates to Wd-725's.
Details
       

 05-18-2013
0.00
Dtrill Wd-725 Aft Canopy Frame Side Angles.
Details
       

 05-17-2013
0.00
Sand Aft Wd-725Canopy Side Frame Angle Flat.
Details
       

 05-16-2013
0.00
Drill C-704 SPlice Plate to Aft Frame Channel.
Details
       

 05-15-2013
0.00
Make the C-704 Aft Canopy Frame Splice Plate.
Details
       

 05-14-2013
0.00
Shape Canopy Frame F-631A Channels.
Details
       

 05-13-2013
0.00
Adjust Fuselage Seal Flange to Canopy Frame.
Details
     

 05-12-2013
0.00
Enlarging the Canopy Frame Goose Neck to 3/8"
Details
     

 05-11-2013
0.00
Finish drilling 1/4" holes through Goose Neck.
Details
       

 05-10-2013
0.00
Initial drilling of the Canopy Frame Goose Neck.
Details
       

 05-09-2013
0.00
Work Bench gets cluttered fast.
Details
     

 05-08-2013
0.00
Drilling Canopy Frame Forward Arms
Details
       

 05-07-2013
0.00
Drilling C-614 Split to Canopy Frame
Details
       

 05-06-2013
0.00
Initial fit of C-614 Canopy Splice Plate.
Details
       

 05-05-2013
0.00
Make C-614 Canopy Splice Plate.
Details
       

 05-04-2013
0.00
Trim C-619 Canopy Hinge Block Spacers.
Details
     

 05-03-2013
0.00
Result Wd-716 aft edge flange adjustment.
Details
       

 05-02-2013
0.00
Remove material from Wd-716 aft edge flange.
Details
       

 05-01-2013
0.00
Trial fit of forward Canopy Frame
Details
       

 03-18-2013
0.00
Canopy Frame. Prep Canopy Frame Top Skin. 2
Details
       

 03-17-2013
0.00
Canopy Frame. Prep Canopy Frame. 1
Details
       

 03-10-2013
0.00
Install Steps. Prep and prime Steps. 10
Details
       

 03-09-2013
0.00
Install Steps. Drill Step Anchor Block. 9
Details
       

 03-08-2013
0.00
Install Steps. Step Plate rivet hole locations. 8
Details
       

 03-07-2013
0.00
Install Steps. Drill remaining column of rivets. 7
Details
       

 03-06-2013
0.00
Install Steps. Drill Step Plate to Fuselage. 6
Details
       

 03-05-2013
0.00
Install Steps. Shape plate and cut off corner. 5
Details
       

 03-04-2013
0.00
Install Steps. Mark and drill Step Plate Holes. 4
Details
       

 03-03-2013
0.00
Install Steps. Mark and drill Step Plate Holes. 3
Details
       

 03-02-2013
0.00
Install Steps. Adjust tube length. 2
Details
       

 03-01-2013
0.00
Install Steps. Adjust tube length. 1
Details
       

 02-19-2013
0.00
Bolt and tourqe the Seat Belt Anchors.
Details
       

 02-18-2013
0.00
Rivet Top Rear Skin with Stephanie.
Details
       

 02-17-2013
0.00
Rivet Rudder Pedal Center Support to Firewall.
Details
       

 02-16-2013
0.00
Rivet the cool air vent bracket.
Details
     

 02-15-2013
0.00
Canopy latch Mechanism. Final Assembly . 4
Details
       

 02-14-2013
0.00
Canopy latch Mechanism. Prep Latch Angles. 3
Details
       

 02-13-2013
0.00
Canopy latch Mechanism. Tap Push Rod. 2
Details
     

 02-12-2013
0.00
Canopy latch Mechanism. Drill C-611 Blocks. 1
Details
       

 02-11-2013
0.00
Canopy Latch Handle, Rivet Latch Angles. 8
Details
       

 02-10-2013
0.00
Canopy Latch Handle, Install spring and wire. 7
Details
       

 02-09-2013
0.00
Canopy Latch Handle, Drill angles throgh skin. 6
Details
       

 02-08-2013
0.00
Canopy Latch Handle, File handle slots in skin. 5
Details
     

 02-07-2013
0.00
Canopy Latch Handle, File handle slots in skin. 4
Details
       

 02-06-2013
0.00
Canopy Latch Handle, Drill skin using angles, 3
Details
       

 02-05-2013
0.00
Canopy Latch Handle, Mark Hole Locations. 2
Details
       

 02-04-2013
0.00
Canopy Latch Handle, Prepare Handle, 1
Details
       

 02-03-2013
0.00
Roller Cart Tool Box.
Details
       

 02-02-2013
0.00
Drill Press is all assembled.
Details
       

 02-01-2013
0.00
New full size drill press.
Details
       

 12-10-2012
0.00
Good friends swapping a fuselage stand.
Details
       

 12-09-2012
0.00
Canopy Release Handle mounted vertically.
Details
     

 12-08-2012
0.00
Sub-Panel Complete and Installed in Fuselage.
Details
       

 12-07-2012
0.00
Sub-Panel Revited.
Details
     

 12-06-2012
0.00
Rivet Sub-Panel
Details
       

 12-05-2012
0.00
Rivet Hat Channel/Seal Supports to Sub Panel.
Details
       

 12-04-2012
0.00
Alternative Canopy Release Handle Position.
Details
       

 12-03-2012
0.00
F-643-1 Channel Interference Modification. 2
Details
     

 12-02-2012
0.00
F-643-1 Channel Interference Modification. 1
Details
       

 12-01-2012
0.00
More F-679 Hat Channel Interference.
Details
       

 11-30-2012
0.00
Drilling Canopy Release Shaft and Arm Together.
Details
       

 11-29-2012
0.00
1/2" Hole instrument Panel for jettison Handle.
Details
       

 11-28-2012
0.00
F-643-1 Channel Interference Modification.
Details
     

 11-27-2012
0.00
Bearing Block and Hat Channel Modification.
Details
       

 11-26-2012
0.00
Hinge Pin Interference bottoming out on Short Rib.
Details
       

 11-25-2012
0.00
Dill holes in end of Canopy Release Links.
Details
       

 11-24-2012
0.00
Canopy Release Bearing Block, Fabrication, 2
Details
       

 11-23-2012
0.00
Canopy Release Bearing Block, Fabrication, 1
Details
       

 11-22-2012
0.00
Cut Slots in Canopy Release Steel Links.
Details
       

 11-21-2012
0.00
Remove Threads and Shape Canopy Hinge Pins.
Details
       

 11-20-2012
0.00
Decrease Diameter of WD-619 Release Shaft.
Details
       

 11-19-2012
0.00
Conopy Hinge, Fit Hinge Blocks
Details
       

 11-18-2012
0.00
Canopy Hinge, Fit Hinge Blocks.
Details
       

 11-17-2012
0.00
Canopy Hinge, Drill Hinge Blocks.
Details
       

 11-16-2012
0.00
Canopy Latch, Fabricate C-619 Spacers.
Details
       

 11-15-2012
0.00
Fresh Air vents, Attach to Fuselage.
Details
       

 11-14-2012
0.00
Fresh Air Vents, Fit to Fuselage.
Details
       

 11-13-2012
0.00
Fresh Air Vents, Fabricate Attach Angles.
Details
       

 11-12-2012
0.00
Fresh Air Vents, Fit/Locate Attach Angles.
Details
       

 11-11-2012
0.00
Service the Compress after hose blow
Details
       

 11-10-2012
0.00
Compressor Blew a HOSE while not at home.
Details
       

 11-09-2012
0.00
Install NACA vents. Shop head washer.Better Idea.
Details
       

 11-08-2012
0.00
Install NACA vents. Shop head washer. BAD IDEA.
Details
       

 11-07-2012
0.00
Install NACA vents. Counter sink vent. Dimple skin
Details
     

 11-06-2012
0.00
Install NACA vents. Drill vents to fuselage.
Details
       

 11-05-2012
0.00
Install NACA vents. Drill hole pattern in vents.
Details
       

 11-04-2012
0.00
Install NACA vents. Locating and Fitting.
Details
     

 11-03-2012
0.00
Glue bug screens in NACA vents.
Details
       

 11-02-2012
0.00
Fit bug screens in NACA vents.
Details
       

 11-01-2012
0.00
Instrument panel anchor point angles and nut-plate
Details
     

 07-23-2012
0.00
Rivet F-703B and C to instrument panel.
Details
       

 07-22-2012
0.00
Prime panel and sub panel parts.Part 2.
Details
       

 07-21-2012
0.00
Prime panel and sub panel parts.
Details
       

 07-20-2012
0.00
Dimple Forward Top Skin
Details
       

 07-19-2012
0.00
Drill all remaining holes in forward top skin.
Details
       

 07-18-2012
0.00
Finalize drilling F-721Cand D attach angles
Details
       

 07-17-2012
0.00
Drilling F-721D Attach Angle to Canopy Deck
Details
       

 07-16-2012
0.00
Drill F721C Attach Angle to canopy Deck
Details
       

 07-15-2012
0.00
Drill F644 flange through top skin.
Details
       

 07-14-2012
0.00
Drill F-643B angle to the firewall.
Details
       

 07-13-2012
0.00
Prep forward top skin
Details
       

 07-12-2012
0.00
Locate and drill F-743B Angle to F-643 Channel
Details
       

 07-11-2012
0.00
Drill F-643 FWD Channel to Top Forward Skin
Details
       

 07-10-2012
0.00
Mindy comes to help. Photo op first. Part 2
Details
       

 07-09-2012
0.00
Mindy comes to help. Photo op first. Part 1
Details
       

 07-08-2012
0.00
Fit and drill F-643 to F-768A Sub Panel.
Details
       

 07-07-2012
0.00
Fit and drill F-644 sShort Ribs to F-768A Sub Pane
Details
       

 07-06-2012
0.00
Fit and Drill F-768C Seal Support To F-768B
Details
       

 07-05-2012
0.00
Drill F-768C Seal Angle To F-768A Sub-Panel
Details
       

 07-04-2012
0.00
Fabricate F-644 Short Ribs Part 2
Details
       

 07-03-2012
0.00
Fabricate F-644 Short Ribs Part 1
Details
       

 07-02-2012
0.00
Frbricate F-703C Angle Part 2
Details
       

 07-01-2012
0.00
Frbricate F-703C Angle Part1
Details
       

 05-09-2012
0.00
Trim F-684 Channel.
Details
       

 05-08-2012
0.00
Fab F-768D, Seal Supprt Angle, Part 4
Details
       

 05-07-2012
0.00
Fab F-768D, Seal Supprt Angle, Part 3
Details
       

 05-06-2012
0.00
Fab F-768D, Seal Supprt Angle, Part 2
Details
       

 05-05-2012
0.00
Fab F-768D, Seal Supprt Angle, Part 1
Details
       

 05-04-2012
0.00
Fab F-703B, Canopy Deck Angle, Part 4
Details
       

 05-03-2012
0.00
Fab F-703B, Canopy Deck Angle, Part 3
Details
       

 05-02-2012
0.00
Fab F-703B, Canopy Deck Angle, Part 2
Details
       

 05-01-2012
0.00
Fab F-703B, Canopy Deck Angle, Part 1
Details
       

 04-04-2012
0.00
Make fuselage rotisserie height adjustable.
Details
       

 04-03-2012
0.00
Fuel vent. Glue screens to fitting ends.
Details
       

 04-02-2012
0.00
Fuel Vent. Shape end to 45 degrees.
Details
       

 04-01-2012
0.00
Fuel Vent Fittings, Gring off threads.
Details
       

 01-07-2012
0.00
Rudder Cable Installed.
Details
       

 01-06-2012
0.00
Wheel Axle Not Wrench
Details
       

 01-05-2012
0.00
Internal Rudder Stop 5, Adjust contact surface.
Details
       

 01-04-2012
0.00
Internal Rudder Stop 4, Cut it.
Details
       

 01-03-2012
0.00
Internal Rudder Stop 3, Cut it.
Details
       

 01-02-2012
0.00
Internal Rudder Stop 2, Cut it.
Details
       

 01-01-2012
0.00
Internal Rudder Stop 1, Measure it.
Details
       

 05-28-2011
0.00
Final mounting of rear VS to fuselage.
Details
       

 05-27-2011
0.00
Debur and finally rivet the tie down bracket.
Details
       

 05-26-2011
0.00
Enlarge 6 holes holding on the VS to 3/16.
Details
       

 05-25-2011
0.00
Drill lower VS spar to fuselage.
Details
       

 05-24-2011
0.00
Drill upper VS spar to elevator stop.
Details
     

 05-23-2011
0.00
Clamp VS in place for drilling.
Details
       

 05-22-2011
0.00
Locating vertical stabilizers lateral angle.
Details
       

 05-21-2011
0.00
Locating vertical stabilizer vertically.
Details
       

 05-20-2011
0.00
Result of drilling elevator stop.
Details
       

 05-19-2011
0.00
Locate and drill F-712D Elevator up stop.
Details
       

 05-18-2011
0.00
Drill tie down hole in fuselage.
Details
     

 05-17-2011
0.00
Locate and drill 4 lower holes in Vertical Stabili
Details
       

 05-16-2011
0.00
Vertical Stabilizer main spar missing rivets.
Details
       

 05-15-2011
0.00
Abby graduates from middle school. Wow.
Details
       

 05-14-2011
0.00
Fabricate F-712D up elevator stop. Part 2.
Details
       

 05-13-2011
0.00
Fabricate F-712D up elevator stop. Part 1.
Details
       

 05-12-2011
0.00
Adjust Vertical Stabilizer main spar flanges.
Details
       

 05-11-2011
0.00
Trial fit of Vertical Stabilizer to fuselage.
Details
       

 05-10-2011
0.00
Tim forward spar of vertical stabilizer.
Details
       

 05-09-2011
0.00
Installed F-789 elevator push tube.
Details
       

 05-08-2011
0.00
Installed a milling attachment to my lathe.
Details
       

 05-07-2011
0.00
Adjust F-789 elevator push tube length.
Details
       

 05-06-2011
0.00
Drill and rivet F-789 elevator push rod.
Details
       

 05-05-2011
0.00
Assemble F-789 elevator pushrod.
Details
       

 05-04-2011
0.00
Elevator trim, rivet anchor not.
Details
       

 05-03-2011
0.00
Connect elevator trim tab cable at each end.
Details
       

 05-02-2011
0.00
Elevator trim cable. Drill anchor nut plate.
Details
       

 05-01-2011
0.00
Elevator trim cable. Mark anchor nut plate rivet h
Details
       

 04-30-2011
0.00
Expand snap bushings, Route Trim cable.
Details
       

 04-29-2011
0.00
Elevator trim cable. Drill more holes.
Details
       

 04-28-2011
0.00
Elevator trim cable. Inspect and disassemble.
Details
       

 04-27-2011
0.00
Elevator push tube. Install.
Details
       

 04-26-2011
0.00
Elevator push tube. Prime and rivet.
Details
       

 04-25-2011
0.00
Elevator push tube, Mark and Drill ends.
Details
       

 04-24-2011
0.00
Make elevator push tube. Part 1.
Details
       

 04-23-2011
0.00
Drill elevator push tube hole.
Details
     

 04-22-2011
0.00
Drill HS aft spar to fuselage.
Details
     

 04-21-2011
0.00
Set and check HS incidence. Angle of attack.
Details
       

 04-20-2011
0.00
Drill forward HS spar to fuselage.
Details
     

 04-19-2011
0.00
Drill hole locations on HS forward spar.
Details
       

 04-18-2011
0.00
Match Drill HS spar angle through shim.
Details
       

 04-16-2011
0.00
Mark hole locations on HS forward spar. 2
Details
       

 04-15-2011
0.00
Mark hole locations on HS forward spar. 1
Details
     

 04-14-2011
0.00
Drill holes on F-711C HS attach bar.
Details
     

 04-13-2011
0.00
Mark hole loc on F-711C HS attach bar.
Details
       

 04-12-2011
0.00
Mount HS for hole location marking, again.
Details
       

 04-11-2011
0.00
Mount HS for hole location marking.
Details
       

 04-10-2011
0.00
Make HS F798 Shims.
Details
     

 04-09-2011
0.00
Drill elevator horns at push tube end.
Details
       

 04-08-2011
0.00
Drill elevator horns at center bearing.
Details
       

 04-07-2011
0.00
Make Elevator horn drill spacer block.
Details
       

 04-06-2011
0.00
HS center bearing is not Perpendicular to spar.
Details
       

 04-05-2011
0.00
Elevator horns not parallel.
Details
       

 04-04-2011
0.00
Elevator horns totally out of wack.
Details
       

 04-03-2011
0.00
Attach elevators to HS.
Details
     

 04-02-2011
0.00
Adjust HS Rod End Bearing Lengths
Details
       

 04-01-2011
0.00
Hinge Tool from Avery
Details
     

 04-01-2011
0.00
Drilling AN3 Holes
Details
       

 12-29-2010
0.00
Finished Roll Bar. Part 2.
Details
       

 12-28-2010
0.00
Finished Roll Bar. Part 1.
Details
       

 12-27-2010
0.00
Roll Bar - Fill hole in 631C/D angle bracket. Part
Details
       

 12-26-2010
0.00
Roll Bar - Fill hole in 631C/D angle bracket. Part
Details
       

 12-25-2010
0.00
Roll Bar - Fill hole in 631C/D angle bracket. Part
Details
       

 12-24-2010
0.00
Hole Fixing - Extract rod and sand shape.
Details
       

 12-23-2010
0.00
Hole Fixing - Fill ugly hole with epoxy.
Details
       

 12-22-2010
0.00
Hole Fixing - Prepare sample ugly holes to repair.
Details
       

 12-21-2010
0.00
Hole Fixing - Alum Fast Epoxy.
Details
       

 12-20-2010
0.00
Hole Fixing - Devcon Fast Epoxy.
Details
       

 12-19-2010
0.00
Mindy and I sit in the fuselage for the first time
Details
       

 12-18-2010
0.00
Roll Bar - Seat Back interference with Roll Bar?.
Details
       

 12-17-2010
0.00
Roll Bar - Seat Back interference with Roll Bar?.
Details
       

 12-16-2010
0.00
Roll Bar - Drill roll bar to fuselage. Part 7.
Details
       

 12-15-2010
0.00
Roll Bar - Drill roll bar to fuselage. Part 6.
Details
     

 12-14-2010
0.00
Roll Bar - Drill roll bar to fuselage. Part 5.
Details
       

 12-13-2010
0.00
Roll Bar - Drill roll bar to fuselage. Part 4.
Details
       

 12-12-2010
0.00
Roll Bar - Drill roll bar to fuselage. Part 3.
Details
     

 12-11-2010
0.00
Roll Bar - Drill roll bar to fuselage. Part 2.
Details
       

 12-11-2010
0.00
Magnetic finger.
Details
       

 12-10-2010
0.00
Roll Bar - Clamp roll bar in its final location.
Details
       

 12-09-2010
0.00
Rolll Bar - Drill roll bar to fuselage. Part 1.
Details
       

 12-08-2010
0.00
Roll Bar - Use thin shim under roll bar to get hei
Details
     

 12-08-2010
0.00
Roll Bar - Check roll bar height before drilling.
Details
       

 12-07-2010
0.00
Roll Bar - Shape 631C/D outer edge to match fusela
Details
       

 12-06-2010
0.00
Roll Bar - Test roll bar width.
Details
       

 12-05-2010
0.00
Roll Bar - Drill 631C/D's to fuselage.
Details
       

 12-04-2010
0.00
Roll Bar - Prepare for drilling roll bar to fusela
Details
       

 12-03-2010
0.00
Roll Bar - Locate roll bar for/aft.
Details
       

 12-02-2010
0.00
Roll Bar - End of roll bar is not square.
Details
       

 12-01-2010
0.00
Roll Bar - Pop rivet aft end of roll bar.
Details
       

 11-17-2010
0.00
Roll Bar - Rivet for/aft roll bar splice plates.
Details
       

 11-16-2010
0.00
Roll Bar - Rivet forward side of roll bar.
Details
       

 11-15-2010
0.00
Roll Bar - Fabricate 632A bottom cover.
Details
       

 11-14-2010
0.00
Roll Bar - Prime the rool bar.
Details
     

 11-13-2010
0.00
Roll Bar - Drill forward holes in 632A channel.
Details
       

 11-12-2010
0.00
Roll Bar - Drill aft end of 632A
Details
       

 11-11-2010
0.00
Roll Bar - Trim 631C/D to fi tthe curve of fuselag
Details
       

 11-10-2010
0.00
Roll Bar - Trim bottom for angle assembly. Part 2.
Details
       

 11-09-2010
0.00
Roll Bar - Trim bottom for angle assembly.
Details
       

 11-08-2010
0.00
Roll Bar - 705J/K/L buckhead interference. Crap.
Details
     

 11-07-2010
0.00
Roll Bar - 705J/K/L buckhead interference. Crap.
Details
       

 11-06-2010
0.00
Roll Bar - Rivet 631C/D keeper rivets.
Details
     

 11-05-2010
0.00
Roll Bar - Drill 631C/D keep rivet holes.
Details
       

 11-04-2010
0.00
Roll Bar - Pre drill 631C/D holes as per planes.
Details
       

 11-03-2010
0.00
Roll Bar - Bend and drill the 732D angle part 2.
Details
       

 11-02-2010
0.00
Roll Bar - Bend and drill the 732D angle.
Details
       

 11-01-2010
0.00
Roll Bar - Cut bolt access holes in rear channel.
Details
       

 09-16-2010
0.00
Roll Bar - Counter sink channel flanges.
Details
       

 09-15-2010
0.00
Roll Bar - Locate and drill the top 631E joint pla
Details
       

 09-14-2010
0.00
Roll Bar - Match drill straps to top channels.
Details
       

 09-13-2010
0.00
Roll Bar - Finnish drilling straps to bottom chann
Details
       

 09-12-2010
0.00
Roll Bar - Drill roll bar straps to bottom channel
Details
       

 09-11-2010
0.00
Roll Bar - Bevel the 631B straps and locate.
Details
       

 09-10-2010
0.00
Roll Bar - Locate top roll bar flange holes.
Details
     

 09-09-2010
0.00
Roll Bar - Drill bottom roll bar channel holes.
Details
       

 09-08-2010
0.00
Roll Bar - Mark hole locations in bottom flange.
Details
       

 09-07-2010
0.00
Roll Bar - Drill 631E splice plate to roll bar cha
Details
       

 09-06-2010
0.00
Roll Bar - Fabricate the 631E splice plate.
Details
       

 09-05-2010
0.00
Roll Bar - Flatten roll bar channel flanges.
Details
       

 09-04-2010
0.00
Roll Bar - Trim the top channels to match to botto
Details
       

 09-03-2010
0.00
Roll Bar - Flatten the bottom of roll bar channel
Details
       

 09-02-2010
0.00
Roll Bar - Mark and trim top of roll bar channel.
Details
       

 09-01-2010
0.00
Roll Bar - Test fit roll bar channels in jig.
Details
       

 06-07-2010
0.00
Roll Bar, Make F-631C and D angles. Part 2.
Details
       

 06-05-2010
0.00
Roll Bar, Make F-631C and D angles. Part 1.
Details
       

 06-04-2010
0.00
Drill top forward holes in top skin to #30. Part 2
Details
       

 06-03-2010
0.00
Drill top forward holes in top skin to #30.
Details
       

 06-02-2010
0.00
Rivet F-709 Bulkhead.
Details
       

 06-01-2010
0.00
New building buddy Mike Bullock.
Details
     

 05-31-2010
0.00
Aft F-656-L Gusset Plate.
Details
       

 05-30-2010
0.00
Aft F-656-R Gusset Plate.
Details
       

 05-29-2010
0.00
Forward F-656-L Gusset Plate.
Details
       

 05-28-2010
0.00
Forward F-656-R Gusset Plate.
Details
       

 05-27-2010
0.00
Pitot Static Part 3, Installation complete.
Details
       

 05-26-2010
0.00
Pitot Static Part 2, Install system, clamp pop riv
Details
       

 05-25-2010
0.00
Pitot Static Part 1, Prepare pop rivet.
Details
       

 05-24-2010
0.00
Atached 21 Platenuts on 706 bullkhead
Details
       

 03-22-2010
0.00
Drove to VANS to pick up Steve's finishing kit.
Details
       

 03-21-2010
0.00
Fitting F-707B angle
Details
       

 03-20-2010
0.00
Drill F-656 Gussets to Longeron
Details
       

 03-19-2010
0.00
Tape aft top skin up and out of the way.
Details
       

 03-18-2010
0.00
Test fit shoulder harness cable through wear block
Details
       

 03-17-2010
0.00
Cut shoulder harness cable slot in F651 bulkhead.
Details
       

 03-16-2010
0.00
Match drill bulkhead halves through wear blocks.
Details
       

 03-15-2010
0.00
Drill shoulder harness cable wear blocks.
Details
       

 03-14-2010
0.00
Match drill upper half edge holes through scrap.
Details
       

 03-13-2010
0.00
Join top/bottom 652/751 bulkhead halves.
Details
       

 03-12-2010
0.00
Shape upper side of F-652 Baggage Bulkhead.
Details
       

 03-11-2010
0.00
Drill F-751 baggage bulkhead to F-706 bulkhead.
Details
     

 03-10-2010
0.00
Platenut the baggage side coverers.
Details
       

 03-09-2010
0.00
Random pictures of aft top skins clecoed on.
Details
       

 03-08-2010
0.00
Final Drill AFt F709 Bulkhead
Details
       

 03-07-2010
0.00
Match drill Aft Top Skins
Details
       

 03-06-2010
0.00
Drill top F-786A J Stiffeners through aft top skin
Details
       

 03-05-2010
0.00
Remake top F-786A Fuse. J Stiffeners.
Details
       

 03-04-2010
0.00
Deblue/debur aft top skins.
Details
       

 03-03-2010
0.00
Static line clip locations.
Details
       

 03-02-2010
0.00
Rivet static line attach clips.
Details
       

 03-01-2010
0.00
Fabricate static line clips, Part 6.
Details
       

 02-28-2010
0.00
Fabricate static line clips, Part 4.
Details
       

 02-27-2010
0.00
Fabricate static line clips, Part 3.
Details
       

 02-26-2010
0.00
Fabricate static line clips, Part 2.
Details
     

 02-25-2010
0.00
Fabricate static line clips, Part 1.
Details
       

 02-24-2010
0.00
Join fore/aft F-721 canopy decks
Details
       

 02-23-2010
0.00
Locate and drill F-721A forward canopy deck.
Details
       

 02-22-2010
0.00
Finished square holes in F-757 gusset.
Details
     

 02-21-2010
0.00
Square hole in F-757 Gusset.
Details
       

 02-20-2010
0.00
Fit F-721-A forwad canopy deck.
Details
       

 02-19-2010
0.00
Results of driling the F-575-T Gusset.
Details
       

 02-18-2010
0.00
Mark and drill the F-757-T through longeron.
Details
       

 02-17-2010
0.00
Trim F-721B aft canopy deck.
Details
       

 02-16-2010
0.00
Bolt and torque rear spar wing spacer.
Details
       

 02-15-2010
0.00
Prime floors and baggage covers.
Details
       

 02-14-2010
0.00
Mystery Picture.
Details
     

 02-13-2010
0.00
Rivet seat bottom mounting hinge.
Details
       

 02-12-2010
0.00
Finish flap actuator mount,
Details
       

 02-11-2010
0.00
Making use of the rotisserie.
Details
       

 02-10-2010
0.00
Aft turtle deck riveted.
Details
     

 02-09-2010
0.00
Rivet F-714 aft turtle deck.
Details
       

 02-08-2010
0.00
Rivet aft deck F-711D angle.
Details
       

 02-07-2010
0.00
Debur and prime aft turtle deck and spacers.
Details
       

 02-06-2010
0.00
Drilling the aft turtle deck.
Details
       

 02-05-2010
0.00
Drill F-714 turtle deck to fuselage.
Details
       

 02-04-2010
0.00
Fabricate turtle deck spacers 710C and 711E.
Details
       

 02-03-2010
0.00
Roll the Boat, or is that Flip the Canoe.
Details
       

 02-02-2010
0.00
Rivet interferes with main gear weldment.
Details
       

 02-01-2010
0.00
Torque Bolts going through wing main spar.
Details
       

 01-09-2010
0.00
Misc fuelage riveting before I roll the boat.
Details
       

 01-08-2010
0.00
Another fuselage rivet session with Mindy.
Details
       

 01-07-2010
0.00
Mindy is my new prefered bucking buddy.
Details
       

 01-06-2010
0.00
More fuselage riveting today.
Details
       

 01-05-2010
0.00
Rivet flap actuator housing.
Details
       

 01-04-2010
0.00
De-Dimmple aft 2 holes on bottom skin flange.
Details
       

 01-03-2010
0.00
Proseal firewall to fuselage.
Details
       

 01-02-2010
0.00
Locate and cleco the F-796/B/C/D
Details
       

 01-01-2010
0.00
Rivet forward floor stiffeners.
Details
       

 12-13-2009
0.00
Attach rotisserie frame to engine stand.
Details
       

 12-12-2009
0.00
Build rotisserie engine stand attach brace.
Details
       

 12-11-2009
0.00
Build rotisserie firewall frame.
Details
     

 12-10-2009
0.00
Prep and prime flap actuator cover parts.
Details
       

 12-09-2009
0.00
Drill for platenuts on the flap backrest brace.
Details
       

 12-08-2009
0.00
Misc flap actuator cover fabrication.
Details
       

 12-07-2009
0.00
Rercess bolt in flap actuator channel.
Details
       

 12-06-2009
0.00
Enlarge engine mount holes to 1/4" and bolt on.
Details
       

 12-05-2009
0.00
Fuselage rivet status.
Details
       

 12-05-2009
0.00
Fuselage conical bend riveted.
Details
       

 12-04-2009
0.00
Drill engine mount to firewall using bushings.
Details
       

 12-03-2009
0.00
Top engine mount hole to firewall alignment.
Details
       

 12-03-2009
0.00
Bottom engine mount hole to firewall alignment.
Details
       

 12-02-2009
0.00
Clamp engine mount to saw horses for drilling.
Details
       

 12-01-2009
0.00
Make drill bushings for drilling engine mount.
Details
       

 11-30-2009
0.00
7 Wing bolts, Cherry max rivets, stack of boxes.
Details
       

 11-30-2009
0.00
6 Just more parts orgainzed in bug boxes.
Details
       

 11-30-2009
0.00
5 Special washers, screws, cotter pins, platenuts.
Details
       

 11-30-2009
0.00
4 Nuts, bolts and washer bug boxes
Details
       

 11-30-2009
0.00
3 Bug boxes filled with parts.
Details
       

 11-30-2009
0.00
2 Another package to break apart.
Details
       

 11-30-2009
0.00
1 Smaller package break down.
Details
       

 11-29-2009
0.00
8 store away the canopy and engine cowl.
Details
     

 11-29-2009
0.00
7 Cleveland wheels and brakes.
Details
       

 11-29-2009
0.00
6 Unwrap packages.
Details
       

 11-29-2009
0.00
5 Small package with engine mount under canopy.
Details
       

 11-29-2009
0.00
4 Remove small packages and cowl.
Details
       

 11-29-2009
0.00
3 Remove small wrapped items.
Details
       

 11-29-2009
0.00
2 Closer look inside finish kit box.
Details
       

 11-29-2009
0.00
1 Pop the top.
Details
       

 11-28-2009
0.00
.....PICKED UP FINISH KIT......
Details
       

 11-27-2009
0.00
Tight flush rivet around rear wing spar.
Details
       

 11-26-2009
0.00
Rivet up the F-601K Firewall Recess. Part 2.
Details
       

 11-25-2009
0.00
Rivet up the F-601K Firewall Recess. Part 1.
Details
       

 11-24-2009
0.00
Install floor platenuts for tunnel and flap housin
Details
       

 11-23-2009
0.00
Fabricate aft end of F-741A Cover Support. Part 3.
Details
       

 11-22-2009
0.00
Fabricate aft end of F-741A Cover Support. Part 2.
Details
       

 11-21-2009
0.00
Fabricate aft end of F-741A Cover Support. Part 1.
Details
       

 11-20-2009
0.00
Drill/Fabricate forward end of 741A cover support.
Details
       

 11-19-2009
0.00
Fabricate F-741B Tunnel Cover Plate.
Details
       

 11-18-2009
0.00
Rivet Seat Backrests, Part 2.
Details
       

 11-18-2009
0.00
Rivet Seat Backrests, Part 1.
Details
       

 11-17-2009
0.00
Drill flap center bearing block.
Details
       

 11-16-2009
0.00
Straighten WD-613 Flap Actuator Weldment.
Details
       

 11-16-2009
0.00
Pick up Steve's Engine Mount kit.
Details
     

 11-15-2009
0.00
9. Trim F-767 Attch Bracket to length.
Details
       

 11-15-2009
0.00
8. Fabricate and drill F-767 Attach Plate.
Details
       

 11-15-2009
0.00
7. Drill top of F-785A Backrest Brace.
Details
       

 11-15-2009
0.00
6. Drill bottom of 785A Backrest Brace.
Details
       

 11-15-2009
0.00
5. Fabricate flap actuator housing F-785B
Details
     

 11-15-2009
0.00
4. Flap bearing block attach hole location is bad.
Details
       

 11-15-2009
0.00
3. Fabricate flap center bearing block.
Details
       

 11-15-2009
0.00
2. Mark up flap center bearing block F-680.
Details
       

 11-15-2009
0.00
14. Fabricate spacer and fit Flap Actuator.
Details
       

 11-15-2009
0.00
13. Match Drill 3 holes in F-766B through Channel.
Details
       

 11-15-2009
0.00
12. Match Drill hole in F-766B Angle.
Details
       

 11-15-2009
0.00
11. Match drill center hole in F-766C Plate.
Details
       

 11-15-2009
0.00
10. Match Drill Actuator Channel through F-766C.
Details
       

 11-15-2009
0.00
1. Fabricate flap actuator F-766B.
Details
       

 11-14-2009
0.00
Remove un-needed piano himge eyes.
Details
       

 11-13-2009
0.00
I take home Dick VanGrunsven's pie.
Details
       

 11-13-2009
0.00
Details on aft seat hinge.
Details
       

 11-12-2009
0.00
Match drill seat through seat hinges.
Details
       

 11-11-2009
0.00
Drill seat hinges, F-637E
Details
       

 11-10-2009
0.00
Drill upper seat back hinge F-637D
Details
       

 11-10-2009
0.00
Drill lightening holes in seat back brace.s
Details
       

 11-10-2009
0.00
Deviation - Drill upper seat back angle, again.
Details
       

 11-10-2009
0.00
Deviation - Drill angle to top top of seat back.
Details
       

 11-10-2009
0.00
Debur and scotch bright seat backs.
Details
       

 11-09-2009
0.00
Drill seat back upper hinge F-637D
Details
       

 11-09-2009
0.00
Drill bottom horizontal seat back angle.
Details
       

 11-09-2009
0.00
Detail pictures of bottom of seat back.
Details
       

 11-08-2009
0.00
Drill top F-637C horizontal angle to seat back.
Details
       

 11-07-2009
0.00
Round top seat back horizontal angle F-637C.
Details
       

 11-07-2009
0.00
Notch vertical angle so hinge fits flush.
Details
       

 11-07-2009
0.00
Cut corner angle in vertical seat back angle.
Details
       

 11-06-2009
0.00
Match drill Seat Back through vertical angle.
Details
       

 11-06-2009
0.00
Mark hole locations on Seat back vertical angle.
Details
       

 11-06-2009
0.00
Drill Seat Back F-637B veritical angles.
Details
       

 11-06-2009
0.00
Cut/Shape F-639B Seat Back verticl angle.
Details
       

 11-05-2009
0.00
Fabricate F-638 seat back brace.
Details
       

 11-04-2009
0.00
Gather setback mterials nd cut angles.
Details
       

 11-03-2009
0.00
Rivet elevator bellcrank.
Details
       

 11-02-2009
0.00
Prime forward fuselage cover plates.
Details
       

 11-01-2009
0.00
Drill 3 holes in 982E for engine control cables.
Details
       

 10-31-2009
0.00
Bent heater vent fins in
Details
       

 10-30-2009
0.00
Mount fuel valve on anchor plate.
Details
       

 10-29-2009
0.00
Prepare fuel valve anchor plate.
Details
       

 10-28-2009
0.00
Prepare forward fuselgae covers.
Details
       

 10-27-2009
0.00
Prep forward cabin area, Part2.
Details
       

 10-26-2009
0.00
Prep forward cabin area, Part1.
Details
       

 10-25-2009
0.00
More fuselage bucking with Stephanie.
Details
       

 10-24-2009
0.00
Misc fuselage prep while I wait for Stephanie.
Details
       

 10-23-2009
0.00
Install platenuts in F-715 outer floor ribs.
Details
       

 10-22-2009
0.00
Rivet F-728B angle to F-728 Bellcrank channel,
Details
     

 10-21-2009
0.00
Rivet 708 bulkhead to 728 bellcrank channel.
Details
       

 10-20-2009
0.00
Fabricate F-634 Elevator Bellcrank
Details
       

 10-19-2009
0.00
Drill shoulder harness anchors.
Details
       

 10-18-2009
0.00
See the F-695 Gusset holes in longerons.
Details
       

 10-18-2009
0.00
See the F-695 Gusset holes in firewall weldment.
Details
       

 10-17-2009
0.00
Debur fuselage anfter drilling F-695 Gusset.
Details
       

 10-16-2009
0.00
Remove F-695 gusset and debur.
Details
       

 10-15-2009
0.00
Drill F-695 Gusset to Fuseage.
Details
       

 10-14-2009
0.00
Drill holes in F-695 Gusset.
Details
       

 10-13-2009
0.00
Measure out hole locations in F-695 Gusset.
Details
     

 10-12-2009
0.00
Rivet Fuselage with Stephanie on bucking bar.
Details
       

 10-11-2009
0.00
Attach F-719 stiffener and agle clip to firewall.
Details
       

 10-10-2009
0.00
Right side conical bend fit.
Details
       

 10-09-2009
0.00
Right spacer, baggage bulkhead and skin.
Details
       

 10-08-2009
0.00
Left side conical bend fit.
Details
       

 10-07-2009
0.00
Left spacer, baggage bulkhead and skin. Part 2.
Details
       

 10-06-2009
0.00
Left spacer, baggage bulkhead and skin. Part 1.
Details
       

 10-05-2009
0.00
Fuselage - Attach forward main spar. Last time.
Details
       

 10-04-2009
0.00
Fuselage - Rivet aft end of outside seat rib, F-71
Details
       

 10-03-2009
0.00
Fuselage - Join center section to aft fuselage.
Details
       

 10-02-2009
0.00
Fuselage - Center section ready to join to aft fus
Details
       

 10-01-2009
0.00
Fuselage - More baggage floor platenuts.
Details
       

 09-30-2009
0.00
Fuselage - Delete hole with horrible edge distance
Details
       

 09-29-2009
0.00
Fuselage - Rivet aft baggage ribs to 706 buckhead.
Details
       

 09-28-2009
0.00
Fuselage - Rivet Longeron.
Details
       

 09-27-2009
0.00
Fuselage - Rivet platenuts for access covers.
Details
       

 09-26-2009
0.00
Fuselage - Rivet F-704H to side skin.
Details
       

 09-25-2009
0.00
Fuselage - Rivet F-7101 to F-902 bulkhead.
Details
       

 09-24-2009
0.00
Fuselage - Rivet firwall misc.
Details
       

 09-23-2009
0.00
Fuselage - Rivet Armrest support angles.
Details
       

 09-22-2009
0.00
Fuselage - Fix 705 bulkhead for baggage rivets.
Details
     

 09-21-2009
0.00
Fuselage - Rivet platenuts to 705. Part 2.
Details
       

 09-20-2009
0.00
Fuselage - Rivet platenuts to 705. Part 1.
Details
       

 09-19-2009
0.00
Fuselage - Prime Longerons and Armrests.
Details
       

 09-18-2009
0.00
Fuselage - Reinforce armrest with angle.
Details
       

 09-17-2009
0.00
Fuselage - Route static, 705 Bulkhead. Part 2.
Details
       

 09-16-2009
0.00
Fuselage - Route static, 705 Bulkhead. Part 1.
Details
       

 09-15-2009
0.00
Fuselage - Counter sink longeron.
Details
       

 09-14-2009
0.00
Fuselage - Misc prep.
Details
       

 09-13-2009
0.00
Fuselage - Prime side main skins, forward bottom s
Details
       

 09-12-2009
0.00
Fuselage - counter sink hard to reach places.
Details
       

 09-11-2009
0.00
Fuselage - Prime center and forward parts.
Details
       

 09-10-2009
0.00
Fuselage - hole in side skin for wing wires.
Details
       

 09-09-2009
0.00
Disassemble forward fuselage. Prep for riveting.
Details
       

 09-08-2009
0.00
Prep Baggge Area Bulkheads. Part 2.
Details
       

 09-08-2009
0.00
Prep Baggge Area Bulkheads. Part 1.
Details
       

 09-07-2009
0.00
Cut lightening holes in rudder center brace.
Details
       

 09-07-2009
0.00
1" hole in side skin for fuel line.
Details
       

 09-06-2009
0.00
Matabo Electric Drill
Details
     

 09-06-2009
0.00
Hole saw.
Details
     

 09-06-2009
0.00
Disassemble and prep forward fuselage parts.
Details
       

 09-06-2009
0.00
Counter sink bottom angle on firewall.
Details
       

 09-05-2009
0.00
Counter Sink #12 holes on forwrd side skin.
Details
       

 09-04-2009
0.00
Drill Gear Leg Weldments.
Details
       

 09-03-2009
0.00
Mount Gear Leg Weldments.
Details
       

 09-02-2009
0.00
Shop Status.
Details
       

 09-02-2009
0.00
Floor Stiffeners - Drill stiffener flange. Part 6.
Details
       

 09-02-2009
0.00
Floor Stiffeners - Drill stiffener flange. Part 5.
Details
       

 09-02-2009
0.00
Floor Stiffeners - Drill outer stiffener. Part 4.
Details
       

 09-02-2009
0.00
Floor Stiffeners - Drill aft end, Part 3.
Details
       

 09-02-2009
0.00
Floor Stiffeners - Drill 601 angle, Part 2.
Details
       

 09-02-2009
0.00
Floor Stiffeners - Drill 601 angle, Part 1.
Details
       

 09-01-2009
0.00
Drill single F-902 bulkhead hole.
Details
       

 08-31-2009
0.00
Work Bench Status
Details
       

 08-30-2009
0.00
Drill brake master cylinder bracket.
Details
       

 08-29-2009
0.00
Trim rudder pedal center brace.
Details
       

 08-28-2009
0.00
Drill rudder bedal center brace and bearing block.
Details
       

 08-27-2009
0.00
Both rudder pedal weldmenst are bent.
Details
       

 08-26-2009
0.00
Drill rudder bedal bearing blocks to 719 stiffener
Details
       

 08-25-2009
0.00
Brake pedal presentation.
Details
       

 08-24-2009
0.00
Rivet bake pedals.
Details
       

 08-23-2009
0.00
Ream brake pedals to accept long AN3-56 bolts.
Details
       

 08-22-2009
0.00
Slice F-6115 center rudder block in half.
Details
     

 08-21-2009
0.00
Drill rudder pedal bearing blocks.
Details
       

 08-20-2009
0.00
Edge and face finish brake pedals.
Details
       

 08-19-2009
0.00
Dirll brake pedals Part 3.
Details
       

 08-18-2009
0.00
Dirll brake pedals Part 2.
Details
       

 08-17-2009
0.00
Drill brake bedals Part 1.
Details
       

 08-16-2009
0.00
Prep break pedal plates.
Details
       

 08-15-2009
0.00
Rudder/Brake preparation.
Details
       

 08-14-2009
0.00
Drill half dozen lower longeron holes.
Details
     

 08-13-2009
0.00
Drill F-795 Fuel Tank Attach Bracket.
Details
       

 08-12-2009
0.00
Drill F-796 B/C/D
Details
       

 08-11-2009
0.00
Fit F-796 B/C/D
Details
       

 08-10-2009
0.00
Fabricate F-796 B/C/D
Details
       

 08-09-2009
0.00
How does this happen.
Details
       

 08-09-2009
0.00
Bought some more Vans clothing.
Details
     

 08-08-2009
0.00
Ruined F-902 and F-7101
Details
       

 08-07-2009
0.00
Locate the F-902 to the F-7101
Details
       

 08-06-2009
0.00
Match Drill the Shims to the F-7101
Details
       

 08-05-2009
0.00
Make shims for F-902 and F-7101.
Details
       

 08-04-2009
0.00
Prep F-902 Forward Bulkhead
Details
       

 08-03-2009
0.00
Drill F-684 Bottom Gusset
Details
       

 08-02-2009
0.00
Locate F-684 Bottom Gusset
Details
       

 08-01-2009
0.00
Complete holes through F-717 and lower Longeron.
Details
       

 07-31-2009
0.00
Drill pilot holes through F-717 and lower Longeron
Details
       

 07-30-2009
0.00
Locate holes, Lower Longeron and wend mont.
Details
       

 07-29-2009
0.00
Fitting F-717 Lower Longeron.
Details
       

 07-28-2009
0.00
Fabricate F-717 Lower Longeron.
Details
       

 07-27-2009
0.00
Drill F-719 Stiffener to airframe.
Details
       

 07-19-2009
0.00
Drill F-7198 Clip to 719 stiffener.
Details
       

 07-18-2009
0.00
Twist and shape F-717 Lower Longeron.
Details
       

 07-17-2009
0.00
Bought some Cherry Max rivets.
Details
       

 07-16-2009
0.00
Make gear hole in forward bottom skin.
Details
       

 07-15-2009
0.00
Fit gear mount, Enlarge holes.
Details
       

 07-14-2009
0.00
Fit gear mount, Add edge notch.
Details
       

 07-13-2009
0.00
Two year building anniversary.
Details
       

 07-12-2009
0.00
Drill firewall weldmont.
Details
       

 07-11-2009
0.00
Drill firewall sides.
Details
       

 07-10-2009
0.00
Dirll Firewall Bottom
Details
       

 07-09-2009
0.00
Make and drill 704 straps
Details
       

 07-08-2009
0.00
Cut forward longeron.
Details
       

 07-07-2009
0.00
Cleco side skin and drill it.
Details
       

 07-06-2009
0.00
Step -Cut holes in fuselage side skin.
Details
       

 07-05-2009
0.00
Curve side skin tab results.
Details
       

 07-04-2009
0.00
Curve side skin tab.
Details
       

 07-03-2009
0.00
Curve side skin tap setup.
Details
       

 07-02-2009
0.00
Drill arm rest.
Details
       

 07-01-2009
0.00
Cleco fuselage side skins.
Details
       

 06-21-2009
0.00
De-Blue center side skin.
Details
       

 06-20-2009
0.00
Mate rear fuselage with center fuselage.
Details
       

 06-19-2009
0.00
Cut longeron slots.
Details
       

 06-18-2009
0.00
Mark longeron slot locations.
Details
       

 06-17-2009
0.00
Center Section - Install forward main spar.
Details
       

 06-16-2009
0.00
Center Section - Rivet bottom Skin.
Details
       

 06-15-2009
0.00
Center Section - Prep for riveting bottom skin.
Details
       

 06-14-2009
0.00
Center Section - Rivet seat and baggage ribs to 70
Details
       

 06-13-2009
0.00
Center Section - Rivet seat ribs to main spar resu
Details
       

 06-12-2009
0.00
Center Section - Rivet seat ribs to main wing spar
Details
       

 06-11-2009
0.00
Mickey meets us in Florida.
Details
       

 06-10-2009
0.00
Center Section - Install 142 platenuts. Or so.
Details
       

 06-09-2009
0.00
Center Section - Rivet center floor rib access pla
Details
     

 06-08-2009
0.00
Center Section - Prime ribs and misc.
Details
       

 06-07-2009
0.00
Center Section - Dimple main spar.
Details
       

 06-06-2009
0.00
Center Section - Dimple away
Details
       

 06-05-2009
0.00
Center Section - Counter sink platenut anchor hole
Details
       

 06-04-2009
0.00
Center Section - Drill floor platenut anchor holes
Details
       

 06-03-2009
0.00
Replace plastic clamp jaws with wood.
Details
       

 06-03-2009
0.00
Center Section - Disassemble and debur.
Details
       

 06-02-2009
0.00
Drill fuselage center section for #8 scews.
Details
       

 06-01-2009
0.00
Platenut Jig from Avery Tools
Details
     

 06-01-2009
0.00
DrillF-715 outside floor rib.
Details
       

 05-31-2009
0.00
Center Section - Strategize for screwing floor ins
Details
       

 05-30-2009
0.00
Center Section - Prep saet and baggage floors.
Details
       

 05-29-2009
0.00
Crotch strap - Locate and drill forward bracket.
Details
       

 05-28-2009
0.00
Crotch strap - Locate and drill aft bracket.
Details
       

 05-27-2009
0.00
drill 2 1/4" holes in center main spar.
Details
     

 05-26-2009
0.00
Center Section - Final drill misc
Details
       

 05-25-2009
0.00
F-623 Corner rib - Trim for step.
Details
       

 05-25-2009
0.00
F-623 Corner rib - Locate trim for step.
Details
       

 05-24-2009
0.00
F-623 Corner rib - Prep the ribs.
Details
       

 05-24-2009
0.00
F-623 Corner rib - fabricate rear rib straps.
Details
       

 05-24-2009
0.00
F-623 Corner rib - Fabricate forward strap.
Details
       

 05-24-2009
0.00
F-623 Corner rib - Drill right rib to bottom skin.
Details
       

 05-24-2009
0.00
F-623 Corner rib - Drill left rib to bottom skin.
Details
       

 05-23-2009
0.00
Final drill center section skin.
Details
       

 05-23-2009
0.00
Final drill center section ribs.
Details
     

 05-22-2009
0.00
Seat and baggage ribs in place.
Details
       

 05-22-2009
0.00
F-776 Center section bottom skin preparation.
Details
       

 05-21-2009
0.00
Trim F-634 Seat belt anchors.
Details
       

 05-20-2009
0.00
F-727 Seat rib snap bushing cutout.
Details
     

 05-20-2009
0.00
F-726 Baggage Rib. Cut 1.5" hole for step.
Details
       

 05-19-2009
0.00
Baggage rib preperation
Details
       

 05-18-2009
0.00
F-716 Seat Rib - More snap bushing holes.
Details
       

 05-17-2009
0.00
F-716 Seat Rib - Cut rib for access plate. Part 2
Details
       

 05-16-2009
0.00
F-716 Seat Rib - Cut rib for access plate. Part 1
Details
       

 05-15-2009
0.00
F-716 Seat Rib - Straighten flanges and flute.
Details
       

 05-14-2009
0.00
Mindy helps to slow things down a bit.
Details
       

 05-14-2009
0.00
F-716 Seat Rib - Access Plate. Part 1.
Details
       

 05-13-2009
0.00
F-716 Seat Rib - 5/8" Snap Bushing holes.
Details
       

 05-12-2009
0.00
F-716 Seat RIb - Expand Lightening Hole. Part 2.
Details
       

 05-11-2009
0.00
F-716 Seat RIb - Expand Lightening Hole. Part 1.
Details
       

 05-10-2009
0.00
F-716 Seat Rib - Finish edges.
Details
       

 05-09-2009
0.00
Rivet aft bottom fuselage bottom skin.
Details
       

 05-09-2009
0.00
Fabricate F-916 Spacers
Details
     

 05-08-2009
0.00
Rivet aft bottom fuselage side skins.
Details
       

 05-07-2009
0.00
Rivet 711, 712 bulkheads to Tail Cone.
Details
       

 05-06-2009
0.00
Prime and re assemble aft fuselage.
Details
       

 05-05-2009
0.00
Drill and dimple rudder cable clamp hole.
Details
       

 05-04-2009
0.00
Dimple aft fuselage.
Details
       

 05-03-2009
0.00
Disassemble, debur aft fuselage.
Details
       

 05-02-2009
0.00
Fabricate shim forward of tail cone.
Details
       

 05-01-2009
0.00
Rudder Stop Alternative.
Details
       

 04-30-2009
0.00
Drill aft bottom fuselage.
Details
       

 04-29-2009
0.00
Cleco aft bottom fuselage. Part 6.
Details
       

 04-29-2009
0.00
Cleco aft bottom fuselage. Part 5.
Details
       

 04-29-2009
0.00
Cleco aft bottom fuselage. Part 4.
Details
       

 04-29-2009
0.00
Cleco aft bottom fuselage. Part 3.
Details
       

 04-29-2009
0.00
Cleco aft bottom fuselage. Part 2.
Details
       

 04-28-2009
0.00
Cleco aft bottom fuselage. Part 1.
Details
       

 04-27-2009
0.00
Shape Tail Cone, Fit 712 bulkhead.
Details
       

 04-26-2009
0.00
Placed 708, 708 Bulkheads, Prep side skins.
Details
       

 04-25-2009
0.00
J Stiffener Prep, Part 2.
Details
       

 04-25-2009
0.00
J Stiffener Prep, Part 1.
Details
       

 04-24-2009
0.00
Aft bottom skin prearation.
Details
       

 04-23-2009
0.00
Fit 711, 712 Bulkhead to Tail Cone.
Details
       

 04-22-2009
0.00
Trim 721 Canopy deck, 786 J channel ends.
Details

 04-21-2009
0.00
Longeron - Sharp bend and twist.
Details
       

 04-20-2009
0.00
Longeron - Drill 721 canopy Deck to Longeron.
Details
       

 04-19-2009
0.00
Longeron - Fit 721 Aft Canopy Deck to Longeron.
Details
       

 04-18-2009
0.00
Longeron - Clamp 0.032 strips.
Details
       

 04-17-2009
0.00
Longeron - Make spacer to simulate skin.
Details
       

 04-16-2009
0.00
Longeron - Check the curve.
Details
       

 04-15-2009
0.00
Longeron - Process of bending the curve.
Details
       

 04-14-2009
0.00
Longeron - Prepare bending tools.
Details
       

 04-13-2009
0.00
Tool Apron.
Details
     

 04-13-2009
0.00
Scribe.
Details
     

 04-13-2009
0.00
Protractor
Details
     

 04-12-2009
0.00
Longeron - Trim aft end.
Details
       

 04-11-2009
0.00
Longeron - Sand to final length.
Details
       

 04-10-2009
0.00
Longeron - Cut to rough length.
Details
       

 04-09-2009
0.00
New large universal vice.
Details
       

 04-09-2009
0.00
F-712 BH - Rivet.
Details
       

 04-09-2009
0.00
F-710, F-711 BH - Rivet
Details
       

 04-09-2009
0.00
F-706 BH - Rivet side bulkheads.
Details
       

 04-09-2009
0.00
Box of large bolts.
Details
     

 04-08-2009
0.00
F-706 BH - Rivet bellcrank junction.
Details
       

 04-08-2009
0.00
F-706 BH - Rivet 728 Angle to 728 rib.
Details
     

 04-08-2009
0.00
F-706 BH - Future rivet fix.
Details
       

 04-07-2009
0.00
F-706 BH - Future rivet problem.
Details
       

 04-06-2009
0.00
Prime 706 through 712 bulkheads.
Details
       

 04-05-2009
0.00
F-712 BH - Dimple 712 bulkhead.
Details
       

 04-04-2009
0.00
F-712 BH - Match drill 712E to bulkhead.
Details
       

 04-03-2009
0.00
F-712 BH - Shape and tap 712E tie down bar.
Details
       

 04-02-2009
0.00
F-711 BH - Shape 711C Stab Attach Bars
Details
       

 04-02-2009
0.00
F-711 BH - Match drill 711D to bulkhead.
Details
       

 04-02-2009
0.00
F-711 BH - Match drill 711C Stab Attach Bar.
Details
       

 04-02-2009
0.00
F-711 BH - Cut out the web.
Details
       

 04-01-2009
0.00
F-710 BH - Fabricate F-710 Bulkhead.
Details
       

 03-31-2009
0.00
F-709,710,711,712 BH - Edge finishing.
Details
     

 03-30-2009
0.00
F-708 BH - Drill Snap Bushing holes.
Details
       

 03-29-2009
0.00
F-707 BH - Drill Snap Bushing holes.
Details
       

 03-28-2009
0.00
Steve my brother gets his Fuselage.
Details
       

 03-28-2009
0.00
F-706 BH - Drill Snap Bushing holes.
Details
       

 03-27-2009
0.00
F-706 BH - Match drill snap bushing hole, Part 3.
Details
       

 03-27-2009
0.00
F-706 BH - Match drill snap bushing hole, Part 2.
Details
       

 03-27-2009
0.00
F-706 BH - Match drill snap bushing hole, Part 1.
Details
       

 03-27-2009
0.00
F-706 BH - Mark location of snap bushing holes.
Details
     

 03-27-2009
0.00
F-607 BH - Drill 728B angle.
Details
       

 03-26-2009
0.00
F-706 BH - Drill a critical hole.
Details
       

 03-25-2009
0.00
F-706 BH - Fab 729B angle and drill.
Details
       

 03-24-2009
0.00
F-706 BH - Lets match drill what we can.
Details
       

 03-23-2009
0.00
F-706 BH - Find the parts, Cleco it up.
Details
       

 03-22-2009
0.00
Edge prep 3 rear bulkheads.
Details
       

 03-21-2009
0.00
F-705 BH - Drill Flap Bearing Block.
Details
       

 03-20-2009
0.00
F-705 BH - Rivet top Channel to side Channels.
Details
       

 03-19-2009
0.00
F-705 BH - Rivet seat back adjustment.
Details
       

 03-18-2009
0.00
F-705 BH - Rivet Rear Spar Attach.
Details
       

 03-17-2009
0.00
F-705 BH - Polish, Etch, Prime.
Details
       

 03-16-2009
0.00
Why I cant Step Drill where I want - Solution.
Details
       

 03-16-2009
0.00
F-705 BH - Details.
Details
     

 03-15-2009
0.00
F-705 BH - 605C counter sunk hole.
Details
       

 03-14-2009
0.00
F-705 BH - 705A Snap Bushings.
Details
       

 03-13-2009
0.00
F-705 BH - 705D Snap Bushings.
Details
       

 03-12-2009
0.00
F-705 BH - Seat Back - End result.
Details
       

 03-11-2009
0.00
F-705 BH - Seat Back - Drill 705F.
Details
       

 03-10-2009
0.00
F-705 BH - Seat Back - Trim pieces to 16 1/4"
Details
       

 03-09-2009
0.00
F-705 BH - Seat Back - Drill 705J Angle.
Details
       

 03-08-2009
0.00
F-705 BH - Seat Back - Drill 705K.
Details
       

 03-07-2009
0.00
F-705 BH - Seat Back - Drill 705L Shim
Details
       

 03-06-2009
0.00
F-705 BH - Seat Back - Bend 705K part 2.
Details
       

 03-05-2009
0.00
F-705 BH - Seat Back - Bend 705K part 1.
Details
       

 03-04-2009
0.00
F-705 BH - Slot 705G angle part 4.
Details
     

 03-03-2009
0.00
F-705 BH - Slot 705G angle part 3.
Details
       

 03-02-2009
0.00
F-705 BH - Slot 705G angle part 2.
Details
       

 03-01-2009
0.00
F-705 BH - Slot 705G angle part 1.
Details
       

 02-28-2009
0.00
Grizzly 2 flute small end mills.
Details
     

 02-27-2009
0.00
Grizzly Metal Lathe Machine.
Details
     

 02-26-2009
0.00
F-705 BH - Drill 705G angle.
Details
       

 02-25-2009
0.00
F-705 BH - Clamp 705G in prep for drilling.
Details
       

 02-24-2009
0.00
F-705 BH - Clamp BH in prep for drilling 705G's.
Details
       

 02-23-2009
0.00
F-705 BH - Drill 634 Seat belt Anchors
Details
       

 02-22-2009
0.00
F-705 BH - Drill 605C and spacers.
Details
       

 02-21-2009
0.00
F-705 BH - Make 705H Spacers
Details
       

 02-20-2009
0.00
F-705 BH - Trim/Drill 705B to 705A
Details
       

 02-18-2009
0.00
F-705 BH - Get parts orginized.
Details
       

 02-17-2009
0.00
F-704 BH - Edge finish cleco the 704C uprights.
Details
       

 02-16-2009
0.00
F-704 BH - Screw on 782 cover support ribs.
Details
       

 02-15-2009
0.00
F-704 BH - Rivet 704M Stiffeners.
Details
       

 02-14-2009
0.00
F-704 BH - Rivet 783B cover support ribs.
Details
       

 02-13-2009
0.00
F-104 BH - Rivet Vertical Bar to center spar.
Details
       

 02-12-2009
0.00
F-104 BH - Rivet F-704C/D's to main spar.
Details
       

 02-11-2009
0.00
F-704 BH - Final drill F-704C/D uprights.
Details
       

 02-10-2009
0.00
F-704 BH - Prime and attach platenuts to cover sup
Details
       

 02-09-2009
0.00
F-704 BH - Drill cover support ribs for snap bushi
Details
       

 02-08-2009
0.00
F-704 BH - Drill another cover support rib.
Details
     

 02-07-2009
0.00
F-704 BH - Drill cover support rib and stiffener.
Details
       

 02-06-2009
0.00
F-704 BH - 18 spar center platenuts.
Details
       

 02-05-2009
0.00
F-704 BH - Bolt on control sticks.
Details
       

 02-04-2009
0.00
F-704 BH - Ream control sticks bolt holes..
Details
       

 02-03-2009
0.00
F-704 BH - Lighten up F-633's. Part 2.
Details
       

 02-03-2009
0.00
F-704 BH - Lighten up F-633's. Part 1.
Details
       

 02-02-2009
0.00
F-704 BH - Drill F-633's. Part 2.
Details
       

 02-01-2009
0.00
F-704 BH - Drill F-633's. Part 1.
Details
       

 01-31-2009
0.00
F-704 BH - Drill F-704 Center section vertical bar
Details
       

 01-30-2009
0.00
F-704 BH - Drill 12 5/8 snap bushing holes.
Details
       

 01-29-2009
0.00
Firewall - Rivet firewall. Part 6.
Details
       

 01-29-2009
0.00
Firewall - Rivet firewall. Part 5.
Details
       

 01-29-2009
0.00
Firewall - Rivet firewall. Part 4.
Details
       

 01-29-2009
0.00
Firewall - Rivet firewall. Part 3.
Details
       

 01-29-2009
0.00
Firewall - Rivet firewall. Part 2.
Details
       

 01-29-2009
0.00
Firewall - Rivet firewall. Part 1.
Details
       

 01-28-2009
0.00
Firewall - Primestiffeners and gussets.
Details
     

 01-27-2009
0.00
Firewall - Dimple stainless steel firewall.
Details
       

 01-26-2009
0.00
Firewall - Debur and polish stiffeners.
Details
       

 01-25-2009
0.00
Firewall - Process stiffeners and gussets.
Details
       

 01-24-2009
0.00
Firewall - Match drill 601J's to firewall. Part 2.
Details
       

 01-24-2009
0.00
Firewall - Match drill 601J's to firewall. Part 1.
Details
       

 01-23-2009
0.00
Firewall - Final drill 601P spacers.
Details
       

 01-22-2009
0.00
Firewall - Vertical stand for firewall.
Details
       

 01-21-2009
0.00
Firewall - Process firewall recess.
Details
       

 01-21-2009
0.00
Firewall - Final drill firewall to stiffeners.
Details
       

 01-20-2009
0.00
Firewall - Fit parts on firewall, Part 3.
Details
       

 01-19-2009
0.00
Firewall - Fit parts on firewall, Part 2.
Details
       

 01-18-2009
0.00
Firewall - Fit parts on firewall, Part 1.
Details
       

 01-17-2009
0.00
Firewall - Debur firewall.
Details
       

 01-16-2009
0.00
Firewall - Make the 601J's, Part 2.
Details
       

 01-15-2009
0.00
Firewall - Make the 601J's, Part 1.
Details
       

 01-14-2009
0.00
Washer Wrench Set
Details
     

 01-14-2009
0.00
Emery cloth from Harbor Frieght.
Details
     

 01-13-2009
0.00
Fuselage - Organize hardware part 2.
Details
       

 01-12-2009
0.00
Fuselage - Organize hardware part 1.
Details
       

 01-06-2009
0.00
Fuselage - Box contents.
Details
       

 01-05-2009
0.00
Fuselage - Open the fuselage box.
Details
       

 01-04-2009
0.00
Aileron - Assemble aileron bellcrank.
Details
       

 01-03-2009
0.00
1/4" Reamer.
Details
     

 01-02-2009
0.00
Aileron - Rivet aileron push tube.
Details
       

 01-02-2009
0.00
Aileron - Primmed push tubes
Details
       

 01-01-2009
0.00
Aileron - Drill aileron push tube.
Details
       

 12-31-2008
0.00
Aileron - Drill/rivet stick push tube.
Details
       

 12-30-2008
0.00
Aileron - Prime inside of control tubes.
Details
       

 12-29-2008
0.00
Aileron - Cut pushrod tubes.
Details
       

 12-28-2008
0.00
WOW, Visit to Vans' to pickup fuselage.
Details
       

 12-27-2008
0.00
Flap - Buck rivet flap main spar to skins.
Details
       

 12-26-2008
0.00
Flap - Pop rivet flap main spar to ribs.
Details
       

 12-25-2008
0.00
Flap - Rivet flap skins. Part 2.
Details
       

 12-24-2008
0.00
Flap - Rivet flap skins. Part 1.
Details
       

 12-23-2008
0.00
Flap - Build flap rivet stand.
Details
       

 12-22-2008
0.00
Flap - Rivet ribs to rear spar.
Details
       

 12-21-2008
0.00
Flap - Rivet rib and spar doublers.
Details
       

 12-20-2008
0.00
Flap - Prime flap parts.
Details
       

 12-19-2008
0.00
Flap - Dimple and prep for primer.
Details
       

 12-18-2008
0.00
Flap - Drill rod end bearing platenut attach holes
Details
       

 12-17-2008
0.00
Flap - Enlarge for rod end bearing.
Details
       

 12-16-2008
0.00
Flap - Trim spar doubler.
Details
     

 12-15-2008
0.00
Flap - Drill rib/spar doublers. Part 2.
Details
       

 12-14-2008
0.00
Flap - Drill rib/spar doublers.
Details
       

 12-13-2008
0.00
Flap - Make spar and rib doubler plates.
Details
       

 12-12-2008
0.00
Flap - Counter sink flap spar on hinge side.
Details
       

 12-11-2008
0.00
Flap - Drill flap piano hinge. Part 2.
Details
       

 12-10-2008
0.00
Flap - Drill flap piano hinge.
Details
       

 12-09-2008
0.00
Flap - Match drill, make shims.
Details
       

 12-08-2008
0.00
Flap - Drill rib to rear spar part 2.
Details
       

 12-07-2008
0.00
Flap - Drill rib to rear spar.
Details
       

 12-06-2008
0.00
Flap - Drill ribs to spar, make shims.
Details
       

 12-05-2008
0.00
Flap - Smooth spar, rib and skin edges.
Details
       

 12-04-2008
0.00
Re-dimple wing access plated.
Details
       

 12-03-2008
0.00
Bottom Skin Prepare part 3.
Details
     

 12-02-2008
0.00
Bottom Skin Prepare part 2.
Details
       

 12-01-2008
0.00
Bottom Skin Prepare.
Details
       

 11-27-2008
0.00
Harbor Freight Puller ground down.
Details
       

 11-26-2008
0.00
Clean shop pictures.
Details
       

 11-25-2008
0.00
Clean and organize shop. Over due.
Details
       

 11-24-2008
0.00
Clear a space in garage for wing storage.
Details
       

 11-02-2008
0.00
Aileron - Joyce helps to mount ailerons.
Details
       

 11-01-2008
0.00
AIleron - fit aileron to wing.
Details
       

 10-31-2008
0.00
Aileron - Final riveting.
Details
       

 10-30-2008
0.00
Aileron - Center 4 skin rivets to spar.
Details
       

 10-29-2008
0.00
Aileron - Rivet skin top top of spar.
Details
       

 10-28-2008
0.00
Aileron - Make secure stand for aileron.
Details
       

 10-27-2008
0.00
Aileron - Rivet aileron skeleton.
Details
       

 10-26-2008
0.00
Tungstun Bucking Bar
Details
       

 10-25-2008
0.00
Aileron - Test fit rivet in water pipe dimple.
Details
       

 10-24-2008
0.00
Aileron - Dimple skin on top of water pipe weight.
Details
       

 10-23-2008
0.00
Aileron - Machine counter sink water pipe.
Details
       

 10-22-2008
0.00
2 differnt edge rolling tools.
Details
     

 10-21-2008
0.00
Aileron - Debur, dimple.
Details
       

 10-20-2008
0.00
Aileron - Drill water pipe through nose flange.
Details
       

 10-19-2008
0.00
Aileron - Cleco on skins and match drill.
Details
       

 10-18-2008
0.00
Aileron - Cleco skeleton together.
Details
       

 10-17-2008
0.00
Aileron - Enlarge spar holes from #30 to #12.
Details
       

 10-16-2008
0.00
Aileron - Prime aileron parts.
Details
     

 10-16-2008
0.00
Aileron - Match drill spar doublers and debur.
Details
       

 10-15-2008
0.00
Aileron - Skin/Rib misalignment.
Details
       

 10-14-2008
0.00
Aileron - Final trailing edge skin bend.
Details
       

 10-13-2008
0.00
Aileron - Back rivet stiffeners.
Details
       

 10-12-2008
0.00
Aileron - Match drill and dimple aileron stiffener
Details
       

 10-11-2008
0.00
Aileron - Make aileron stiffeners.
Details
       

 10-10-2008
0.00
Rivet Aileron hinge brackets to rear spar.
Details
       

 10-09-2008
0.00
Rivet aileron hinge brackets.
Details
       

 10-08-2008
0.00
Prep the aileron hinge brackets.
Details
       

 10-07-2008
0.00
Fit problem with the aleron hinge brackets.
Details
       

 10-06-2008
0.00
Squeeze inboard top main wing skins.
Details
       

 10-05-2008
0.00
Squeeze trailing edge top main wing skins.
Details
       

 10-04-2008
0.00
Both wings in cradle.
Details
       

 10-03-2008
0.00
Moved wings to cradle.
Details
       

 10-02-2008
0.00
Finished back riveting the top main wing skins.
Details
       

 10-01-2008
0.00
Rivet top main wing skins.
Details
       

 09-30-2008
0.00
Tank/Leading Edge Pucker. AGAIN.
Details
       

 09-29-2008
0.00
Mindy and Abby
Details
       

 09-28-2008
0.00
Wing Storage Cradle, Part 2.
Details
       

 09-27-2008
0.00
Wing Storage Cradle, Part 1.
Details
       

 09-26-2008
0.00
Rivet top main wing skins
Details
       

 09-25-2008
0.00
Dimpled top wing skins.
Details
       

 09-24-2008
0.00
Wing skin scarf joint.
Details
       

 09-23-2008
0.00
LE/tank skin mis alaignment Fix.
Details
       

 09-22-2008
0.00
LE/tank skin mis alaignment.
Details
       

 09-21-2008
0.00
Leading edge rivet skin to main spar flange
Details
       

 09-20-2008
0.00
Leading edge rib flange rivet to spar.
Details
       

 09-19-2008
0.00
Final mounting of landing/taxi light.
Details
       

 09-18-2008
0.00
Tank leak test results. Part3.
Details
       

 09-17-2008
0.00
Tank leak test procedure. Part2.
Details
       

 09-16-2008
0.00
Tank leak test preparation. Part1.
Details
       

 09-15-2008
0.00
Casey and Lisa visit.
Details
       

 09-14-2008
0.00
Drill LE hole for wing tiedown
Details
       

 09-13-2008
0.00
Remove plastic from main wing skins.
Details
       

 09-12-2008
0.00
Rivet main wing spar mystery holes.
Details
       

 09-12-2008
0.00
Less dimples main wing ribs.
Details
       

 09-12-2008
0.00
Are tanks leak free.
Details
       

 09-11-2008
0.00
Seal tank inspection plate.
Details
       

 09-10-2008
0.00
Seal tank rear baffle, Part 3.
Details
       

 09-09-2008
0.00
Seal tank rear baffle, Part 2.
Details
       

 09-08-2008
0.00
Seal tank rear baffle, Part 1.
Details
       

 09-07-2008
0.00
First fit of leading edge and tank.
Details
       

 09-06-2008
0.00
Install DuckWorks landing lights. Part 4
Details
     

 09-05-2008
0.00
Leading edge riveting. Part 2.
Details
       

 09-04-2008
0.00
Leading edge riveting. Part 1.
Details
       

 09-03-2008
0.00
Prime leading edge ribs, skins and joint-plates.
Details
       

 09-02-2008
0.00
Landing light bracket attach plate-nuts.
Details
       

 09-01-2008
0.00
Leading edge joint plate, Part3.
Details
     

 09-01-2008
0.00
Leading edge joint plate, Part2.
Details
       

 09-01-2008
0.00
Leading edge joint plate, Part1.
Details
       

 08-31-2008
0.00
DRDT-2 Dimple table
Details
       

 08-30-2008
0.00
Prep leading edge for riveting.
Details
       

 08-29-2008
0.00
Install DuckWorks landing lights. Part 3
Details
       

 08-28-2008
0.00
Install DuckWorks landing lights. Part 2
Details
       

 08-27-2008
0.00
Install DuckWorks landing lights. Part 1
Details
       

 08-26-2008
0.00
Tank - Prep tank baffle's
Details
       

 08-25-2008
0.00
Debur and dimple main wing skins.
Details
       

 08-24-2008
0.00
Tank - Pre baffle seal, Inspection part 6
Details
       

 08-24-2008
0.00
Tank - Pre baffle seal, Inspection part 5
Details
       

 08-23-2008
0.00
Tank - Pre baffle seal, Inspection part 4
Details
       

 08-23-2008
0.00
Tank - Pre baffle seal, Inspection part 3
Details
       

 08-22-2008
0.00
Tank - Pre baffle seal, Inspection part 2
Details
       

 08-22-2008
0.00
Tank - Pre baffle seal, Inspection part 1
Details
       

 08-21-2008
0.00
$5.00 rivet puller to distroy.
Details
     

 08-20-2008
0.00
Tank - Outboard tank rib installed.
Details
       

 08-19-2008
0.00
Tank - Inboard tank rib installed. Right.
Details
       

 08-18-2008
0.00
Tank - Inboard tank rib installed. Left.
Details
       

 08-17-2008
0.00
Tank - Inboard rib, inspection plate flange Pro-Se
Details
       

 08-16-2008
0.00
Tank - fuel gate, dam, flop tube bracket. Right.
Details
       

 08-15-2008
0.00
Tank - fuel gate, dam, flop tube bracket. Left.
Details
       

 08-14-2008
0.00
Tank inboard bay showing flaired tube ends.
Details
       

 08-13-2008
0.00
Tank - 3rd bay fuel return tube.
Details
       

 08-12-2008
0.00
Tank - Capacitance fuel sender, Right.
Details
       

 08-11-2008
0.00
Tank - Capacitance fuel sender, Left.
Details
       

 08-10-2008
0.00
Tank - Fuel cap flange sealed.
Details
       

 08-09-2008
0.00
Pro-Sealed a few tank things
Details
       

 08-08-2008
0.00
Torque and wire wrap flop tubes.
Details
       

 08-08-2008
0.00
tank end ribs and parts cleaned with M.E.K.
Details
       

 08-07-2008
0.00
Mock up tank end ribs. Bend/flair tubing.
Details
       

 08-06-2008
0.00
Rivet tank ribs part 3.
Details
       

 08-05-2008
0.00
Rivet tank ribs part 2.
Details
       

 08-04-2008
0.00
Rivet tank ribs part 1.
Details
       

 08-03-2008
0.00
Mindy prepairs to help rivet tank ribs.
Details
       

 08-02-2008
0.00
Prepare to rivet fuel tank rib.
Details
       

 08-01-2008
0.00
Rivet fuel tank ribs.
Details
       

 07-30-2008
0.00
Rivet fuel tank drain flange.
Details
       

 07-30-2008
0.00
Prep tank for fuel cap flange.
Details
       

 07-29-2008
0.00
Plug center hole in second tank rib.
Details
       

 07-29-2008
0.00
Drill holes in ribs for fuel/vapor return.
Details
     

 07-29-2008
0.00
Clean tank ribs before installing.
Details
       

 07-28-2008
0.00
Socket head screws for inspection plate.
Details

 07-28-2008
0.00
More tank rib preparation.
Details
       

 07-27-2008
0.00
Rivet tank stiffeners Part 3
Details
       

 07-27-2008
0.00
Abby decorates my part cans.
Details
       

 07-26-2008
0.00
Rivet tank stiffeners Part 2
Details
       

 07-25-2008
0.00
First Pro-Seal adventure.
Details
       

 07-24-2008
0.00
Shopped for Pro-Seal supplys.
Details
     

 07-23-2008
0.00
Dimple tank skins
Details
       

 07-22-2008
0.00
Remove blue protection from fuel tank.
Details
       

 07-21-2008
0.00
Rough up ribs and dimple.
Details
       

 07-21-2008
0.00
Mindy Deburs fuel tank ribs.
Details
       

 07-21-2008
0.00
Label, final drill tank stiffeners.
Details
       

 07-21-2008
0.00
Drill doubler plate in fuel tank outboard rib.
Details
       

 07-21-2008
0.00
Debur, rough up and dimple.
Details
       

 07-21-2008
0.00
Anti flop tube jam guard
Details
       

 07-20-2008
0.00
One way gas tank door fabrication.
Details
       

 07-19-2008
0.00
Add anti flop tube hang up strap.
Details
       

 07-18-2008
0.00
Match drill fuel drain valve housing.
Details
     

 07-17-2008
0.00
Fuel cap fent line vent clip fabrication.
Details
       

 07-16-2008
0.00
Drill fuel cap to skin
Details
       

 07-15-2008
0.00
Drill the 9/16" hole through T-405.
Details
       

 07-14-2008
0.00
Drill the T-405 rivet holes.
Details
       

 07-13-2008
0.00
Trim T-405 Tank Attach Angle.
Details
       

 07-12-2008
0.00
Rivet Gase Tank Inspection Plate Reforcement Ring.
Details
       

 07-11-2008
0.00
Prepare gase tank inspection plate.
Details
       

 07-10-2008
0.00
Drill gase tank cover plate attach holes.
Details
       

 07-09-2008
0.00
Abby shows off the BNC and Vent hardware.
Details
       

 07-08-2008
0.00
Cut out the inspection plate hole.
Details
       

 07-07-2008
0.00
Gas Tank End RIb Holes
Details
       

 03-27-2008
0.00
Steve gets his test flight. Part 3.
Details
       

 03-26-2008
0.00
Steve gets his test flight. Part 2.
Details
       

 03-25-2008
0.00
Steve gets his test flight. Part 1.
Details
       

 03-24-2008
0.00
Steve works on his flap practice kit.
Details
       

 03-23-2008
0.00
Capacitance Fuel Sender, Part 4.
Details
       

 03-22-2008
0.00
Capacitance Fuel Sender, Part 3.
Details
       

 03-21-2008
0.00
Capacitance Fuel Sender, Part 2.
Details
       

 03-20-2008
0.00
Capacitance Fuel Sender, Part 1.
Details
       

 03-19-2008
0.00
Gas tank stiffener fabrication. Part 2.
Details
       

 03-18-2008
0.00
Gas tank stiffener fabrication. Part 1.
Details
       

 03-17-2008
0.00
405 Tank attach angles Part 4.
Details
       

 03-16-2008
0.00
405 Tank attach angles Part 3.
Details
       

 03-15-2008
0.00
405 Tank attach angles Part 2.
Details
       

 03-14-2008
0.00
405 Tank attach angles Part 1.
Details
       

 03-13-2008
0.00
Machine counter sink gas tank.
Details
     

 03-12-2008
0.00
Abby wants to build a tresure chest.
Details
       

 03-11-2008
0.00
Pneumatic Cleco Tool
Details
       

 03-10-2008
0.00
Mount Gas Tank Part 3
Details
       

 03-09-2008
0.00
Mount Gas Tank Part 2
Details
       

 03-08-2008
0.00
Mount Gas Tank Part 1
Details
       

 03-07-2008
0.00
Inboard Wing, Tank Z Bracket, Nut Plates, part 2
Details
       

 03-06-2008
0.00
Inboard Wing, Tank Z Bracket, Nut Plates.
Details
       

 03-05-2008
0.00
DRDT-2 VS C-Frame
Details
     

 03-04-2008
0.00
Gas Tank Z Bracket Prep Part 4.
Details
       

 03-03-2008
0.00
Gas Tank Z Bracket Prep Part 3.
Details
       

 03-02-2008
0.00
Gas Tank Z Bracket Prep Part 2.
Details
       

 03-01-2008
0.00
Gas Tank Z Bracket Prep Part 1.
Details
       

 02-29-2008
0.00
Gas tank Z bracket prep begins. A
Details
     

 02-28-2008
0.00
Cleco ribs in gas tank skins. Part 2.
Details
       

 02-27-2008
0.00
Cleco ribs in gas tank skins.
Details
       

 02-26-2008
0.00
Install leading edge/gas tank joint plate.
Details
       

 02-25-2008
0.00
More pictures of leading edge on wing.
Details
       

 02-24-2008
0.00
More pictures of leading edge on wing.
Details
       

 02-23-2008
0.00
Leading edge fits on wing.
Details
       

 02-22-2008
0.00
Made a leading edge craddle.
Details
       

 02-21-2008
0.00
Cleco and drill wing skins.
Details
       

 02-19-2008
0.00
Trimmed and drilled the wing walk doubler plate.
Details
       

 02-15-2008
0.00
Wing jig, out board rear spar.
Details
       

 02-15-2008
0.00
Wing jig, out board main spar.
Details
       

 02-15-2008
0.00
Wing jig, in board rear spar.
Details
       

 02-15-2008
0.00
Wing jig, in board main spar.
Details
       

 02-15-2008
0.00
Wing jig, general
Details
       

 02-15-2008
0.00
Wing jig, center support.
Details
       

 02-15-2008
0.00
Replaced doublers on wing rear spar.
Details
       

 02-13-2008
0.00
Rivet wing rear spar to ribs.
Details
       

 02-12-2008
0.00
Finished riveting wins ribs to main spar.
Details
       

 02-11-2008
0.00
Rivet wing main ribs to main spar.
Details
       

 02-09-2008
0.00
Prime wing main ribs.
Details
       

 02-08-2008
0.00
Clean the wing ribs to prepare for priming.
Details
       

 02-08-2008
0.00
Asked kids to help with rib cleaning.
Details
       

 02-07-2008
0.00
Scotch bright all main wing ribs.
Details
       

 02-06-2008
0.00
Drilled holes in wing ribs for wires.
Details
       

 02-05-2008
0.00
Added a table to my little drill press.
Details
     

 02-04-2008
0.00
Fix tip end of main spar to jig.
Details
       

 01-30-2008
0.00
Straighten wing ribs with vise grip flute tool.
Details
       

 01-30-2008
0.00
Mobile grinder station.
Details
       

 01-30-2008
0.00
Dust hoods on tools.
Details
       

 01-30-2008
0.00
Dust hood on belt sander.
Details
       

 01-30-2008
0.00
Debur wing rib flange ends
Details
       

 01-29-2008
0.00
Wing nose rib flange bump.
Details
       

 01-29-2008
0.00
Debur wig rib edge flanges.
Details
       

 01-28-2008
0.00
Organize Wing Ribs.
Details
       

 01-28-2008
0.00
Adjust wing rib flange to web.
Details
       

 01-27-2008
0.00
Rivet WIng Rear Spar
Details
       

 01-26-2008
0.00
Dust Collection System Continued.
Details
       

 01-26-2008
0.00
Dust Collection System
Details
       

 01-23-2008
0.00
Tie down and rear spar primmed.
Details
     

 01-22-2008
0.00
Prime wing tie down and rear spar.
Details
       

 01-21-2008
0.00
Drill rear spar doubler plate hole.
Details
     

 01-20-2008
0.00
Wing rear spar preperation.
Details
       

 01-20-2008
0.00
Rear spar fork prep.
Details
       

 01-19-2008
0.00
Wing hardware.
Details
       

 01-18-2008
0.00
A draw full of rivets.
Details
     

 01-17-2008
0.00
Wing tie down work.
Details
       

 01-17-2008
0.00
Wing tie down spacers.
Details
       

 01-16-2008
0.00
Main spar nut plates installed.
Details
       

 01-15-2008
0.00
More main spar nut plates.
Details
       

 01-14-2008
0.00
Main Spar Nut Plates
Details
       

 01-11-2008
0.00
Open those wing boxes.
Details
       

 01-10-2008
0.00
Picture inside the vertical stabalizer.
Details
       

 01-10-2008
0.00
Fit the rudder to vertical stabalizer.
Details
       

 01-09-2008
0.00
Rolling elevator leading edge continued.
Details
       

 01-08-2008
0.00
Rolling leading edge of elevators.
Details
       

 01-07-2008
0.00
Rolling Rudder Leading Edge
Details
       

 12-27-2007
0.00
Drill and rivet on the elevator trim tab.
Details
       

 12-26-2007
0.00
Time to close the elevator skins.
Details
       

 12-26-2007
0.00
Elevators ready to be riveted.
Details
       

 12-25-2007
0.00
Paint over spray sucker upper.
Details
       

 12-24-2007
0.00
New down draft paint booth
Details
       

 12-13-2007
0.00
Prime elevator trim tab parts
Details
     

 12-12-2007
0.00
Clamp doen the elevator trim tab.
Details
       

 12-12-2007
0.00
Bend the elevator trim tab.
Details
       

 12-10-2007
0.00
Time to smack on the elevator tim tabs.
Details
       

 12-09-2007
0.00
Becning those left elevator tabs.
Details
       

 12-08-2007
0.00
House I almost bought.
Details
       

 12-07-2007
0.00
More elevator sleleton riveting.
Details
       

 12-05-2007
0.00
Lets rivet the elevator skeleton
Details
       

 12-04-2007
0.00
Primed left elevator parts.
Details
       

 12-03-2007
0.00
Counter sink elevator parts
Details
       

 12-02-2007
0.00
Left elevator holes drilled
Details
       

 12-01-2007
0.00
Picked up the wing kit
Details
     

 11-02-2007
0.00
Bending the elevator trailing edge.
Details
       

 11-01-2007
0.00
Cleco elevator counter weight housing.
Details
       

 10-19-2007
0.00
Prime stiffeners, rivet nutplates to trim access.
Details
       

 10-18-2007
0.00
Drill elevator stiffeners.
Details
       

 10-17-2007
0.00
Process the elevator trim access plate.
Details
       

 10-16-2007
0.00
Dimple elevator stiffeners.
Details
       

 10-14-2007
0.00
Continue with elevator stiffeners.
Details
       

 10-12-2007
0.00
Finish the elevator stiffeners.
Details
       

 10-11-2007
0.00
Elevator stiffeners.
Details
       

 10-10-2007
0.00
Setting the remaing rudder edge rivets.
Details
       

 10-09-2007
0.00
Rudder control hord and counter weight.
Details
       

 10-08-2007
0.00
Prepare rudder edge rivets holes.
Details
       

 10-07-2007
0.00
Rudder skeleton.
Details
       

 10-06-2007
0.00
Cleaco every other hole, then drill.
Details
       

 10-05-2007
0.00
Makeing rudder stiffeners.
Details
       

 10-04-2007
0.00
Some bad rivets on the VS Rear Spar lower hinge.
Details
       

 10-03-2007
0.00
Riveting up the VS skin.
Details
       

 10-02-2007
0.00
Final assembly of the VS Skeleton
Details
     

 10-01-2007
0.00
Priming the Vertical Stabalizer, VS
Details
       

 09-25-2007
0.00
Skin is on and all skin holes final drilled.
Details
       

 09-24-2007
0.00
The start of the VS vertical stabalizer.
Details
       

 09-24-2007
0.00
Comleted the HS.
Details
       

 09-23-2007
0.00
All HS rivets bucked.
Details
       

 09-11-2007
0.00
Clecoed the left skin back on.
Details
       

 09-10-2007
0.00
HS Skeleton taking shape
Details
       

 09-05-2007
0.00
HS front spar riveted.
Details
       

 09-04-2007
0.00
Finally, a completed sub assembly. HS Rear Spar
Details
       

 09-03-2007
0.00
Primed the HS parts
Details
       

 09-02-2007
0.00
HS degreased and laid out for priming.
Details
       

 09-01-2007
0.00
I make a bunch of part paint hangers.
Details
       

 08-31-2007
0.00
Mindy now dimples the HS spars.
Details
       

 08-30-2007
0.00
Mindy has fun dimpling.
Details
       

 08-29-2007
0.00
Another prep step on skeleton, debur and polish.
Details
       

 08-28-2007
0.00
All HS holes are drilled. Clecoed every other hole
Details
       

 08-27-2007
0.00
Right side of HS clecoed together.
Details
       

 08-27-2007
0.00
Finally looks like an airplane part.
Details
       

 08-22-2007
0.00
Romeve protective plastic at rivet locations.
Details
       

 08-21-2007
0.00
Making of the Hor. Stab. skin sqeezers.
Details
       

 08-20-2007
0.00
Horizontal Stabalizer work jig.
Details
     

 08-19-2007
0.00
Horizontal stabalizer front spar channels.
Details
       

 08-18-2007
0.00
Horizontal stabalizer front spar supports.
Details
       

 08-17-2007
0.00
Rear main spar of the Horizontal Stabalizer.
Details
       

 08-16-2007
0.00
Empennage unpacked and shelved.
Details
     

 08-15-2007
0.00
The Shop
Details
       

 08-15-2007
0.00
The compressor, Husky Pro from Home Depot.
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.