KitLog pro

Powered By Kitlog Pro v2.0

BARRY'S WEB SITE
Work Logs Found: 76
Category Work Time: 334 Hours
 Date
Hours
Work Log Summary

Details

 10-22-2002
3.00
installed prop

 10-21-2002
3.00
cal. fuel tank senders

 10-16-2002
4.00
hook airlons & flaps to push rods

 10-15-2002
4.00
fit wings to plane

 09-24-2002
8.00
Polished wing Installed flaps & ailerons

 09-23-2002
3.00
Install radio & GPS units
Details

 09-23-2002
5.00
Clean & polish bottoom side of wing

 09-20-2002
3.00
Assemble Prop, Install Chute

 09-19-2002
8.00
Install all lexan windows & doors

 09-17-2002
2.00
installed port side window

 09-13-2002
6.00
make up control panel

 09-12-2002
6.00
Run wiring

 09-11-2002
6.00
Safty wire, paint & splice wires

 09-10-2002
8.00
Run wiring, hook brakes & engine control

 09-09-2002
8.00
Run wiring & Control cables

 09-06-2002
5.00
run chooke, & trottle & gas lines

 09-05-2002
4.00
engine components

 09-04-2002
8.00
Mount engine & hook up control cables

 09-03-2002
8.00
Install rdder & horizontal stabilizer

 08-30-2002
6.00
Paint fuselage
Details

 08-29-2002
2.00
Etched Alum for painting

 08-28-2002
10.00
Panit control surfaces & prep fuselage

 08-26-2002
5.00
Spray poly brush & poly spray

 08-15-2002
4.00
Shink fabric on control surfaces

 08-14-2002
6.00
Covered control surfaces

 08-13-2002
1.00
Started fabric covering control surfaces

 08-12-2002
4.00
Install flap motor

 08-07-2002
4.00
Glued control surfaces for fabric

 08-05-2002
6.00
Bondo rivit lines

 07-17-2002
3.00
Rivet trim to top of fuselage

 07-08-2002
2.00
drilled out panel for switches & breaker

 07-02-2002
2.00
Cut in compass & fit panel

 07-01-2002
2.00
Install switches on stick

 06-18-2002
4.00
Install vertical Stabilzer & Strobe

 06-17-2002
3.00
Cover engine area & fit alum.

 06-16-2002
6.00
cover inside of fuslage front area

 06-15-2002
6.00
Fit lexan glass parts & drill holes

 06-14-2002
3.00
cover inside fuselage

 06-11-2002
6.00
Fit wing for 1st time
Details

 06-10-2002
5.00
Install body to fuselage Install brakes

 06-09-2002
3.00
Cover deck panel & install

 06-06-2002
3.00
Cut instrument panel in

 06-05-2002
3.00
fit panel deck cover

 06-04-2002
3.00
Clean & sand parts to be fabric covered

 06-02-2002
10.00
Fit fuselages body & more
Details

 05-30-2002
3.00
Fitt trim tab servo motor

 05-29-2002
4.00
Rivet tail boom to fuselage & file edges

 05-28-2002
4.00
Cut & fit wing tips

 05-23-2002
2.00
Fit vert. stabilizer & inspection plates

 05-21-2002
2.00
Install tail boom & align stabilzer

 05-20-2002
4.00
Install wing tip ribs & fit wing tips

 05-18-2002
6.00
Installed top wing skins & set wash

 05-16-2002
4.00
Fit tork tube & sand flaps-ailerons

 05-15-2002
4.00
Glued & installed bottom wing skins

 05-14-2002
4.00
Prepare skins for attachment

 05-13-2002
4.00
Fit ailerons & flaps

 05-09-2002
4.00
Install & fit flap & aileron hinges

 05-08-2002
6.00
Prepare ribs & skins for glue & riveting

 05-06-2002
4.00
Remove & deburr wing skin holes

 05-05-2002
5.00
Fit top wing skins

 05-02-2002
3.00
Cut & drill wing stiffeners

 05-01-2002
3.00
Change ailerons tork tubes
Details

 04-30-2002
4.00
Finished fitting bottom wing skins

 04-29-2002
4.00
Fit bottom wing skins

 04-10-2002
4.00
Rivet & install trim tab on stabilizer
Details

 04-09-2002
3.00
Install aileron tork tube & clean boom

 04-08-2002
5.00
Install rudder fittings

 04-06-2002
4.00
Fit tail boom & horizontal stabilzer

 04-04-2002
4.00
Rivet ailerons tork tubes

 04-03-2002
8.00
Install tork tube, push rods & tail boom
Details

 04-02-2002
8.00
Rivet ribs, flaps, ailerons & ass tires

 04-01-2002
6.00
Installed ribs & box ribs onto D cell

 03-31-2002
2.00
Drilled rivet holes into ribs

 03-25-2002
1.00
Marked out rib spacing on wing D cell

 03-13-2002
1.00
Kit arrived, unload plane
       

 01-03-2002
0.50
Ordered Gull 2000
     










Copyright © 2001-2024 Matronics. All Rights Reserved.