Powered By Kitlog Pro v2.0
DENNIS'S WEB SITE
Sonerai IILS
All
Work Logs Found:
132
Category Work Time:
350 Hours
Date
Hours
Work Log Summary
Details
05-08-2013
1.50
Rust Conversion
Details
05-04-2013
3.00
Sealed inside of main longerons with linseed oil
05-04-2013
2.00
Harness attachments
Details
05-04-2013
2.00
Corrected brake pedals
Details
04-30-2013
2.00
Brushed of some rust
Details
04-30-2013
3.00
Bow for belly pan
Details
04-28-2013
3.00
Welded control stops for rudder
04-28-2013
2.00
Made belly pan bow
04-26-2013
3.00
Welded in control stops for elevator
Details
04-25-2013
2.00
Elevator torque tube
Details
04-21-2013
2.00
Shelf supports
Details
04-21-2013
3.00
Added the aileron control stops
04-20-2013
2.00
Finished adding stubs and saddles for stringers
04-20-2013
5.00
Control stick assembly
Details
04-14-2013
2.00
Welding and more welding
Details
04-14-2013
4.00
Started the saddles and standoff's for stringers
Details
04-07-2013
5.00
Added floor board mounting tabs and pedal spring t
08-29-2009
4.00
Welding
Details
08-28-2009
3.00
Landing Gear Mounts
Details
08-23-2009
2.00
Welded in the elevator hinges
08-23-2009
5.00
Tabs
Details
08-23-2009
2.00
Elevator Pushrod
08-16-2009
6.00
Wing Folding and Spar Box
Details
08-15-2009
2.00
Spar Carry Thru
Details
08-10-2009
1.50
Spar Box
Details
08-08-2009
7.50
Aft Ribs and Rear Spar
Details
08-07-2009
2.50
Aft wing ribs
Details
08-05-2009
2.50
Set up aft ribs
Details
08-02-2009
4.00
Set up left wing nose ribs
Details
08-01-2009
6.50
Spar Work
Details
07-31-2009
2.50
Preparing rib supports
Details
05-14-2008
2.00
Spar Box
Details
05-11-2008
3.00
Welded Spar Carry Through
Details
05-11-2008
1.00
Finished up the aileron tube assembly
05-10-2008
3.00
Fuel Shutoff
Details
05-10-2008
1.00
Aileron torque tubes
05-10-2008
3.00
Aileron torque tube supports
Details
05-05-2008
2.00
Welded square tubes for spare box
05-04-2008
2.00
Laying out Spar Box
05-04-2008
1.00
Finished riveting left spar
05-02-2008
1.00
Riveting
04-27-2008
2.00
Throttle levers
Details
04-21-2008
2.00
Setting Rivets on Left Spar
04-21-2008
2.00
Oxide on Wing Ribs
04-20-2008
2.00
Tech Counselor
Details
04-19-2008
4.00
Ribs
Details
03-20-2008
2.00
More rivet setting
03-18-2008
1.50
Setting rivets in wing spars
03-16-2008
1.00
Rivet setting
Details
03-12-2008
2.00
Started setting the rivets in font spar
03-08-2008
7.00
Zinc Oxide
Details
01-25-2008
2.00
Wing Ribs
Details
01-11-2008
3.00
Wing Rib Supports
Details
01-05-2008
3.00
Riveting
Details
01-05-2008
2.00
Angle brackets
Details
01-01-2008
5.00
Spar work
Details
12-31-2007
4.00
Rib forming
Details
12-30-2007
4.00
Wing spar assembly
Details
12-16-2007
5.00
Spar end plates
Details
12-13-2007
2.00
Forming wing ribs
Details
12-12-2007
1.50
Formed wing ribs
Details
11-23-2007
2.00
Fluted the nose ribs
Details
11-22-2007
4.00
Wings
Details
11-21-2007
2.00
Wings
Details
11-18-2007
2.00
Wings
Details
11-17-2007
5.00
Wings
Details
11-16-2007
4.00
Wings
Details
11-11-2007
3.00
Wings
Details
11-09-2007
3.00
Wings
Details
11-04-2007
2.00
Table
Details
11-03-2007
5.00
Spars
Details
11-03-2007
3.00
Canopy
Details
11-02-2007
2.00
Studying wing drawings.
10-31-2007
2.00
More work on canopy frame.
10-28-2007
4.00
Canopy Frame
Details
10-27-2007
2.50
Canopy Frame Hinges attached
10-26-2007
2.00
Built canopy frame hinges
10-25-2007
2.00
Arbor Press
Details
10-20-2007
2.00
Pedals
Details
10-20-2007
1.50
Mounted Control Sticks
10-17-2007
2.50
Rudder Pedals
Details
10-15-2007
2.00
Lofting
Details
10-13-2007
6.00
Built Elevator and Rudder
10-06-2007
3.00
Details
10-05-2007
2.50
Details
10-04-2007
1.00
Details
09-30-2007
2.00
Details
09-16-2007
5.00
Details
09-14-2007
1.00
Details
09-11-2007
1.50
Finish Welded turtle deck tubing.
09-10-2007
1.00
Bearing Blocks
Details
09-09-2007
2.50
Elevator Trim
Details
09-08-2007
2.50
Welding
Details
09-08-2007
3.00
Trim
Details
09-05-2007
2.50
Worked on plates for trim assembly.
08-25-2007
1.50
Welding
Details
08-25-2007
2.50
Welding
Details
08-19-2007
2.00
Welding
Details
08-19-2007
4.00
Finished welding seats and tail area.
08-18-2007
4.00
More Welding.
Details
08-11-2007
4.00
Added Engine mount supports.
08-06-2007
1.50
Welded Engine Mount Brackets.
Details
08-05-2007
4.00
Stab Spars
Details
08-03-2007
2.00
And again... More clusters!
Details
08-02-2007
2.00
More Cluser Welds
07-23-2007
3.00
Welding... What else?
Details
07-20-2007
2.00
More finish welds.
07-14-2007
4.00
More finish welds on the clusters.
07-11-2007
2.50
Cut 4130 ribes for tail surfaces.
07-06-2007
1.50
Some more cluser welds.
07-05-2007
2.00
Allows easy rotation of fuselage for welding the c
07-04-2007
1.50
07-02-2007
2.00
Added some more diagonals and corrected some warpi
07-01-2007
2.50
Welded motor mount area and pilot seat and started
06-29-2007
1.50
Welded in Pilot Seat
06-26-2007
1.50
Added cross members in forward fuselage floor.
06-24-2007
3.00
Bent rear fuselage in and installed bottom cross m
06-22-2007
1.50
Added more cross members in cockpit area.
06-21-2007
2.50
Added more cross members in cockpit area.
06-13-2007
1.50
Added cross tubes in cockpit area.
06-11-2007
2.00
Set up table for fuselage cross members.
06-10-2007
4.00
06-09-2007
1.50
06-08-2007
2.00
Cut and started tacking second fuselage side.
06-07-2007
2.00
Tack welding one fuselage.
06-06-2007
1.00
06-03-2007
5.00
Laid out the fuselage tubes and began tack welding
06-01-2007
2.00
Built holder for tubes and finished drafting fusel
05-20-2007
1.50
05-19-2007
2.00
05-12-2007
2.00
Wielded different size tube scraps for practice
02-12-2007
1.00
SITE NAVIGATION
Contact Builder
Sonerai IILS Home
Category
# Logs
# Hours
All
132
350
Controls
15
35
Empennage
5
17
Engine
1
5
Fuselage
63
158
Miscellaneous
7
14
Plans Study
2
3
Tech Counselor Visit
1
2
Wings
38
116
Copyright © 2001-2024 Matronics. All Rights Reserved.