Powered By Kitlog Pro v2.0
JAMES'S WEB SITE
RV-9
All
Work Logs Found:
63
Category Work Time:
108 Hours
Date
Hours
Work Log Summary
Details
10-07-2007
1.00
Riveted Trailing edge
Details
10-04-2007
4.50
Right Elevator assembly
Details
10-03-2007
3.00
Primed Parts
Details
10-02-2007
2.00
Deburring
Details
10-01-2007
0.50
Match drilled elevator spar
Details
09-21-2007
0.50
Match drilled WD-605
Details
09-20-2007
4.50
Match Drilled counterbalance
Details
09-19-2007
1.50
Finished Dimpling Right Elevator
Details
09-18-2007
0.50
Dimpling Right Elevator
Details
09-10-2007
1.00
Dimpling Right Elevator
Details
09-09-2007
1.00
Clecoed and match drill stiffners
Details
09-07-2007
1.50
Cut stiffners
Details
09-05-2007
0.00
WINGS ORDERED
Details
09-05-2007
1.00
Rolled leading edge
Details
09-04-2007
1.00
Riveting trailing edge
Details
08-27-2007
1.00
Prefabed R918
Details
08-26-2007
0.50
Riveting
Details
08-24-2007
3.00
Finished Riveting skin on rudder
Details
08-22-2007
5.00
Primed and assembled Rudder
Details
08-21-2007
5.50
Clecoed Rudder skin
Details
08-13-2007
3.50
Right rudder skin
Details
08-12-2007
1.50
Prep right rudder stiffners
Details
08-10-2007
2.00
Dimpled and Backriveted rudder skin
Details
08-10-2007
2.50
Assembled rudder skeleton
Details
08-08-2007
3.00
Trim and debur stiffners
Details
08-05-2007
1.00
Rudder Prep
Details
08-04-2007
1.50
Riveted Rear spar to skn
Details
08-03-2007
1.00
Riveted rear spar to VS808PP
Details
08-02-2007
1.00
Deburred VS808PP
Details
07-30-2007
2.00
Riveted Skin
Details
07-29-2007
1.50
Primed VS
Details
07-28-2007
1.00
Dimpling
Details
07-27-2007
1.00
Deburring and Dimpling
Details
07-16-2007
0.50
Match drilled VP901 skin
Details
07-14-2007
2.50
Started Vetical Stabilizer
Details
06-18-2007
1.50
Finished HS
Details
06-17-2007
2.00
Rivet
Details
06-16-2007
2.50
Rivet
Details
06-15-2007
1.50
Riveted
Details
06-04-2007
1.00
Rivet
Details
06-03-2007
1.50
Rivet
Details
05-31-2007
1.50
Rivet
Details
05-30-2007
1.50
Details
05-29-2007
0.50
Rivet
Details
05-18-2007
1.50
Riveting begins
Details
05-18-2007
1.00
Rivet
Details
05-18-2007
1.50
Primed
Details
05-15-2007
1.50
Coutersink
Details
05-14-2007
3.50
Right HS Skin
Details
05-08-2007
1.50
disassemble, deburred and dimpled
Details
05-01-2007
0.50
Match drill
Details
04-26-2007
1.50
Assembled right HS
Details
04-17-2007
2.00
dimpling
Details
04-07-2007
2.00
Started to Dimple left HS
Details
04-06-2007
2.00
Deburring of left HS
Details
03-26-2007
0.50
finished clecoing the left HS together
Details
03-15-2007
3.00
assembled most of left side of Horizontal stabiliz
Details
03-14-2007
2.00
Fabricated HS908L/R
Details
03-09-2007
2.00
Clecoed and match drill hole
Details
03-02-2007
1.50
Prepaired main ribs and nose ribs
Details
03-01-2007
2.00
Clecoed the front and rear spars
Details
02-28-2007
1.00
Unpacked and took inventory
Details
02-27-2007
0.00
The Empennage Arrives!
Details
SITE NAVIGATION
Contact Builder
RV-9 Home
Category
# Logs
# Hours
All
63
108
Empennage
62
108
Wings
1
Copyright © 2001-2024 Matronics. All Rights Reserved.