KitLog pro

Powered By Kitlog Pro v2.0

JOE'S WEB SITE
Work Logs Found: 512
Category Work Time: 1991 Hours
 Date
Hours
Work Log Summary

Details

 06-17-2020
2.00
Bungee Style Elevator Balance
Details
       

 12-01-2018
4.00
First Inspection and Maintenance
Details
       

 11-15-2018
2.00
Moved Aileron Connecting Rod to Inner Hole
       

 11-08-2018
1.00
Added WiFi to Skyview system
Details

 11-05-2018
1.00
Imobilized movement of traverse canopy latch tube.
Details
     

 10-23-2018
1.00
Replaced left red and clear incandescant lamps wit

 10-22-2018
3.00
Pitot/Static System Checked & Passed
Details
       

 10-19-2018
1.00
Took to Continental Avionics for Pitot/static chec
Details

 10-18-2018
1.00
Check on some electrical issues.
Details

 10-12-2018
1.00
Flight check ADS-B In & Out OK!

 10-05-2018
1.00
Discovered shorted shield to center on coax
Details

 09-29-2018
3.00
Added upholstery and vent nozzles to center consol
       

 09-22-2018
2.00
Added flat black upholstery material to glare shie
     

 09-21-2018
1.00
Carb Heat Cable Loosened
Details
     

 09-08-2018
2.00
Replaced Rudder Cable Turnbuckle Barrel
Details
       

 08-15-2018
2.00
Airworthiness Readiness Inspection and tweaking
Details

 08-13-2018
2.00
Airworthiness Readiness Inspection and tweaking
Details
     

 08-11-2018
3.00
Airworthiness Readiness Inspection and tweaking
Details

 08-07-2018
5.00
Airworthiness Readiness Inspection and tweaking
Details

 08-04-2018
4.00
Airworthiness Readiness Inspection and tweaking
Details
       

 08-02-2018
1.00
Airworthiness Readiness Inspection and tweaking
Details
     

 08-01-2018
5.00
Airworthiness Readiness Inspection and tweaking
Details
       

 07-30-2018
3.00
Fixed line connection leak.

 07-08-2018
1.00
Registered ELT with NOAA
     

 07-07-2018
4.00
Adjusted Nose Wheel Steering.
Details

 07-03-2018
1.00
Corrected Carb Heat cable connection.
Details

 07-03-2018
2.00
Added Decals
Details
       

 06-30-2018
7.00
Completed Pitot/Static Connections, Weighed, Ran E
Details

 06-27-2018
2.00
Run & connect primary static air lines.
Details
       

 06-27-2018
1.00
Remove Flap Servo
Details

 06-27-2018
2.00
Connect fuel lines.
       

 06-23-2018
3.00
Difficulties Encountered
Details
     

 06-21-2018
2.00
Inspection & Service
Details

 06-20-2018
6.00
Rattached Spinner, Cowling & Canopy
Details
     

 06-18-2018
1.00
Connected air to carb air box and carb heat
       

 06-12-2018
2.00
Routed and connected Pitot Static AOA to D6
       

 06-11-2018
8.00
Cut prop hole in spinner and mounted prop and spin
Details
       

 06-01-2018
6.00
Routed pitot & static lines
Details

 05-31-2018
6.00
Connected Wiring to AP Servos and Flaps
Details
       

 05-26-2018
4.00
Pitch AP Servo Connected to Elevator Cable
     

 05-24-2018
2.00
Reinstalled Flap Drive Motor
     

 05-24-2018
2.00
Connected Roll AP Servo to Aileron Torque Tube
     

 05-22-2018
4.00
Installed Fairlead Material for Aileron Push Rods
     

 05-18-2018
4.00
Installed Landing/Taxi Light Lens
Details
     

 05-04-2018
10.00
Aileron Push Rod Installation
Details

 04-14-2018
20.00
Wing Installation
Details
       

 04-06-2018
1.00
Attached Aileron Stop to Left Wing
     

 03-31-2018
1.00
Final Trim and Fitting
       

 03-30-2018
1.00
Check N601GE for bolt access hole
     

 03-29-2018
1.00
Complete Skin Trim to Fit
     

 03-28-2018
3.00
Temporarily Attach Right Wing
Details
       

 03-27-2018
1.00
Install Aileron Stop
       

 03-24-2018
1.00
Reinstall nav lights after painting
       

 12-14-2017
1.00
Rudder Safety Wire both left and right
Details
       

 12-14-2017
1.00
Final Assembly Empennage
       

 12-14-2017
1.00
Elevator travel final check
Details
       

 12-11-2017
1.00
Safety Wired Prop Hub
Details
       

 12-11-2017
1.00
Removed masking tape and paint came with it.
     

 12-11-2017
2.00
Installed Blind Nuts on Saddle
Details
     

 12-06-2017
3.00
Fitting Saddle (Fuselage to Rudder Transition)
Details

 11-27-2017
2.00
Safety wired barrel turnbuckles on elevator cables
Details
       

 11-27-2017
2.00
Retrieved right wing from paint shop
     

 11-27-2017
1.00
Mounted flying rudder for test fit of saddle.
     

 11-20-2017
2.00
Mount Cowl for Prop Hub Distance Measurements
Details
       

 11-11-2017
2.00
Elevator Down Limit Blocks
Details
     

 11-09-2017
2.00
Made a wing dolley to facilitate mounting wing to
     

 11-03-2017
2.00
Install Elevator Cables
Details

 10-29-2017
2.00
Making template for prop cutout on spinner
     

 10-26-2017
3.00
Took Wings to Paint Shop

 10-25-2017
3.00
Loaded and secured wings on trailer for transport

 10-20-2017
1.00
Washed Bottom of Left Wing

 10-16-2017
3.00
Retrieved Fuselage from Paint Shop
       

 10-03-2017
5.00
Relocated to paint shop
Details

 09-27-2017
7.00
Inspect and complete missed items
Details
       

 09-25-2017
5.00
Prepping for painting
       

 09-25-2017
2.00
Finished handbrake.
Details
       

 09-23-2017
2.00
Work continues on hand/parking brake.

 09-23-2017
2.00
Prepping fuselage for painting.
Details

 09-20-2017
4.00
Connected right brake line to wheel cylinder.
Details
       

 09-14-2017
1.00
Paint Cowl
Details

 09-05-2017
0.00
Paint Horiz Stab

 08-14-2017
0.00
Paint Rudder

 08-11-2017
2.00
Continued fitting spinner to prop.

 08-10-2017
2.00
Began fitting spinner to prop.

 08-08-2017
2.00
Cleaned and prepped rudder for painting and took t

 08-06-2017
2.00
Complete Pilot's Horiz Stab Gap Cover
Details
     

 08-05-2017
3.00
Fabricate covers for gap under horiz stab
Details
       

 08-03-2017
2.00
Install Horiz Stab and fabricate attachment for ru
Details
       

 07-31-2017
1.00
Swap pins 4 & 12 on the control stick switches con
Details
     

 07-29-2017
3.00
Experimented with SkyView Setup and took photos of
Details
     

 07-27-2017
2.00
Began documenting panel install procedures.
Details

 07-25-2017
4.00
Temp install flap position sensor and setup EFIS
Details
       

 07-20-2017
3.00
Flap Work
Details

 07-19-2017
2.00
Fabricating flap position mount
Details
       

 07-11-2017
5.00
Address three issues after first power on.
Details

 07-10-2017
3.00
Attempt to set limits for flap acutator.
Details
     

 07-08-2017
3.00
First Panel Poweron
Details
       

 07-06-2017
4.00
Finalize engine installation
Details

 07-05-2017
5.00
Complete Engine Installation
Details
       

 06-25-2017
3.00
Install Xpdr and ADS-B Antennas
Details
     

 06-25-2017
2.00
Continued work on Ram Air Ducts, Pilot Side
Details
       

 06-19-2017
3.00
Install Comm Antenna & Installed Pass Side Air Duc
Details
       

 06-14-2017
4.00
Cut to length and installed connectors on CHT & EG
       

 06-11-2017
3.00
EMS Wiring
Details
       

 06-10-2017
2.00
Safety wire for prop flange extension.
Details

 06-10-2017
1.00
CHT & EGT Probe Installation
Details
     

 06-07-2017
3.00
Making Improvements to Ram Air Ducts

 06-07-2017
2.00
CHT & EGT Probe Installation
Details
       

 06-05-2017
2.00
Making Improvements to Ram Air Ducts
Details

 06-01-2017
2.00
Mount oil recovery tank and gascolator
Details
       

 06-01-2017
2.00
Making Improvements to Ram Air Ducts
Details
       

 05-31-2017
3.00
Making Improvements to Ram Air Ducts
Details
     

 05-29-2017
3.00
Making Improvements to Ram Air Ducts
Details
       

 05-24-2017
4.00
Making Improvements to Ram Air Ducts
Details
       

 05-22-2017
4.00
Finished EMS wiring
       

 05-17-2017
4.00
EMS-Wiring for Oil Pressure and Temperature
Details
       

 05-16-2017
5.00
EMS-Wiring
Details

 05-11-2017
3.00
Oil Drain and Fuel System Work
       

 05-04-2017
3.00
Shunt Installation and Fuel System Work
     

 05-03-2017
3.00
Ring out EMS wiring harness

 05-02-2017
4.00
Straighten out work shop in prep for wiring effort

 04-26-2017
4.00
Completed Airframe Wiring
       

 04-25-2017
4.00
Working Airframe Wiring
       

 04-20-2017
3.00
Aircraft Front Connector, Master and Key Switch Wi
Details
       

 04-18-2017
3.00
Oil Cooler Configuration Complete
Details
       

 04-10-2017
7.00
Configuring Oil Cooler
       

 04-07-2017
2.00
Configuring Oil Cooler
Details
       

 03-29-2017
4.00
Attach Oil Level Check Door
Details
       

 03-28-2017
3.00
Cowl installation
Details
     

 03-27-2017
3.00
Camloc determination
Details
       

 03-22-2017
6.00
Cowling Fitting
Details
       

 03-15-2017
1.00
Wired Regulator
Details
     

 03-14-2017
1.00
Trimmed excess material form skin
Details
       

 03-07-2017
1.00
Safety wire inside spring.
     

 03-07-2017
2.00
Installed SCAT
       

 02-27-2017
4.00
Removed Lower Engine Mount & Install Cabin Heat Ca
Details
       

 02-25-2017
7.00
Finalize air box, battery mount & cabin heat mixer
Details
       

 02-23-2017
4.00
Check Engine Alignment #2
Details
       

 02-20-2017
2.00
Check Engine Alignment #1
Details
       

 02-11-2017
4.00
Installed Battery, Cabin/Carb Heat Box, Starter So
Details
     

 02-10-2017
1.00
Mate Carb/Cabin Heat with Muffler
Details
       

 02-10-2017
3.00
Attachd Muffler to Engine
Details
       

 02-06-2017
0.00
Install Air Box Cable (Carb Heat) #2
Details
       

 02-06-2017
3.00
Install Air Box Cable (Carb Heat) #1
       

 02-05-2017
2.00
Fabricate New Choke Cable Connection
Details
       

 01-31-2017
2.00
Connect Choke Cable
Details
     

 12-17-2016
1.00
Reangle Cart Heat Cable Outer Clamp
Details
       

 12-17-2016
0.00
Reangle Cart Heat Cable Outer Clamp
     

 12-15-2016
3.00
Throttle, Choke, Cabin Heat & Carb Heat Work
Details
       

 12-14-2016
3.00
Installed and connected throttles to carburetor
Details
       

 12-13-2016
3.00
Dual Throttle Redesign and Insatll
Details
       

 12-13-2016
1.00
Added throttle arm extenstion
       

 12-12-2016
2.00
Mount Airbox
Details
     

 12-10-2016
1.00
Change Angle of Carb Heat Cable Outer Clamp
Details
       

 12-08-2016
3.00
Attached engine mount to engine and mounted engine
Details
       

 12-05-2016
1.00
Mounted Nose Wheel Fork and Nose Wheel
Details
       

 12-03-2016
1.00
Painted Engine Mount and Nose Wheel Fork

 12-02-2016
3.00
Cleaned and primed engine mount and nose wheel for
Details
       

 11-29-2016
3.00
Inventoried FWF Kit
       

 10-25-2016
4.00
Installed Strobe Light Power Supply
Details
     

 10-21-2016
2.00
Complete Work on ACM Aircraft Rear Cable
       

 10-20-2016
2.00
Work on ACM Aircraft Rear Cable #2
Details
       

 10-19-2016
2.00
Work on ACM Aircraft Rear Cable
Details
       

 10-14-2016
1.00
Rerouted wires behind panel on copilot side
     

 10-14-2016
2.00
Installed Aileron Trim Connector
Details
       

 10-14-2016
4.00
ACM Aircraft Rear Connector
Details
     

 08-24-2016
2.00
Add connectors to left wing electrical.
Details
       

 08-23-2016
1.00
Check out taxi and landing light mount and wiring.
Details
     

 08-21-2016
3.00
Check out left wing wiring
Details
       

 08-13-2016
1.00
Put DB-15 connector on Trim and Flap Wires
Details
       

 08-13-2016
3.00
Installed GPS for 2020 transponder
Details
       

 08-06-2016
8.00
Elevator & Aileron Trim and Flap Drive & Position
Details
       

 07-10-2016
2.00
Installed the ELT Antenna and Stab Trim Cable
Details
       

 06-04-2016
2.00
Inserted a 6 pin molex connector in roll trim cabl
Details
     

 06-02-2016
2.00
Inserted a 6 pin molex connector in pitch trim cab
Details
     

 06-01-2016
8.00
Installed cable and servos for autopilot
Details
       

 05-12-2016
2.00
Mount ELT Antenna
       

 05-10-2016
4.00
ELT Installation
Details
       

 05-06-2016
3.00
ELT Installation
Details
       

 04-27-2016
2.00
Complete fabricated cable
Details
     

 04-26-2016
6.00
Fabricated cable from ACM to Control Stick
Details
     

 03-23-2016
6.00
Installed Molex Connectors on Control Stick
Details
     

 02-03-2016
3.00
Preparing Y Stick for Grip Mounting
       

 01-26-2016
2.00
Reroute cables and begin securing
       

 11-14-2015
4.00
Install ADAHRS and Remote Compass Tray in PLane
       

 11-10-2015
5.00
ADAHRS & Remote Compass Installation
Details
       

 11-04-2015
4.00
Fabricated mount for EMS and Backup Battery.
     

 11-03-2015
6.00
Installed Remote Avionics and connected cables
       

 11-02-2015
3.00
Fabricate and Install Inst Subpanel Cont
Details
     

 10-17-2015
8.00
Fabricate and Install Inst Subpanel
Details
       

 09-21-2015
0.00
Inspect and do all Service Bulletins
Details

 07-31-2015
3.00
Attach New Panel to Old
Details
       

 07-22-2015
3.00
Install Avionics
Details
     

 03-07-2015
4.00
Sand blast, prime and paint nose gear strut

 02-09-2015
2.00
Replace Bungee with Spring
Details
       

 01-28-2015
3.00
Redesigned Heated AOA/Pitot Probe
Details
     

 05-15-2014
6.00
Add fibreglass tips to horizontal stab
Details
       

 05-14-2014
3.00
Horizontal Stab Tip
Details
       

 05-05-2014
3.00
Prepare plane for relocation to Collier.
Details

 05-05-2014
3.00
Finish Center Console
Details
       

 03-11-2014
1.00
Rivet 6K2-1 to 6B7-2
Details
       

 02-12-2014
2.00
Center Console Work
Details

 02-09-2014
2.00
Center Console Work
Details

 02-08-2014
5.00
Center Console Work
Details
       

 02-07-2014
2.00
Center Console Work
Details
       

 02-05-2014
2.00
Center Console Work
Details
       

 02-04-2014
2.00
Begin Center Console
Details
       

 10-18-2013
4.00
Complete Canopy except weather stripping
Details
       

 10-01-2013
3.00
Installed Canopy Sides
Details
       

 09-30-2013
3.00
Sanded Primed Canopy Sides and Painted Flat Black

 09-29-2013
3.00
Removed Canopy Bottom Trim & Primed
Details
       

 09-26-2013
2.00
Fabricate and Install Canopy Aluminum Trim Copilot
Details
     

 09-25-2013
3.00
Fabricate and Install Canopy Aluminum Trim
Details
       

 09-23-2013
2.00
Completed Riveting Rear Portion of Canopy
Details
       

 09-20-2013
3.00
Canopy Front Bubble Work
       

 09-19-2013
4.00
Complete Rear Canopy
Details
       

 09-18-2013
4.00
Cover Baggage Compartment with Felt
       

 09-09-2013
1.00
Attach 65C-13 to canopy frame
Details
     

 09-08-2013
1.00
Covered front hoop with heat shrink.
Details
     

 09-05-2013
3.00
Canopy Front Hoop
Details
       

 05-20-2013
1.00
Side Cover 65C3-6
Details
     

 05-20-2013
2.00
Final Assembly of Overlap Strip
Details
       

 05-18-2013
2.00
Overlap Strip 65C3-11
Details
       

 05-14-2013
2.00
Remove Rear Canopy Bubble & Trim
Details
       

 05-14-2013
1.00
Provide exit for vent air.
Details
       

 05-12-2013
2.00
Completed the cutting to size of the canopy gap se
Details
       

 05-11-2013
2.00
Begin Canopy Overlap Strip Fabrication 6-C-3-11
Details
     

 05-10-2013
2.00
Spliced the two rear deck halves
Details
     

 05-09-2013
1.00
Riveted rear canopy to hoop.
     

 05-07-2013
2.00
Enlarged all holes to 0.125 & clecoed.

 05-06-2013
4.00
Continue Turtle Deck
Details
       

 05-04-2013
4.00
Continue turtle deck
       

 05-01-2013
1.00
Side Cover 65C3-6 Final Trim
Details
     

 04-29-2013
4.00
Continue turtle deck
       

 04-28-2013
4.00
Begin fabrication of one piece turtle deck.
Details
       

 03-17-2013
4.00
More Canopy Details
Details

 03-10-2013
3.00
Installed rear portion of canopy
Details
     

 03-09-2013
6.00
Cut Canopy into
Details
       

 03-08-2013
3.00
Still fitting canopy
Details
       

 03-07-2013
3.00
Canopy Measuring and Fitting
Details
       

 03-06-2013
3.00
Canopy Marking and Cutting to fit
Details

 03-05-2013
0.10
Jim helped me relocate canopy from work bench to f

 03-04-2013
2.00
Attached Side Cover to Side Frame and trimmed cano
Details

 03-02-2013
2.00
Final trimming on forward top skin and side cover.
Details

 02-25-2013
2.00
Add L to outside of trim servo
Details
       

 02-20-2013
2.00
Trimmed Canopy
Details

 01-24-2013
3.00
Pilot Drill Canopy Side Rails and handles
Details
       

 12-23-2012
1.00
Removed Canopy from package and place on plane
Details
       

 10-11-2012
2.00
Right brake line inside portion
Details
       

 07-19-2012
2.00
Connect Left Brake Line #3
Details

 07-17-2012
2.00
Connect Left Brake Line #2
Details
       

 07-13-2012
2.00
Connect Left Brake Line #1
Details
       

 06-26-2012
1.00
Fabricate Guide for Canopy Trimming
Details
     

 06-26-2012
2.00
Drill and Cleco Hoop to Fuselage
       

 06-19-2012
4.00
Mount Roll Over and Hoop
       

 01-29-2012
1.00
Fabricating & Installing a Parking Brake
Details
       

 01-24-2012
2.50
Fabricating & Installing a Parking Brake
Details
       

 01-10-2012
3.00
Rivet Arm Rest and Seats
       

 01-09-2012
2.00
Remove forward top. Rivet pilot arm rest side
     

 01-08-2012
2.00
Moved fuselage from barn to little hangar.
Details
     

 10-22-2011
1.00
Engine Protection
Details

 09-28-2011
3.00
Riveted rear wing skin.
       

 09-26-2011
2.00
Corrosion proofed and clecoed wing skin on.
Details
       

 09-21-2011
3.00
Connected Aileron and attached flap to right wing.

 09-20-2011
3.00
Mounted Aileron with balance weigths and stops.
Details
       

 09-19-2011
6.00
Backup Pitot Static & Aileron Control Rod Access
Details
       

 09-13-2011
1.00
Clean up work bench and put away tools.

 09-01-2011
3.00
Added the hinge to the right flap.
     

 08-29-2011
5.00
Found some AN3-12a bolts and finished aileron upgr
Details
     

 08-26-2011
2.00
Conversion of hingeless aileron to piano hinge.

 08-26-2011
2.00
Aileron work on hold for screws on back order.
Details
     

 08-24-2011
2.00
Aileron Upgrade

 08-23-2011
3.00
Aileron Upgrade

 08-21-2011
2.00
Riveted Upgrade Ls to bottom skin
Details
       

 08-20-2011
3.00
Remove top skin and rivet upgrade parts to wing.
     

 08-17-2011
3.00
Put on top skin to drill holes in added Ls.
Details
       

 08-16-2011
4.00
Replaced old Bellcrank Support Channel with L angl
       

 08-15-2011
3.00
L Angle installation span wise on both upper and l
Details
       

 08-11-2011
3.00
Rivet the Rear Channel Doubler, Top Rear Spar Angl
Details
       

 08-08-2011
5.00
Wing Rear Channel Work
Details
       

 07-17-2011
3.00
Rear Spar Upgrade
Details
       

 07-09-2011
2.00
Removed clecos and riveted nose skin on right wing
       

 06-29-2011
3.00
Fabricated a maint/inspection panel
Details

 06-28-2011
4.00
Remove clecos and fuel filler from top nose skin
Details

 06-27-2011
3.00
Nose Skin holes for fuel vent and drain.
Details

 06-25-2011
8.00
Finished putting cork on fuel tank.
Details
       

 06-20-2011
2.00
Put cork on tank.
       

 06-08-2011
4.00
Installed fuel level sending unit.
     

 06-02-2011
6.00
Wing Right Spar & Rib Upgrade
Details
       

 06-01-2011
2.00
Clecoed skins on to drill added extrusion to spar

 05-20-2011
4.00
Extrusion and doubler bolted on.
Details

 05-05-2011
2.00
Right Wing Upgrade
Details
       

 05-04-2011
3.00
Removed spar rivets and positioned the new doubler

 04-26-2011
3.00
Removed Front and Top Skins
Details
       

 04-22-2011
2.00
Completed Wing Riveting.
Details
       

 04-21-2011
8.00
Clecoed every other hole and began riveting.
     

 04-20-2011
6.00
Cleaning and electrical tests prior to closing.
       

 04-19-2011
4.00
Flap permanently attached to left wing
Details
     

 04-18-2011
6.00
Began Flap and Aileron Permanent Attachment.

 04-16-2011
8.00
On display at JKA Aviation Day
       

 04-15-2011
6.00
On display at JKA Aviation Day

 04-14-2011
5.00
Attached Ailerons and Flaps
Details

 04-12-2011
7.00
Aileron Control and AOA-Pitot Tube
       

 04-11-2011
6.00
Complete Aileron Balance

 04-08-2011
5.00
Installed aileron trim servo and balance aileron.
Details
       

 04-05-2011
5.00
Installed Aileron Trim
Details
     

 04-03-2011
6.00
Fabricated new aileron bellcrank
Details
     

 03-26-2011
5.00
Install Nose Gear
       

 03-23-2011
4.00
Finish structure changes for aileron Upgrade
Details
       

 03-22-2011
4.00
Aileron Trim and Upgrade to trim servo
       

 03-18-2011
3.00
Aileron Trim & Upgrade
Details
       

 03-16-2011
4.00
Aileron Trim & Hingeless to Hinge Conversion
Details
     

 03-12-2011
4.00
Aileron Push Tube Holes
Details
       

 03-11-2011
8.00
Fuel Filler Wing Skin Hole
Details
       

 03-05-2011
2.00
Leak Tested New Left Wing Fuel Tank
Details

 03-03-2011
2.00
Cut gasket material into washers for fuel sender b
Details

 03-02-2011
3.00
Fuel Tank inspection cover & Fuel Level Sender
       

 03-02-2011
3.00
Completed Inspection Cover for Fuel Tank End
Details
       

 03-01-2011
3.00
Riveting doublers behind old nose rib 2 & holes.
Details

 02-28-2011
6.00
Fabricated Skin Hole Plugs to support tank swap
       

 02-26-2011
5.00
Clean up shop and locate parts. Also a little mor
Details

 02-25-2011
4.00
New Fuel Tank Work and Access Holes for PushPull T
       

 02-25-2011
1.00
Fuel Tank Work
     

 02-24-2011
3.00
Started Push/Pull Aileron Control

 02-23-2011
3.00
Bellcrank & upper and lower L enhancements.
Details
       

 02-22-2011
3.00
Began installing L angles spanwise on bottom of ri

 02-21-2011
5.00
Added L angles between ribs 6 & 7 and #4 to Tip
Details
       

 02-19-2011
2.00
Now 6-ZU-1 is complete.

 02-16-2011
6.00
Nearly Completed 6-ZU-1 and began 6-ZU-3a
Details
       

 02-13-2011
6.00
Bolted Spar Doubler vice solid rivets.

 02-12-2011
6.00
Add nose rib angles.
Details
       

 02-10-2011
7.00
Add nose angles to nose ribs 1 through 3.
       

 02-10-2011
1.00
Add nose angles to nose ribs 1 through 3
       

 02-04-2011
5.00
Upgrade Wing
Details

 02-03-2011
7.00
Upgrade Wing
Details
       

 02-02-2011
3.00
Upgrade Left Wing
Details

 02-01-2011
6.00
Riveted Entry Step
Details
       

 01-31-2011
3.00
Locate and install entry step
       

 01-30-2011
1.00
Put Fuselage Between Lift Post
Details
       

 01-30-2011
1.00
Moved wing into little hangar for upgrade
       

 01-29-2011
1.00
Test Mounted Rudder and Removed.

 01-27-2011
3.00
Mounted HS to fuselage.
Details

 01-26-2011
3.00
Added doubler to HS mounts
Details
     

 01-14-2011
3.00
Add doubler to HS foreward mount
     

 01-09-2011
6.00
Change Placement of 6T2-1 & 2
Details
       

 01-08-2011
2.00
Main Gear Completed
Details
       

 01-08-2011
2.00
Main Gear Attached to Fuselage
Details
       

 01-07-2011
6.00
Begin Construction of Main Gear
Details
       

 01-06-2011
6.00
Completed Fuselage sans canopy and step
Details
       

 01-05-2011
2.00
Baggage Floor Work and Rear Top Skin
       

 01-04-2011
1.00
Began baggage compartment floor installaiton.

 01-03-2011
4.00
Pinned canopy latch bellcranks to torque tube.

 12-31-2010
4.00
Fuselage Forward Top Skin Completed
Details
       

 12-30-2010
4.00
Capture Nut Installation Continues
Details
       

 12-30-2010
1.00
Attached link to canopy latch
Details
       

 12-29-2010
4.00
Fuselage Forward Top Skin
Details
       

 12-28-2010
4.00
Instrument Panel
Details
       

 12-27-2010
6.00
Installed Canopy Latches & Handle
     

 12-23-2010
3.00
Instrument Panel Capture Nuts
       

 12-22-2010
2.00
Instrument Panel Capture Nuts
Details
       

 12-21-2010
1.00
Make Capture Nut Drill Template
Details
       

 12-18-2010
6.00
Removed forward top skin to install capture nuts
Details

 12-17-2010
3.00
Complete drilling and clecoing forward top skin
Details
       

 12-16-2010
5.00
Continue fitting forward top skin
       

 12-15-2010
2.00
More fitting of top skin
Details

 12-14-2010
3.00
Test Fitting Forward Top Skin
Details
       

 12-14-2010
1.00
Installed Flap Motor and torque rod

 12-13-2010
4.00
650 Canopy Hinge
Details
       

 12-10-2010
3.00
Began Canopy Installation
Details
       

 12-07-2010
3.00
Replace Temporary Bolts
Details

 12-07-2010
8.00
Bottom Access Door
Details
       

 12-06-2010
4.50
Misc Riveting
Details
       

 12-05-2010
4.00
Permanently Attach Front Sides & Seats
Details
       

 12-03-2010
1.00
Permanently Attach Front Sides
Details
       

 12-02-2010
6.00
Permanently Attach Front sides.
       

 12-02-2010
2.00
Add Capture Nuts to Instrument Panel
       

 12-01-2010
4.00
Prime, paint and assemble aileron AP trays.
     

 11-26-2010
4.00
Layout Plans and Fabricate Aileron AP Trays
       

 11-24-2010
6.00
Cortec and Assemble Elevator Trays
     

 11-23-2010
6.00
Fabricate AP Elevator Servo Tray
       

 11-22-2010
6.00
Lay out plans for elevator servo tray

 11-21-2010
2.00
Installed elevator cables.
       

 11-21-2010
2.00
Installation of Rudder Control Cables
       

 11-20-2010
2.00
Began elevator control cable installation
       

 11-19-2010
4.00
Reassembled Flap Position Sensor after painting
       

 11-18-2010
6.00
Added fairlead for rudder and elevator cables.
Details
       

 11-15-2010
5.00
Rudder work for permanent mount.

 11-14-2010
6.00
Temporarily attached horizontal stab and flying ru
       

 11-13-2010
1.00
Installed Control Stick Assembly
Details
       

 11-10-2010
2.00
Removed, made a new doubler and reinstalled.
Details
       

 11-09-2010
8.00
Primed inside of fuselage with green zinc chromate
       

 11-08-2010
4.00
Work on flap position sensor painting.

 11-06-2010
2.00
Removed flap position sensor for corrosion protect

 11-05-2010
6.00
Fabricated Flap Position Sensor Mount
       

 11-04-2010
4.00
Autopilot Mount Fabrication

 11-02-2010
4.00
Studying for AP servo installation.

 11-02-2010
2.00
Made numerous expense log entries.

 11-01-2010
3.00
Cleaning parts in preparation for priming

 10-28-2010
2.00
Permanently attached Upper Engine Mount to Longero

 10-27-2010
4.00
Trimed Turtle Deck

 10-26-2010
2.00
Riveted the two new 6B15-1 parts and 6B16-2.

 10-25-2010
4.00
Fabricate 2 new 6B15-1 parts

 10-20-2010
3.00
Continue with clean up and priming.
Details

 10-19-2010
3.00
Effort continues to clean, prime and rivit fuselag

 10-15-2010
3.00
Continue effort on corrosion treatment.

 10-14-2010
5.00
Continue work on left side and interior.

 10-13-2010
2.00
Fuselage left side work
Details
     

 10-12-2010
2.00
Fuselage sides finish up.
Details
       

 10-11-2010
6.00
Finish up in several locations.
Details
     

 10-04-2010
2.00
Rivet Center Wing Spar to Fuselage Floor
       

 10-04-2010
7.00
Complete the Aileron Control Stop in Fuselage.
Details
       

 09-30-2010
7.00
Control Limits - Fuselage
Details

 09-09-2010
3.00
Flap Control Installation.
Details

 09-07-2010
3.00
Continue Flap Drive Work

 08-31-2010
3.00
Continue Flap Drive Work
Details

 08-24-2010
2.00
Conitnue Flap Drive Work
Details
       

 08-23-2010
7.00
Some more disassembly for deburring and corrosion
Details
       

 08-22-2010
2.00
Watched 601 to 650 Canopy Conversion DVD

 08-22-2010
1.00
Drill and cleco cool air vent SV-1.
Details
       

 08-22-2010
3.00
Began disassembly for deburring and corrosion prot
Details

 08-19-2010
1.00
Shortening Inst Panel
Details
       

 08-19-2010
1.00
Complete Forward side skin drilling and clecoing.
Details
       

 08-18-2010
3.00
Shoulder Harness Fitting
Details
       

 08-17-2010
4.00
Top Rear Fuselage Skin
Details
       

 08-15-2010
2.00
Top Rear Fuselage Skin
Details
       

 08-14-2010
4.00
Electric Flap Mount
Details
       

 08-13-2010
3.00
Seat Back Support
Details

 08-13-2010
3.00
Installation of baggage floor.
Details
       

 08-12-2010
6.00
Passneger Seat
Details
     

 08-11-2010
6.00
Upper Longeron Splice
Details
       

 08-10-2010
6.00
Center Wing Spar Uprights
Details

 08-09-2010
3.00
General Clean Up
Details

 08-06-2010
6.00
Add doubler to end of center wing spar
Details
       

 08-05-2010
6.00
Front Seat Panel Work
Details
       

 08-04-2010
3.00
Complete Gear Channel Upright Installation
     

 08-03-2010
3.00
Replace Gear Channel Uprights
Details

 08-02-2010
6.00
Complete Forward Side Skin Attachment
Details
       

 07-31-2010
3.00
Install Z Channel
Details
     

 07-30-2010
3.00
Install Side Doublers
Details

 07-29-2010
6.00
Install Upright Doublers
Details

 07-28-2010
2.00
Forward fuselage side panels
Details

 07-27-2010
3.00
Begin left forward side skin installation.
Details

 07-26-2010
6.00
Begin right forward side skin installation. (Conti
Details

 07-24-2010
1.00
Fabricate Rear Center Spar Upright
Details
     

 07-24-2010
2.50
Begin right forward side skin installation.
Details

 07-22-2010
1.00
Replaced Left Toe Brake Pedal.
Details

 07-21-2010
4.00
Fuselage Assembly
Details

 07-21-2010
1.00
Fabricate 6B12-5 L & R
Details

 07-16-2010
7.00
Reinstall Pedal Bearing Channel
Details

 07-15-2010
2.00
Remove rudder pedals and heel plate.
Details

 07-14-2010
1.00
Rear Fuselage Assembly Bulkheads
Details

 07-14-2010
1.00
Re-install gussets 6B10-4 left and right
Details

 07-14-2010
1.00
Forward Fuselage Assembly
Details

 07-13-2010
12.00
Rear Frame Assembly
Details
       

 05-26-2010
6.00
Final assembly of center wing spar.
Details
       

 05-24-2010
6.00
Assemble the two Center Spar halves.
Details

 05-23-2010
8.00
Complete Spar Uprights
Details

 05-21-2010
3.00
Spar upright work
Details

 05-12-2010
6.00
Back Drill Holes as needed in upgrade parts.
Details

 05-11-2010
6.00
Back Drill Holes as needed in upgrade parts.
Details

 05-10-2010
6.00
Disassemble Center Spar Section
Details
       

 05-01-2010
4.00
Inventory Canopy and Upgrade Package
Details

 04-30-2010
3.00
Pick up Canopy and Upgrade Package

 03-31-2010
2.00
Check Wing Jig
Details

 03-30-2010
0.50
Consult with Roger Dubbert
Details

 03-29-2010
1.00
Rudder Pedals
Details

 03-29-2010
0.50
Join the cabin floor to the gear channel
Details

 03-29-2010
2.00
Cabin Floor
Details

 03-22-2010
3.00
Remove Center Wing Spar
Details
       

 03-15-2010
1.00
Catch up on log.
Details

 03-13-2010
5.00
Began installing updated firewall parts.
Details
       

 03-12-2010
1.00
Received and inventoried parts.

 03-09-2010
1.00
Ordered more updated parts for firewall.

 03-07-2010
2.00
Drill and rivet 6B8-1 to 6B8-7
Details
       

 02-28-2010
6.00
Detailed inventory of parts.

 02-27-2010
5.00
Detailed inventory of parts.

 02-26-2010
2.00
Confirmed each step properly completed!
Details

 02-24-2010
2.00
Gear Channel & Firewall & Stiffener/ Engine Mount
Details

 02-22-2010
2.00
Confirmed each step properly completed!
Details
     

 02-21-2010
3.00
Confirmed each step properly completed!
Details
     

 02-15-2010
35.00
Purchased Partially Build Zodiac 601XL
Details
       

 01-24-2010
3.00
Complete Elevator Trim Installation
Details
       

 01-21-2009
2.00
Elevator Trim
       

 01-20-2009
2.00
Continue final riveting
     

 01-19-2009
2.00
Continue final assembly of horizontal stab, elevat
       

 01-16-2009
4.00
Begin final elevator assembly with rivets.
Details
       

 01-02-2009
4.00
Remove clecos, debur, corrosion treatment for insi

 02-20-2008
45.00
Flap Control
Details

 09-10-2007
17.00
Elevator & Trim
Details
       

 09-04-2007
12.00
More Horizontal Stabilizer Work
Details
     

 08-23-2007
12.00
More horizontal stab work.
Details
       

 08-18-2007
5.00
Front and rear spar drilled and primed.
Details
       

 08-12-2007
2.00
Stabilizer Rear Spar & Doublers
Details

 08-12-2007
3.00
Stabilizer Front Spar & Doublers
       

 08-06-2007
2.00
Drive to YellowFreight in Mobile to get tail compo
Details
       

 08-01-2007
3.00
Completed starter kit. Vertical Stabilizer
       

 07-31-2007
40.00
Completed Hobby Room for Building Site
Details
       

 07-25-2007
1.00
Ordered new parts
Details

 07-24-2007
0.00
Received Drawings and Photo CD

 07-08-2007
9.50
Completed Rudder with Clecos
Details
       

 07-05-2007
1.00
Start rudder assembly
Details
       

 07-04-2007
2.00
Read instructions and drawings
Details

 07-03-2007
1.00
Inventory Starter Kit
Details
     

 08-05-2006
62.00
Fuselage work.
Details

 04-22-2006
23.00
Attach cockpit floor to firewall and rear section
Details

 03-12-2006
23.00
Forward skins and longerons.
Details

 02-12-2006
28.00
Front side panels.
Details

 09-01-2005
66.00
Cockpit floor, braces and rudder pedals.
Details

 01-23-2005
32.00
Firewall Construction
Details

 12-04-2004
12.00
Build work bench & Review Drawings
Details

 01-14-2002
1.00
Fair Lead Work & Other Fuselage Work
Details

 01-14-2002
8.00
Clecoed and partially riveted rear floor and sides
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.