KitLog pro

Powered By Kitlog Pro v2.0

KENNETH T.'S WEB SITE
Work Logs Found: 720
Category Work Time: 3308 Hours
 Date
Hours
Work Log Summary

Details

 10-05-2013
2.00
Airworthiness Inspection Completed
Details
     

 09-18-2013
5.00
Installing interior materials & carpet.
Details
     

 09-11-2013
4.00
Added hinges to baggage floor for tie downs.
Details
       

 09-05-2013
4.00
Added a fire extinguisher and installed the GPS.
Details
       

 09-03-2013
5.50
Unwired stick fuel boost switches.
Details
       

 08-31-2013
3.50
Charlotte applied N numbers to fuselage.
Details
       

 08-23-2013
3.50
Installed Kroger sun shade.
Details
       

 08-17-2013
3.50
Engine "First Start"!
Details
       

 08-14-2013
8.00
Programed Dynon and applied labels to panel.
Details
       

 08-10-2013
4.00
Cowling work completed (well almost).
Details
       

 08-07-2013
4.00
Panel lables and cowling work.
Details
       

 08-06-2013
5.00
Installing cowling with the prop installed.
Details
       

 08-04-2013
6.00
Installed the Whirlwind 200RV prop.
Details
       

 08-03-2013
4.00
Checked fuel boost pump operation.
Details

 08-01-2013
4.00
Programing the Dynon D180 & D100.
Details
       

 07-30-2013
4.00
Parking brake lever & wing root fairing.
Details
       

 07-28-2013
3.00
Removed and replaced leaking brake fitting.
Details
       

 07-27-2013
3.50
Uploaded a new Dynon firmware update.
Details
       

 07-26-2013
4.00
Installed alternate static air source.
Details
       

 07-25-2013
5.00
Installed wingtips.
Details
       

 07-24-2013
6.00
Aligned the ailerons.
Details
       

 07-23-2013
5.00
Flap rod adjustments.
Details
       

 07-22-2013
4.00
Wing work.
Details
       

 07-21-2013
10.00
Cut the sticks shorter.
Details
       

 07-17-2013
6.00
Both wings on.
Details
       

 07-16-2013
5.50
Installed the left wing.
Details
       

 07-15-2013
4.00
Bled the brakes & removed windshield protection.
Details
       

 07-14-2013
6.00
Painted canopy bow aluminum band.
Details
       

 07-13-2013
5.00
Applied the primer to the windshield layups.
Details
       

 07-12-2013
4.00
Removed tape from the windshield layup.
Details
       

 07-11-2013
8.00
Windshield layup filling, sanding, & priming.
Details
       

 07-08-2013
4.00
Windshield sand & fill, fill & sand.
Details
       

 07-05-2013
4.00
Sanded edges & added glass beads.
Details
       

 07-03-2013
5.00
Sanding the windshield layup.
Details
       

 07-02-2013
6.50
Filling and sanding the windshield.
Details
       

 07-01-2013
4.50
The windshield fiberglass layup.
Details
       

 06-29-2013
3.50
Final prep on the windshield before the layup.
Details
       

 06-28-2013
4.50
Sanded flox and filled with Superfil.
Details
       

 06-27-2013
4.00
More prep for windshield installation.
Details
       

 06-26-2013
12.00
Preparation for windshield fiberglass layup.
Details
       

 06-23-2013
6.00
Installed glareshield cover & started taping.
Details
       

 06-22-2013
4.50
Removed windshield to prep for glareshield coverin
Details
       

 06-21-2013
6.00
Riveted, Superfiled, & visited with windshield adv
Details
       

 06-20-2013
5.00
Sanded elevator weights & sealed FW.
Details
       

 06-19-2013
4.00
Still waiting for windshield advice.
Details
       

 06-18-2013
5.50
Trying to fit windshield.
Details
       

 06-15-2013
6.50
Finished forward top skin riveting.
Details
       

 06-08-2013
5.00
Started riveting the forward top skin.
Details
       

 06-07-2013
5.00
Prepaired forward top skin for riveting.
Details
       

 06-06-2013
5.00
Made false floor to rivet top forward skin.
Details
       

 06-05-2013
5.00
Located pitot tubes positions behind subpanel.
Details
       

 06-03-2013
4.00
Prepping to install the wings for naught.
Details

 05-31-2013
5.50
Sanded cowling filler and painted plenum.
Details
       

 05-30-2013
5.50
Filler on the cowling and drilled out rivets.
Details
       

 05-29-2013
5.50
Drained preservitive oil and moved quick drain.
Details
       

 05-28-2013
5.50
Finished scat hose install & worked on cowl.
Details
       

 05-27-2013
5.50
Reinstalling engine stuff.
Details
       

 05-26-2013
7.00
Fabricated baffle tension rods.
Details
       

 05-24-2013
2.50
Added nutplates for intersection fairings.
Details
       

 05-23-2013
5.00
Set breakout force on nose gear fork.
Details
       

 05-22-2013
4.00
Marked wheel pants for tire inflation holes.
Details
     

 05-21-2013
5.00
Installed engine parts.
Details
       

 05-20-2013
5.50
Started adding/replacing engine parts remove for p
Details
       

 05-18-2013
6.00
Final plenum angles riveted.
Details
       

 05-17-2013
5.00
Shortened right air inlet ramp.
Details
       

 05-16-2013
4.50
Riveted angle to left side baffle and inlet.
Details
       

 05-15-2013
5.00
Removed conical gusset from right inlet.
Details
       

 05-13-2013
5.00
Riveted last side angles to plenum.
Details
       

 05-11-2013
8.00
Finished most angles for the plenum.
Details
       

 05-06-2013
5.00
Riveted part of the plenum.
Details
       

 05-05-2013
6.50
Wheel pant and plenum work.
Details
       

 05-04-2013
5.50
Match drilled plenum angles to the baffles.
Details
       

 05-03-2013
4.00
Plenum angle trimming and fitting.
Details
       

 05-01-2013
6.00
Sanded wheel pants and drilled plenum flange.
Details
       

 04-30-2013
5.50
Last coat of micro beads on fairings.
Details
       

 04-29-2013
4.00
I sanded to smooth the intersection fairings.
Details
       

 04-28-2013
5.00
Spread glass beads onto the intersection fairings.
Details
       

 04-27-2013
5.00
Used flox to cover the fairing juncture gap.
Details
       

 04-26-2013
4.50
Prepped wheel pants for fairing gap filler.
Details
       

 04-25-2013
5.00
More work on the plenum.
Details
       

 04-24-2013
5.00
Glassed the wheel pant intersection f
Details
       

 04-23-2013
4.50
Trimmed molded plenum.
Details
       

 04-21-2013
7.00
Riveting baffle clips on forward baffles and inlet
Details
       

 04-19-2013
4.50
Sanded on oil filler door install and riveted righ
Details
       

 04-18-2013
4.50
Riveted nutplates to wheel pants.
Details
       

 04-17-2013
6.00
Epoxied interface fairings to main wheel pants.
Details
       

 04-16-2013
5.00
Sanding, drilling, & more work on pants.
Details
       

 04-15-2013
4.00
Finished (maybe) the oil filler door.
Details
       

 04-14-2013
5.00
More intersection fairing work & oil filler door i
Details
       

 04-13-2013
6.50
Worked on leg-to-wheel pant intersection fairings.
Details
       

 04-12-2013
5.00
Worked on main gear leg & interface fairings.
Details
       

 04-11-2013
4.00
Temporarily attached interface fairings.
Details
       

 04-10-2013
4.00
Redrilled and cut on the reinforced wheel pants.
Details
       

 04-09-2013
6.50
Reinforced inside of wheel pants.
Details
       

 04-08-2013
4.50
Corrected wheel pant mistake.
Details
     

 04-07-2013
7.00
Still working on main wheel pants.
Details
       

 04-05-2013
4.00
Worked on forward baffles.
Details
       

 04-04-2013
8.00
Another day of wheel pant work.
Details
       

 04-03-2013
6.00
More wheel pants work
Details
       

 04-02-2013
6.00
Started work on main gear wheel pants.
Details
       

 03-28-2013
3.50
Rigged floor jack to lift plane off main gear.
Details
       

 03-27-2013
5.50
More work on nose gear fairings.
Details
       

 03-26-2013
7.00
Installed gear leg fairing hinges.
Details
       

 03-23-2013
3.00
More thinking on gear leg fairings.
Details
     

 03-22-2013
5.00
Continued gear leg fairing work.
Details
       

 03-21-2013
4.00
Started on main gear leg fairings.
Details
       

 03-20-2013
5.00
Added piano hinge to nose gear leg fairing.
Details
       

 03-19-2013
6.00
Nose wheel pant and leg fairing work.
Details
       

 03-17-2013
5.50
More nose wheel pant work.
Details
       

 03-16-2013
7.00
Nose wheel pant work.
Details
       

 03-15-2013
3.00
Molded an engine plenum out of fiberglass.
Details
       

 03-14-2013
4.00
Instrument panel lighting & nose wheel pant work.
Details
       

 03-13-2013
3.00
Riveted #4 baffle and then went flying.
Details
     

 03-12-2013
4.00
Started on nose wheel pant.
Details
       

 03-08-2013
3.50
Worked on baggage, panel, and glareshield lights.
Details
       

 03-07-2013
4.00
Nutplate installed on elevator horn inspection hol
Details
       

 03-05-2013
4.00
Sanded fairing & connected elevator push rod.
Details
       

 03-04-2013
3.50
Trimmed off excess glass on empennage fairing.
Details
       

 03-03-2013
4.50
Brake, airblast tube, and empennage work.
Details
       

 03-02-2013
5.00
Made the last (I hope) baffle cuts.
Details
       

 03-01-2013
4.00
More measurements before the cut.
Details
       

 02-28-2013
4.00
First cuts on the baffles.
Details
       

 02-27-2013
4.00
More baffling measurements.
Details
       

 02-26-2013
4.00
Began measuring baffles for trimming.
Details
     

 02-25-2013
4.00
Riveted rudder cable fairings.
Details
       

 02-23-2013
4.00
Continued empennage work.
Details
       

 02-22-2013
4.00
Trimmed empennage fairing.
Details
       

 02-18-2013
3.50
Removed enclosure for more needed work.
Details
     

 02-17-2013
4.00
Crimped pins to wires for circular molex connector
Details
       

 02-16-2013
4.00
Match drilled rudder enclosure for pop-rivets.
Details
       

 02-15-2013
4.00
Final fitting of the bottom rudder enclosure.
Details
       

 02-14-2013
3.50
More trimming on bottom rudder enclosure.
Details
     

 02-13-2013
4.00
Pulled wires through the aft bulkhead.
Details
       

 02-12-2013
4.00
Started installing rudder bottom enclosure.
Details
       

 02-11-2013
4.00
Fabricated rudder pedal to cable links & installed
Details
       

 02-08-2013
4.00
Pulled rudder cables.
Details
       

 02-07-2013
4.50
Worked on upper & lower horz. fairings.
Details
       

 02-06-2013
4.00
Drilled empennage fairing screw holes.
Details

 02-05-2013
4.00
Installed Vert Stab with AntiSplat mod.
Details
     

 02-04-2013
4.00
Drilled nutplate holes on vert & horiz. stabs.
Details

 02-02-2013
4.00
Installed Horizontal Stabilizer
Details

 01-31-2013
20.00
Set up shop in the hangar.
Details
       

 01-24-2013
3.00
Moved fuselage to a hangar at KGTU in Georgetown,
Details
       

 01-21-2013
4.00
Air filter bypass door installed on snorkle.
Details
       

 12-06-2012
4.00
Finished attaching the snorkle flanges.
Details
       

 11-24-2012
4.00
Contiuing snorkle madness.
Details
       

 11-19-2012
2.00
Started on snorkle for forward induction.
Details

 11-12-2012
4.00
Finished fitting the cowling.
Details
       

 11-11-2012
5.00
Lower cowl flanges riveted & receptacles installed
Details
       

 11-10-2012
4.00
Lower cowl side flanges installed.
Details
       

 11-09-2012
7.00
Lower cowl installed.
Details
       

 11-07-2012
6.00
Installed Skybolt camlocks on upper cowling.
Details
       

 11-05-2012
7.00
Installed Skybolt flanges to FW.
Details
       

 11-03-2012
4.00
Fabbed 13" disc to help install cowling.
Details
       

 11-01-2012
4.00
Started the install of the cowling.
Details
       

 10-27-2012
5.00
Installed prop to get spinner/cowling gap.
Details
       

 10-26-2012
5.00
EGT & CHT wires routed & Sniffle valve plumbed.
Details
       

 10-10-2012
4.00
Fabricated the P-Mag ignition wires and routed.
Details
       

 10-04-2012
4.00
Cut the baffle holes for the ignition wire seals.
Details
       

 10-03-2012
4.00
Routed magneto ignition wires.
Details
       

 09-20-2012
8.00
Wired magneto & P-Mag electronic ignition.
Details
       

 09-12-2012
6.00
Wired starter and alternator.
Details
       

 09-07-2012
4.00
More wiring and hose installations.
Details
       

 08-28-2012
4.00
Hose and wire routing iterations.
Details
       

 08-24-2012
4.00
Discovered I had the wrong heat muff.
Details
       

 08-23-2012
6.00
Fabricated a throttle cable bracket.
Details
       

 08-20-2012
4.00
Installed sniffle valve.
Details
       

 08-18-2012
4.00
Started installing parts on the engine.
Details
       

 08-17-2012
4.00
We hung the engine today.
Details
       

 08-15-2012
3.00
Tried fitting oil cooler hoses.
Details
     

 08-13-2012
3.00
Rearranged garage to hang engine.
Details
       

 08-11-2012
4.00
Installed #1 baffle & fitted right air ramp.
Details
       

 08-09-2012
6.00
Started #3 cylinder aft and side baffles.
Details
       

 08-08-2012
6.00
Installed #3 Aft baffle with mid engine bracket.
Details
       

 08-06-2012
7.00
Riveted oil cooler baffle/doubler & installed.
Details
       

 08-05-2012
5.00
Added angles to oil cooler fabrication.
Details
       

 08-04-2012
6.00
Cut air hole into the oil cooler baffle/doubler.
Details
       

 07-30-2012
4.00
Started install of baffle kit.
Details
       

 07-27-2012
2.00
Installed Jihostroj govenor.
Details
       

 07-26-2012
2.00
Sorted out baffle kit.
Details
       

 07-23-2012
4.00
Installed bracket onto Jihostroj governor.
Details
       

 07-20-2012
4.00
Removed engine from stand to sawhorses.
Details
       

 07-18-2012
4.00
Installed new Matco nose wheel axle.
Details
       

 07-07-2012
5.00
Brake work.
Details
       

 06-25-2012
5.00
Removed Aux Batt Box and then reinstalled.
Details
       

 06-23-2012
2.00
Worked on nose wheel pant brackets.
Details
       

 06-12-2012
5.00
Updated wiring schematics.
Details

 06-11-2012
4.00
Connected Static, Pitot, & AOA tubing.
Details
       

 06-09-2012
4.00
Visit from AF buddy about electrical system.
Details
       

 06-08-2012
3.00
Installed the Aux Battery box.
Details
     

 06-07-2012
4.00
Securing and protecting wiring.
Details
       

 06-05-2012
7.00
Removed Airflow pump to add Flaretite seals.
Details
       

 06-03-2012
4.00
Installed main gear legs and wheels.
Details
       

 06-01-2012
4.00
Pulled wires for fuel quantity senders.
Details
       

 05-30-2012
3.00
Tubes and tires installed to main wheels.
Details
       

 05-29-2012
9.00
Main landing gear wheels & brakes.
Details
       

 05-21-2012
12.00
Finished right wing and stored in cradle.
Details
       

 05-16-2012
2.00
Cut and flared fuel tube for left wing.
Details
     

 05-15-2012
5.00
Installed nutplates on wing for the fairing.
Details
       

 05-14-2012
5.50
Installed wing root fairing then removed.
Details
       

 05-11-2012
4.00
Fabricated fuel tank vent tube.
Details
     

 05-07-2012
4.00
Flap actuating rod installed.
Details
       

 05-03-2012
4.00
Fuel tank attach bracket installed.
Details
     

 05-01-2012
7.00
Installed right wing and drilled aft spars.
Details
       

 04-26-2012
4.00
Left wing moved to garage & installed.
Details
       

 04-19-2012
3.00
Fabricated drill guides of drilling rear spars.
Details
     

 04-16-2012
3.50
Drilled out QB wing rivets on inboard rib.
Details
       

 04-09-2012
4.00
Practiced driving drift pins into carrythru spar.
Details
       

 04-06-2012
4.00
Trimmed wing rear spars.
Details
       

 04-04-2012
4.00
Repositioned fuselage for wing attachment.
Details
       

 03-17-2012
6.00
Installed rudder stops.
Details
       

 03-16-2012
4.00
Installed rudder to vertical stabilzer.
Details
     

 03-15-2012
4.00
Rewired Aveo 6-in-1 lights.
Details
       

 03-14-2012
6.00
Reinstalled Aveo 6-in-1 wingtip light modules.
Details
       

 03-12-2012
4.00
Riveted attach plate to VS forward spar.
Details
       

 03-10-2012
4.00
Match drilled VS forward spar to attach plate.
Details
       

 03-09-2012
6.00
Clamped VS to the forward spar attach plate.
Details
     

 03-08-2012
3.00
Clamped VS to the HS for measuring.
Details
       

 03-07-2012
4.00
Started installing vertical stabilizer.
Details
       

 03-02-2012
6.00
Elevator deflection angles continued.
Details
       

 02-28-2012
8.00
Installed elevator pushrods to check deflection an
Details
       

 02-26-2012
5.00
Connected elevator trim wiring in aft tailcone.
Details
       

 02-24-2012
4.00
Installed elevator trim servo.
Details
       

 02-23-2012
5.00
Drilled HS forward and aft spars.
Details
       

 02-22-2012
4.00
Started leveling HS on aft deck.
Details
       

 02-18-2012
2.00
Started installing empennage.
Details
       

 02-17-2012
4.00
Fabricated tail tie down and installed wing tie do
Details
       

 02-15-2012
2.00
Functional test of Aveo 6-in-1 lights.
Details

 02-14-2012
2.00
Connected wire bundles to terminal blocks.
Details
       

 02-13-2012
4.00
Made wire bundles for attaching to lights.
Details
       

 02-12-2012
4.00
Wing wires attached to terminal blocks.
Details
     

 02-11-2012
4.00
Started wiring wingtip lights.
Details
       

 02-08-2012
3.50
Fabricated right wingtip cutout lens.
Details
       

 02-07-2012
4.50
Cut wingtip lenses and fabbed the left tip lens.
Details
       

 02-06-2012
3.00
Shimed the foam rib on right wingtip.
Details
     

 02-03-2012
4.00
Cut out foam wingtip ribs and glued.
Details
       

 02-02-2012
5.50
Flap hinge loops cutout for pins insertion.
Details
       

 02-01-2012
6.00
Started designing a foam rib to strengthen fibergl
Details
       

 01-29-2012
3.00
Finished installing nutplates on wingtips.
Details
       

 01-27-2012
4.00
Updated Dynon avionics & installed nuplates on tip
Details
       

 01-26-2012
4.00
Fabbed laning/taxi/strobe light reflector.
Details
       

 01-25-2012
5.00
Riveted nutplates and dimpled wing skins.
Details
       

 01-23-2012
4.00
Drilled nutplate holes onto wingtips.
Details
       

 01-22-2012
4.00
Matchdrilled strip and wingtip end tip.
Details
       

 01-21-2012
5.00
Added reinforcing srtips to wingtips.
Details
       

 01-19-2012
4.50
Cut left wingtip to aileron gap and matchdrilled.
Details
       

 01-18-2012
4.00
Marked left wingtip for aileron gap.
Details

 01-17-2012
4.00
Prepping wingtip for installation
Details
       

 01-15-2012
9.00
Finished riveting last skin on the right wing.
Details
       

 01-12-2012
4.50
Finished riveting left wing and installed pitot.
Details
       

 01-11-2012
4.00
More riveting.
Details
     

 01-10-2012
5.00
More left wing skin riveting.
Details
       

 01-09-2012
3.00
Started riveting last skin on left wing.
Details
       

 01-08-2012
3.00
Redoing pitot heat wiring and tubing.
Details
       

 01-05-2012
6.00
Fabricated "aileron stop" bushings.
Details
       

 01-03-2012
4.00
Removed aluminum aileron stops.
Details
       

 11-30-2011
4.00
Added wiring conduit clamps
Details
       

 11-27-2011
1.00
Moved wings into garage.
Details

 11-17-2011
3.50
Moved left wing to deck and wired the right wing.
Details

 11-16-2011
2.00
Scarf joint problem solved.
Details

 11-14-2011
4.50
Added nutplates to wing skin access hole.
Details
       

 11-12-2011
4.00
Continuity check of wiring & pitot ops check.
Details
     

 11-11-2011
4.00
Added wingtip lighting wires.
Details
       

 11-08-2011
6.00
Pitot installation continued.
Details
       

 11-04-2011
4.00
Secured PVC wiring conduit in the wings.
Details
       

 11-02-2011
4.00
Started Dynon pitot/heat installation.
Details
       

 09-29-2011
4.00
Trial run on wingtip cut-out reflector.
Details
     

 09-27-2011
4.00
Finished cradles.
Details
       

 09-26-2011
4.00
Floxing the cradle.
Details
       

 09-19-2011
4.00
Cradle building.
Details
       

 09-05-2011
4.00
Continuing building the cradle.
Details
       

 09-01-2011
4.00
More landing light cradle building.
Details
       

 08-23-2011
4.00
Landing/taxi light cradle development.
Details
       

 08-20-2011
4.00
Set up model on the workbench.
Details
       

 08-18-2011
5.00
CAD drawing of the tip cut-out grid.
Details
       

 08-03-2011
2.00
Trying to sketch fixture for landing light.
Details

 07-09-2011
2.50
Olive can landing light experiments.
Details
       

 07-05-2011
3.00
Resealed right wing tank.
Details
       

 06-25-2011
8.00
Updated Dynon equipment firmware.
Details
       

 06-24-2011
4.50
Finished the wiring of roll servo.
Details
     

 06-23-2011
4.00
Wired the AP roll servo to wing connector.
Details
     

 06-22-2011
5.50
Sevice Bulletin on fuel tube accomplished.
Details
       

 06-13-2011
3.50
Started wiring the right wing.
Details
       

 06-12-2011
4.00
Wiring tidy-up and carried in the right wing.
Details
       

 06-11-2011
2.50
Repaired Forest-of-tabs ground block.
Details

 06-10-2011
4.00
Finished riveting and attaching removed parts.
Details
       

 06-09-2011
6.00
Riveted foil to the FW.
Details
       

 06-08-2011
5.00
Continued with SS foil cutting/drilling.
Details
       

 06-07-2011
6.00
Marking and drilling holes in the foil.
Details
       

 06-06-2011
6.00
Begin FW insulation job.
Details

 06-04-2011
4.00
Removed FW items in prep to insulate.
Details
       

 06-03-2011
3.50
Installed SafeAir1 FW penetration kit.
Details

 06-02-2011
3.00
Fabricated supports for cables.
Details

 06-01-2011
4.50
Made FW penetration for cabin heat cable.
Details
       

 05-31-2011
3.50
Continued subpanel angle install.
Details
       

 05-30-2011
4.00
Temporarily installed throttle, prop, mixture, and
Details
       

 05-29-2011
1.50
Com radio testing.
Details

 05-27-2011
2.00
Troubleshot Com radio and intercom.
Details

 05-26-2011
6.00
Made brackets for Safety Trim modules.
Details
       

 05-25-2011
4.00
Tech counselor visit to inspect wiring.
Details
       

 05-24-2011
2.00
Installed the rest of my avionics.
Details
       

 05-23-2011
2.00
Installed some avionics into panel.
Details

 05-22-2011
3.00
Installed enter/exit rollbar handles.
Details
       

 05-21-2011
6.00
Finished wiring Warning Lights panel.
Details
       

 05-19-2011
3.00
Misc wiring of overlooked items.
Details

 05-18-2011
5.00
Zip tied the wires and static tube to the glue mou
Details
       

 05-17-2011
6.00
Added glued mounts to support adhesive mounts.
Details
       

 05-16-2011
5.00
Continued removing adhesive from mounts.
Details
       

 05-13-2011
3.00
Removed foam adhesive from zip tie mounts.
Details

 05-11-2011
1.00
Gluing zip tie mount experiments.
Details

 05-10-2011
3.00
Experiments with adhesive zip tie mounts.
Details

 05-09-2011
5.00
Wired WigWag switch.
Details
       

 05-07-2011
4.00
Pulled Pitot Heat wire and wired switch.
Details
     

 05-06-2011
5.00
Wired Exterior Lights switches.
Details
       

 05-05-2011
4.00
Wired Nav/Pos, Strobes, Landing/Taxi to connectors
Details
       

 04-30-2011
6.00
Wired fuselage connector for AP roll servo.
Details
     

 04-29-2011
2.00
Pulled rudder strobe power wire.
Details
       

 04-27-2011
4.00
Wired connectors and pulled rudder wire.
Details
       

 04-26-2011
3.00
Pulled wire from left to right side.
Details

 04-23-2011
3.00
More crimping pins for Molex connectors.
Details
       

 04-21-2011
4.00
Pulled more wires for exterior lighting.
Details

 04-20-2011
4.00
Started wiring wing-fuselage connectors.
Details
       

 04-18-2011
4.00
Pulled some shielded wire.
Details

 04-15-2011
3.00
Ordered my Exterior Lighting.
Details

 04-13-2011
2.00
More research on exterior lighting.
Details

 04-11-2011
2.50
Drawing the Exterior lights schematic.
Details

 04-08-2011
4.00
Wired the cabin lights and tested.
Details
       

 04-07-2011
4.50
Mounted baggage lights.
Details
       

 04-05-2011
4.00
Pulled wiring for Interior Lighting.
Details

 04-04-2011
1.00
Ordered firewall insulation materials.
Details

 03-31-2011
4.00
Firewall insulation researched.
Details

 03-28-2011
6.00
Rewired the Interior Lights switch.
Details

 03-24-2011
4.00
Reworked interior lighting diagram.
Details
       

 03-20-2011
6.00
Drew schematic of wing to fuselage connections.
Details
     

 03-16-2011
3.00
Research on wing-fuselage connectors.
Details
       

 03-14-2011
6.00
Installed ELT remote controls.
Details
       

 03-12-2011
4.00
Installed CP side power port.
Details
       

 03-09-2011
6.00
Continued with ELT antenna.
Details
       

 03-07-2011
6.00
Continued the install of the ELT.
Details
       

 03-02-2011
4.00
Started install of ELT
Details

 02-25-2011
7.00
Installed coax to VOR antenna.
Details
       

 02-24-2011
4.00
Finished wiring AP74 harness & riveted doubler.
Details
       

 02-22-2011
6.50
Fabricated VOR antenna doubler.
Details
       

 02-21-2011
4.00
Wired fuse links & sketched doubler.
Details
       

 02-18-2011
6.00
Installed antenna coax cables.
Details
       

 02-16-2011
2.00
Rewired boost pump and fuel flow meter.
Details
       

 02-15-2011
4.00
Started wiring the D180 EMS harness.
Details

 02-13-2011
4.50
Drilled holes and installed zip-tie mounts.
Details

 02-12-2011
6.00
Installed com & xponder antennas.
Details
       

 02-10-2011
4.00
Positioned aileron trim D-sub connectors.
Details
       

 02-08-2011
4.00
Wired GP circuits for trim & flaps.
Details
       

 02-05-2011
4.00
Prep for wiring EMS GP circuits.
Details
       

 02-03-2011
4.00
Wire grouping and hole drilling.
Details
       

 01-31-2011
3.00
Wired D180 power wire to E-Bus.
Details

 01-27-2011
3.00
Tested GPS pwr/data cable.
Details

 01-24-2011
6.00
Wired the GPS pwr/data cable.
Details

 01-20-2011
2.00
Ops checked the intercom!
Details
       

 01-19-2011
5.00
Wired GPS audio to music jack.
Details
       

 01-17-2011
4.00
Wire headset jacks.
Details
       

 01-14-2011
6.00
Wired intercom audio input wires.
Details
       

 01-11-2011
5.00
Wired the 10K pot for HS34 audio.
Details
       

 01-05-2011
4.00
Changed wiring schematicl
Details
       

 01-03-2011
4.00
Wired nav/com power & HS34 ground.
Details

 12-23-2010
4.00
Wrapping and tying off wires and bundles.
Details
       

 12-22-2010
4.00
HS34 harness wiring.
Details
       

 12-21-2010
8.00
Wired Dynon Smart Avionic Bus (DSAB).
Details
       

 12-20-2010
4.00
Installed PTT intercom switches.
Details
       

 12-19-2010
12.00
Intercom wiring diagram and research.
Details
     

 10-19-2010
4.00
Fabricated an D-sub avionics grounding bus.
Details
       

 10-06-2010
2.50
Wired the flap position sensor.
Details
     

 10-05-2010
4.50
Installed flap position sensor.
Details
       

 10-04-2010
2.50
Shopped for parts to install flap position sensor.
Details

 10-03-2010
3.00
Wired the twisted bundle to the pitch servo.
Details
     

 10-01-2010
3.00
Added wire to AP twisted bundle then pulled to ser
Details

 09-29-2010
4.00
Connected EFIS harnesses to remote compasses.
Details
       

 09-28-2010
5.00
Finished the wiring to the remote compasses.
Details
       

 09-27-2010
6.00
Drilling and wiring to the tailcone.
Details
       

 09-26-2010
3.00
Researched VAF forum about OAT probe location.
Details

 09-24-2010
4.00
Installed PowerSchottky diode for E-Bus.
Details
       

 09-23-2010
6.50
Finished stick grip wiring to terminal blocks.
Details
       

 09-21-2010
6.00
Wired copilot stick grip to terminal blocks.
Details
       

 09-19-2010
5.50
Wired AMP connector/installed crotch strap kits.
Details
       

 09-18-2010
4.00
Wired flap motor and did continuity testing.
Details
       

 09-16-2010
5.00
Pulled wires from/to FW & from/to terminal blocks.
Details
       

 09-14-2010
5.00
Installed terminal blocks and started stick wiring
Details
       

 09-12-2010
5.00
Installed Safety-Trim and Flap Controller harnesse
Details
       

 09-10-2010
8.00
Drilled holes for connectors and wire passage.
Details
       

 09-08-2010
5.50
The crotch strap kit arrived, started installation
Details
       

 09-05-2010
5.50
Rewired fuel boost pump circuit & potted stick.
Details
       

 09-04-2010
6.00
Installed copilot's Infinity stick grip.
Details
       

 09-03-2010
5.00
Installed the Infinity grip onto the pilot's stick
Details
     

 09-02-2010
4.00
Reinstalled Safety-Trim and Flaps Modules.
Details
       

 08-30-2010
35.00
Spent 10 days making schematics for stick wiring.
Details

 08-19-2010
5.00
Added more to the Pitot/Static system.
Details
     

 08-18-2010
5.00
Added hoses to avionics fan and wired some LEDs.
Details
       

 08-17-2010
4.00
Installed avionics fan and wired.
Details
     

 08-16-2010
7.50
Installed the Pitot/Static/AOA to instrument panel
Details
       

 08-15-2010
6.50
Worked on pitot/static/AOA system.
Details
       

 08-13-2010
5.00
Changed dimmer wiring & wired servo pwr switch.
Details

 08-12-2010
4.00
Added LED warning lights and dimmer pot.
Details
     

 08-10-2010
5.00
Added servo and avionics pwr switches.
Details
       

 08-08-2010
5.00
Wired pitot heat switch and determined wire gauge.
Details
       

 08-06-2010
3.50
Wired Nav/Strobe and Taxi/Ldg lights switches.
Details
     

 08-05-2010
5.00
More switches wired including the fuel boost pump.
Details
       

 08-03-2010
5.00
Updating drawings and riveting tie mounts.
Details
       

 07-30-2010
4.00
Started wiring switches on the switch panel.
Details
       

 07-28-2010
6.00
Installed in-line fuse holders off batteries.
Details
       

 07-26-2010
4.00
Installed subpanel engine controls bracket.
Details
       

 07-24-2010
3.00
Finished wiring the E-bus Alt Feed Relay.
Details
       

 07-23-2010
7.00
Wired E-Bus Alt Feed Relay and switch.
Details
       

 07-21-2010
2.50
Made battery strap for bat removal from battery bo
Details
       

 07-20-2010
6.00
Fished installing all the battery cables.
Details
       

 07-19-2010
6.50
Made Aux battery cables to contactor and ground.
Details
       

 07-18-2010
4.00
Made a fat wire support bracket for the Aux batter
Details

 07-16-2010
3.00
Series wiring is "not" parallel wiring!
Details
       

 07-15-2010
5.00
Crimped fat wires for electrical system.
Details
       

 07-14-2010
3.50
Installed the TWC Safety Trim module.
Details
       

 07-13-2010
5.00
Bought some parts and installed TWC Flap Module.
Details
       

 07-10-2010
3.00
Ordered PC680 battery and other parts.
Details

 07-09-2010
4.00
Crimper delivered and I try a fat wire crimp.
Details
       

 07-08-2010
4.00
Wired busses together through the Schottky diode.
Details
       

 07-07-2010
4.50
Fabricated center stack spacer and top cover.
Details
       

 07-06-2010
8.00
Painted instrlument panel and installed switches.
Details
       

 07-05-2010
5.00
Uninstalled instrument panel to prime and paint.
Details
     

 07-03-2010
4.00
Added intercom to panel before prepping for primer
Details
       

 07-02-2010
2.00
Second engine preservation and prop arrived.
Details
       

 07-01-2010
4.00
Fabricated some cable supports.
Details
       

 06-30-2010
6.00
Installed Aux battery contactor.
Details
       

 06-27-2010
3.00
Wired diodes to Van's batt and starter contactors.
Details
       

 06-26-2010
5.00
Mounted ammeter shunt and ANL base.
Details
       

 06-25-2010
4.00
Bought welding cable to make fat wires.
Details
       

 06-22-2010
8.00
Ordered some bolts, nuts, screws, and terminals.
Details

 06-17-2010
4.50
Installed remote compasses & bracket into tailcone
Details
       

 06-14-2010
7.50
Fabricated bracket for Dynon remote compasses.
Details
       

 06-09-2010
3.00
Installed fuse blocks and Schottky diode.
Details
       

 06-08-2010
4.00
Installed Main battery box & contactors to FW.
Details
       

 06-02-2010
7.00
Dismantling and reengineering the Aux battery box.
Details
       

 05-31-2010
2.00
Researching various throttle cable FW penetrations
Details

 05-12-2010
1.00
Added springs to Matco master brakes.
Details
       

 05-08-2010
3.50
Riveted the drop down fuse block panel parts.
Details
       

 05-07-2010
4.00
Started drop down fuse block panel.
Details
       

 05-04-2010
3.00
Determining location of fuse blocks.
Details

 05-03-2010
2.50
Need an alternate throttle cable FW penetration.
Details

 04-24-2010
5.50
Added SL-30 tray & Air Gizmo GPS dock.
Details
       

 04-23-2010
5.50
Fabricated brackets for transponder tray.
Details
       

 04-22-2010
3.50
Decided how to support transponder tray.
Details

 04-21-2010
4.00
Finished cuting angles and riveting to subpane.
Details
       

 04-20-2010
4.50
Contiued working on forward subpanel.
Details
       

 04-13-2010
4.50
Riveted angles to frame and cut hole in the subpan
Details
       

 04-12-2010
4.50
Started fabricating structure for radio stack.
Details
       

 04-10-2010
5.50
Riveted Dynon trays to panel plates.
Details
       

 04-09-2010
6.00
Finished cutting holes and temporarily monted to p
Details
       

 04-08-2010
6.00
Cut instrument holes into panel plates.
Details
       

 04-06-2010
4.00
Drilled holes in panel plates to cut rectangular h
Details
     

 04-05-2010
4.00
Finished drilling the switch holes.
Details
       

 03-31-2010
6.00
Drilled toggle switch holes into the subpanel.
Details
       

 03-30-2010
4.50
Riveted the panel frame and subpanel support brack
Details
       

 03-29-2010
6.50
Drilled fuselage skin and support angle brackets.
Details
       

 03-28-2010
4.50
Finished riveting nutplates and connected subpanel
Details
       

 03-27-2010
6.00
Riveted the nutplates to the frame angle stiffener
Details
       

 03-26-2010
6.00
Frame stiffener angle drilled and nutplates rivete
Details
     

 03-23-2010
4.00
Started the subpanel.
Details
     

 03-22-2010
4.50
Spent time with Dynon D-180 and tray.
Details

 03-21-2010
4.50
Started drawing on TurboCad for panel cuts.
Details
       

 03-20-2010
4.00
Fabricated angle brackets that connect to fuselage
Details
       

 03-18-2010
5.00
Drilled the vent outlets with the receptacles and
Details
     

 03-17-2010
5.00
Riveted nutplates to panel frame.
Details
       

 03-16-2010
4.50
Modified F-7103C attach angles.
Details
       

 03-15-2010
5.00
Started installing the modular instrument panel.
Details

 03-12-2010
6.50
Aux battery box nearly finished.
Details
       

 03-11-2010
5.50
Still working on Aux Battery box installation.
Details
       

 03-10-2010
6.00
Continued Aux Battery box construction.
Details
       

 03-09-2010
6.00
Start construction of Aux Battery enclosure.
Details
       

 03-08-2010
4.00
Designed and purchased material for Aux Bat Box.
Details

 03-07-2010
3.00
Designed Electrical system and finalized avionics.
Details

 10-12-2009
3.00
Removed plastic protection from canopy.
Details
       

 10-01-2009
3.00
Sanded epoxy to remove bubbles than added another
Details
     

 09-30-2009
4.00
Sanded, primed, and epoxied the rear skirt.
Details
       

 09-29-2009
3.00
Sanded rear skirt and touch-up pinholes with fille
Details
     

 09-28-2009
6.00
Finished riveting side skirts and epoxied rear ski
Details
       

 09-27-2009
6.50
Riveted canopy plexiglass to frame.
Details
       

 09-26-2009
6.00
Painted canopy frame and cover strips.
Details
       

 09-25-2009
7.00
Made tool then sanded and primed rear skirt.
Details
       

 09-24-2009
6.00
Finished the canopy latch and drilled rear skirt.
Details
       

 09-23-2009
4.00
More prep work to cover and forward strips.
Details

 09-22-2009
2.00
Prepared canopy for help-opening handle.
Details

 09-21-2009
8.00
Sanded and drilled getting ready for riveting.
Details
       

 09-20-2009
6.00
Worked on side skirt and drilled out canopy holes.
Details
       

 09-19-2009
3.00
Sanded and added more primer to skirt.
Details
     

 09-18-2009
4.00
Primed the rear skirt with surface primer.
Details
     

 09-16-2009
2.00
Rear skirt epoxy filler work
Details
     

 09-08-2009
6.00
Fabricated adapter for engine stand.
Details
       

 09-06-2009
4.00
Six month represervation of IO-360 engine.
Details
       

 09-05-2009
4.00
Sanded and drilled rear skirt.
Details
       

 09-03-2009
4.00
More sanding on aft skirt.
Details
       

 09-02-2009
4.00
Sanded filler and primed surface.
Details
       

 09-01-2009
4.00
Started adding filler to aft skirt.
Details
       

 08-31-2009
3.00
Removed aft skirt to trim off excess fiberglass.
Details
       

 08-30-2009
2.00
Added three more fiberglass plies to aft skirt.
Details

 08-29-2009
2.00
Saturated 3 plies of fiberglass to make rear skirt
Details
       

 08-28-2009
7.00
Cut fiberglass cloth and taped off work area.
Details
       

 08-26-2009
6.00
Fine tuned latch, installed roller botls & anchor
Details
       

 08-25-2009
5.00
Tried forming (bending) the side skins for better
Details
     

 08-24-2009
3.00
Trip to Home Depot for tools and stuff.
Details
     

 08-21-2009
4.00
Tapped rear canopy bow to hold plexiglass.
Details
       

 08-20-2009
3.50
Checked windshield fit after drilling and sanding.
Details
     

 08-19-2009
5.50
Countersunk windshield and tapped roll bar.
Details
       

 08-18-2009
6.00
Drilled and sanded the windshield.
Details
       

 08-17-2009
4.00
Windshield prepped and rear skirt pattern made.
Details
     

 08-16-2009
5.00
Installed the rear canopy anchor blocks.
Details
       

 08-15-2009
3.00
Worked on canopy latch.
Details
     

 08-13-2009
2.00
Practiced drilling plexiglass
Details

 08-04-2009
4.00
Finished the front edge canopy trim strip.
Details
       

 08-03-2009
4.00
Match drilled to canopy front edge.
Details

 08-02-2009
4.00
Cut new canopy top cover and front strip.
Details

 07-30-2009
5.00
Match drilled canopy braces to side skirts.
Details
     

 07-29-2009
6.00
Fabricated canopy brace and match drilled.
Details
       

 07-28-2009
5.00
Drilled side skirts to canopy frame.
Details
       

 07-27-2009
4.00
Drilled side skirts.
Details
     

 07-26-2009
5.00
Canopy trim pattern made.
Details
       

 07-25-2009
4.00
Permanently installed roller tracks.
Details
       

 07-23-2009
4.00
Sanded the canopy edges.
Details
       

 07-21-2009
5.00
Checked windshield against canopy.
Details
     

 07-20-2009
4.00
Drilled canopy to canopy frame.
Details
       

 07-16-2009
4.00
Cut windshield to fit forward fuselage skin.
Details
       

 07-15-2009
2.00
Clecoed on the forward fuselage skin.
Details
     

 07-13-2009
4.00
Sanded edges of canopy and windshield.
Details
       

 07-12-2009
6.00
Cut windshield and trimmed canopy.
Details
       

 07-11-2009
3.00
Cut latch hole and clamped frame to bubble.
Details
       

 07-10-2009
5.00
Cut the flanges off the canopy bubble.
Details
       

 07-09-2009
3.00
Fitted frame to bubble and marked latch hole.
Details
       

 07-08-2009
2.00
Finally, the canopy frame is welded.
Details
       

 07-07-2009
2.00
Getting canopy frame welded.
Details

 07-05-2009
2.00
Rearranged the garage and pulled out the canopy.
Details
     

 07-03-2009
4.00
Adjusted the right side bow before welding the bo
Details
     

 07-01-2009
5.00
More canopy frame "cutting" and bending.
Details
       

 06-29-2009
4.00
Forward cockpit tunnel area tasks.
Details
       

 06-28-2009
4.00
Fabricated doubler for center tunnel cover.
Details
       

 06-25-2009
6.00
More bending methods.
Details
       

 06-24-2009
6.00
More bending the canopy frame.
Details
       

 06-23-2009
6.00
Installed cabin heat box/tried bending canopy fram
Details
       

 06-20-2009
5.00
Installed doubler and swivle eyeball pass throughs
Details
       

 06-16-2009
3.00
Avery Tools order again.
Details

 06-15-2009
5.00
Started firewall penetrations.
Details
       

 06-13-2009
4.00
Constructed engine stand.
Details
       

 06-10-2009
6.00
Hang engine to verify FW penetration locations.
Details
       

 06-09-2009
6.50
Install engine mount & temporarily hang engine.
Details
       

 06-08-2009
5.00
Marked firewall penetrations.
Details

 06-07-2009
3.00
Riveted doubler for battery & starter relays,
Details
     

 06-05-2009
4.00
Fabricated doubler for battery & starter relays.
Details
       

 06-04-2009
4.00
Priming, painting, and mounting battery box.
Details
       

 06-03-2009
3.00
More on the battery box.
Details
       

 06-02-2009
4.00
Searching for best avionics prices.
Details

 06-01-2009
3.00
Hangar rental
Details

 05-31-2009
5.00
The Odyssey battery box.
Details
       

 05-30-2009
6.00
More canopy bending attempts.
Details
       

 05-29-2009
4.00
Contiuing the canopy fitting.
Details
     

 05-28-2009
4.00
Continue working on the canopy fit.
Details
       

 05-26-2009
4.00
Trying to fit canopy frame.
Details
       

 05-20-2009
4.00
Drilled and riveted canopy slider spacer & rail.
Details
       

 05-19-2009
8.00
Finished riveting aft top skin; started canopy.
Details
       

 05-18-2009
3.00
Continued riveting the forward aft top skin.
Details
       

 05-17-2009
6.50
Started riveting the forward aft top skin.
Details
       

 05-16-2009
4.00
Inventoried FWF Kit
Details

 05-14-2009
6.00
Finished riveting panel, subpanel framework.
Details
       

 05-12-2009
4.00
Started riveting the panel framework to firewall.
Details
       

 05-08-2009
2.00
Ordered FWF Kit, Eng Vibration Mounts, & tools.
Details

 05-06-2009
7.00
Riveted brackets and drilled roll bar brace.
Details
       

 05-05-2009
1.00
Drilled holes for canopy deck bracket to hold pane
Details

 05-04-2009
7.00
Finished installing the roll bar.
Details
       

 05-03-2009
4.50
Finished trimming, prepping, & priming forward top
Details
       

 05-02-2009
7.50
Fitting and match drilling top forward fuselage sk
Details
       

 05-01-2009
4.00
Clecoed new skin to forward top fuselage.
Details
     

 04-30-2009
6.00
Cut and drilled roll bar spacers.
Details
       

 04-25-2009
6.00
Finished static system to panel, accomplished SB.
Details
       

 04-21-2009
2.00
Clecoed top fuselage skin.
Details
     

 04-13-2009
3.00
Drilled and riveted platenuts to fwd fuselage part
Details
       

 04-09-2009
3.00
More electrical system design and fun.
Details
       

 04-04-2009
3.00
Electrical system design and planning.
Details
       

 03-23-2009
4.00
Mattituck TMX IO-360 arrives.
Details
       

 03-10-2009
3.50
Finished parts for fwd upper fuselage.
Details
       

 03-09-2009
6.00
Started fabricating fwd top fuselage parts.
Details
       

 02-23-2009
3.00
Finished aileron trim installation.
Details
       

 02-17-2009
6.00
Started installing Aileron electric trim.
Details
     

 02-16-2009
6.00
Finishing Kit arrived.
Details
       

 02-10-2009
6.00
Installed sticks and drilled elevator horns.
Details
       

 02-09-2009
4.00
Ground down pushrod hole in F-705 bulkhead.
Details
       

 02-06-2009
5.00
Tried to install elevator pushrod.
Details
       

 02-04-2009
4.00
Riveted AP pitch servo bracket to rib.
Details
     

 02-02-2009
4.00
Begin Dynon AP pitch servo installation.
Details
       

 02-01-2009
6.00
Installed brake hoses to master cylinders.
Details
       

 01-31-2009
6.00
Bent fuel line tubes from tanks to fuel selector.
Details
       

 01-30-2009
4.00
Finish parking brake & begin fuel tubes.
Details
       

 01-29-2009
4.00
Complete parking brake install.
Details
       

 01-28-2009
4.00
Parking brake bracket and placement.
Details
       

 01-26-2009
6.00
Finish tube bending for boost pump kit.
Details
       

 01-25-2009
6.00
Tube bending started.
Details
       

 01-22-2009
4.00
Riveted pump cover & drilled holes in floor stiffn
Details
       

 01-19-2009
4.00
Mounted boost pump and filter for trial fitting.
Details
       

 01-18-2009
3.00
Started fabricating for Airflow Boost pump kit.
Details
       

 01-03-2009
2.00
Installed brake reservoir.
Details
       

 11-23-2008
4.00
Installed static ports and tubing.
Details
       

 11-10-2008
4.00
Fabricated fuel vent tubing in fuselage.
Details
       

 10-29-2008
5.00
Installed Dynon AP servo in right wing.
Details
       

 10-28-2008
5.00
Fabricated flap pushrods & primed elev. pushrods.
Details
       

 10-26-2008
5.00
Made elevator push rods & installed stick control
Details
       

 10-25-2008
3.00
Started installing pitot line in left wing.
Details

 10-23-2008
4.00
Installed flap actutating system and AP servo.
Details
       

 10-19-2008
6.00
Finished installing gear mount sockets.
Details
       

 10-18-2008
5.00
Continue install gear mounts.
Details
       

 10-17-2008
3.00
Started installing the gear mount sockets.
Details

 09-30-2008
6.00
Painted cockpit and baggage area.
Details
       

 09-29-2008
4.00
Painted cockpit and baggage parts & panels.
Details
       

 09-28-2008
3.00
Match drilled gear sockets to gear legs.
Details
       

 09-27-2008
5.00
Masked off the fuselage to paint cockpit area.
Details
       

 09-25-2008
5.00
Set up paint booth in garage for cockpit painting.
Details
       

 09-19-2008
2.50
Primed a batch of panels and parts.
Details
       

 09-18-2008
6.50
Riveted steps and baggage floors/ side panels.
Details
       

 09-17-2008
5.00
Finished flap actuator and clecoed step kit.
Details
       

 09-16-2008
6.00
Worked on flap actuator and baggage floor.
Details
       

 09-14-2008
3.00
Working on flap actuator parts.
Details
       

 09-13-2008
3.00
Finished cutting out most parts for flap actuator.
Details
     

 09-12-2008
3.00
Put in seat cushions to determine rudder placement
Details
       

 09-11-2008
2.50
Moved wings to garage due to Hurricane Ike.
Details

 09-09-2008
3.50
Started installing flap actuator assembly.
Details
       

 09-08-2008
3.50
Match drilled firewall recess with center cover.
Details
     

 09-07-2008
4.00
Match drilled center cabin cover.
Details
       

 09-06-2008
5.00
Center Cabin Covers installment.
Details
       

 08-14-2008
5.00
Riveted rudder assembly brace and firewall recess.
Details
       

 08-13-2008
4.00
Riveted the seat backs and braces.
Details
       

 08-12-2008
2.50
Primed seat parts and forward aft top skin.
Details
     

 08-10-2008
5.00
Removed seat back brace slot angles to fix screw-u
Details
     

 08-09-2008
6.00
Match drilled the seat backs and hinges using the
Details
       

 08-08-2008
5.00
Marked and drilled holes on the seat support angle
Details
       

 08-07-2008
4.00
Riveted forward tunnel cover and cut angles for se
Details
       

 08-06-2008
1.50
Primed forward tunnel cover pieces.
Details

 08-05-2008
5.50
Tunnel cover and seat support angles cut.
Details
       

 08-04-2008
5.00
Removed fwd-aft skin for prep & started fabricatin
Details
       

 08-03-2008
5.00
Installed skin stiffener rib and clecoed baggage f
Details
       

 08-02-2008
5.00
Finished elev. bellcrank then clecoed fwd aft top
Details
       

 07-25-2008
5.00
Riveted side rails and prepaired elev. bellcrank.
Details
       

 07-24-2008
5.00
Fit left gear leg socket and modified side rails.
Details
       

 07-23-2008
5.00
Drilled rudder assembly support brace and more.
Details
       

 07-22-2008
5.00
Temporarily installed rudder pedal assembly.
Details
       

 07-20-2008
5.00
Drill Step Kit plastic blocks to baggage rib, etc.
Details
       

 07-19-2008
5.00
Finish preping rudder/brake pedals.
Details
       

 07-18-2008
5.00
Drilled rudder/brake pedal angles and parts.
Details
       

 07-17-2008
5.00
Finished Step drilling and drilled gear socket hol
Details
       

 07-16-2008
5.00
Finished fuel tank attach hardware fabrication.
Details
       

 07-15-2008
5.00
Began fabricating fuel tank attach hardware.
Details
       

 07-11-2008
5.00
Finish drilling right step.
Details
       

 07-10-2008
6.00
Began installing right & left "Step Kits ".
Details
       

 07-09-2008
4.00
Fitted flap end blocks to F-705 assembly.
Details
     

 07-08-2008
6.00
Finish installing seat adjustment supports.
Details
       

 07-06-2008
5.50
Install control sticks and hardware to fuselage.
Details
       

 07-05-2008
4.00
Worked on QB Firewall.
Details
       

 07-02-2008
1.00
Moved Fuselage to garage/Wings to patio deck.
Details

 06-23-2008
2.00
Finished installing VS tip.
Details
       

 06-20-2008
3.00
Fabricated HS tip plexiglass enclosure.
Details
     

 06-18-2008
3.00
Start install of Tip on Vertical Stabilizer.
Details
       

 06-17-2008
3.00
Enclosed HS Tips using Plexiglass & Fiberglass.
Details
       

 06-16-2008
4.00
Started Horizontal Stab Tips Installation.
Details
       

 06-11-2008
4.00
Installed elevators onto horizontal stabilizer.
Details
       

 06-09-2008
5.00
Finish elevator tips installation.
Details
       

 06-07-2008
4.00
Mounted elevators to HS.
Details
       

 06-05-2008
3.00
Start to install elevator fiberglass tips.
Details
     

 06-04-2008
5.00
Installed elevator trim servo.
Details
       

 06-03-2008
4.50
Installed elevator rod end hinges & counter weight
Details
       

 05-29-2008
4.00
Installed fuel pickup tubes & quantity sensors.
Details
       

 05-03-2008
3.00
Prepared Fuel Sensors for Wing Fuel Tanks.
Details
       

 04-23-2008
3.00
Mounted Dynon Pitot Heater Control Box
Details
       

 04-15-2008
3.00
Drilled and tapped Dynon pitot.
Details
       

 04-14-2008
4.50
Cut streamline pitot hole, deburred, dimpled, prim
Details
       

 04-13-2008
6.00
Riveted bracket & preped pitot mounting plates.
Details
       

 04-12-2008
2.00
Dimpled Lower Wing Spars, Ribs, and Skins
Details
       

 04-11-2008
5.00
Back Drilled Lower Outboard Right Wing Skin
Details

 04-10-2008
5.00
Prep to Install Dynon Heated AOA Pitot
Details
       

 09-10-2007
3.00
Charlotte and I riveted the aileron gap fairings.
Details
       

 09-07-2007
6.50
Prepped and riveted left flap brace and hinge.
Details
       

 09-04-2007
6.00
Prepped and riveted right flap brace & hinge.
Details
       

 09-03-2007
6.50
Riveted outboard aileron hinge brackets.
Details
       

 09-01-2007
4.50
Attached aileron hardware & drilled oversize holes
Details
       

 08-31-2007
2.50
Drilled aileron attach hardware.
Details
     

 08-28-2007
6.50
Set inbd. aileron brackets and prepped flap brace.
Details
       

 08-27-2007
5.00
Drilled the aileron hinge brackets to rear spar.
Details

 08-25-2007
6.00
Riveted and primed aileron push rods.
Details
       

 08-24-2007
6.50
Drilled Aileron pushrod and rod ends.
Details
       

 08-14-2007
3.50
Finished drilling wing wiring holes and cut ailero
Details
       

 08-11-2007
4.00
Installed aileron bellcranks onto QB wings.
Details
     

 08-10-2007
3.00
Drilled wiring conduit holes on the right wing.
Details
     

 08-09-2007
6.00
Started drilling wing wiring conduit holes in the
Details
       

 08-08-2007
4.00
Drilled out and reriveted 3 rivet in aileron hinge
Details
       

 08-07-2007
6.00
Assembled the aileron hinges.
Details
       

 07-31-2007
2.50
Moved fuselage from garage to store it on the deck
Details
       

 07-26-2007
8.00
Built my fuselage rotisserie.
Details
       

 07-24-2007
3.00
Analyzed fuselage layout (Dwg 17A) to find axis of
Details
       

 07-23-2007
4.00
Inventoried parts for QB wings and fuselage.
Details
       

 07-16-2007
1.50
Quick Build Wings and Fuselaged Delivered.
Details
       

 07-09-2007
4.00
Finished building wing cradle.
Details

 06-15-2007
4.00
Started constructing Wing Cradle while waiting for
Details
     

 05-25-2007
1.00
Drilled out bad rivets and used new Tungsten bucki
Details
       

 05-22-2007
2.00
Riveted the VS rear spar to the other side of the
Details
       

 05-21-2007
2.00
Inventoried ordered tools then tried riveting the
Details
       

 05-17-2007
3.00
Riveted VS skin to the VS frame (ribs and front sp
Details
       

 05-16-2007
5.00
Riveted VS ribs to the front spar with difficulty.
Details
     

 05-15-2007
4.00
Riveted the rear spar, doubler and hinge brackets.
Details
       

 05-14-2007
3.00
Set up and primed Vertical Stabilizer Components
Details
       

 05-12-2007
4.00
Tried to set up to prime VS components.
Details

 05-11-2007
4.50
Dimpled spars and ribs and countersunk holes in do
Details
       

 05-10-2007
2.00
Finished deburring components and dimpled skin.
Details
       

 05-09-2007
4.00
Match drilled VS skin to frame then disassembled a
Details
     

 05-08-2007
3.00
Assembled and drilled frame then clecoed skin on.
Details
       

 03-14-2007
0.00
Home with the goodies.
Details
       

 03-11-2007
4.00
Finished and installed trim tab.
Details
       

 03-10-2007
11.50
Finish riveting HS skins and elevator skins.
Details
       

 03-09-2007
11.00
Rivet rudder and start riveting HS skins.
Details
       

 03-08-2007
11.50
Start Elevator Prep and riveting HS rear spar.
Details
       

 03-07-2007
10.75
Finished HS Prep and start Rudder Prep
Details
       

 03-06-2007
11.50
Continued prepping Horizontal Stabilize.
Details
       

 03-05-2007
10.00
Started on the empennage kit by inventoriing.
Details
       










Copyright © 2001-2024 Matronics. All Rights Reserved.