Powered By Kitlog Pro v2.0
BARRY'S WEB SITE
Gull 2000
All
Work Logs Found:
76
Category Work Time:
334 Hours
Date
Hours
Work Log Summary
Details
10-22-2002
3.00
installed prop
10-21-2002
3.00
cal. fuel tank senders
10-16-2002
4.00
hook airlons & flaps to push rods
10-15-2002
4.00
fit wings to plane
09-24-2002
8.00
Polished wing Installed flaps & ailerons
09-23-2002
3.00
Install radio & GPS units
Details
09-23-2002
5.00
Clean & polish bottoom side of wing
09-20-2002
3.00
Assemble Prop, Install Chute
09-19-2002
8.00
Install all lexan windows & doors
09-17-2002
2.00
installed port side window
09-13-2002
6.00
make up control panel
09-12-2002
6.00
Run wiring
09-11-2002
6.00
Safty wire, paint & splice wires
09-10-2002
8.00
Run wiring, hook brakes & engine control
09-09-2002
8.00
Run wiring & Control cables
09-06-2002
5.00
run chooke, & trottle & gas lines
09-05-2002
4.00
engine components
09-04-2002
8.00
Mount engine & hook up control cables
09-03-2002
8.00
Install rdder & horizontal stabilizer
08-30-2002
6.00
Paint fuselage
Details
08-29-2002
2.00
Etched Alum for painting
08-28-2002
10.00
Panit control surfaces & prep fuselage
08-26-2002
5.00
Spray poly brush & poly spray
08-15-2002
4.00
Shink fabric on control surfaces
08-14-2002
6.00
Covered control surfaces
08-13-2002
1.00
Started fabric covering control surfaces
08-12-2002
4.00
Install flap motor
08-07-2002
4.00
Glued control surfaces for fabric
08-05-2002
6.00
Bondo rivit lines
07-17-2002
3.00
Rivet trim to top of fuselage
07-08-2002
2.00
drilled out panel for switches & breaker
07-02-2002
2.00
Cut in compass & fit panel
07-01-2002
2.00
Install switches on stick
06-18-2002
4.00
Install vertical Stabilzer & Strobe
06-17-2002
3.00
Cover engine area & fit alum.
06-16-2002
6.00
cover inside of fuslage front area
06-15-2002
6.00
Fit lexan glass parts & drill holes
06-14-2002
3.00
cover inside fuselage
06-11-2002
6.00
Fit wing for 1st time
Details
06-10-2002
5.00
Install body to fuselage Install brakes
06-09-2002
3.00
Cover deck panel & install
06-06-2002
3.00
Cut instrument panel in
06-05-2002
3.00
fit panel deck cover
06-04-2002
3.00
Clean & sand parts to be fabric covered
06-02-2002
10.00
Fit fuselages body & more
Details
05-30-2002
3.00
Fitt trim tab servo motor
05-29-2002
4.00
Rivet tail boom to fuselage & file edges
05-28-2002
4.00
Cut & fit wing tips
05-23-2002
2.00
Fit vert. stabilizer & inspection plates
05-21-2002
2.00
Install tail boom & align stabilzer
05-20-2002
4.00
Install wing tip ribs & fit wing tips
05-18-2002
6.00
Installed top wing skins & set wash
05-16-2002
4.00
Fit tork tube & sand flaps-ailerons
05-15-2002
4.00
Glued & installed bottom wing skins
05-14-2002
4.00
Prepare skins for attachment
05-13-2002
4.00
Fit ailerons & flaps
05-09-2002
4.00
Install & fit flap & aileron hinges
05-08-2002
6.00
Prepare ribs & skins for glue & riveting
05-06-2002
4.00
Remove & deburr wing skin holes
05-05-2002
5.00
Fit top wing skins
05-02-2002
3.00
Cut & drill wing stiffeners
05-01-2002
3.00
Change ailerons tork tubes
Details
04-30-2002
4.00
Finished fitting bottom wing skins
04-29-2002
4.00
Fit bottom wing skins
04-10-2002
4.00
Rivet & install trim tab on stabilizer
Details
04-09-2002
3.00
Install aileron tork tube & clean boom
04-08-2002
5.00
Install rudder fittings
04-06-2002
4.00
Fit tail boom & horizontal stabilzer
04-04-2002
4.00
Rivet ailerons tork tubes
04-03-2002
8.00
Install tork tube, push rods & tail boom
Details
04-02-2002
8.00
Rivet ribs, flaps, ailerons & ass tires
04-01-2002
6.00
Installed ribs & box ribs onto D cell
03-31-2002
2.00
Drilled rivet holes into ribs
03-25-2002
1.00
Marked out rib spacing on wing D cell
03-13-2002
1.00
Kit arrived, unload plane
01-03-2002
0.50
Ordered Gull 2000
SITE NAVIGATION
Contact Builder
Gull 2000 Home
Category
# Logs
# Hours
All
76
335
Empennage
49
202
Engine
6
33
Fuselage
9
47
Hardware
5
28
Interior
1
3
Kit
2
2
Systems
1
3
Wings
3
17
Copyright © 2001-2024 Matronics. All Rights Reserved.