Date
|
Hours
|
Work Log Summary
|
Details
|
06-17-2020
|
2.00
|
Bungee Style Elevator Balance
|
Details
|
|
|
12-01-2018
|
4.00
|
First Inspection and Maintenance
|
Details
|
|
|
11-15-2018
|
2.00
|
Moved Aileron Connecting Rod to Inner Hole
|
|
|
|
11-08-2018
|
1.00
|
Added WiFi to Skyview system
|
Details
|
|
|
11-05-2018
|
1.00
|
Imobilized movement of traverse canopy latch tube.
|
Details
|
|
|
10-23-2018
|
1.00
|
Replaced left red and clear incandescant lamps wit
|
|
|
|
10-22-2018
|
3.00
|
Pitot/Static System Checked & Passed
|
Details
|
|
|
10-19-2018
|
1.00
|
Took to Continental Avionics for Pitot/static chec
|
Details
|
|
|
10-18-2018
|
1.00
|
Check on some electrical issues.
|
Details
|
|
|
10-12-2018
|
1.00
|
Flight check ADS-B In & Out OK!
|
|
|
|
10-05-2018
|
1.00
|
Discovered shorted shield to center on coax
|
Details
|
|
|
09-29-2018
|
3.00
|
Added upholstery and vent nozzles to center consol
|
|
|
|
09-22-2018
|
2.00
|
Added flat black upholstery material to glare shie
|
|
|
|
09-21-2018
|
1.00
|
Carb Heat Cable Loosened
|
Details
|
|
|
09-08-2018
|
2.00
|
Replaced Rudder Cable Turnbuckle Barrel
|
Details
|
|
|
08-15-2018
|
2.00
|
Airworthiness Readiness Inspection and tweaking
|
Details
|
|
|
08-13-2018
|
2.00
|
Airworthiness Readiness Inspection and tweaking
|
Details
|
|
|
08-11-2018
|
3.00
|
Airworthiness Readiness Inspection and tweaking
|
Details
|
|
|
08-07-2018
|
5.00
|
Airworthiness Readiness Inspection and tweaking
|
Details
|
|
|
08-04-2018
|
4.00
|
Airworthiness Readiness Inspection and tweaking
|
Details
|
|
|
08-02-2018
|
1.00
|
Airworthiness Readiness Inspection and tweaking
|
Details
|
|
|
08-01-2018
|
5.00
|
Airworthiness Readiness Inspection and tweaking
|
Details
|
|
|
07-30-2018
|
3.00
|
Fixed line connection leak.
|
|
|
|
07-08-2018
|
1.00
|
Registered ELT with NOAA
|
|
|
|
07-07-2018
|
4.00
|
Adjusted Nose Wheel Steering.
|
Details
|
|
|
07-03-2018
|
1.00
|
Corrected Carb Heat cable connection.
|
Details
|
|
|
07-03-2018
|
2.00
|
Added Decals
|
Details
|
|
|
06-30-2018
|
7.00
|
Completed Pitot/Static Connections, Weighed, Ran E
|
Details
|
|
|
06-27-2018
|
2.00
|
Run & connect primary static air lines.
|
Details
|
|
|
06-27-2018
|
1.00
|
Remove Flap Servo
|
Details
|
|
|
06-27-2018
|
2.00
|
Connect fuel lines.
|
|
|
|
06-23-2018
|
3.00
|
Difficulties Encountered
|
Details
|
|
|
06-21-2018
|
2.00
|
Inspection & Service
|
Details
|
|
|
06-20-2018
|
6.00
|
Rattached Spinner, Cowling & Canopy
|
Details
|
|
|
06-18-2018
|
1.00
|
Connected air to carb air box and carb heat
|
|
|
|
06-12-2018
|
2.00
|
Routed and connected Pitot Static AOA to D6
|
|
|
|
06-11-2018
|
8.00
|
Cut prop hole in spinner and mounted prop and spin
|
Details
|
|
|
06-01-2018
|
6.00
|
Routed pitot & static lines
|
Details
|
|
|
05-31-2018
|
6.00
|
Connected Wiring to AP Servos and Flaps
|
Details
|
|
|
05-26-2018
|
4.00
|
Pitch AP Servo Connected to Elevator Cable
|
|
|
|
05-24-2018
|
2.00
|
Reinstalled Flap Drive Motor
|
|
|
|
05-24-2018
|
2.00
|
Connected Roll AP Servo to Aileron Torque Tube
|
|
|
|
05-22-2018
|
4.00
|
Installed Fairlead Material for Aileron Push Rods
|
|
|
|
05-18-2018
|
4.00
|
Installed Landing/Taxi Light Lens
|
Details
|
|
|
05-04-2018
|
10.00
|
Aileron Push Rod Installation
|
Details
|
|
|
04-14-2018
|
20.00
|
Wing Installation
|
Details
|
|
|
04-06-2018
|
1.00
|
Attached Aileron Stop to Left Wing
|
|
|
|
03-31-2018
|
1.00
|
Final Trim and Fitting
|
|
|
|
03-30-2018
|
1.00
|
Check N601GE for bolt access hole
|
|
|
|
03-29-2018
|
1.00
|
Complete Skin Trim to Fit
|
|
|
|
03-28-2018
|
3.00
|
Temporarily Attach Right Wing
|
Details
|
|
|
03-27-2018
|
1.00
|
Install Aileron Stop
|
|
|
|
03-24-2018
|
1.00
|
Reinstall nav lights after painting
|
|
|
|
12-14-2017
|
1.00
|
Rudder Safety Wire both left and right
|
Details
|
|
|
12-14-2017
|
1.00
|
Final Assembly Empennage
|
|
|
|
12-14-2017
|
1.00
|
Elevator travel final check
|
Details
|
|
|
12-11-2017
|
1.00
|
Safety Wired Prop Hub
|
Details
|
|
|
12-11-2017
|
1.00
|
Removed masking tape and paint came with it.
|
|
|
|
12-11-2017
|
2.00
|
Installed Blind Nuts on Saddle
|
Details
|
|
|
12-06-2017
|
3.00
|
Fitting Saddle (Fuselage to Rudder Transition)
|
Details
|
|
|
11-27-2017
|
2.00
|
Safety wired barrel turnbuckles on elevator cables
|
Details
|
|
|
11-27-2017
|
2.00
|
Retrieved right wing from paint shop
|
|
|
|
11-27-2017
|
1.00
|
Mounted flying rudder for test fit of saddle.
|
|
|
|
11-20-2017
|
2.00
|
Mount Cowl for Prop Hub Distance Measurements
|
Details
|
|
|
11-11-2017
|
2.00
|
Elevator Down Limit Blocks
|
Details
|
|
|
11-09-2017
|
2.00
|
Made a wing dolley to facilitate mounting wing to
|
|
|
|
11-03-2017
|
2.00
|
Install Elevator Cables
|
Details
|
|
|
10-29-2017
|
2.00
|
Making template for prop cutout on spinner
|
|
|
|
10-26-2017
|
3.00
|
Took Wings to Paint Shop
|
|
|
|
10-25-2017
|
3.00
|
Loaded and secured wings on trailer for transport
|
|
|
|
10-20-2017
|
1.00
|
Washed Bottom of Left Wing
|
|
|
|
10-16-2017
|
3.00
|
Retrieved Fuselage from Paint Shop
|
|
|
|
10-03-2017
|
5.00
|
Relocated to paint shop
|
Details
|
|
|
09-27-2017
|
7.00
|
Inspect and complete missed items
|
Details
|
|
|
09-25-2017
|
5.00
|
Prepping for painting
|
|
|
|
09-25-2017
|
2.00
|
Finished handbrake.
|
Details
|
|
|
09-23-2017
|
2.00
|
Work continues on hand/parking brake.
|
|
|
|
09-23-2017
|
2.00
|
Prepping fuselage for painting.
|
Details
|
|
|
09-20-2017
|
4.00
|
Connected right brake line to wheel cylinder.
|
Details
|
|
|
09-14-2017
|
1.00
|
Paint Cowl
|
Details
|
|
|
09-05-2017
|
0.00
|
Paint Horiz Stab
|
|
|
|
08-14-2017
|
0.00
|
Paint Rudder
|
|
|
|
08-11-2017
|
2.00
|
Continued fitting spinner to prop.
|
|
|
|
08-10-2017
|
2.00
|
Began fitting spinner to prop.
|
|
|
|
08-08-2017
|
2.00
|
Cleaned and prepped rudder for painting and took t
|
|
|
|
08-06-2017
|
2.00
|
Complete Pilot's Horiz Stab Gap Cover
|
Details
|
|
|
08-05-2017
|
3.00
|
Fabricate covers for gap under horiz stab
|
Details
|
|
|
08-03-2017
|
2.00
|
Install Horiz Stab and fabricate attachment for ru
|
Details
|
|
|
07-31-2017
|
1.00
|
Swap pins 4 & 12 on the control stick switches con
|
Details
|
|
|
07-29-2017
|
3.00
|
Experimented with SkyView Setup and took photos of
|
Details
|
|
|
07-27-2017
|
2.00
|
Began documenting panel install procedures.
|
Details
|
|
|
07-25-2017
|
4.00
|
Temp install flap position sensor and setup EFIS
|
Details
|
|
|
07-20-2017
|
3.00
|
Flap Work
|
Details
|
|
|
07-19-2017
|
2.00
|
Fabricating flap position mount
|
Details
|
|
|
07-11-2017
|
5.00
|
Address three issues after first power on.
|
Details
|
|
|
07-10-2017
|
3.00
|
Attempt to set limits for flap acutator.
|
Details
|
|
|
07-08-2017
|
3.00
|
First Panel Poweron
|
Details
|
|
|
07-06-2017
|
4.00
|
Finalize engine installation
|
Details
|
|
|
07-05-2017
|
5.00
|
Complete Engine Installation
|
Details
|
|
|
06-25-2017
|
3.00
|
Install Xpdr and ADS-B Antennas
|
Details
|
|
|
06-25-2017
|
2.00
|
Continued work on Ram Air Ducts, Pilot Side
|
Details
|
|
|
06-19-2017
|
3.00
|
Install Comm Antenna & Installed Pass Side Air Duc
|
Details
|
|
|
06-14-2017
|
4.00
|
Cut to length and installed connectors on CHT & EG
|
|
|
|
06-11-2017
|
3.00
|
EMS Wiring
|
Details
|
|
|
06-10-2017
|
2.00
|
Safety wire for prop flange extension.
|
Details
|
|
|
06-10-2017
|
1.00
|
CHT & EGT Probe Installation
|
Details
|
|
|
06-07-2017
|
3.00
|
Making Improvements to Ram Air Ducts
|
|
|
|
06-07-2017
|
2.00
|
CHT & EGT Probe Installation
|
Details
|
|
|
06-05-2017
|
2.00
|
Making Improvements to Ram Air Ducts
|
Details
|
|
|
06-01-2017
|
2.00
|
Mount oil recovery tank and gascolator
|
Details
|
|
|
06-01-2017
|
2.00
|
Making Improvements to Ram Air Ducts
|
Details
|
|
|
05-31-2017
|
3.00
|
Making Improvements to Ram Air Ducts
|
Details
|
|
|
05-29-2017
|
3.00
|
Making Improvements to Ram Air Ducts
|
Details
|
|
|
05-24-2017
|
4.00
|
Making Improvements to Ram Air Ducts
|
Details
|
|
|
05-22-2017
|
4.00
|
Finished EMS wiring
|
|
|
|
05-17-2017
|
4.00
|
EMS-Wiring for Oil Pressure and Temperature
|
Details
|
|
|
05-16-2017
|
5.00
|
EMS-Wiring
|
Details
|
|
|
05-11-2017
|
3.00
|
Oil Drain and Fuel System Work
|
|
|
|
05-04-2017
|
3.00
|
Shunt Installation and Fuel System Work
|
|
|
|
05-03-2017
|
3.00
|
Ring out EMS wiring harness
|
|
|
|
05-02-2017
|
4.00
|
Straighten out work shop in prep for wiring effort
|
|
|
|
04-26-2017
|
4.00
|
Completed Airframe Wiring
|
|
|
|
04-25-2017
|
4.00
|
Working Airframe Wiring
|
|
|
|
04-20-2017
|
3.00
|
Aircraft Front Connector, Master and Key Switch Wi
|
Details
|
|
|
04-18-2017
|
3.00
|
Oil Cooler Configuration Complete
|
Details
|
|
|
04-10-2017
|
7.00
|
Configuring Oil Cooler
|
|
|
|
04-07-2017
|
2.00
|
Configuring Oil Cooler
|
Details
|
|
|
03-29-2017
|
4.00
|
Attach Oil Level Check Door
|
Details
|
|
|
03-28-2017
|
3.00
|
Cowl installation
|
Details
|
|
|
03-27-2017
|
3.00
|
Camloc determination
|
Details
|
|
|
03-22-2017
|
6.00
|
Cowling Fitting
|
Details
|
|
|
03-15-2017
|
1.00
|
Wired Regulator
|
Details
|
|
|
03-14-2017
|
1.00
|
Trimmed excess material form skin
|
Details
|
|
|
03-07-2017
|
1.00
|
Safety wire inside spring.
|
|
|
|
03-07-2017
|
2.00
|
Installed SCAT
|
|
|
|
02-27-2017
|
4.00
|
Removed Lower Engine Mount & Install Cabin Heat Ca
|
Details
|
|
|
02-25-2017
|
7.00
|
Finalize air box, battery mount & cabin heat mixer
|
Details
|
|
|
02-23-2017
|
4.00
|
Check Engine Alignment #2
|
Details
|
|
|
02-20-2017
|
2.00
|
Check Engine Alignment #1
|
Details
|
|
|
02-11-2017
|
4.00
|
Installed Battery, Cabin/Carb Heat Box, Starter So
|
Details
|
|
|
02-10-2017
|
1.00
|
Mate Carb/Cabin Heat with Muffler
|
Details
|
|
|
02-10-2017
|
3.00
|
Attachd Muffler to Engine
|
Details
|
|
|
02-06-2017
|
0.00
|
Install Air Box Cable (Carb Heat) #2
|
Details
|
|
|
02-06-2017
|
3.00
|
Install Air Box Cable (Carb Heat) #1
|
|
|
|
02-05-2017
|
2.00
|
Fabricate New Choke Cable Connection
|
Details
|
|
|
01-31-2017
|
2.00
|
Connect Choke Cable
|
Details
|
|
|
12-17-2016
|
1.00
|
Reangle Cart Heat Cable Outer Clamp
|
Details
|
|
|
12-17-2016
|
0.00
|
Reangle Cart Heat Cable Outer Clamp
|
|
|
|
12-15-2016
|
3.00
|
Throttle, Choke, Cabin Heat & Carb Heat Work
|
Details
|
|
|
12-14-2016
|
3.00
|
Installed and connected throttles to carburetor
|
Details
|
|
|
12-13-2016
|
3.00
|
Dual Throttle Redesign and Insatll
|
Details
|
|
|
12-13-2016
|
1.00
|
Added throttle arm extenstion
|
|
|
|
12-12-2016
|
2.00
|
Mount Airbox
|
Details
|
|
|
12-10-2016
|
1.00
|
Change Angle of Carb Heat Cable Outer Clamp
|
Details
|
|
|
12-08-2016
|
3.00
|
Attached engine mount to engine and mounted engine
|
Details
|
|
|
12-05-2016
|
1.00
|
Mounted Nose Wheel Fork and Nose Wheel
|
Details
|
|
|
12-03-2016
|
1.00
|
Painted Engine Mount and Nose Wheel Fork
|
|
|
|
12-02-2016
|
3.00
|
Cleaned and primed engine mount and nose wheel for
|
Details
|
|
|
11-29-2016
|
3.00
|
Inventoried FWF Kit
|
|
|
|
10-25-2016
|
4.00
|
Installed Strobe Light Power Supply
|
Details
|
|
|
10-21-2016
|
2.00
|
Complete Work on ACM Aircraft Rear Cable
|
|
|
|
10-20-2016
|
2.00
|
Work on ACM Aircraft Rear Cable #2
|
Details
|
|
|
10-19-2016
|
2.00
|
Work on ACM Aircraft Rear Cable
|
Details
|
|
|
10-14-2016
|
1.00
|
Rerouted wires behind panel on copilot side
|
|
|
|
10-14-2016
|
2.00
|
Installed Aileron Trim Connector
|
Details
|
|
|
10-14-2016
|
4.00
|
ACM Aircraft Rear Connector
|
Details
|
|
|
08-24-2016
|
2.00
|
Add connectors to left wing electrical.
|
Details
|
|
|
08-23-2016
|
1.00
|
Check out taxi and landing light mount and wiring.
|
Details
|
|
|
08-21-2016
|
3.00
|
Check out left wing wiring
|
Details
|
|
|
08-13-2016
|
1.00
|
Put DB-15 connector on Trim and Flap Wires
|
Details
|
|
|
08-13-2016
|
3.00
|
Installed GPS for 2020 transponder
|
Details
|
|
|
08-06-2016
|
8.00
|
Elevator & Aileron Trim and Flap Drive & Position
|
Details
|
|
|
07-10-2016
|
2.00
|
Installed the ELT Antenna and Stab Trim Cable
|
Details
|
|
|
06-04-2016
|
2.00
|
Inserted a 6 pin molex connector in roll trim cabl
|
Details
|
|
|
06-02-2016
|
2.00
|
Inserted a 6 pin molex connector in pitch trim cab
|
Details
|
|
|
06-01-2016
|
8.00
|
Installed cable and servos for autopilot
|
Details
|
|
|
05-12-2016
|
2.00
|
Mount ELT Antenna
|
|
|
|
05-10-2016
|
4.00
|
ELT Installation
|
Details
|
|
|
05-06-2016
|
3.00
|
ELT Installation
|
Details
|
|
|
04-27-2016
|
2.00
|
Complete fabricated cable
|
Details
|
|
|
04-26-2016
|
6.00
|
Fabricated cable from ACM to Control Stick
|
Details
|
|
|
03-23-2016
|
6.00
|
Installed Molex Connectors on Control Stick
|
Details
|
|
|
02-03-2016
|
3.00
|
Preparing Y Stick for Grip Mounting
|
|
|
|
01-26-2016
|
2.00
|
Reroute cables and begin securing
|
|
|
|
11-14-2015
|
4.00
|
Install ADAHRS and Remote Compass Tray in PLane
|
|
|
|
11-10-2015
|
5.00
|
ADAHRS & Remote Compass Installation
|
Details
|
|
|
11-04-2015
|
4.00
|
Fabricated mount for EMS and Backup Battery.
|
|
|
|
11-03-2015
|
6.00
|
Installed Remote Avionics and connected cables
|
|
|
|
11-02-2015
|
3.00
|
Fabricate and Install Inst Subpanel Cont
|
Details
|
|
|
10-17-2015
|
8.00
|
Fabricate and Install Inst Subpanel
|
Details
|
|
|
09-21-2015
|
0.00
|
Inspect and do all Service Bulletins
|
Details
|
|
|
07-31-2015
|
3.00
|
Attach New Panel to Old
|
Details
|
|
|
07-22-2015
|
3.00
|
Install Avionics
|
Details
|
|
|
03-07-2015
|
4.00
|
Sand blast, prime and paint nose gear strut
|
|
|
|
02-09-2015
|
2.00
|
Replace Bungee with Spring
|
Details
|
|
|
01-28-2015
|
3.00
|
Redesigned Heated AOA/Pitot Probe
|
Details
|
|
|
05-15-2014
|
6.00
|
Add fibreglass tips to horizontal stab
|
Details
|
|
|
05-14-2014
|
3.00
|
Horizontal Stab Tip
|
Details
|
|
|
05-05-2014
|
3.00
|
Prepare plane for relocation to Collier.
|
Details
|
|
|
05-05-2014
|
3.00
|
Finish Center Console
|
Details
|
|
|
03-11-2014
|
1.00
|
Rivet 6K2-1 to 6B7-2
|
Details
|
|
|
02-12-2014
|
2.00
|
Center Console Work
|
Details
|
|
|
02-09-2014
|
2.00
|
Center Console Work
|
Details
|
|
|
02-08-2014
|
5.00
|
Center Console Work
|
Details
|
|
|
02-07-2014
|
2.00
|
Center Console Work
|
Details
|
|
|
02-05-2014
|
2.00
|
Center Console Work
|
Details
|
|
|
02-04-2014
|
2.00
|
Begin Center Console
|
Details
|
|
|
10-18-2013
|
4.00
|
Complete Canopy except weather stripping
|
Details
|
|
|
10-01-2013
|
3.00
|
Installed Canopy Sides
|
Details
|
|
|
09-30-2013
|
3.00
|
Sanded Primed Canopy Sides and Painted Flat Black
|
|
|
|
09-29-2013
|
3.00
|
Removed Canopy Bottom Trim & Primed
|
Details
|
|
|
09-26-2013
|
2.00
|
Fabricate and Install Canopy Aluminum Trim Copilot
|
Details
|
|
|
09-25-2013
|
3.00
|
Fabricate and Install Canopy Aluminum Trim
|
Details
|
|
|
09-23-2013
|
2.00
|
Completed Riveting Rear Portion of Canopy
|
Details
|
|
|
09-20-2013
|
3.00
|
Canopy Front Bubble Work
|
|
|
|
09-19-2013
|
4.00
|
Complete Rear Canopy
|
Details
|
|
|
09-18-2013
|
4.00
|
Cover Baggage Compartment with Felt
|
|
|
|
09-09-2013
|
1.00
|
Attach 65C-13 to canopy frame
|
Details
|
|
|
09-08-2013
|
1.00
|
Covered front hoop with heat shrink.
|
Details
|
|
|
09-05-2013
|
3.00
|
Canopy Front Hoop
|
Details
|
|
|
05-20-2013
|
1.00
|
Side Cover 65C3-6
|
Details
|
|
|
05-20-2013
|
2.00
|
Final Assembly of Overlap Strip
|
Details
|
|
|
05-18-2013
|
2.00
|
Overlap Strip 65C3-11
|
Details
|
|
|
05-14-2013
|
2.00
|
Remove Rear Canopy Bubble & Trim
|
Details
|
|
|
05-14-2013
|
1.00
|
Provide exit for vent air.
|
Details
|
|
|
05-12-2013
|
2.00
|
Completed the cutting to size of the canopy gap se
|
Details
|
|
|
05-11-2013
|
2.00
|
Begin Canopy Overlap Strip Fabrication 6-C-3-11
|
Details
|
|
|
05-10-2013
|
2.00
|
Spliced the two rear deck halves
|
Details
|
|
|
05-09-2013
|
1.00
|
Riveted rear canopy to hoop.
|
|
|
|
05-07-2013
|
2.00
|
Enlarged all holes to 0.125 & clecoed.
|
|
|
|
05-06-2013
|
4.00
|
Continue Turtle Deck
|
Details
|
|
|
05-04-2013
|
4.00
|
Continue turtle deck
|
|
|
|
05-01-2013
|
1.00
|
Side Cover 65C3-6 Final Trim
|
Details
|
|
|
04-29-2013
|
4.00
|
Continue turtle deck
|
|
|
|
04-28-2013
|
4.00
|
Begin fabrication of one piece turtle deck.
|
Details
|
|
|
03-17-2013
|
4.00
|
More Canopy Details
|
Details
|
|
|
03-10-2013
|
3.00
|
Installed rear portion of canopy
|
Details
|
|
|
03-09-2013
|
6.00
|
Cut Canopy into
|
Details
|
|
|
03-08-2013
|
3.00
|
Still fitting canopy
|
Details
|
|
|
03-07-2013
|
3.00
|
Canopy Measuring and Fitting
|
Details
|
|
|
03-06-2013
|
3.00
|
Canopy Marking and Cutting to fit
|
Details
|
|
|
03-05-2013
|
0.10
|
Jim helped me relocate canopy from work bench to f
|
|
|
|
03-04-2013
|
2.00
|
Attached Side Cover to Side Frame and trimmed cano
|
Details
|
|
|
03-02-2013
|
2.00
|
Final trimming on forward top skin and side cover.
|
Details
|
|
|
02-25-2013
|
2.00
|
Add L to outside of trim servo
|
Details
|
|
|
02-20-2013
|
2.00
|
Trimmed Canopy
|
Details
|
|
|
01-24-2013
|
3.00
|
Pilot Drill Canopy Side Rails and handles
|
Details
|
|
|
12-23-2012
|
1.00
|
Removed Canopy from package and place on plane
|
Details
|
|
|
10-11-2012
|
2.00
|
Right brake line inside portion
|
Details
|
|
|
07-19-2012
|
2.00
|
Connect Left Brake Line #3
|
Details
|
|
|
07-17-2012
|
2.00
|
Connect Left Brake Line #2
|
Details
|
|
|
07-13-2012
|
2.00
|
Connect Left Brake Line #1
|
Details
|
|
|
06-26-2012
|
1.00
|
Fabricate Guide for Canopy Trimming
|
Details
|
|
|
06-26-2012
|
2.00
|
Drill and Cleco Hoop to Fuselage
|
|
|
|
06-19-2012
|
4.00
|
Mount Roll Over and Hoop
|
|
|
|
01-29-2012
|
1.00
|
Fabricating & Installing a Parking Brake
|
Details
|
|
|
01-24-2012
|
2.50
|
Fabricating & Installing a Parking Brake
|
Details
|
|
|
01-10-2012
|
3.00
|
Rivet Arm Rest and Seats
|
|
|
|
01-09-2012
|
2.00
|
Remove forward top. Rivet pilot arm rest side
|
|
|
|
01-08-2012
|
2.00
|
Moved fuselage from barn to little hangar.
|
Details
|
|
|
10-22-2011
|
1.00
|
Engine Protection
|
Details
|
|
|
09-28-2011
|
3.00
|
Riveted rear wing skin.
|
|
|
|
09-26-2011
|
2.00
|
Corrosion proofed and clecoed wing skin on.
|
Details
|
|
|
09-21-2011
|
3.00
|
Connected Aileron and attached flap to right wing.
|
|
|
|
09-20-2011
|
3.00
|
Mounted Aileron with balance weigths and stops.
|
Details
|
|
|
09-19-2011
|
6.00
|
Backup Pitot Static & Aileron Control Rod Access
|
Details
|
|
|
09-13-2011
|
1.00
|
Clean up work bench and put away tools.
|
|
|
|
09-01-2011
|
3.00
|
Added the hinge to the right flap.
|
|
|
|
08-29-2011
|
5.00
|
Found some AN3-12a bolts and finished aileron upgr
|
Details
|
|
|
08-26-2011
|
2.00
|
Conversion of hingeless aileron to piano hinge.
|
|
|
|
08-26-2011
|
2.00
|
Aileron work on hold for screws on back order.
|
Details
|
|
|
08-24-2011
|
2.00
|
Aileron Upgrade
|
|
|
|
08-23-2011
|
3.00
|
Aileron Upgrade
|
|
|
|
08-21-2011
|
2.00
|
Riveted Upgrade Ls to bottom skin
|
Details
|
|
|
08-20-2011
|
3.00
|
Remove top skin and rivet upgrade parts to wing.
|
|
|
|
08-17-2011
|
3.00
|
Put on top skin to drill holes in added Ls.
|
Details
|
|
|
08-16-2011
|
4.00
|
Replaced old Bellcrank Support Channel with L angl
|
|
|
|
08-15-2011
|
3.00
|
L Angle installation span wise on both upper and l
|
Details
|
|
|
08-11-2011
|
3.00
|
Rivet the Rear Channel Doubler, Top Rear Spar Angl
|
Details
|
|
|
08-08-2011
|
5.00
|
Wing Rear Channel Work
|
Details
|
|
|
07-17-2011
|
3.00
|
Rear Spar Upgrade
|
Details
|
|
|
07-09-2011
|
2.00
|
Removed clecos and riveted nose skin on right wing
|
|
|
|
06-29-2011
|
3.00
|
Fabricated a maint/inspection panel
|
Details
|
|
|
06-28-2011
|
4.00
|
Remove clecos and fuel filler from top nose skin
|
Details
|
|
|
06-27-2011
|
3.00
|
Nose Skin holes for fuel vent and drain.
|
Details
|
|
|
06-25-2011
|
8.00
|
Finished putting cork on fuel tank.
|
Details
|
|
|
06-20-2011
|
2.00
|
Put cork on tank.
|
|
|
|
06-08-2011
|
4.00
|
Installed fuel level sending unit.
|
|
|
|
06-02-2011
|
6.00
|
Wing Right Spar & Rib Upgrade
|
Details
|
|
|
06-01-2011
|
2.00
|
Clecoed skins on to drill added extrusion to spar
|
|
|
|
05-20-2011
|
4.00
|
Extrusion and doubler bolted on.
|
Details
|
|
|
05-05-2011
|
2.00
|
Right Wing Upgrade
|
Details
|
|
|
05-04-2011
|
3.00
|
Removed spar rivets and positioned the new doubler
|
|
|
|
04-26-2011
|
3.00
|
Removed Front and Top Skins
|
Details
|
|
|
04-22-2011
|
2.00
|
Completed Wing Riveting.
|
Details
|
|
|
04-21-2011
|
8.00
|
Clecoed every other hole and began riveting.
|
|
|
|
04-20-2011
|
6.00
|
Cleaning and electrical tests prior to closing.
|
|
|
|
04-19-2011
|
4.00
|
Flap permanently attached to left wing
|
Details
|
|
|
04-18-2011
|
6.00
|
Began Flap and Aileron Permanent Attachment.
|
|
|
|
04-16-2011
|
8.00
|
On display at JKA Aviation Day
|
|
|
|
04-15-2011
|
6.00
|
On display at JKA Aviation Day
|
|
|
|
04-14-2011
|
5.00
|
Attached Ailerons and Flaps
|
Details
|
|
|
04-12-2011
|
7.00
|
Aileron Control and AOA-Pitot Tube
|
|
|
|
04-11-2011
|
6.00
|
Complete Aileron Balance
|
|
|
|
04-08-2011
|
5.00
|
Installed aileron trim servo and balance aileron.
|
Details
|
|
|
04-05-2011
|
5.00
|
Installed Aileron Trim
|
Details
|
|
|
04-03-2011
|
6.00
|
Fabricated new aileron bellcrank
|
Details
|
|
|
03-26-2011
|
5.00
|
Install Nose Gear
|
|
|
|
03-23-2011
|
4.00
|
Finish structure changes for aileron Upgrade
|
Details
|
|
|
03-22-2011
|
4.00
|
Aileron Trim and Upgrade to trim servo
|
|
|
|
03-18-2011
|
3.00
|
Aileron Trim & Upgrade
|
Details
|
|
|
03-16-2011
|
4.00
|
Aileron Trim & Hingeless to Hinge Conversion
|
Details
|
|
|
03-12-2011
|
4.00
|
Aileron Push Tube Holes
|
Details
|
|
|
03-11-2011
|
8.00
|
Fuel Filler Wing Skin Hole
|
Details
|
|
|
03-05-2011
|
2.00
|
Leak Tested New Left Wing Fuel Tank
|
Details
|
|
|
03-03-2011
|
2.00
|
Cut gasket material into washers for fuel sender b
|
Details
|
|
|
03-02-2011
|
3.00
|
Fuel Tank inspection cover & Fuel Level Sender
|
|
|
|
03-02-2011
|
3.00
|
Completed Inspection Cover for Fuel Tank End
|
Details
|
|
|
03-01-2011
|
3.00
|
Riveting doublers behind old nose rib 2 & holes.
|
Details
|
|
|
02-28-2011
|
6.00
|
Fabricated Skin Hole Plugs to support tank swap
|
|
|
|
02-26-2011
|
5.00
|
Clean up shop and locate parts. Also a little mor
|
Details
|
|
|
02-25-2011
|
4.00
|
New Fuel Tank Work and Access Holes for PushPull T
|
|
|
|
02-25-2011
|
1.00
|
Fuel Tank Work
|
|
|
|
02-24-2011
|
3.00
|
Started Push/Pull Aileron Control
|
|
|
|
02-23-2011
|
3.00
|
Bellcrank & upper and lower L enhancements.
|
Details
|
|
|
02-22-2011
|
3.00
|
Began installing L angles spanwise on bottom of ri
|
|
|
|
02-21-2011
|
5.00
|
Added L angles between ribs 6 & 7 and #4 to Tip
|
Details
|
|
|
02-19-2011
|
2.00
|
Now 6-ZU-1 is complete.
|
|
|
|
02-16-2011
|
6.00
|
Nearly Completed 6-ZU-1 and began 6-ZU-3a
|
Details
|
|
|
02-13-2011
|
6.00
|
Bolted Spar Doubler vice solid rivets.
|
|
|
|
02-12-2011
|
6.00
|
Add nose rib angles.
|
Details
|
|
|
02-10-2011
|
7.00
|
Add nose angles to nose ribs 1 through 3.
|
|
|
|
02-10-2011
|
1.00
|
Add nose angles to nose ribs 1 through 3
|
|
|
|
02-04-2011
|
5.00
|
Upgrade Wing
|
Details
|
|
|
02-03-2011
|
7.00
|
Upgrade Wing
|
Details
|
|
|
02-02-2011
|
3.00
|
Upgrade Left Wing
|
Details
|
|
|
02-01-2011
|
6.00
|
Riveted Entry Step
|
Details
|
|
|
01-31-2011
|
3.00
|
Locate and install entry step
|
|
|
|
01-30-2011
|
1.00
|
Put Fuselage Between Lift Post
|
Details
|
|
|
01-30-2011
|
1.00
|
Moved wing into little hangar for upgrade
|
|
|
|
01-29-2011
|
1.00
|
Test Mounted Rudder and Removed.
|
|
|
|
01-27-2011
|
3.00
|
Mounted HS to fuselage.
|
Details
|
|
|
01-26-2011
|
3.00
|
Added doubler to HS mounts
|
Details
|
|
|
01-14-2011
|
3.00
|
Add doubler to HS foreward mount
|
|
|
|
01-09-2011
|
6.00
|
Change Placement of 6T2-1 & 2
|
Details
|
|
|
01-08-2011
|
2.00
|
Main Gear Completed
|
Details
|
|
|
01-08-2011
|
2.00
|
Main Gear Attached to Fuselage
|
Details
|
|
|
01-07-2011
|
6.00
|
Begin Construction of Main Gear
|
Details
|
|
|
01-06-2011
|
6.00
|
Completed Fuselage sans canopy and step
|
Details
|
|
|
01-05-2011
|
2.00
|
Baggage Floor Work and Rear Top Skin
|
|
|
|
01-04-2011
|
1.00
|
Began baggage compartment floor installaiton.
|
|
|
|
01-03-2011
|
4.00
|
Pinned canopy latch bellcranks to torque tube.
|
|
|
|
12-31-2010
|
4.00
|
Fuselage Forward Top Skin Completed
|
Details
|
|
|
12-30-2010
|
4.00
|
Capture Nut Installation Continues
|
Details
|
|
|
12-30-2010
|
1.00
|
Attached link to canopy latch
|
Details
|
|
|
12-29-2010
|
4.00
|
Fuselage Forward Top Skin
|
Details
|
|
|
12-28-2010
|
4.00
|
Instrument Panel
|
Details
|
|
|
12-27-2010
|
6.00
|
Installed Canopy Latches & Handle
|
|
|
|
12-23-2010
|
3.00
|
Instrument Panel Capture Nuts
|
|
|
|
12-22-2010
|
2.00
|
Instrument Panel Capture Nuts
|
Details
|
|
|
12-21-2010
|
1.00
|
Make Capture Nut Drill Template
|
Details
|
|
|
12-18-2010
|
6.00
|
Removed forward top skin to install capture nuts
|
Details
|
|
|
12-17-2010
|
3.00
|
Complete drilling and clecoing forward top skin
|
Details
|
|
|
12-16-2010
|
5.00
|
Continue fitting forward top skin
|
|
|
|
12-15-2010
|
2.00
|
More fitting of top skin
|
Details
|
|
|
12-14-2010
|
3.00
|
Test Fitting Forward Top Skin
|
Details
|
|
|
12-14-2010
|
1.00
|
Installed Flap Motor and torque rod
|
|
|
|
12-13-2010
|
4.00
|
650 Canopy Hinge
|
Details
|
|
|
12-10-2010
|
3.00
|
Began Canopy Installation
|
Details
|
|
|
12-07-2010
|
3.00
|
Replace Temporary Bolts
|
Details
|
|
|
12-07-2010
|
8.00
|
Bottom Access Door
|
Details
|
|
|
12-06-2010
|
4.50
|
Misc Riveting
|
Details
|
|
|
12-05-2010
|
4.00
|
Permanently Attach Front Sides & Seats
|
Details
|
|
|
12-03-2010
|
1.00
|
Permanently Attach Front Sides
|
Details
|
|
|
12-02-2010
|
6.00
|
Permanently Attach Front sides.
|
|
|
|
12-02-2010
|
2.00
|
Add Capture Nuts to Instrument Panel
|
|
|
|
12-01-2010
|
4.00
|
Prime, paint and assemble aileron AP trays.
|
|
|
|
11-26-2010
|
4.00
|
Layout Plans and Fabricate Aileron AP Trays
|
|
|
|
11-24-2010
|
6.00
|
Cortec and Assemble Elevator Trays
|
|
|
|
11-23-2010
|
6.00
|
Fabricate AP Elevator Servo Tray
|
|
|
|
11-22-2010
|
6.00
|
Lay out plans for elevator servo tray
|
|
|
|
11-21-2010
|
2.00
|
Installed elevator cables.
|
|
|
|
11-21-2010
|
2.00
|
Installation of Rudder Control Cables
|
|
|
|
11-20-2010
|
2.00
|
Began elevator control cable installation
|
|
|
|
11-19-2010
|
4.00
|
Reassembled Flap Position Sensor after painting
|
|
|
|
11-18-2010
|
6.00
|
Added fairlead for rudder and elevator cables.
|
Details
|
|
|
11-15-2010
|
5.00
|
Rudder work for permanent mount.
|
|
|
|
11-14-2010
|
6.00
|
Temporarily attached horizontal stab and flying ru
|
|
|
|
11-13-2010
|
1.00
|
Installed Control Stick Assembly
|
Details
|
|
|
11-10-2010
|
2.00
|
Removed, made a new doubler and reinstalled.
|
Details
|
|
|
11-09-2010
|
8.00
|
Primed inside of fuselage with green zinc chromate
|
|
|
|
11-08-2010
|
4.00
|
Work on flap position sensor painting.
|
|
|
|
11-06-2010
|
2.00
|
Removed flap position sensor for corrosion protect
|
|
|
|
11-05-2010
|
6.00
|
Fabricated Flap Position Sensor Mount
|
|
|
|
11-04-2010
|
4.00
|
Autopilot Mount Fabrication
|
|
|
|
11-02-2010
|
4.00
|
Studying for AP servo installation.
|
|
|
|
11-02-2010
|
2.00
|
Made numerous expense log entries.
|
|
|
|
11-01-2010
|
3.00
|
Cleaning parts in preparation for priming
|
|
|
|
10-28-2010
|
2.00
|
Permanently attached Upper Engine Mount to Longero
|
|
|
|
10-27-2010
|
4.00
|
Trimed Turtle Deck
|
|
|
|
10-26-2010
|
2.00
|
Riveted the two new 6B15-1 parts and 6B16-2.
|
|
|
|
10-25-2010
|
4.00
|
Fabricate 2 new 6B15-1 parts
|
|
|
|
10-20-2010
|
3.00
|
Continue with clean up and priming.
|
Details
|
|
|
10-19-2010
|
3.00
|
Effort continues to clean, prime and rivit fuselag
|
|
|
|
10-15-2010
|
3.00
|
Continue effort on corrosion treatment.
|
|
|
|
10-14-2010
|
5.00
|
Continue work on left side and interior.
|
|
|
|
10-13-2010
|
2.00
|
Fuselage left side work
|
Details
|
|
|
10-12-2010
|
2.00
|
Fuselage sides finish up.
|
Details
|
|
|
10-11-2010
|
6.00
|
Finish up in several locations.
|
Details
|
|
|
10-04-2010
|
2.00
|
Rivet Center Wing Spar to Fuselage Floor
|
|
|
|
10-04-2010
|
7.00
|
Complete the Aileron Control Stop in Fuselage.
|
Details
|
|
|
09-30-2010
|
7.00
|
Control Limits - Fuselage
|
Details
|
|
|
09-09-2010
|
3.00
|
Flap Control Installation.
|
Details
|
|
|
09-07-2010
|
3.00
|
Continue Flap Drive Work
|
|
|
|
08-31-2010
|
3.00
|
Continue Flap Drive Work
|
Details
|
|
|
08-24-2010
|
2.00
|
Conitnue Flap Drive Work
|
Details
|
|
|
08-23-2010
|
7.00
|
Some more disassembly for deburring and corrosion
|
Details
|
|
|
08-22-2010
|
2.00
|
Watched 601 to 650 Canopy Conversion DVD
|
|
|
|
08-22-2010
|
1.00
|
Drill and cleco cool air vent SV-1.
|
Details
|
|
|
08-22-2010
|
3.00
|
Began disassembly for deburring and corrosion prot
|
Details
|
|
|
08-19-2010
|
1.00
|
Shortening Inst Panel
|
Details
|
|
|
08-19-2010
|
1.00
|
Complete Forward side skin drilling and clecoing.
|
Details
|
|
|
08-18-2010
|
3.00
|
Shoulder Harness Fitting
|
Details
|
|
|
08-17-2010
|
4.00
|
Top Rear Fuselage Skin
|
Details
|
|
|
08-15-2010
|
2.00
|
Top Rear Fuselage Skin
|
Details
|
|
|
08-14-2010
|
4.00
|
Electric Flap Mount
|
Details
|
|
|
08-13-2010
|
3.00
|
Seat Back Support
|
Details
|
|
|
08-13-2010
|
3.00
|
Installation of baggage floor.
|
Details
|
|
|
08-12-2010
|
6.00
|
Passneger Seat
|
Details
|
|
|
08-11-2010
|
6.00
|
Upper Longeron Splice
|
Details
|
|
|
08-10-2010
|
6.00
|
Center Wing Spar Uprights
|
Details
|
|
|
08-09-2010
|
3.00
|
General Clean Up
|
Details
|
|
|
08-06-2010
|
6.00
|
Add doubler to end of center wing spar
|
Details
|
|
|
08-05-2010
|
6.00
|
Front Seat Panel Work
|
Details
|
|
|
08-04-2010
|
3.00
|
Complete Gear Channel Upright Installation
|
|
|
|
08-03-2010
|
3.00
|
Replace Gear Channel Uprights
|
Details
|
|
|
08-02-2010
|
6.00
|
Complete Forward Side Skin Attachment
|
Details
|
|
|
07-31-2010
|
3.00
|
Install Z Channel
|
Details
|
|
|
07-30-2010
|
3.00
|
Install Side Doublers
|
Details
|
|
|
07-29-2010
|
6.00
|
Install Upright Doublers
|
Details
|
|
|
07-28-2010
|
2.00
|
Forward fuselage side panels
|
Details
|
|
|
07-27-2010
|
3.00
|
Begin left forward side skin installation.
|
Details
|
|
|
07-26-2010
|
6.00
|
Begin right forward side skin installation. (Conti
|
Details
|
|
|
07-24-2010
|
1.00
|
Fabricate Rear Center Spar Upright
|
Details
|
|
|
07-24-2010
|
2.50
|
Begin right forward side skin installation.
|
Details
|
|
|
07-22-2010
|
1.00
|
Replaced Left Toe Brake Pedal.
|
Details
|
|
|
07-21-2010
|
4.00
|
Fuselage Assembly
|
Details
|
|
|
07-21-2010
|
1.00
|
Fabricate 6B12-5 L & R
|
Details
|
|
|
07-16-2010
|
7.00
|
Reinstall Pedal Bearing Channel
|
Details
|
|
|
07-15-2010
|
2.00
|
Remove rudder pedals and heel plate.
|
Details
|
|
|
07-14-2010
|
1.00
|
Rear Fuselage Assembly Bulkheads
|
Details
|
|
|
07-14-2010
|
1.00
|
Re-install gussets 6B10-4 left and right
|
Details
|
|
|
07-14-2010
|
1.00
|
Forward Fuselage Assembly
|
Details
|
|
|
07-13-2010
|
12.00
|
Rear Frame Assembly
|
Details
|
|
|
05-26-2010
|
6.00
|
Final assembly of center wing spar.
|
Details
|
|
|
05-24-2010
|
6.00
|
Assemble the two Center Spar halves.
|
Details
|
|
|
05-23-2010
|
8.00
|
Complete Spar Uprights
|
Details
|
|
|
05-21-2010
|
3.00
|
Spar upright work
|
Details
|
|
|
05-12-2010
|
6.00
|
Back Drill Holes as needed in upgrade parts.
|
Details
|
|
|
05-11-2010
|
6.00
|
Back Drill Holes as needed in upgrade parts.
|
Details
|
|
|
05-10-2010
|
6.00
|
Disassemble Center Spar Section
|
Details
|
|
|
05-01-2010
|
4.00
|
Inventory Canopy and Upgrade Package
|
Details
|
|
|
04-30-2010
|
3.00
|
Pick up Canopy and Upgrade Package
|
|
|
|
03-31-2010
|
2.00
|
Check Wing Jig
|
Details
|
|
|
03-30-2010
|
0.50
|
Consult with Roger Dubbert
|
Details
|
|
|
03-29-2010
|
1.00
|
Rudder Pedals
|
Details
|
|
|
03-29-2010
|
0.50
|
Join the cabin floor to the gear channel
|
Details
|
|
|
03-29-2010
|
2.00
|
Cabin Floor
|
Details
|
|
|
03-22-2010
|
3.00
|
Remove Center Wing Spar
|
Details
|
|
|
03-15-2010
|
1.00
|
Catch up on log.
|
Details
|
|
|
03-13-2010
|
5.00
|
Began installing updated firewall parts.
|
Details
|
|
|
03-12-2010
|
1.00
|
Received and inventoried parts.
|
|
|
|
03-09-2010
|
1.00
|
Ordered more updated parts for firewall.
|
|
|
|
03-07-2010
|
2.00
|
Drill and rivet 6B8-1 to 6B8-7
|
Details
|
|
|
02-28-2010
|
6.00
|
Detailed inventory of parts.
|
|
|
|
02-27-2010
|
5.00
|
Detailed inventory of parts.
|
|
|
|
02-26-2010
|
2.00
|
Confirmed each step properly completed!
|
Details
|
|
|
02-24-2010
|
2.00
|
Gear Channel & Firewall & Stiffener/ Engine Mount
|
Details
|
|
|
02-22-2010
|
2.00
|
Confirmed each step properly completed!
|
Details
|
|
|
02-21-2010
|
3.00
|
Confirmed each step properly completed!
|
Details
|
|
|
02-15-2010
|
35.00
|
Purchased Partially Build Zodiac 601XL
|
Details
|
|
|
01-24-2010
|
3.00
|
Complete Elevator Trim Installation
|
Details
|
|
|
01-21-2009
|
2.00
|
Elevator Trim
|
|
|
|
01-20-2009
|
2.00
|
Continue final riveting
|
|
|
|
01-19-2009
|
2.00
|
Continue final assembly of horizontal stab, elevat
|
|
|
|
01-16-2009
|
4.00
|
Begin final elevator assembly with rivets.
|
Details
|
|
|
01-02-2009
|
4.00
|
Remove clecos, debur, corrosion treatment for insi
|
|
|
|
02-20-2008
|
45.00
|
Flap Control
|
Details
|
|
|
09-10-2007
|
17.00
|
Elevator & Trim
|
Details
|
|
|
09-04-2007
|
12.00
|
More Horizontal Stabilizer Work
|
Details
|
|
|
08-23-2007
|
12.00
|
More horizontal stab work.
|
Details
|
|
|
08-18-2007
|
5.00
|
Front and rear spar drilled and primed.
|
Details
|
|
|
08-12-2007
|
2.00
|
Stabilizer Rear Spar & Doublers
|
Details
|
|
|
08-12-2007
|
3.00
|
Stabilizer Front Spar & Doublers
|
|
|
|
08-06-2007
|
2.00
|
Drive to YellowFreight in Mobile to get tail compo
|
Details
|
|
|
08-01-2007
|
3.00
|
Completed starter kit. Vertical Stabilizer
|
|
|
|
07-31-2007
|
40.00
|
Completed Hobby Room for Building Site
|
Details
|
|
|
07-25-2007
|
1.00
|
Ordered new parts
|
Details
|
|
|
07-24-2007
|
0.00
|
Received Drawings and Photo CD
|
|
|
|
07-08-2007
|
9.50
|
Completed Rudder with Clecos
|
Details
|
|
|
07-05-2007
|
1.00
|
Start rudder assembly
|
Details
|
|
|
07-04-2007
|
2.00
|
Read instructions and drawings
|
Details
|
|
|
07-03-2007
|
1.00
|
Inventory Starter Kit
|
Details
|
|
|
08-05-2006
|
62.00
|
Fuselage work.
|
Details
|
|
|
04-22-2006
|
23.00
|
Attach cockpit floor to firewall and rear section
|
Details
|
|
|
03-12-2006
|
23.00
|
Forward skins and longerons.
|
Details
|
|
|
02-12-2006
|
28.00
|
Front side panels.
|
Details
|
|
|
09-01-2005
|
66.00
|
Cockpit floor, braces and rudder pedals.
|
Details
|
|
|
01-23-2005
|
32.00
|
Firewall Construction
|
Details
|
|
|
12-04-2004
|
12.00
|
Build work bench & Review Drawings
|
Details
|
|
|
01-14-2002
|
1.00
|
Fair Lead Work & Other Fuselage Work
|
Details
|
|
|
01-14-2002
|
8.00
|
Clecoed and partially riveted rear floor and sides
|
Details
|
|