Date
|
Hours
|
Work Log Summary

|
Details

|
12-14-2012
|
0.00
|
Video from 4th flight
|
Details
|
  |
|
12-12-2012
|
0.00
|
Yippee!
|
Details
|
|
|
12-11-2012
|
2.75
|
Installed new Fuel Press Sender
|
Details
|
  |
|
12-10-2012
|
6.75
|
Stuff while waiting for Wx to clear
|
Details
|
  |
|
12-09-2012
|
7.25
|
More first flight preperations
|
Details
|
|
|
12-08-2012
|
8.25
|
First flight training and final prep
|
Details
|
  |
|
12-07-2012
|
4.75
|
Mag timing and first flight preperation
|
Details
|
  |
|
12-06-2012
|
7.00
|
Spinner, Oil, Timing
|
Details
|
|
|
12-05-2012
|
1.50
|
Foil inside cowl
|
Details
|
 |
|
12-05-2012
|
0.00
|
First Flight Training
|
Details
|
  |
|
12-04-2012
|
3.00
|
Cowl sealing
|
Details
|
  |
|
12-03-2012
|
2.75
|
Installed inspection covers tail and wing
|
Details
|
|
|
12-02-2012
|
7.50
|
Airworthiness Inspection - PASSED
|
Details
|
|
|
12-01-2012
|
10.00
|
Pre-Inspection work
|
Details
|
|
|
11-30-2012
|
6.00
|
CB Panel decals
|
Details
|
 |
|
11-29-2012
|
7.00
|
Cockpit labels
|
Details
|
|
|
11-28-2012
|
3.00
|
Seal inside of cowl
|
Details
|
  |
|
11-27-2012
|
5.75
|
Trouble shoot fuel system
|
Details
|
|
|
11-27-2012
|
2.25
|
Set Alt Belt Tension
|
Details
|
|
|
11-26-2012
|
3.75
|
Test Fuel System
|
Details
|
  |
|
11-25-2012
|
4.75
|
Oil Door / Prop bolts
|
Details
|
|
|
11-24-2012
|
4.75
|
Required Placards
|
Details
|
|
|
11-23-2012
|
3.25
|
Nothing accomplished
|
Details
|
 |
|
11-21-2012
|
4.75
|
Finished Gear slot filler
|
Details
|
|
|
11-20-2012
|
3.50
|
Cowl slot filler piece U-816
|
Details
|
|
|
11-16-2012
|
5.00
|
Weight and Balance
|
Details
|
|
|
11-14-2012
|
3.00
|
Tested cowl fit with all seals
|
Details
|
|
|
11-13-2012
|
2.75
|
Inlet baffel seals
|
Details
|
|
|
11-11-2012
|
3.00
|
Engine stuff
|
Details
|
|
|
11-10-2012
|
5.25
|
Tail fairing final fit / gas tank flush
|
Details
|
|
|
11-09-2012
|
3.00
|
Lower cowl fasteners / Defuel rig
|
Details
|
|
|
11-08-2012
|
6.00
|
Seat belt / heat SCAT tubes
|
Details
|
|
|
11-07-2012
|
2.25
|
Installed oil breather tube
|
Details
|
|
|
11-06-2012
|
4.75
|
Installed rudder, riveted on rear baggage floor
|
Details
|
|
|
11-05-2012
|
4.75
|
Installed nut plate and tapped holes for tail fair
|
Details
|
|
|
11-04-2012
|
6.00
|
Fit Emp Fairing
|
Details
|
|
|
11-02-2012
|
5.50
|
Rivet baffle seal
|
Details
|
|
|
11-01-2012
|
3.00
|
Secured CHT/EGT wires
|
Details
|
|
|
10-31-2012
|
2.75
|
Baffle seal fitting
|
Details
|
|
|
10-28-2012
|
2.50
|
Installed oil cooler
|
Details
|
|
|
10-27-2012
|
10.00
|
Install exhasut and sensor wires
|
Details
|
|
|
10-26-2012
|
6.50
|
Baffle threaded rods
|
Details
|
|
|
10-25-2012
|
3.75
|
GPS Shelf
|
Details
|
|
|
10-24-2012
|
6.50
|
Secure engine wires
|
Details
|
|
|
10-23-2012
|
6.25
|
Right side plug wires
|
Details
|
|
|
10-22-2012
|
4.50
|
Spark Plug wires/Sump heater
|
Details
|
|
|
10-21-2012
|
4.50
|
Purge valve cable
|
Details
|
|
|
10-20-2012
|
2.50
|
Drilled EGT hole in exhaust
|
Details
|
|
|
10-16-2012
|
5.75
|
Finished FAB
|
Details
|
|
|
10-11-2012
|
4.25
|
Cut and glassed inlet scoop hole
|
Details
|
|
|
10-10-2012
|
4.75
|
Riveted FAB, prepared for some glass work
|
Details
|
|
|
10-09-2012
|
2.00
|
Paint FAB
|
Details
|
|
|
10-08-2012
|
3.75
|
Baffle clips and other stuff
|
Details
|
|
|
10-06-2012
|
6.00
|
Riveted front baffle
|
Details
|
|
|
10-05-2012
|
6.75
|
Front Baffle / Alt Air Door
|
Details
|
|
|
10-04-2012
|
8.00
|
Riveted L/R aft baffle
|
Details
|
|
|
10-03-2012
|
4.50
|
Baffle and FAB work
|
Details
|
|
|
10-02-2012
|
4.50
|
Primed baffle
|
Details
|
|
|
10-01-2012
|
5.00
|
Baffle prep for primer
|
Details
|
|
|
09-30-2012
|
2.75
|
FAB bottom fit
|
Details
|
|
|
09-29-2012
|
5.50
|
FAB fitting
|
Details
|
|
|
09-28-2012
|
5.50
|
Began FAB
|
Details
|
|
|
09-27-2012
|
6.25
|
Starter wire, Fuel Flow sensor
|
Details
|
|
|
09-26-2012
|
5.50
|
Alternator/Starter wires at firewall.
|
Details
|
|
|
09-25-2012
|
7.00
|
More engine connections
|
Details
|
|
|
09-24-2012
|
3.75
|
Wired P-Mag connections
|
Details
|
|
|
09-23-2012
|
3.00
|
Hooked up Man Pressure wires
|
Details
|
 |
|
09-22-2012
|
6.75
|
Hooked up Fuel Press, Oil Press and Oil Temp
|
Details
|
|
|
09-21-2012
|
2.00
|
Purge return and cooling tube
|
Details
|
|
|
09-20-2012
|
5.00
|
Baffle Brace
|
Details
|
|
|
09-19-2012
|
7.50
|
Oil cooler corner brace
|
Details
|
|
|
09-18-2012
|
7.00
|
EAA Inpection, Oil cooler doubler
|
Details
|
|
|
09-17-2012
|
6.50
|
Cut upper baffle for gap
|
Details
|
|
|
09-16-2012
|
5.00
|
Marking the contour with upper cowl.
|
Details
|
|
|
09-15-2012
|
6.75
|
Corner gusset, trim top
|
Details
|
|
|
09-14-2012
|
7.00
|
Front center baffle
|
Details
|
|
|
09-13-2012
|
5.25
|
Baffle behind spinner
|
Details
|
|
|
09-12-2012
|
5.25
|
Front baffle work
|
Details
|
|
|
09-11-2012
|
5.75
|
Tested instrument panel
|
Details
|
|
|
09-04-2012
|
6.25
|
Completed wing tips
|
Details
|
|
|
09-03-2012
|
6.00
|
Prepared right wing tip for nut plates
|
Details
|
|
|
09-02-2012
|
6.75
|
Left wing tip nut plates
|
Details
|
|
|
08-31-2012
|
7.25
|
Tip lens, wing wires
|
Details
|
|
|
08-30-2012
|
5.25
|
Wired right wing lights
|
Details
|
|
|
08-30-2012
|
3.50
|
Door Open Sensor
|
Details
|
|
|
08-29-2012
|
4.50
|
2. NAV/STROBE and Landing lights
|
Details
|
|
|
08-29-2012
|
3.00
|
1. Baggage door latch blocks
|
Details
|
|
|
08-28-2012
|
8.00
|
New Baggage door
|
Details
|
|
|
08-27-2012
|
8.25
|
Fit wing tip ribs
|
Details
|
|
|
08-26-2012
|
6.50
|
Initial fit of wing tips
|
Details
|
|
|
08-25-2012
|
0.75
|
2. Rudder cable fairings
|
Details
|
|
|
08-25-2012
|
8.50
|
1. Made new baggage door
|
Details
|
|
|
08-24-2012
|
4.50
|
Installed Pitot, wired roll servo started emp. fai
|
Details
|
|
|
08-23-2012
|
7.75
|
Installed VS and Flaps
|
Details
|
|
|
08-18-2012
|
9.25
|
Installed elevator tested trim
|
Details
|
|
|
08-17-2012
|
6.00
|
Primed tips hooked up tail light
|
Details
|
|
|
08-16-2012
|
6.25
|
Riveted rudder bottom
|
Details
|
|
|
08-15-2012
|
3.00
|
Elevator rigging and more glass work
|
Details
|
|
|
08-14-2012
|
6.25
|
Elevator fit and movement
|
Details
|
|
|
08-13-2012
|
6.75
|
Mounted elevator and fit wire to tail light
|
Details
|
 |
|
08-11-2012
|
6.75
|
Made attachment for tail light
|
Details
|
|
|
08-10-2012
|
5.25
|
Riveted on elevator tips
|
Details
|
|
|
08-09-2012
|
6.50
|
Installed elevator trim servo and wire
|
Details
|
|
|
08-08-2012
|
6.75
|
VS, rudder pedals, & switch console
|
Details
|
|
|
08-07-2012
|
7.75
|
Fuel lines and console
|
Details
|
|
|
08-06-2012
|
7.75
|
Aileron push rods and front floor
|
Details
|
|
|
08-05-2012
|
3.25
|
Installed Horizontal Stab
|
Details
|
|
|
08-01-2012
|
4.50
|
2. Riveted on floor.
|
Details
|
|
|
08-01-2012
|
1.75
|
1. Made wing connections.
|
Details
|
|
|
07-31-2012
|
7.50
|
Final fit the wings
|
Details
|
|
|
07-30-2012
|
3.75
|
Prepared for wing install tomorrow
|
Details
|
|
|
07-29-2012
|
0.25
|
Sanded left elevator tip
|
Details
|
  |
|
07-29-2012
|
4.00
|
Closed tank and leak tested
|
Details
|
|
|
07-25-2012
|
1.25
|
2. More elevator tips
|
Details
|
|
|
07-25-2012
|
3.75
|
1. Splice wires to wing
|
Details
|
|
|
07-24-2012
|
3.00
|
2. Riveted on flap fairings
|
Details
|
|
|
07-24-2012
|
0.75
|
1. More elevator tip work
|
Details
|
|
|
07-23-2012
|
0.25
|
3. Pulled Pitot/AOA lines
|
Details
|
|
|
07-23-2012
|
1.75
|
2. Tail Inspection Covers
|
Details
|
|
|
07-23-2012
|
2.75
|
1. Laid elevator tip ends
|
Details
|
|
|
07-19-2012
|
3.25
|
2. See thru Tail Inspectoin cover
|
Details
|
|
|
07-19-2012
|
1.50
|
1. Primed flap fairing/ Pitot lines
|
Details
|
|
|
07-18-2012
|
6.25
|
Wing nut plates
|
Details
|
|
|
07-17-2012
|
7.25
|
Installed upper wing nut plates
|
Details
|
|
|
07-17-2012
|
1.00
|
1. More fuel sender tests
|
Details
|
  |
|
07-16-2012
|
2.50
|
2. Testing fuel senders
|
Details
|
  |
|
07-16-2012
|
0.50
|
1. Sanded VS tip layup
|
Details
|
  |
|
07-13-2012
|
0.75
|
4. VS tip end
|
Details
|
|
|
07-13-2012
|
1.25
|
3. Wing root nut plate holes
|
Details
|
 |
|
07-13-2012
|
1.75
|
2. Dimpled holes for flap fairing
|
Details
|
  |
|
07-13-2012
|
3.50
|
1. Drilled rear spar to size
|
Details
|
|
|
07-12-2012
|
4.25
|
VS tip and elevator tips
|
Details
|
|
|
07-11-2012
|
3.25
|
Fixed flap bottom fit to belly
|
Details
|
|
|
07-11-2012
|
4.00
|
Fit rudder top and bottom
|
Details
|
|
|
07-10-2012
|
2.00
|
Riveted on step
|
Details
|
|
|
07-09-2012
|
5.75
|
Cut hole for the step
|
Details
|
|
|
07-08-2012
|
4.75
|
Fit flap fairings
|
Details
|
|
|
07-07-2012
|
9.00
|
Wing root fairings
|
Details
|
|
|
07-06-2012
|
5.75
|
Installed and rigged flaps
|
Details
|
|
|
07-06-2012
|
1.00
|
2. Drilled bolt hole in tank supports
|
Details
|
|
|
07-06-2012
|
2.50
|
1. Check Sweep, fuel vent lines
|
Details
|
|
|
07-04-2012
|
2.75
|
2. Rig Ailerons
|
Details
|
|
|
07-04-2012
|
4.75
|
1. Drilled Tank Support Brackets
|
Details
|
|
|
07-03-2012
|
2.50
|
Installed wings first time!
|
Details
|
|
|
07-02-2012
|
5.25
|
Ready work for wing install
|
Details
|
|
|
07-01-2012
|
5.00
|
Wing stuff before fitting
|
Details
|
|
|
07-01-2012
|
0.50
|
Sanded filler at corners
|
Details
|
|
|
06-27-2012
|
0.00
|
Jack stands
|
Details
|
 |
|
06-23-2012
|
4.75
|
Made tank support brackets
|
Details
|
|
|
06-22-2012
|
3.25
|
Riveted F804 Caps
|
Details
|
|
|
06-21-2012
|
0.50
|
Added filler to corners
|
Details
|
|
|
06-20-2012
|
0.00
|
Update
|
Details
|
|
|
06-11-2012
|
4.25
|
Primed skirt and windscreen
|
Details
|
|
|
06-09-2012
|
3.00
|
Last layer of neat resing to skirt
|
Details
|
 |
|
06-08-2012
|
0.25
|
Sanded filler on insde of windscreen
|
Details
|
 |
|
06-08-2012
|
1.25
|
Sanded & refilled rivets
|
Details
|
 |
|
06-06-2012
|
1.00
|
Filled underside of fairing some
|
Details
|
 |
|
06-06-2012
|
2.75
|
Filled rivet holes, faired handle area
|
Details
|
|
|
06-06-2012
|
2.50
|
Baffle 6 - Trim Rt aft baffle
|
Details
|
|
|
06-01-2012
|
0.25
|
Sanded filler at spinner
|
Details
|
|
|
06-01-2012
|
1.25
|
Final layer of resing on WS
|
Details
|
|
|
06-01-2012
|
1.25
|
Baffle 5 -Riveted Doubler
|
Details
|
|
|
05-31-2012
|
1.75
|
Sanded front area to shape
|
Details
|
|
|
05-31-2012
|
1.50
|
Laid on clear resin
|
Details
|
|
|
05-31-2012
|
1.25
|
Filled skirt rivet centers
|
Details
|
 |
|
05-30-2012
|
3.00
|
Sanded Windscreen
|
Details
|
 |
|
05-29-2012
|
1.75
|
Started to fill pinholes
|
Details
|
 |
|
05-29-2012
|
2.50
|
Filler at spinner flange part 2
|
Details
|
|
|
05-29-2012
|
1.75
|
Baffle 4- Fit Rt-Aft
|
Details
|
 |
|
05-28-2012
|
1.50
|
Filled at spinner flange
|
Details
|
|
|
05-28-2012
|
1.50
|
Baffle 3 - Rivted plates fit 707D bracket
|
Details
|
  |
|
05-27-2012
|
1.00
|
Opened canopy with some effort
|
Details
|
|
|
05-25-2012
|
3.50
|
Sanded down filler to shape
|
Details
|
|
|
05-25-2012
|
0.75
|
Baffle 2 - Cyl 1,2,3 prep
|
Details
|
 |
|
05-24-2012
|
2.00
|
Baffle 1 - Cly 4 Prep
|
Details
|
 |
|
05-24-2012
|
1.75
|
Applied resin filler Mix
|
Details
|
|
|
05-23-2012
|
5.50
|
Sanded winscreen fairing to shape
|
Details
|
|
|
05-21-2012
|
7.00
|
Laid up upper faring
|
Details
|
|
|
05-20-2012
|
1.00
|
2. Fill void behind cowl spinner flange
|
Details
|
 |
|
05-20-2012
|
0.50
|
1. Filled some of lower fairing
|
Details
|
|
|
05-19-2012
|
0.50
|
2. Refined cowl fit.
|
Details
|
  |
|
05-19-2012
|
2.50
|
1. Pop riveted lower aft windscreen
|
Details
|
|
|
05-17-2012
|
2.00
|
2. Started forward fit of cowling.
|
Details
|
|
|
05-17-2012
|
3.00
|
1. Laid up lower aft windscreen fairing
|
Details
|
|
|
05-16-2012
|
3.50
|
2. Started to lay up aft lower windscreen
|
Details
|
|
|
05-16-2012
|
0.50
|
1. Finished riveting upper cowl hinge
|
Details
|
  |
|
05-14-2012
|
4.25
|
Riveted top cowl hinges
|
Details
|
|
|
05-13-2012
|
5.75
|
Laid up lower windscreen fairing
|
Details
|
|
|
05-12-2012
|
2.25
|
Glued upper cowl hinges
|
Details
|
|
|
05-12-2012
|
3.50
|
Glassed extension to aft skin
|
Details
|
|
|
05-11-2012
|
4.50
|
Riiveted lower cowl hinges
|
Details
|
|
|
05-10-2012
|
0.75
|
Counter Sink lower cowl rivet holes
|
Details
|
 |
|
05-06-2012
|
2.50
|
2. Marked fairing location.
|
Details
|
|
|
05-06-2012
|
1.50
|
1. Epoxied on lower cowl hinges
|
Details
|
|
|
05-05-2012
|
4.00
|
Gap fix / hinge glue prep.
|
Details
|
|
|
05-04-2012
|
1.00
|
2. Fixed skirt to windscreen transition
|
Details
|
|
|
05-04-2012
|
0.50
|
1. Filled void in back of gap layup
|
Details
|
  |
|
05-03-2012
|
2.25
|
2. Taped up fairing edge
|
Details
|
|
|
05-03-2012
|
1.25
|
1. Laid up glass to fix gap
|
Details
|
|
|
05-02-2012
|
1.75
|
Drilled weep holes
|
Details
|
 |
|
05-01-2012
|
1.75
|
More paint gap work
|
Details
|
|
|
04-30-2012
|
5.25
|
Set paint gap/removed prop
|
Details
|
|
|
04-28-2012
|
6.50
|
Drilled long horizontal hinges to cowl
|
Details
|
|
|
04-27-2012
|
2.75
|
Made upper cowl taper pins
|
Details
|
|
|
04-25-2012
|
4.25
|
Trimed upper/lower cowl line
|
Details
|
|
|
04-24-2012
|
4.75
|
Drilled lower cowl vertical hinges
|
Details
|
|
|
04-22-2012
|
3.25
|
Set and drilled side hinges
|
Details
|
|
|
04-21-2012
|
4.25
|
Trimed and drilled bottom of Cowl
|
Details
|
|
|
04-20-2012
|
6.00
|
Slotted lower cowl
|
Details
|
|
|
04-19-2012
|
4.25
|
Drilled upper cowl to firewall hinge
|
Details
|
|
|
04-18-2012
|
7.75
|
Fit top cowl
|
Details
|
|
|
04-17-2012
|
5.50
|
Installed prop to fit cowl
|
Details
|
|
|
04-15-2012
|
1.50
|
2. Installed Velcro on glare shield
|
Details
|
|
|
04-15-2012
|
1.00
|
1. Marked 2" reference line
|
Details
|
 |
|
04-13-2012
|
4.25
|
Initial cuts to fit cowls halves
|
Details
|
|
|
04-12-2012
|
2.00
|
Riveted on upper hinge
|
Details
|
|
|
04-11-2012
|
4.00
|
Upper hinge
|
Details
|
|
|
04-10-2012
|
2.00
|
Worked on spinner mockup
|
Details
|
|
|
04-09-2012
|
3.75
|
Drilled bag door hinge Lock and Latch
|
Details
|
|
|
04-08-2012
|
0.00
|
Gettting ready at hanger
|
Details
|
|
|
04-07-2012
|
1.00
|
Riveted door inner skin
|
Details
|
|
|
04-06-2012
|
1.50
|
Canopy handle spring install
|
Details
|
|
|
04-05-2012
|
1.00
|
2. Prosealed baggage door
|
Details
|
|
|
04-05-2012
|
2.00
|
1. Added final layer of glue
|
Details
|
|
|
04-03-2012
|
6.75
|
Glued windscreen
|
Details
|
|
|
03-24-2012
|
2.00
|
Started to fit windscreen
|
Details
|
|
|
03-23-2012
|
0.50
|
Part 2 Alt Static handle
|
Details
|
|
|
03-23-2012
|
1.50
|
Part 1 Canopy Handle
|
Details
|
|
|
03-22-2012
|
3.00
|
Installed (L) side Cherry rivets
|
Details
|
|
|
03-21-2012
|
2.50
|
Painted Dash
|
Details
|
|
|
03-20-2012
|
3.75
|
Riveted Top Skin longeron rivets
|
Details
|
|
|
03-19-2012
|
2.50
|
Fit Canopy Latch
|
Details
|
|
|
03-16-2012
|
1.75
|
Fitting baggage door
|
Details
|
|
|
03-15-2012
|
5.50
|
Started to rivet boot cowl
|
Details
|
|
|
03-14-2012
|
2.25
|
Installed Alt Air Cable
|
Details
|
|
|
03-13-2012
|
1.00
|
Rivet side skin support
|
Details
|
 |
|
03-13-2012
|
1.00
|
Pitot Heat Warning
|
Details
|
|
|
03-12-2012
|
4.25
|
Prepare to rivet boot cowl
|
Details
|
|
|
03-11-2012
|
2.00
|
Air hose work
|
Details
|
|
|
03-09-2012
|
4.75
|
G/S Antenna & Alt Static Air
|
Details
|
|
|
03-07-2012
|
2.25
|
Wired F804 Cap lights
|
Details
|
  |
|
03-06-2012
|
2.50
|
Tested sensor circuits
|
Details
|
|
|
03-04-2012
|
2.25
|
Re-installed CB and Inst Panels
|
Details
|
 |
|
03-03-2012
|
1.50
|
Battery hold down strap
|
Details
|
|
|
03-02-2012
|
4.50
|
Riveted on skirt
|
Details
|
|
|
03-01-2012
|
1.75
|
Part 2. Fuel Flow sensor and line
|
Details
|
|
|
03-01-2012
|
2.25
|
Part 1. Fill Voids on skirt edge
|
Details
|
|
|
02-29-2012
|
6.75
|
Glued on skirt (upper edge)
|
Details
|
|
|
02-28-2012
|
2.75
|
Primed inside of skirt
|
Details
|
|
|
02-27-2012
|
1.75
|
Primed inside of skirt
|
Details
|
 |
|
02-12-2012
|
0.50
|
Marked glue lines
|
Details
|
  |
|
02-11-2012
|
5.25
|
Sanded skirt and test fit
|
Details
|
|
|
02-09-2012
|
3.75
|
Part 2 Hose and wire route test
|
Details
|
|
|
02-09-2012
|
0.75
|
Part 1 Another coating of epoxy
|
Details
|
|
|
02-08-2012
|
0.50
|
Part 3 Power wires
|
Details
|
  |
|
02-08-2012
|
0.75
|
Part 2 Wrapped some wire bundles
|
Details
|
|
|
02-08-2012
|
1.75
|
Part 1 More aft skirt filling
|
Details
|
|
|
02-07-2012
|
1.50
|
Part 4 Starter wire route
|
Details
|
|
|
02-07-2012
|
1.50
|
Part 3 Left tank fuel line
|
Details
|
|
|
02-07-2012
|
1.25
|
Part 2 Wire bundle tying
|
Details
|
  |
|
02-07-2012
|
0.25
|
Part 1 More dry micro on skirt
|
Details
|
 |
|
02-05-2012
|
0.75
|
Sanded aft skirt
|
Details
|
 |
|
02-04-2012
|
1.00
|
Applied more micro to aft skirt
|
Details
|
|
|
02-03-2012
|
2.25
|
Sanded down epoxy coat from yesterday
|
Details
|
  |
|
02-02-2012
|
1.75
|
2. More wire tying
|
Details
|
|
|
02-02-2012
|
2.00
|
1. Filled outside of skirt with epoxy
|
Details
|
 |
|
02-01-2012
|
1.00
|
2. Marked EGT probe positions
|
Details
|
|
|
02-01-2012
|
1.50
|
1. Secured rear stick cable
|
Details
|
|
|
01-28-2012
|
0.25
|
2. Painted underside of glare shield
|
Details
|
 |
|
01-28-2012
|
2.50
|
1. Removed uncured epoxy
|
Details
|
|
|
01-27-2012
|
2.50
|
Installed cooling fan and guard
|
Details
|
|
|
01-26-2012
|
1.50
|
Started Coolin Fan Guard
|
Details
|
 |
|
01-16-2012
|
1.50
|
Coated inside of skirt with resin
|
Details
|
|
|
01-14-2012
|
3.25
|
Cooling Fan - ELT cable
|
Details
|
|
|
01-13-2012
|
2.25
|
Continued Cooling Fan
|
Details
|
|
|
01-12-2012
|
3.50
|
2: Drilled baggage wall for air pass thru
|
Details
|
|
|
01-12-2012
|
2.25
|
1: Installed brake valve - tested (L) master
|
Details
|
 |
|
01-11-2012
|
1.25
|
2: Tested (R) Master and Park Valve for leaks
|
Details
|
 |
|
01-11-2012
|
0.75
|
1: More micro on duct
|
Details
|
  |
|
01-10-2012
|
0.50
|
Laid on dry micro to fair inlet
|
Details
|
 |
|
01-08-2012
|
0.75
|
Laid up new inlet duct
|
Details
|
  |
|
01-01-2012
|
1.00
|
2: Redo master cylinder fittings
|
Details
|
 |
|
01-01-2012
|
2.50
|
1: Sanded and formed cooling duct
|
Details
|
|
|
12-31-2011
|
2.00
|
Glassed cooling duct
|
Details
|
|
|
12-30-2011
|
0.50
|
Fitting into brake valve
|
|
 |
|
12-30-2011
|
2.50
|
Cooling duct
|
Details
|
|
|
12-29-2011
|
1.50
|
More cooling fan work
|
Details
|
|
|
12-28-2011
|
1.25
|
Equpment Cooling Fan
|
Details
|
|
|
12-23-2011
|
1.25
|
Parking brake valve assembly
|
Details
|
|
|
12-22-2011
|
5.50
|
Parking brake knob and fit
|
Details
|
|
|
12-20-2011
|
3.00
|
Fabricating parking brake bracket
|
Details
|
|
|
12-19-2011
|
0.75
|
Drilled out F866-D
|
Details
|
|
|
12-17-2011
|
1.75
|
Parking Brake bracket
|
Details
|
  |
|
12-17-2011
|
2.00
|
1. Primer coat on underside of skirt
|
Details
|
|
|
12-15-2011
|
1.75
|
Filled more on underside of skirt
|
Details
|
 |
|
12-13-2011
|
3.00
|
More work on underside of skirt
|
Details
|
|
|
11-26-2011
|
0.50
|
Sanded aft end of skirt
|
Details
|
 |
|
11-14-2011
|
0.50
|
More fairing work
|
Details
|
 |
|
10-13-2011
|
1.00
|
Sanded off some of the underside shim
|
Details
|
  |
|
10-10-2011
|
0.50
|
2. Defrost, Equipment cooling
|
Details
|
  |
|
10-10-2011
|
0.50
|
1. Applied clear epoxy to underside of skirt
|
Details
|
 |
|
10-09-2011
|
1.00
|
Glassed underside of skirt seam
|
Details
|
 |
|
09-27-2011
|
0.50
|
Made handle bushing
|
Details
|
|
|
09-26-2011
|
2.00
|
Shaped external handle
|
Details
|
|
|
09-22-2011
|
0.00
|
Moved wings to airport
|
Details
|
|
|
09-06-2011
|
1.50
|
Another slurry layer.
|
Details
|
  |
|
08-29-2011
|
0.50
|
Sanded aft section of skirt
|
Details
|
|
|
08-22-2011
|
1.50
|
More liquid shimming
|
Details
|
 |
|
08-21-2011
|
2.75
|
Filled gap at the track
|
Details
|
|
|
08-20-2011
|
2.00
|
Last layer on rear skirt seam
|
Details
|
|
|
08-17-2011
|
0.75
|
Laid up middle of skirt seam
|
Details
|
|
|
08-16-2011
|
1.50
|
Laid up first layer to skirt halves
|
Details
|
|
|
08-15-2011
|
1.25
|
Cleaned up shims
|
Details
|
|
|
08-14-2011
|
0.75
|
2. Set windscreen edge
|
Details
|
|
|
08-14-2011
|
1.50
|
1. Shimmed vertical parts of skirt
|
Details
|
|
|
08-13-2011
|
1.25
|
Filled goofed up holes
|
Details
|
|
|
08-09-2011
|
2.50
|
Canopy front edge
|
Details
|
|
|
08-01-2011
|
3.75
|
Upper skirt gap work
|
Details
|
|
|
07-25-2011
|
2.50
|
Trimmed lower side of skirts
|
Details
|
|
|
07-21-2011
|
5.25
|
Matching skirt "S" curve
|
Details
|
|
|
07-19-2011
|
5.50
|
More work on the skirt
|
Details
|
|
|
07-18-2011
|
5.00
|
Fit aft skirt section.
|
Details
|
|
|
07-17-2011
|
3.25
|
Fuel pump fittings
|
Details
|
|
|
07-16-2011
|
0.75
|
2. Engine sesnors
|
Details
|
|
|
07-16-2011
|
3.75
|
1. Fwd Baggage conduit
|
Details
|
|
|
07-15-2011
|
4.00
|
Check valve bracket
|
Details
|
|
|
07-14-2011
|
0.50
|
2, Tested purge valve cable
|
Details
|
|
|
07-14-2011
|
2.25
|
1. Purge line Check Valve
|
Details
|
|
|
07-13-2011
|
6.00
|
Drilled anchor block and rollers
|
Details
|
|
|
07-12-2011
|
6.50
|
Wing NACA vent
|
Details
|
|
|
07-10-2011
|
4.00
|
Cabin heat Cable
|
Details
|
|
|
07-09-2011
|
1.00
|
2. Paint NACA vent and air vent cover
|
Details
|
|
|
07-09-2011
|
2.25
|
1. Purge valve cable anchor bracket
|
Details
|
|
|
07-08-2011
|
0.00
|
2. Oil filler tube move.
|
Details
|
|
|
07-08-2011
|
6.75
|
1. Heat valve cable support
|
Details
|
|
|
07-07-2011
|
0.00
|
2. Rear throttle and cable eyeballs
|
Details
|
|
|
07-07-2011
|
8.25
|
1. Mixture cable
|
Details
|
|
|
07-06-2011
|
0.75
|
2. Installed front NACA vent
|
Details
|
|
|
07-06-2011
|
3.50
|
1. Install Roll Servo
|
Details
|
|
|
07-05-2011
|
2.50
|
Throttle cable hook-up
|
Details
|
|
|
07-02-2011
|
0.75
|
Fuel control bracket install
|
Details
|
 |
|
07-01-2011
|
0.50
|
Throttle/Mixture brackets
|
Details
|
  |
|
06-24-2011
|
1.50
|
Alternator
|
Details
|
 |
|
06-23-2011
|
3.00
|
2. Exhaust hangers
|
Details
|
|
|
06-23-2011
|
1.25
|
1. Prop Cable
|
Details
|
|
|
06-22-2011
|
1.75
|
Cable lengths
|
Details
|
|
|
06-21-2011
|
1.75
|
Mixture pass thru
|
Details
|
  |
|
06-20-2011
|
4.75
|
Throt/Mix brackets done
|
Details
|
|
|
06-13-2011
|
3.25
|
More mixture bracket work
|
Details
|
|
|
06-09-2011
|
3.00
|
Cut out mixture bracket
|
Details
|
|
|
06-08-2011
|
0.50
|
Took off prototype mixture bracket
|
Details
|
  |
|
06-07-2011
|
2.25
|
Prototype mixture bracket
|
Details
|
|
|
06-03-2011
|
2.50
|
Settled on tail pipe position
|
Details
|
|
|
06-02-2011
|
1.25
|
Exhaust
|
Details
|
|
|
05-24-2011
|
0.75
|
Test fit Exhaust
|
Details
|
|
|
05-23-2011
|
3.00
|
2. Throttle cable anchor
|
Details
|
|
|
05-23-2011
|
4.00
|
1. Hung Engine Solo!
|
Details
|
|
|
05-22-2011
|
2.50
|
Engine hanging day NOT!
|
Details
|
|
|
05-21-2011
|
0.00
|
2. Prop Governor
|
Details
|
|
|
05-21-2011
|
5.25
|
1. Fuel Pump fitting / SD20 install
|
Details
|
|
|
05-20-2011
|
2.75
|
Made bracket for Manifold Pressure fitting
|
Details
|
|
|
05-19-2011
|
1.00
|
2. Engine mount bolts
|
Details
|
|
|
05-19-2011
|
2.00
|
1. Restrictor fitting
|
Details
|
|
|
05-18-2011
|
2.00
|
Upper wire pass through
|
Details
|
|
|
05-17-2011
|
3.00
|
Firewall items
|
Details
|
|
|
05-16-2011
|
3.50
|
Finding where things go.
|
Details
|
|
|
05-15-2011
|
2.25
|
More test fitting
|
Details
|
|
|
05-09-2011
|
0.75
|
Removed govenor to ship back!
|
Details
|
|
|
05-08-2011
|
2.75
|
Re-installed OFA
|
Details
|
|
|
05-08-2011
|
2.00
|
Prop Governor Bracket
|
Details
|
|
|
05-02-2011
|
2.00
|
Started to polish canopy tracks
|
Details
|
 |
|
05-02-2011
|
1.00
|
Removed OFA spacer
|
Details
|
|
|
04-30-2011
|
0.00
|
Set up for engine install work
|
Details
|
|
|
04-26-2011
|
1.75
|
Installed nose gear
|
Details
|
|
|
04-25-2011
|
3.00
|
Main tires, nose gear leg
|
Details
|
|
|
04-24-2011
|
1.50
|
Installed main gear legs
|
Details
|
|
|
04-24-2011
|
3.00
|
Drilled mains for cotter pin
|
Details
|
|
|
04-23-2011
|
1.00
|
Packed wheel bearings
|
Details
|
 |
|
04-23-2011
|
4.50
|
Installed eyeball pass throughs
|
Details
|
|
|
04-22-2011
|
4.00
|
Installed shunt and ANL
|
Details
|
 |
|
04-21-2011
|
4.00
|
Fit main wheels and brakes
|
Details
|
|
|
04-20-2011
|
2.75
|
Set fork breakout - started mains
|
Details
|
|
|
04-19-2011
|
1.25
|
Installed nose gear flange and fork
|
Details
|
 |
|
04-18-2011
|
1.00
|
Lace tied wires
|
Details
|
|
|
04-18-2011
|
2.75
|
Drilled nose gear leg
|
|
|
|
04-14-2011
|
1.75
|
Hooked up fuel boost pump wires
|
Details
|
 |
|
04-14-2011
|
0.50
|
Heat valve control cable
|
Details
|
 |
|
03-27-2011
|
1.00
|
Part 2: Front power outlet
|
Details
|
|
|
03-27-2011
|
6.00
|
Part 1: Finished heat vent
|
Details
|
|
|
03-26-2011
|
5.75
|
Made heat vent bracket
|
Details
|
|
|
03-25-2011
|
0.50
|
Part 2: Heat vent bracket
|
Details
|
 |
|
03-25-2011
|
3.25
|
Part 1: Removed panel, lace tied harness
|
Details
|
 |
|
03-23-2011
|
2.50
|
More RFI trouble shoting
|
Details
|
 |
|
03-20-2011
|
2.50
|
2. Landing gear prep
|
Details
|
  |
|
03-20-2011
|
3.75
|
1. Trouble shot RFI again
|
Details
|
  |
|
03-19-2011
|
4.50
|
E-bus feed diode and relay
|
Details
|
|
|
03-18-2011
|
3.00
|
Hot Battery Bus items
|
Details
|
|
|
03-17-2011
|
0.00
|
Part 2: Static sytem leak check
|
Details
|
|
|
03-17-2011
|
4.00
|
Part 1: Trim speed switch Pitot, Static and AOA li
|
Details
|
|
|
03-16-2011
|
2.75
|
Heat Valve, trim speed switch
|
Details
|
|
|
03-11-2011
|
2.50
|
Solved DSAB drops
|
Details
|
  |
|
03-06-2011
|
1.75
|
Rear seat jacks
|
Details
|
|
|
03-05-2011
|
3.25
|
PLT MIC now works, config AP
|
Details
|
|
|
03-04-2011
|
4.75
|
PLT- headset jacks
|
Details
|
 |
|
03-04-2011
|
0.00
|
EAA Tech Counselor Inspection
|
Details
|
  |
|
03-03-2011
|
0.00
|
Replace molex for DB9
|
Details
|
|
|
03-03-2011
|
5.25
|
Part 1: Updated Dynon Equipment
|
Details
|
|
|
03-02-2011
|
6.25
|
Powered up the panel
|
Details
|
 |
|
03-01-2011
|
7.00
|
Grounds and DSAB
|
Details
|
|
|
02-28-2011
|
8.75
|
New wire bundle support
|
Details
|
|
|
02-27-2011
|
4.75
|
More wires and CBs
|
Details
|
|
|
02-26-2011
|
3.25
|
Fixed broken wire, tied more wire!
|
Details
|
|
|
02-25-2011
|
6.25
|
Conected 496 to intercom
|
Details
|
|
|
02-24-2011
|
3.50
|
Installd new power wires to 430W
|
Details
|
|
|
02-20-2011
|
5.25
|
GPS Dock and wire lace
|
Details
|
|
|
02-16-2011
|
0.00
|
Part 2: 496 data cable
|
Details
|
|
|
02-16-2011
|
5.25
|
Part 1: G496 Data Cable
|
Details
|
|
|
02-15-2011
|
3.50
|
AP-74 wires
|
Details
|
|
|
02-14-2011
|
2.50
|
Installed support clamp and stuff
|
Details
|
|
|
02-12-2011
|
3.50
|
DRILLED FINGER!!
|
Details
|
 |
|
02-11-2011
|
4.75
|
Tied wire bundle
|
Details
|
|
|
02-10-2011
|
2.25
|
Terminated right side switches
|
Details
|
 |
|
02-09-2011
|
4.75
|
Dynon serial plug holder
|
Details
|
|
|
02-08-2011
|
0.00
|
Part 2; Re-installed left panel switches
|
Details
|
 |
|
02-08-2011
|
6.25
|
Part 1: Pliced comm wires
|
Details
|
|
|
02-07-2011
|
1.25
|
DSAB bus Hub
|
Details
|
 |
|
02-06-2011
|
1.50
|
Made retainer bracket for HS34
|
Details
|
  |
|
02-05-2011
|
3.50
|
Mapped wires/Orgainize harness
|
Details
|
 |
|
02-01-2011
|
1.75
|
Installed Inst GND Bus
|
Details
|
|
|
01-30-2011
|
2.00
|
Finished hard AOA/Pitot lines
|
Details
|
|
|
01-29-2011
|
1.50
|
Flared Pitot/AOA tubes
|
Details
|
  |
|
01-16-2011
|
0.75
|
Flared pitot/AOA lines
|
Details
|
 |
|
01-09-2011
|
4.00
|
Start Arm decal and tested circuits
|
Details
|
|
|
01-08-2011
|
2.50
|
Terminated more CB wires
|
Details
|
 |
|
01-07-2011
|
3.00
|
Terminated CB wires
|
Details
|
 |
|
01-05-2011
|
3.00
|
Organized wires behind CB panel
|
Details
|
|
|
01-04-2011
|
4.25
|
Completed (R) console connections
|
Details
|
|
|
01-02-2011
|
5.50
|
Molex connection to right console
|
Details
|
|
|
01-01-2011
|
1.75
|
Front LED side lights
|
Details
|
  |
|
12-31-2010
|
2.25
|
Soldered wire to LED lights
|
Details
|
|
|
12-30-2010
|
2.50
|
Pulled wires for Alt Field and IGN
|
Details
|
|
|
12-29-2010
|
1.25
|
Finished label plate
|
Details
|
 |
|
12-28-2010
|
3.25
|
Re-painted CB panel
|
Details
|
|
|
12-27-2010
|
2.50
|
Made Bracket for standoffs
|
Details
|
 |
|
12-22-2010
|
3.75
|
CB panel fit
|
Details
|
|
|
12-19-2010
|
6.25
|
Right Console Molex connnections
|
Details
|
 |
|
12-18-2010
|
5.50
|
Re-layed out CBs
|
Details
|
|
|
12-17-2010
|
3.25
|
Continued to wire (R) Console
|
Details
|
|
|
12-16-2010
|
1.50
|
Molex connection on (R) console
|
Details
|
  |
|
12-15-2010
|
2.75
|
Connected Main Bus Feed
|
Details
|
 |
|
12-14-2010
|
1.50
|
Part 2: Wire organization
|
Details
|
|
|
12-14-2010
|
2.75
|
Part 1: Front floor modification
|
Details
|
 |
|
12-13-2010
|
4.50
|
Spliced NAV/STRB, LAND and TAXI wires
|
Details
|
|
|
12-12-2010
|
6.75
|
Hooked up remianing wires under seat
|
Details
|
|
|
12-11-2010
|
2.50
|
Solder wires to switch
|
Details
|
|
|
12-06-2010
|
4.25
|
Installed standoff
|
Details
|
|
|
12-05-2010
|
1.75
|
Made stand off
|
Details
|
 |
|
12-04-2010
|
3.00
|
Tested Aileron Trim
|
Details
|
 |
|
11-30-2010
|
3.00
|
Tested Smart Start
|
Details
|
 |
|
11-29-2010
|
1.25
|
Drilled battery tray to floor
|
Details
|
 |
|
11-28-2010
|
6.25
|
WIre supports for E&E bay
|
Details
|
|
|
11-27-2010
|
5.25
|
E&E Bay wires
|
Details
|
|
|
11-26-2010
|
5.00
|
Connected Aileron Trim
|
Details
|
|
|
11-24-2010
|
1.25
|
Installed Smart Start Arm button
|
Details
|
 |
|
11-22-2010
|
4.25
|
Wired sticks to terminal and tested
|
Details
|
|
|
11-21-2010
|
3.50
|
Stick wire arrangement
|
Details
|
 |
|
11-20-2010
|
4.00
|
Wired servos to terminal
|
Details
|
|
|
11-18-2010
|
4.50
|
Terminal for A/P servo wires
|
Details
|
  |
|
11-17-2010
|
3.00
|
Secured stick wires
|
Details
|
|
|
11-15-2010
|
5.00
|
Terminal/relay tray under front seat
|
Details
|
|
|
11-14-2010
|
7.25
|
Rear stick connector
|
Details
|
|
|
11-12-2010
|
0.00
|
Put engine on stand
|
Details
|
|
|
11-11-2010
|
1.00
|
Rear stick connector
|
Details
|
|
|
11-11-2010
|
2.75
|
Part 1: Installed Prop Gov. and Oil Temp Sensor
|
Details
|
|
|
11-09-2010
|
5.25
|
Rear control cover con't
|
Details
|
|
|
11-08-2010
|
3.25
|
More Aft Control Cover
|
Details
|
|
|
11-07-2010
|
3.00
|
Build first part of rear control cover
|
Details
|
|
|
11-06-2010
|
6.00
|
Rear Control Cover con't
|
Details
|
|
|
11-04-2010
|
1.50
|
New rear stick
|
Details
|
 |
|
11-03-2010
|
1.00
|
Rear control cover
|
Details
|
 |
|
11-02-2010
|
2.00
|
Rear stick grip
|
Details
|
|
|
11-01-2010
|
2.75
|
Installed stick grips
|
Details
|
|
|
10-31-2010
|
4.25
|
Solved friction in control mount
|
Details
|
|
|
10-30-2010
|
3.25
|
Safety wired pitch servo
|
Details
|
|
|
10-29-2010
|
1.25
|
Pitch servo wires
|
Details
|
|
|
10-28-2010
|
4.00
|
Pitch Servo
|
Details
|
|
|
10-27-2010
|
2.75
|
Made support for rear of radio stack
|
Details
|
|
|
10-26-2010
|
1.75
|
Panel fitting
|
Details
|
|
|
10-19-2010
|
3.00
|
More AOA/Pitot
|
Details
|
 |
|
10-13-2010
|
5.25
|
AOA and Pitot lines
|
Details
|
|
|
10-12-2010
|
2.25
|
Strobe sync wire
|
Details
|
 |
|
10-08-2010
|
3.50
|
EMS harness fit and wire organization
|
Details
|
|
|
10-07-2010
|
2.50
|
Rear power outlet and seat heat
|
Details
|
  |
|
10-06-2010
|
3.00
|
Left wire bundle Pitot AOA line route
|
Details
|
  |
|
09-30-2010
|
2.50
|
Front cockpit LED lights
|
Details
|
  |
|
09-29-2010
|
1.25
|
Set torque on roll bar bolts
|
Details
|
|
|
08-08-2010
|
6.25
|
Finished (R) wing riveting
|
Details
|
|
|
08-07-2010
|
6.00
|
Started to rivet (R) bottom skin
|
Details
|
|
|
07-22-2010
|
7.25
|
Finished riveting (L) wing!!!
|
Details
|
|
|
07-21-2010
|
3.75
|
And more wing skin riveting
|
Details
|
 |
|
07-20-2010
|
2.25
|
Continued riveting bottom skin
|
Details
|
|
|
07-16-2010
|
4.25
|
Started to rivet (L) bottom skin
|
Details
|
 |
|
07-15-2010
|
2.25
|
Riveted on Map light mount
|
Details
|
|
|
07-13-2010
|
1.25
|
Painted mount for Map Light
|
Details
|
 |
|
07-12-2010
|
3.25
|
Part II - Map light mount
|
Details
|
 |
|
07-12-2010
|
2.50
|
Part I - Clecoed skin for riveting
|
Details
|
 |
|
07-03-2010
|
3.25
|
Prepared wing skins for riveting
|
Details
|
|
|
07-02-2010
|
4.50
|
RCP LED ligths
|
Details
|
|
|
07-01-2010
|
4.00
|
Light in the rear baggage area
|
Details
|
|
|
06-29-2010
|
0.50
|
Installed LED stirps
|
Details
|
|
|
06-28-2010
|
3.75
|
Part II - Rear cockpit lighting
|
Details
|
|
|
06-28-2010
|
1.00
|
Part I - Pitch Servo Hardware
|
Details
|
 |
|
05-30-2010
|
1.25
|
Cockpit lighting and Trim
|
Details
|
 |
|
05-28-2010
|
3.50
|
Heated seat wires
|
Details
|
|
|
05-27-2010
|
1.50
|
Flap motor wire
|
Details
|
|
|
05-26-2010
|
1.50
|
Part 2 Re-installing contols rods
|
Details
|
 |
|
05-26-2010
|
5.00
|
Part 1-Connectors on antenna cables & A/P wires
|
Details
|
|
|
05-25-2010
|
0.75
|
Test fit new Dynon 10A EFIS
|
Details
|
|
|
05-24-2010
|
3.25
|
Left side wire bundle
|
Details
|
|
|
05-23-2010
|
4.00
|
More wire work!!!
|
Details
|
|
|
05-22-2010
|
7.25
|
Electrical - More wires, and redos
|
Details
|
|
|
05-21-2010
|
1.50
|
More Left side wire bundle
|
Details
|
|
|
05-20-2010
|
4.50
|
Left side wire bundle standoff
|
Details
|
 |
|
05-03-2010
|
5.75
|
Finished aileron boots
|
Details
|
|
|
04-27-2010
|
3.00
|
2. Started aileron boot rings
|
Details
|
|
|
04-27-2010
|
3.25
|
1. Wire route for instrument panel harness
|
Details
|
 |
|
04-20-2010
|
1.25
|
Made bezel to hold ELT Control
|
Details
|
|
|
04-19-2010
|
1.50
|
Primed/Pained (L) Gear mount
|
Details
|
 |
|
04-18-2010
|
0.50
|
Riveted rear shoulder strap anchors
|
Details
|
|
|
04-07-2010
|
3.50
|
Electical wires continued
|
Details
|
|
|
04-01-2010
|
4.00
|
Tested LED strip lights
|
Details
|
|
|
03-31-2010
|
2.25
|
Wired CBs to Molex
|
Details
|
|
|
03-31-2010
|
3.50
|
Touched up CB panel chips
|
Details
|
|
|
03-30-2010
|
4.50
|
New wires to console swtiches
|
Details
|
|
|
03-29-2010
|
3.25
|
Made bracket to hold Molex connector
|
Details
|
|
|
03-28-2010
|
3.00
|
Wired console switches to CBs
|
Details
|
 |
|
03-27-2010
|
6.00
|
(R) console labels
|
Details
|
|
|
03-26-2010
|
5.00
|
(R) Console Switches
|
Details
|
|
|
03-25-2010
|
5.75
|
Wired Batt to Master Switch
|
Details
|
|
|
03-24-2010
|
4.00
|
Install Engine Mount
|
Details
|
|
|
03-23-2010
|
3.00
|
Installed firewall pass thru
|
Details
|
|
|
03-22-2010
|
4.50
|
More polishing
|
Details
|
|
|
03-21-2010
|
2.75
|
Started to polish belly
|
Details
|
|
|
03-21-2010
|
1.00
|
Riveted antenna doublers
|
Details
|
|
|
03-20-2010
|
3.50
|
Fixed aft spread of canopy frame
|
Details
|
 |
|
03-18-2010
|
5.50
|
Drilled Canopy Skirts
|
Details
|
|
|
02-27-2010
|
6.75
|
Started Canopy Skirt
|
Details
|
|
|
02-25-2010
|
3.00
|
Fit windscreen to roll bar
|
Details
|
|
|
02-24-2010
|
2.75
|
Canopy gluing complete
|
Details
|
|
|
02-23-2010
|
2.75
|
Prepared canopy for cosmetic layer of glue
|
Details
|
|
|
02-21-2010
|
6.75
|
Glued on canopy
|
Details
|
|
|
02-20-2010
|
2.25
|
Tape off canopy and frame
|
Details
|
|
|
02-19-2010
|
6.50
|
Final fit of canopy
|
Details
|
|
|
02-18-2010
|
4.00
|
THE BIG CUT
|
Details
|
|
|
02-16-2010
|
4.75
|
More canopy fitting
|
Details
|
 |
|
02-15-2010
|
4.00
|
Canopy fitting
|
Details
|
|
|
02-14-2010
|
1.50
|
Mounted nose wheel tire and tube
|
Details
|
|
|
02-04-2010
|
1.50
|
Mounted main tires on wheels
|
Details
|
|
|
02-03-2010
|
0.50
|
Main tire and wheel
|
Details
|
|
|
02-02-2010
|
1.75
|
Trimming canopy flange
|
Details
|
 |
|
02-01-2010
|
2.75
|
Canopy stand
|
Details
|
|
|
01-31-2010
|
4.00
|
Drilled Canopy Rails
|
Details
|
|
|
01-30-2010
|
2.50
|
Outer skin of door done.
|
Details
|
|
|
01-29-2010
|
1.25
|
Started to rivet baggage door
|
Details
|
|
|
01-28-2010
|
6.50
|
Baggage door
|
Details
|
|
|
01-27-2010
|
2.75
|
Fixed another QB mistake
|
Details
|
|
|
01-26-2010
|
1.50
|
Worked on canopy handle/latch
|
Details
|
|
|
01-25-2010
|
1.00
|
Canopy latch
|
Details
|
 |
|
01-24-2010
|
2.00
|
More canopy frame fitting
|
Details
|
|
|
01-23-2010
|
7.50
|
Canopy frame started
|
Details
|
|
|
01-20-2010
|
2.00
|
Rear Track done
|
Details
|
|
|
12-29-2009
|
4.75
|
Riveted canopy track
|
Details
|
|
|
12-21-2009
|
5.00
|
Continued Canopy track
|
Details
|
|
|
12-20-2009
|
4.75
|
Started canopy track
|
Details
|
|
|
12-19-2009
|
3.75
|
Primed parts & dimpled floor
|
Details
|
|
|
12-18-2009
|
6.00
|
XPDR Antenna doubler and stuff
|
Details
|
|
|
12-17-2009
|
5.75
|
Fitting VHF antennas
|
Details
|
|
|
12-16-2009
|
1.00
|
VHF Antenna doubler
|
Details
|
 |
|
12-15-2009
|
5.00
|
Transponder antenna doubler
|
Details
|
|
|
12-14-2009
|
4.75
|
VHF Antenna doublers con't
|
Details
|
|
|
12-13-2009
|
4.50
|
VHF Antenna doublers
|
Details
|
|
|
11-30-2009
|
1.75
|
2. Safety Trim module
|
Details
|
|
|
11-30-2009
|
1.75
|
1. Installed ruder pedals
|
Details
|
 |
|
11-29-2009
|
3.25
|
Riveted on pedal extensions
|
Details
|
|
|
11-28-2009
|
2.00
|
More wiring ideas
|
Details
|
|
|
11-27-2009
|
2.00
|
2. Instrument panel harness
|
Details
|
|
|
11-27-2009
|
3.00
|
1. Finishe aft top skin
|
Details
|
|
|
11-26-2009
|
3.00
|
Aft top skin
|
Details
|
|
|
11-25-2009
|
2.25
|
2. Started riveting aft top skin
|
Details
|
|
|
11-25-2009
|
3.75
|
1. Panel switches
|
Details
|
|
|
11-24-2009
|
1.00
|
3. Rivet anit-rotation tab
|
Details
|
 |
|
11-24-2009
|
1.75
|
2. Tail stand
|
Details
|
|
|
11-24-2009
|
0.00
|
1. Propeller Delivered
|
Details
|
 |
|
11-23-2009
|
1.00
|
Pitch Servo wire
|
Details
|
 |
|
11-22-2009
|
3.75
|
2. Aft Top Skin
|
Details
|
|
|
11-22-2009
|
2.25
|
1. Primed Step & Stuff
|
Details
|
|
|
11-21-2009
|
1.75
|
Prepare to rivet step
|
Details
|
 |
|
11-21-2009
|
3.75
|
Finished up wires to tail section
|
Details
|
|
|
11-20-2009
|
2.25
|
More switch layouts
|
Details
|
|
|
11-11-2009
|
1.25
|
Instrument Panel Labels
|
Details
|
|
|
11-10-2009
|
2.75
|
Installed Batt Bus & Stby Reg
|
Details
|
 |
|
11-09-2009
|
1.00
|
Fit main panel to sub-panel
|
Details
|
 |
|
11-01-2009
|
1.00
|
New connection between ANL and Relay
|
Details
|
 |
|
11-01-2009
|
4.25
|
Baggage floor extension done
|
Details
|
|
|
10-31-2009
|
5.00
|
Baggage floor extension con't
|
Details
|
|
|
10-30-2009
|
2.25
|
Baggage floor extension
|
Details
|
|
|
10-30-2009
|
1.00
|
1. Switch labels
|
Details
|
|
|
10-29-2009
|
1.75
|
Painted first coat on instrument panel
|
Details
|
|
|
10-29-2009
|
1.50
|
EAA Technical Counselor Visit
|
Details
|
  |
|
10-28-2009
|
1.75
|
Installed ANL holder, cut battery bolts
|
Details
|
|
|
10-26-2009
|
2.75
|
P-Mag push buttons
|
Details
|
|
|
10-26-2009
|
0.00
|
Lighted Pitot Heat Toggle
|
Details
|
|
|
10-25-2009
|
3.00
|
Moved ANL, set battery tray
|
Details
|
|
|
10-25-2009
|
0.75
|
Finished purge return line
|
Details
|
|
|
10-24-2009
|
4.00
|
Purge return line
|
Details
|
|
|
10-24-2009
|
2.75
|
Ammeter shunt and ANL
|
Details
|
 |
|
10-23-2009
|
3.50
|
Diode to E-bus jumper
|
Details
|
|
|
10-22-2009
|
6.00
|
Caution lights
|
Details
|
|
|
10-21-2009
|
3.75
|
Connected big cables
|
Details
|
|
|
10-20-2009
|
5.25
|
Big wire to circuit breaker
|
Details
|
|
|
10-19-2009
|
4.25
|
Installed CBs and Bus bar
|
Details
|
|
|
10-18-2009
|
5.00
|
CB labels done
|
Details
|
 |
|
10-17-2009
|
6.00
|
Made some CB Labels
|
Details
|
|
|
10-16-2009
|
4.00
|
CB Labels
|
Details
|
  |
|
10-07-2009
|
3.00
|
Painted CB Panel, started Purge line
|
Details
|
 |
|
10-01-2009
|
1.25
|
Installed Dehydrator plugs
|
Details
|
|
|
09-30-2009
|
2.50
|
Switch Template - (R) Console
|
Details
|
|
|
09-30-2009
|
3.00
|
Drilled CB Holes
|
Details
|
|
|
09-29-2009
|
9.50
|
Circuit breakers and doide
|
Details
|
|
|
09-27-2009
|
1.00
|
Continuted purge return line
|
Details
|
  |
|
09-26-2009
|
1.50
|
Purge return line
|
Details
|
  |
|
09-25-2009
|
5.75
|
Mounted Relays
|
Details
|
|
|
09-23-2009
|
2.75
|
Worked on CB Layout - Installed ELT BNC connectors
|
Details
|
 |
|
09-15-2009
|
0.25
|
Test fit 3rd Panel
|
Details
|
|
|
08-31-2009
|
1.25
|
Test fit Panel
|
Details
|
|
|
08-30-2009
|
2.00
|
More tail wires
|
Details
|
|
|
08-30-2009
|
2.50
|
Drilled Fwd Top Skin
|
Details
|
|
|
08-19-2009
|
4.75
|
Instument sub panels clecoed top skin
|
Details
|
|
|
08-18-2009
|
4.00
|
Cut holes in panel for G-meter and air vent
|
Details
|
|
|
08-17-2009
|
2.00
|
Instrument panel arrived
|
Details
|
|
|
08-16-2009
|
5.00
|
Prepared to fit front top skin
|
Details
|
|
|
08-12-2009
|
1.00
|
Metal Punch
|
Details
|
|
|
08-12-2009
|
2.75
|
Installed OAT probe & Rear stick pin
|
Details
|
|
|
08-10-2009
|
3.75
|
Lace tied aft wires
|
Details
|
|
|
08-03-2009
|
3.00
|
New (R) tank fuel line
|
Details
|
|
|
08-02-2009
|
4.50
|
Finished battery holder
|
Details
|
|
|
08-01-2009
|
3.50
|
Fabricating battery holder
|
Details
|
|
|
07-31-2009
|
5.75
|
Built ELT deck
|
Details
|
|
|
07-24-2009
|
0.00
|
Panel cutting
|
Details
|
|
|
07-11-2009
|
1.25
|
Static line
|
Details
|
|
|
07-11-2009
|
5.50
|
Pitot connection & Securing wires
|
Details
|
|
|
07-10-2009
|
4.25
|
ELT antenna & more aft wiring
|
Details
|
|
|
07-09-2009
|
0.00
|
Arlington Fly-In (drive in for me)
|
Details
|
|
|
07-08-2009
|
2.25
|
Removed aft battery cable
|
Details
|
 |
|
07-07-2009
|
5.00
|
Picked up finish kit
|
Details
|
|
|
07-06-2009
|
0.00
|
Final Panel Design
|
Details
|
|
|
07-05-2009
|
9.25
|
Prepared bottom skins for riveting
|
Details
|
|
|
07-04-2009
|
2.25
|
Wire Pitot Heat
|
Details
|
|
|
07-04-2009
|
1.00
|
Counter sink (R) wing rear spar for skin dimples
|
Details
|
 |
|
07-03-2009
|
4.50
|
Safety Trim system
|
Details
|
 |
|
07-01-2009
|
1.50
|
Engine has arrived
|
Details
|
|
|
06-30-2009
|
5.00
|
Battery cable to the firewall
|
Details
|
|
|
06-29-2009
|
3.75
|
Primed and riveted the "Wall of Breakers"
|
Details
|
|
|
06-28-2009
|
2.00
|
Drilled for nut plates on new console assembly
|
Details
|
|
|
06-27-2009
|
5.75
|
New right console with breaker panel
|
Details
|
|
|
06-27-2009
|
1.25
|
More battery cable analysis
|
Details
|
 |
|
06-26-2009
|
2.00
|
Route battery cable to firewall NOT!
|
Details
|
|
|
06-26-2009
|
3.25
|
Finished remote compass bracket
|
Details
|
 |
|
06-25-2009
|
4.50
|
Remote compass bracket
|
Details
|
|
|
06-23-2009
|
3.50
|
Pitot mounting screws
|
Details
|
|
|
06-23-2009
|
0.00
|
Engine is shipping
|
Details
|
 |
|
06-19-2009
|
0.00
|
Panel Plans
|
Details
|
|
|
06-11-2009
|
0.00
|
Panel Design
|
Details
|
 |
|
06-10-2009
|
3.25
|
Dynon Pitot Controller
|
Details
|
|
|
06-10-2009
|
0.75
|
Aft end of static system
|
Details
|
 |
|
06-09-2009
|
1.75
|
Wing Conduit/Torque tank bolts
|
Details
|
|
|
06-09-2009
|
0.75
|
Installed Static Ports
|
Details
|
|
|
06-08-2009
|
1.00
|
Finished Bead Blasting Pedals
|
Details
|
|
|
06-08-2009
|
2.25
|
(L) wing conduit
|
Details
|
|
|
06-04-2009
|
0.75
|
Bead Blast rudder pedals
|
Details
|
  |
|
06-03-2009
|
2.50
|
Riveted on Exhaust Cooling Ramp
|
Details
|
 |
|
06-02-2009
|
2.75
|
Static line clips
|
Details
|
|
|
05-24-2009
|
2.25
|
Shim for Cooling Ramp
|
Details
|
|
|
05-24-2009
|
0.00
|
Roll servo bracket
|
Details
|
|
|
05-23-2009
|
0.00
|
New roll bracket
|
Details
|
|
|
05-23-2009
|
1.50
|
Cooling Air Ramp
|
Details
|
 |
|
05-22-2009
|
4.50
|
(R) Wing conduit
|
Details
|
|
|
05-21-2009
|
0.75
|
Roll servo bracket
|
Details
|
|
|
05-21-2009
|
2.75
|
Right Fuel Sender and P/U
|
Details
|
 |
|
05-20-2009
|
3.00
|
Left fuel sender and pickup
|
Details
|
|
|
05-17-2009
|
1.00
|
Left Fuel Sender
|
Details
|
  |
|
04-24-2009
|
2.75
|
Battery Tray
|
Details
|
 |
|
04-02-2009
|
2.25
|
"Human Factor Test" - Test fit rear throttle
|
Details
|
|
|
04-01-2009
|
3.50
|
Rivet bulkhead tops
|
Details
|
|
|
03-31-2009
|
4.50
|
Primed and riveted aft bulkhead parts.
|
Details
|
|
|
03-28-2009
|
3.50
|
Made flap arm cover from template
|
Details
|
 |
|
03-27-2009
|
2.00
|
Prepare instrument panel
|
Details
|
 |
|
03-26-2009
|
4.25
|
Deburred aft top skin and bulkheads
|
Details
|
|
|
03-24-2009
|
3.00
|
Drilled canopy bow
|
Details
|
|
|
03-22-2009
|
6.50
|
Aft top skin, start canopy bow
|
Details
|
|
|
03-21-2009
|
4.50
|
Clecoed on aft top skin
|
Details
|
|
|
03-20-2009
|
6.00
|
Starting upper aft fuselage
|
Details
|
|
|
03-19-2009
|
4.75
|
Last fuel line. Fit Step
|
Details
|
|
|
03-18-2009
|
3.00
|
(R) Brake line, Fuel return line
|
Details
|
|
|
03-16-2009
|
2.50
|
Left brake line though cockpit
|
Details
|
|
|
03-15-2009
|
2.75
|
Fuel line between filter and pump
|
Details
|
 |
|
03-14-2009
|
2.75
|
More fuel lines, left and to filter
|
Details
|
|
|
03-13-2009
|
6.00
|
Right fuel supply line and vent lines
|
Details
|
|
|
02-26-2009
|
6.25
|
Installed Fuel Pump and (L) vent line
|
Details
|
|
|
02-25-2009
|
4.50
|
Half of right vent, installed fuel filter
|
Details
|
|
|
02-24-2009
|
4.25
|
Set torque on (R) mount
|
Details
|
|
|
02-23-2009
|
1.75
|
Installed bolts holding (R) gear mount
|
Details
|
 |
|
02-22-2009
|
4.75
|
More fitting right gear weld mount
|
Details
|
|
|
02-21-2009
|
1.25
|
Removed bolts to right gear weld mount
|
Details
|
  |
|
02-20-2009
|
3.25
|
Installed and set torque on (L) gear weld moun
|
Details
|
|
|
02-04-2009
|
0.50
|
Installed bolts into left gear weld mount
|
Details
|
  |
|
02-03-2009
|
2.00
|
Finished (L) gear weld mount
|
Details
|
|
|
02-02-2009
|
3.75
|
Gear Weld Mount Part 3
|
Details
|
|
|
02-01-2009
|
2.50
|
Remove Gear Weld Mount Part 2
|
Details
|
|
|
01-31-2009
|
0.75
|
Remove Gear Weld Mount Part I
|
Details
|
 |
|
01-30-2009
|
1.50
|
Removed left wooden spar
|
Details
|
  |
|
01-29-2009
|
2.00
|
Installed fuel and brake bulkhead fittings
|
Details
|
|
|
01-28-2009
|
1.00
|
Checked torque of gear mounts
|
Details
|
 |
|
01-20-2009
|
0.75
|
Removed seat and floor panels
|
Details
|
 |
|
01-05-2009
|
1.00
|
Riveted some nut plates
|
Details
|
|
|
01-05-2009
|
3.00
|
Interior Paint Complete
|
Details
|
|
|
01-04-2009
|
7.50
|
Painted removable interior parts
|
Details
|
|
|
01-03-2009
|
7.50
|
Painting Interior begins!
|
Details
|
|
|
01-02-2009
|
4.50
|
Clean and tape cockpit for paint
|
Details
|
 |
|
01-01-2009
|
3.00
|
Install "eyball" lights to 804 caps
|
Details
|
|
|
12-31-2008
|
1.75
|
Install nut plates for bracket
|
Details
|
 |
|
12-30-2008
|
5.00
|
Install Andair Fuel valve
|
Details
|
|
|
12-26-2008
|
4.00
|
Rear Throttle complete
|
Details
|
|
|
12-22-2008
|
4.75
|
Rear Throttle continued
|
Details
|
|
|
12-19-2008
|
1.75
|
Rear throttle continued
|
Details
|
  |
|
12-18-2008
|
1.50
|
Rear Throttle rod holes
|
Details
|
|
|
12-11-2008
|
3.25
|
Contined Rear Throttle, Removed Tail
|
Details
|
|
|
12-09-2008
|
2.00
|
Rear Throttle kit
|
Details
|
|
|
12-01-2008
|
1.50
|
Began fuel system section
|
Details
|
  |
|
11-29-2008
|
3.00
|
Adjusted fit of aft mount
|
Details
|
|
|
11-28-2008
|
6.50
|
Installed flap motor, and rudder cables
|
Details
|
|
|
11-27-2008
|
1.25
|
Drilled flap actuator for safety wire
|
Details
|
 |
|
11-25-2008
|
3.00
|
Hung the rudder and trimed the stops
|
Details
|
|
|
11-24-2008
|
2.75
|
Finished trimming elevator stops
|
Details
|
|
|
11-24-2008
|
4.25
|
Drilled elevator horns and connecte push rod
|
Details
|
|
|
11-23-2008
|
2.50
|
Trimmed HS, Set (R) elevator travel limits
|
Details
|
|
|
11-22-2008
|
5.75
|
Continued control linkages
|
Details
|
|
|
11-21-2008
|
0.50
|
Began install of control column
|
Details
|
 |
|
11-20-2008
|
6.00
|
Finished VS install.
|
Details
|
|
|
11-19-2008
|
6.50
|
Installed Vertical Stab
|
Details
|
|
|
11-18-2008
|
3.00
|
Drilled attach holes for HS
|
Details
|
|
|
11-17-2008
|
4.50
|
Began installing Horzontal Stab
|
Details
|
|
|
10-28-2008
|
1.50
|
Pitch Servo Bracket continued.
|
Details
|
|
|
10-27-2008
|
1.50
|
Servo bracket install continued
|
Details
|
|
|
10-27-2008
|
1.50
|
Install pitch servo bracket
|
Details
|
|
|
10-10-2008
|
2.00
|
Drill pedal extensions to pedal
|
Details
|
|
|
09-29-2008
|
5.00
|
Continued brake pedal extensions
|
Details
|
|
|
09-28-2008
|
3.00
|
Pedal Extensions
|
Details
|
|
|
09-27-2008
|
2.00
|
Pedal release assembly
|
Details
|
|
|
09-26-2008
|
4.25
|
Brake pedals and master cylinders
|
Details
|
|
|
09-25-2008
|
1.00
|
Rudder pedal slide blocks
|
Details
|
|
|
09-24-2008
|
2.50
|
Rudder pedal slide bar
|
Details
|
|
|
09-23-2008
|
4.75
|
Replace bad F-810C angle
|
Details
|
|
|
09-22-2008
|
0.00
|
Major issue with F810C-1
|
Details
|
|
|
09-21-2008
|
5.50
|
Install electric aileron trim brackets and rod
|
Details
|
|
|
09-20-2008
|
3.75
|
Primed out side of tubes installed stick bushings
|
Details
|
|
|
09-19-2008
|
2.25
|
Prime control tubes, start aileron trim parts
|
Details
|
|
|
09-18-2008
|
1.00
|
Riveted on bearing to F-841 tube
|
Details
|
  |
|
09-16-2008
|
5.50
|
Elevator bell crank and push rods
|
Details
|
|
|
09-13-2008
|
0.00
|
Test ride!
|
Details
|
|
|
09-12-2008
|
0.75
|
Rivet on tail tie down
|
Details
|
|
|
09-11-2008
|
4.50
|
Installed (R) longeron console nuts
|
Details
|
|
|
09-10-2008
|
1.75
|
Drilled F-812 angle, tapped tie down
|
Details
|
|
|
09-09-2008
|
3.00
|
(L) console nut plates. F812B angle
|
Details
|
|
|
09-08-2008
|
0.50
|
Drilled rivet holes for nut plates in right longer
|
Details
|
 |
|
08-27-2008
|
1.50
|
Tapped holes in cable anchor bracket
|
Details
|
|
|
08-26-2008
|
3.00
|
Fit rear pedal idler arm. L/R upper console suppo
|
Details
|
|
|
08-24-2008
|
4.00
|
Drilled left longeron for console cover
|
Details
|
|
|
08-17-2008
|
5.00
|
Installed nut plates for rear rudder pedal guides
|
Details
|
|
|
08-16-2008
|
2.00
|
Part 2: Rear rudder pedals
|
Details
|
|
|
08-16-2008
|
5.50
|
Part 1: Rivet nut plates on to floors and consoles
|
Details
|
|
|
08-15-2008
|
5.75
|
Deburr and Prime floor and console parts
|
Details
|
|
|
08-14-2008
|
4.50
|
New flap blocks, front consoles
|
Details
|
|
|
08-13-2008
|
2.50
|
Tail tie down and cable anchor
|
Details
|
|
|
08-12-2008
|
5.50
|
Main Gear mounting Bolt Reaming
|
Details
|
|
|
08-11-2008
|
2.25
|
Floor panel stiffeners and rear seat hinge
|
Details
|
|
|
08-10-2008
|
7.50
|
Front seat floor stiffeners and nut plates
|
Details
|
|
|
08-02-2008
|
1.00
|
Continued work on flap blocks
|
Details
|
|
|
08-01-2008
|
1.75
|
Flap weld mount blocks
|
Details
|
|
|
07-14-2008
|
0.00
|
Part: 2 Bulkhead bulge
|
Details
|
|
|
07-14-2008
|
5.50
|
Part 1: Fiished riveting rear seatback, clecoed fl
|
Details
|
|
|
07-13-2008
|
7.00
|
Finished Front Seat Back and started the rear seat
|
Details
|
|
|
07-12-2008
|
2.25
|
Started front seat back
|
Details
|
|
|
07-11-2008
|
2.00
|
Started work on mounting step
|
Details
|
|
|
07-10-2008
|
5.00
|
Built fuselage rotisserie
|
Details
|
|
|
07-07-2008
|
2.50
|
Finished up mounting (R) flap
|
Details
|
|
|
07-06-2008
|
5.25
|
Started mounting of (R) flap
|
Details
|
|
|
05-21-2008
|
0.75
|
Part 3: Set (R) aileron neutral position
|
Details
|
 |
|
05-21-2008
|
3.00
|
Part 2: Aileron stops installed, checked travel li
|
Details
|
|
|
05-21-2008
|
2.00
|
Part 1: Rivet (L) flap hinge to wing
|
Details
|
|
|
05-20-2008
|
2.75
|
Prep flap hinge, install (R) aileron bell crank
|
Details
|
|
|
05-19-2008
|
3.25
|
Drilled (L) flap hinge to wing and brace
|
Details
|
|
|
05-18-2008
|
3.50
|
Rivet (R) gap seal, make aileron bushings
|
Details
|
|
|
05-16-2008
|
2.50
|
Aileron rigging jig, aileron bushings
|
Details
|
|
|
05-11-2008
|
5.25
|
Rolled and riveted elevator leading edges
|
Details
|
|
|
05-08-2008
|
0.50
|
Riveted on nutplates to pitot mast
|
Details
|
|
|
05-07-2008
|
1.00
|
Primed push rods and pitot mast parts
|
Details
|
|
|
05-06-2008
|
2.25
|
TIG Welded the W-818 push rods
|
Details
|
|
|
05-02-2008
|
1.00
|
Deburr pitot mount, cut tube on the pitot
|
Details
|
|
|
04-30-2008
|
1.50
|
EAA Technical Counselor Visit
|
Details
|
|
|
04-30-2008
|
4.50
|
Drilled Pitot mount and cut bottom skin to fit
|
Details
|
|
|
04-27-2008
|
0.50
|
Clecoed on (R) bottom skin
|
Details
|
 |
|
04-26-2008
|
4.50
|
Reamed brass bushings, drill left bottom skin
|
Details
|
|
|
04-24-2008
|
0.50
|
Rivet left gap seal top skin rivets
|
Details
|
|
|
04-23-2008
|
2.25
|
Rolled and riveted rudder leading edge
|
Details
|
|
|
04-22-2008
|
4.50
|
Rivet W-816 Push rods, rivet on gap seals
|
Details
|
|
|
04-22-2008
|
0.00
|
Explaination and pictures of push rods
|
Details
|
|
|
04-21-2008
|
4.25
|
Primed and riveted flap brace and gap seal
|
Details
|
|
|
04-19-2008
|
5.25
|
Drilled holes in W-816 push rods
|
Details
|
|
|
04-17-2008
|
4.00
|
Marked holes to push rod end, drilled gap and flap
|
Details
|
|
|
04-16-2008
|
1.25
|
Cut brass bushing and cut large push rods
|
Details
|
 |
|
04-15-2008
|
3.00
|
Cut small aileron push rods and aluminum bushings
|
Details
|
|
|
04-14-2008
|
2.25
|
Attached bracket onto left aileron
|
Details
|
|
|
04-13-2008
|
3.00
|
Riveted right W412/414, drilled aileron for bracke
|
Details
|
|
|
04-12-2008
|
0.00
|
Flew to SnF
|
Details
|
|
|
04-04-2008
|
2.00
|
Cleco right wing bottom skin
|
Details
|
 |
|
04-01-2008
|
1.50
|
Drilled out cracked rivet
|
Details
|
  |
|
03-31-2008
|
1.00
|
Drilled out bad rivet and reset
|
Details
|
|
|
03-30-2008
|
2.00
|
Riveted on left mid spar aileron bracket
|
Details
|
|
|
03-29-2008
|
1.75
|
Tried to fit bottom skin!
|
Details
|
|
|
03-29-2008
|
6.25
|
Primed and then riveted aileron bracket
|
Details
|
|
|
03-28-2008
|
2.00
|
Smothed edges of aileron braket parts
|
Details
|
  |
|
03-27-2008
|
1.00
|
Start Wings
|
Details
|
|
|
03-26-2008
|
0.00
|
Hardware organization
|
Details
|
|
|
03-23-2008
|
4.25
|
Trim Tab riveted inplace
|
Details
|
|
|
03-22-2008
|
2.25
|
Riveted bottom of trim tab
|
Details
|
|
|
03-19-2008
|
1.75
|
Finished riveting elevator up to trim tab holes
|
Details
|
|
|
03-18-2008
|
1.25
|
Re-worked counterweight with wrong holes
|
Details
|
|
|
03-18-2008
|
3.00
|
Placed RTV and started riveting left elevator
|
Details
|
|
|
03-17-2008
|
3.00
|
Rivet left elevator understructure
|
Details
|
|
|
03-16-2008
|
3.75
|
Trim tab
|
Details
|
|
|
03-16-2008
|
0.00
|
Cherry Max and Van's MK319BS
|
Details
|
|
|
03-15-2008
|
5.25
|
Cut off elevator tabs and built "riblet"
|
Details
|
|
|
03-14-2008
|
3.50
|
Bent ends of the trim tab
|
Details
|
|
|
03-11-2008
|
1.75
|
Bent trim tab trailing edge
|
Details
|
 |
|
03-07-2008
|
2.25
|
Prepared new E-606 trim spar
|
Details
|
|
|
03-06-2008
|
6.50
|
Riveted right elevator to understructure
|
Details
|
|
|
03-06-2008
|
0.00
|
Hard to reach end rivets
|
Details
|
|
|
03-06-2008
|
0.00
|
Getting RTV into tight places
|
Details
|
|
|
03-05-2008
|
2.50
|
Prime Elevator parts
|
Details
|
|
|
03-04-2008
|
0.75
|
Front seatback
|
Details
|
|
|
03-03-2008
|
0.00
|
Dimple narrow part of ribs
|
Details
|
|
|
02-29-2008
|
2.50
|
Countersink 702 and 606 spars, scuff trim tab part
|
Details
|
|
|
02-27-2008
|
2.75
|
Deburr right elevator spar and ribs
|
Details
|
  |
|
02-26-2008
|
5.00
|
Drilled left elevator ribs, dimpled right elevator
|
Details
|
|
|
02-23-2008
|
3.25
|
Flute new ribs and drilled counter weight
|
Details
|
 |
|
02-18-2008
|
5.50
|
Drilled holes in left counter weight, sort of
|
Details
|
|
|
02-17-2008
|
4.50
|
Drilled CS holes in spar for 709 rib
|
Details
|
  |
|
02-16-2008
|
2.75
|
Riveted on nut plates and left elevator stiffeners
|
Details
|
|
|
02-16-2008
|
4.75
|
Began right elevator construction - all matched dr
|
Details
|
|
|
02-15-2008
|
3.25
|
Left elevator stiffeners, E-615 plate nuts
|
Details
|
|
|
02-14-2008
|
4.50
|
Riveted on right elevator stiffeners
|
Details
|
|
|
02-13-2008
|
2.00
|
Began right elevator
|
Details
|
  |
|
02-12-2008
|
2.50
|
Rinished riveting the rudder
|
Details
|
|
|
02-11-2008
|
8.25
|
Finished rudder structure, began rudder skin rivet
|
Details
|
|
|
02-10-2008
|
8.00
|
Primed elevator and rudder parts, Rivet rudder fra
|
Details
|
|
|
02-08-2008
|
1.25
|
Gathered elevator parts
|
Details
|
 |
|
02-06-2008
|
3.25
|
Deburr and dimle rudder parts
|
Details
|
|
|
02-05-2008
|
2.25
|
Drilled out remining holes of skin to frame
|
Details
|
  |
|
02-04-2008
|
2.00
|
Primed rermainder of rudder skin
|
Details
|
|
|
02-04-2008
|
0.00
|
Cleocoed on skin to structure, to evaluate bend
|
Details
|
|
|
02-03-2008
|
4.75
|
Prmed stiffeners / Riveted on stiffeners
|
Details
|
|
|
02-02-2008
|
5.75
|
Fabricated rudder stiffeners a 2nd time
|
Details
|
|
|
01-20-2008
|
1.00
|
Getting help with back riveting
|
Details
|
  |
|
01-16-2008
|
2.00
|
Tried to figure out what I am doing wrong!
|
Details
|
  |
|
01-15-2008
|
10.50
|
Dimple, prime, rivet rudder stiffener and skin
|
Details
|
|
|
01-06-2008
|
4.00
|
2. Elevator stiffener fabrication
|
Details
|
|
|
01-06-2008
|
2.00
|
1. Final drilled 802 Rudder Spar, reserached nut p
|
Details
|
 |
|
01-05-2008
|
4.00
|
Lower Rudder structure/upper rudder rib
|
Details
|
|
|
01-04-2008
|
2.75
|
Rudder rear spar, R-710 brace
|
Details
|
|
|
01-04-2008
|
4.00
|
Back rivet board and control surface bender.
|
Details
|
|
|
01-02-2008
|
2.50
|
Fabricate rudder stiffeners
|
Details
|
 |
|
12-30-2007
|
7.00
|
HS is done:)
|
Details
|
|
|
12-29-2007
|
8.00
|
Riveted interior rivets on HS
|
Details
|
|
|
12-28-2007
|
5.00
|
Finsihed rear spar and riveted front spar
|
Details
|
|
|
12-27-2007
|
3.50
|
Primed RT skin and riveted bars onto rear spar
|
Details
|
 |
|
12-27-2007
|
3.00
|
Cut out lower HS rear spar for elevator
|
Details
|
|
|
12-13-2007
|
1.00
|
Notch in bottom of HS Spar
|
Details
|
  |
|
12-11-2007
|
4.00
|
Primed L/R HS ribs, spars and Lt skin
|
Details
|
|
|
12-10-2007
|
1.50
|
Dimpled right and left HS ribs and spars
|
Details
|
 |
|
12-06-2007
|
4.50
|
Smoothed Lt HS skin, Dimpled Rt HS skin
|
Details
|
|
|
12-03-2007
|
1.00
|
Deburred Rt HS parts
|
Details
|
  |
|
11-23-2007
|
3.25
|
Dirlled critical hole is Right side 405, and skin
|
Details
|
|
|
11-22-2007
|
3.25
|
Prepared right HS ribs and drilled attach holes
|
Details
|
  |
|
11-22-2007
|
0.00
|
HS 814 reinforcing angle clearance
|
Details
|
|
|
11-22-2007
|
4.50
|
Drilled 404/405 rib holes and all skin to frame
|
Details
|
|
|
11-19-2007
|
4.25
|
Drilled Left HS ribs to spar, marked and fluted
|
Details
|
|
|
11-18-2007
|
2.00
|
Marking holes for 405 forward flange
|
Details
|
|
|
11-17-2007
|
3.00
|
HS Fwd spar reinforcing angle bends
|
Details
|
|
|
11-17-2007
|
4.00
|
Front Spar: Reinforcing angle prep
|
Details
|
|
|
11-17-2007
|
3.00
|
Fluting HS ribs
|
Details
|
  |
|
11-15-2007
|
0.75
|
Riveted VA-146 Bearing.
|
Details
|
|
|
11-14-2007
|
1.00
|
VS Complete!
|
Details
|
|
|
11-13-2007
|
7.00
|
Riveted remaining skin rivets
|
Details
|
|
|
11-12-2007
|
3.50
|
Rivet VS skin to structure
|
Details
|
|
|
11-12-2007
|
4.00
|
Rear Spar Assembly
|
Details
|
 |
|
11-11-2007
|
1.50
|
Primed the VS
|
Details
|
|
|
11-10-2007
|
1.00
|
Deburred edges of VS
|
Details
|
 |
|
11-09-2007
|
4.00
|
Finished Paint booth, reset 2 rivets
|
Details
|
|
|
11-08-2007
|
5.75
|
Started to build paint booth
|
Details
|
|
|
11-06-2007
|
1.50
|
Finished dimpling of the VS skin
|
Details
|
  |
|
11-05-2007
|
0.00
|
First item of panel arrived today
|
Details
|
 |
|
11-05-2007
|
1.00
|
Finished deburring the skin and started dimples
|
Details
|
  |
|
11-04-2007
|
2.50
|
Built table for DRDT-2 / deburr VS
|
Details
|
 |
|
10-26-2007
|
3.50
|
Primed and riveted VS ribs
|
Details
|
|
|
10-25-2007
|
5.75
|
Primed and riveted VS spar and doubler
|
Details
|
|
|
10-24-2007
|
2.75
|
Deburr VS main spar and doubler
|
Details
|
 |
|
10-18-2007
|
5.00
|
Fluiting the Ribs / Matched drill VS
|
Details
|
|
|
10-17-2007
|
3.00
|
Fluting VS rib (NOT!)
|
Details
|
  |
|
10-16-2007
|
0.75
|
Vertical Stab Main spar preperation
|
Details
|
 |
|
10-15-2007
|
1.50
|
Van's Toolbox Hinge
|
Details
|
  |
|
10-15-2007
|
1.50
|
Riveted on hinge to toolbox
|
Details
|
|
|
09-27-2007
|
2.00
|
Riveted side of Van's toobox
|
Details
|
 |
|
09-26-2007
|
0.00
|
Damaged Drawings
|
Details
|
|
|
09-24-2007
|
6.75
|
Built Rack for Wings
|
Details
|
|
|
09-18-2007
|
1.50
|
Training Project
|
Details
|
  |
|
09-10-2007
|
0.00
|
Answers from Van's
|
Details
|
|
|
09-08-2007
|
0.00
|
Possible Damage?
|
Details
|
|
|
09-08-2007
|
9.00
|
Inventory of Second QB kit
|
Details
|
|
|
09-07-2007
|
9.00
|
Return QB Kit #1
|
Details
|
|
|
08-29-2007
|
6.00
|
Inventory of QB Kit
|
Details
|
  |
|
08-28-2007
|
0.00
|
Picked up QB kit
|
Details
|
|
|
08-20-2007
|
0.00
|
QB kit is ready for pick up
|
Details
|
  |
|
08-14-2007
|
2.00
|
Practice Project
|
Details
|
|
|
08-10-2007
|
0.00
|
My RV Factory
|
Details
|
|
|
08-08-2007
|
2.00
|
Inventory of Empanage
|
Details
|
 |
|
07-30-2007
|
4.50
|
Reviewed Plans HS
|
Details
|
  |
|
07-28-2007
|
0.00
|
Fundamental class Synergy Inc.
|
Details
|
|
|
07-27-2007
|
0.00
|
Picked Up Tail Kit
|
Details
|
  |