KitLog pro

Powered By Kitlog Pro v2.0

Aarons Sonex N771AK
Work Logs Found: 143
Category Work Time: 860 Hours
 Date
Hours
Work Log Summary

Details

 08-24-2008
0.50
60 Hours Flown!
Details
       

 06-13-2008
5.00
First Five Hours
Details
       

 06-07-2008
2.00
First Flight !!!
Details
       

 05-31-2008
4.00
Tuning, Cowling, Tires, Charger
Details
       

 05-29-2008
2.00
Airworthiness
Details
     

 05-24-2008
10.00
Final Setup & Rigging
Details
       

 05-18-2008
7.00
Delivery & Wing attachment
Details
       

 05-03-2008
4.00
Aileron Balance & prep
Details
     

 04-02-2008
6.00
Baffling & Misc
Details

 03-29-2008
12.00
Canopy
Details
       

 03-22-2008
12.00
Left Cowl re-do & right baffle seal
Details
       

 03-21-2008
10.00
Aerocarb re-fit and Engine Test!
Details
       

 03-18-2008
3.00
Cabin heat control, right cowling inlet
Details
     

 03-16-2008
5.00
Smoke Injectors & Firewall Cabin Heat
Details
     

 03-15-2008
11.00
Cowling work
Details

 03-09-2008
3.00
Pitch Trim Install
Details

 03-08-2008
5.00
AeroCarb Install
Details
     

 03-01-2008
12.00
Mounted Engine
Details
       

 02-16-2008
9.00
Baggage & Com Antenna
Details
       

 02-10-2008
3.00
Seat Pan & Battery Case Prep
Details

 02-09-2008
12.00
Antennas, ELT, Gas Vent, Gas Drain & More
Details
       

 02-08-2008
11.00
Battery Case & Power
Details
       

 02-07-2008
8.00
Avionics Wiring Neg
Details
     

 02-06-2008
6.00
Avionics Wiring Pos
Details

 01-26-2008
7.00
Installed panel & other modules
Details
       

 01-21-2008
3.00
Loaded Panel
Details
     

 01-13-2008
6.00
Canopy Frame
Details
     

 01-12-2008
8.00
Raw panel finishing
Details

 01-05-2008
9.00
Panel Work
Details

 12-31-2007
6.00
Wheel Pants, leg fairings
Details
     

 12-24-2007
8.00
Brake Finish, Fuel System
Details

 12-08-2007
9.00
Root Doubler & Wing Walk, Misc
Details
       

 11-25-2007
5.00
Aileron Fine tuning and Flap handle
Details
       

 11-24-2007
6.00
Wing Aileron rigging
Details
       

 11-23-2007
10.00
Rudder & Elevator Controls
Details

 11-22-2007
5.00
Control preparation
Details

 11-18-2007
4.50
Spar tunnel final riveting
Details
       

 11-17-2007
5.00
Wing Rigging & Drilling
Details
       

 11-11-2007
5.00
Rear Spar carry-through
Details
       

 11-10-2007
6.00
Leveling Wing & Fuselage
Details
       

 11-04-2007
4.00
Windshield Finish
Details
       

 11-03-2007
12.00
Glaresheild Finish & Winshield Prep
Details
       

 10-21-2007
7.00
Glareshield & Instrument Panel Install
Details
     

 10-20-2007
5.50
Seat Pan Install
Details
     

 10-15-2007
2.00
Seat layout
Details

 10-14-2007
5.00
Finished lower cabin details & riveted
Details
     

 10-13-2007
4.00
Seat Pan Install
     

 10-13-2007
8.00
Lower Fuselage details
Details

 10-11-2007
3.00
Tailwheel & tires
Details
       

 10-08-2007
9.00
Landing gear, brakes
Details
     

 10-07-2007
9.50
Fwd Fuselage details, motor mount & rear gear
Details
       

 10-06-2007
16.00
Forward Fuselage Sides Riveting
Details

 09-30-2007
9.00
Forward Fuselage Assembly
Details
       

 09-29-2007
8.00
Fuselage Side Panels Final
Details

 09-27-2007
5.00
Fwd Fuselage Left Hand Side Panel
Details
       

 09-25-2007
4.50
Right Forward Side Panel
Details
     

 09-23-2007
6.00
Fuselage sidewall prep
Details

 09-22-2007
6.00
Upper Firewall & Fwd Fslg Details
Details
     

 09-16-2007
4.00
Access Panels & Upper Firewall
Details

 09-15-2007
8.00
Tail Mounting Finish & Details
Details
     

 09-11-2007
3.00
Horizontal Tail Fuselage Mount
Details

 09-08-2007
14.00
Turtledeck assembly
Details
       

 09-07-2007
16.00
Fuselage Box Cone Final Assembly
Details
       

 09-05-2007
4.00
Rear Fuselage Box Details
Details

 09-04-2007
4.00
Tail cone box details
Details
       

 09-03-2007
11.50
Rear Fuselage Tail Cone Box Assembly
Details
       

 09-01-2007
15.50
Finished Flaps &,Ailerons, started rear Fuselage
Details
       

 08-28-2007
2.00
Ailerons/Flaps prep
Details

 08-26-2007
3.00
Attached wing tips and adjust landing lights
Details
     

 08-25-2007
8.00
Ailerons & wing joining
Details
     

 08-19-2007
5.00
Sanded Fairings & Assembled Flaps
Details
       

 08-18-2007
4.00
Left Wing light and 2 fairings
Details
     

 08-16-2007
4.00
Wired & Closed up leading edge
Details
       

 08-13-2007
5.00
Front leading edge
Details

 08-12-2007
4.00
Riveted left wing skins
Details
     

 08-11-2007
15.50
Left wing long haul
Details

 08-10-2007
3.00
Left wing leading edge fitting
Details

 08-08-2007
7.00
Left Wing Ribs & Skins Assembly
Details

 08-05-2007
6.00
Finished wiring & riveted leading edge
Details
       

 08-04-2007
10.00
Fairing and Right Wing Front Edge
Details
     

 07-29-2007
2.00
Right wing light fairing
Details

 07-28-2007
13.00
Right Wing Box Riveting
Details
       

 07-27-2007
4.00
Zinc & misc
Details

 07-26-2007
3.00
Debur & Zinc
Details

 07-25-2007
3.00
Deburred ribs
Details

 07-25-2007
3.00
Deburred & Dimpled Ribs
Details

 07-23-2007
13.00
Right Wing Skins & Fitting
Details
     

 07-22-2007
3.00
Right wing aft lower skin
Details
     

 07-21-2007
6.00
Right wing rib frame finish
Details

 07-20-2007
3.00
Finish assembling Right wing ribs
Details

 07-17-2007
2.50
Right Wing Root Ribs
Details
     

 07-15-2007
2.50
Wing box/rib assembly
Details
       

 07-14-2007
14.00
Solid Rivet Main Spars
Details
       

 07-13-2007
5.00
Left Spar
Details

 07-10-2007
3.00
Added parts to Left Main Spar
Details

 07-08-2007
5.00
Laid out & Drilled Left Main Spar
Details
       

 06-30-2007
10.00
Right Main Spar
Details
       

 06-28-2007
4.00
Started Main Wing Spars
Details

 06-24-2007
3.00
Rear Spars
Details

 06-24-2007
12.00
Moved into Barn/Workshop
Details
       

 06-23-2007
5.00
Hinge Pins & Horizonal Stab tail tips
Details

 05-26-2007
5.00
Riveted Final Horizontal Stab
Details
     

 05-24-2007
3.00
Assembled and riveted frame
Details
     

 05-22-2007
2.50
Deburred all parts & skins
Details

 05-20-2007
5.00
Skinned Horizontal Stabilizor
Details
     

 05-19-2007
8.00
Build Horizontal Stabilizor Frame
Details
     

 05-16-2007
3.00
Spars & Elevators
Details

 05-11-2007
2.00
Main & Forward Spars
Details

 04-29-2007
2.00
Vertical Stabilizor Fiberglass Tip
Details
     

 04-28-2007
8.00
Finished Rudder & Vertical Stabilaizor
Details
       

 04-18-2007
3.00
Vertical Tail Assembly 2
Details
     

 04-17-2007
3.00
Vertical Tail Frame
Details

 04-16-2007
4.50
Rudder Assembly
Details
     

 04-15-2007
4.00
Vertical Tail Spars Assembly
Details
       

 03-25-2007
2.00
Longest Longeron & Idler Angle
Details

 03-16-2007
2.00
Control Panel Design
Details
     

 03-06-2007
1.50
Glare Shield
Details

 03-04-2007
5.00
Done with formed alum
Details
     

 03-03-2007
5.00
Alum Angle Clips
Details

 03-01-2007
2.00
Starting thin angle
Details

 02-25-2007
7.00
Piano Hinge Parts
Details
     

 02-24-2007
4.00
Finished all channel parts
Details

 02-24-2007
2.00
Elevator skins
Details
     

 02-24-2007
4.00
Aileron skins
Details
     

 02-20-2007
2.00
Horiz Stab Channel parts
Details
     

 02-17-2007
8.00
Tail & Fuselage channel work
Details
     

 02-15-2007
2.50
Left Flap surface & rudder skin
Details

 02-14-2007
2.00
Right Flap Prep
Details

 02-13-2007
4.00
Spar Carry though channel
Details

 02-10-2007
10.00
Channel Parts & Phenolic
Details
       

 02-05-2007
3.50
Tail Rear & Forward channel
Details

 02-03-2007
16.00
Sonex Workshop
Details
       

 01-27-2007
6.00
Starting Formed Channel parts
Details
     

 01-13-2007
1.00
Order formed Alum kit / Schedule workshop
Details

 01-06-2007
5.00
Final Deburring Polishing
Details
     

 01-01-2007
8.00
Angle Finished
Details
       

 12-31-2006
6.00
Almost Done
Details

 12-30-2006
4.00
Angle Parts
Details

 12-26-2006
4.50
Angle Parts
Details

 12-23-2006
8.00
More Angle Parts
Details
     

 12-16-2006
5.50
Making Angle Parts
Details

 12-12-2006
0.50
Project Begins
Details

 12-09-2006
12.00
Basement Workshop Prep
Details
     










Copyright © 2001-2024 Matronics. All Rights Reserved.