Date
|
Hours
|
Work Log Summary
|
Details
|
06-24-2007
|
0.75
|
Ran fuel flow test again 20.2 GPH
|
Details
|
|
|
06-24-2007
|
2.00
|
Preinspection paperwork with Bobby Thomas
|
Details
|
|
|
06-23-2007
|
2.00
|
worked on paperwork
|
Details
|
|
|
06-21-2007
|
3.00
|
worked on construction log
|
Details
|
|
|
06-20-2007
|
3.00
|
worked on construction log
|
Details
|
|
|
06-19-2007
|
2.00
|
worked on construction log
|
Details
|
|
|
05-10-2007
|
2.00
|
worked on construction log
|
Details
|
|
|
03-25-2007
|
5.00
|
Diagnosed throttle cable, nose wheel, and tachomet
|
Details
|
|
|
03-03-2007
|
2.00
|
rented scales and weighed the aircraft, total weig
|
Details
|
|
|
01-14-2007
|
1.00
|
Worked on updating builders log.
|
Details
|
|
|
01-13-2007
|
1.00
|
Removed throttle cable and examined
|
Details
|
|
|
12-30-2006
|
4.00
|
Tryed to fix throttle cable problems
|
Details
|
|
|
12-23-2006
|
3.00
|
Removed header tank an replaced fuel lines.
|
Details
|
|
|
12-09-2006
|
3.00
|
Diagnosed starting problem.
|
Details
|
|
|
12-02-2006
|
2.00
|
Installed elevator gap seal
|
Details
|
|
|
11-25-2006
|
2.00
|
finished rear center cover weather stripping, inst
|
Details
|
|
|
11-18-2006
|
4.00
|
Weather stripping and taxi test
|
Details
|
|
|
11-12-2006
|
4.00
|
Removed front wheel tightened and cleaned pilot pa
|
Details
|
|
|
10-15-2006
|
6.00
|
Installed center cover and caulked
|
Details
|
|
|
10-01-2006
|
4.00
|
finished right jury stru, ran engine and taxi-ed
|
Details
|
|
|
09-30-2006
|
4.00
|
Started right jury struts and got 3/4 way done.
|
Details
|
|
|
09-10-2006
|
3.00
|
finish left jury strut and 1st engine start!!!!
|
Details
|
|
|
09-09-2006
|
4.00
|
jury struts left wing
|
Details
|
|
|
09-04-2006
|
5.00
|
tailwheel, BRS bridle, ELT antenna, rear center co
|
Details
|
|
|
09-03-2006
|
5.00
|
more work on BRS and center cover
|
Details
|
|
|
09-02-2006
|
9.00
|
Center cover and BRS
|
Details
|
|
|
08-15-2006
|
10.00
|
Finished most of the tail
|
Details
|
|
|
08-13-2006
|
8.00
|
Completed some wiring, lights and tail booms
|
Details
|
|
|
08-12-2006
|
4.00
|
Tightened wings, fuel lines, air lines, control ca
|
Details
|
|
|
08-05-2006
|
6.00
|
Hung wings
|
Details
|
|
|
08-02-2006
|
0.50
|
Moved tools and parts and added pull in straps
|
Details
|
|
|
07-31-2006
|
1.00
|
Cleaned up barn and began moving stuff into traile
|
Details
|
|
|
07-27-2006
|
1.50
|
Caulked and riveted in front window
|
Details
|
|
|
07-24-2006
|
0.75
|
caulked and rivited in rear windows
|
Details
|
|
|
07-23-2006
|
4.00
|
doors and windows work
|
Details
|
|
|
07-22-2006
|
2.00
|
Reglassed door and bought lock
|
Details
|
|
|
07-19-2006
|
3.00
|
painted windows and glass left door
|
Details
|
|
|
07-18-2006
|
1.00
|
Repainted inside of doors and rear window edges
|
Details
|
|
|
07-17-2006
|
0.25
|
Added hardener to left door fiberglass
|
Details
|
|
|
07-16-2006
|
3.00
|
dash, windows and doors
|
Details
|
|
|
06-11-2006
|
1.00
|
more on windows
|
Details
|
|
|
06-10-2006
|
3.00
|
workder on windows and drilled finger
|
Details
|
|
|
05-21-2006
|
2.00
|
worked on doors and windows
|
Details
|
|
|
05-06-2006
|
2.00
|
finished arraching hinges for elevator
|
Details
|
|
|
04-30-2006
|
2.00
|
Worked on empennage
|
Details
|
|
|
04-29-2006
|
4.00
|
Started tail and worked on windows
|
Details
|
|
|
03-26-2006
|
4.00
|
prop, alternator, wiring, radiator door
|
Details
|
|
|
03-19-2006
|
4.00
|
Bled brakes and adding charging cable to battery
|
Details
|
|
|
03-12-2006
|
6.00
|
Misc stuff
|
Details
|
|
|
03-06-2006
|
2.00
|
safety wired and messed with radiator plug
|
Details
|
|
|
03-04-2006
|
1.00
|
Re-sealed radiator plug, widened hole for radiator
|
Details
|
|
|
02-18-2006
|
2.00
|
pulled radiator, attempted to install prop and alt
|
Details
|
|
|
02-11-2006
|
1.00
|
Bagan installing alternator and filled coolant
|
Details
|
|
|
01-24-2006
|
1.50
|
finished battery plaform
|
Details
|
|
|
01-22-2006
|
3.50
|
Wiring and oil cooler bracket
|
Details
|
|
|
01-21-2006
|
4.00
|
finished & installed battery platform
|
Details
|
|
|
01-18-2006
|
1.50
|
worked on battery platform
|
Details
|
|
|
01-17-2006
|
2.00
|
worked on battery platform
|
Details
|
|
|
01-16-2006
|
1.50
|
worked on battery platform
|
Details
|
|
|
01-15-2006
|
2.00
|
instarted battery platform and misc
|
Details
|
|
|
01-09-2006
|
3.00
|
started making oil cooler bracket
|
Details
|
|
|
01-07-2006
|
3.50
|
began installing oil res and oil cooler
|
Details
|
|
|
01-05-2006
|
3.00
|
installed coolant hoses and misc stuff
|
Details
|
|
|
01-04-2006
|
1.00
|
worked on engine
|
Details
|
|
|
01-03-2006
|
7.00
|
installed venturi and backup charging wiring
|
Details
|
|
|
01-01-2006
|
4.00
|
installed fuel lines and water/fuel seperator
|
Details
|
|
|
12-30-2005
|
4.00
|
installed regulator, solenoid and wiring
|
Details
|
|
|
12-06-2005
|
4.00
|
Cleaned, rewired and installed rectifier and solen
|
Details
|
|
|
11-27-2005
|
3.00
|
Began connecting engine components
|
Details
|
|
|
11-26-2005
|
1.50
|
Mounted engine on airframe
|
Details
|
|
|
11-23-2005
|
3.00
|
Uncrated engine and other stuff
|
Details
|
|
|
11-23-2005
|
1.00
|
Picked up engine from shipping company
|
Details
|
|
|
11-18-2005
|
0.50
|
The engine shipped from the factory today
|
Details
|
|
|
11-16-2005
|
1.00
|
Moved fuselage into barn and started to remove som
|
Details
|
|
|
11-13-2005
|
5.00
|
Trailered everything home
|
Details
|
|
|
11-12-2005
|
3.00
|
Bubble wrapped peices and loaded trailer
|
Details
|
|
|
11-11-2005
|
4.00
|
Repainted fuselage to fix pin holes
|
Details
|
|
|
11-10-2005
|
4.00
|
Sanded and painted wing and tail
|
Details
|
|
|
11-09-2005
|
4.00
|
Sanded and painted fuselage
|
Details
|
|
|
10-09-2005
|
2.00
|
Cleaned up booth and loaded trailer
|
Details
|
|
|
10-08-2005
|
12.00
|
Prepped and primered all parts
|
Details
|
|
|
10-07-2005
|
9.00
|
Trailered plane to Uncle Norman's
|
Details
|
|
|
10-06-2005
|
5.00
|
Sanded and prepped for paint
|
Details
|
|
|
10-05-2005
|
5.00
|
Sanded and prepped for paint
|
Details
|
|
|
10-04-2005
|
5.00
|
Sanded and prepped for paint
|
Details
|
|
|
10-03-2005
|
4.00
|
Sanded and prepped for paint
|
Details
|
|
|
10-02-2005
|
6.50
|
Attched airleronto left wing
|
Details
|
|
|
10-01-2005
|
5.00
|
attached airleron and taped gap seal on rt wing
|
Details
|
|
|
09-24-2005
|
3.00
|
worked on attaching airleron to right wing
|
Details
|
|
|
09-18-2005
|
4.00
|
putty and sand fuselage
|
Details
|
|
|
09-17-2005
|
2.00
|
installed drains
|
Details
|
|
|
08-20-2005
|
5.00
|
taping and sanding
|
Details
|
|
|
08-13-2005
|
6.00
|
MIsc panel work and trib tab work
|
Details
|
|
|
08-03-2005
|
3.00
|
Ordered misc parts
|
Details
|
|
|
07-30-2005
|
4.00
|
Airleron work
|
Details
|
|
|
04-10-2005
|
3.00
|
Misc wing work
|
Details
|
|
|
04-02-2005
|
1.00
|
ordered misc parts
|
Details
|
|
|
04-01-2005
|
2.00
|
Lighting
|
Details
|
|
|
03-19-2005
|
3.00
|
Created Visio drawing of panel wiring
|
Details
|
|
|
01-16-2005
|
3.50
|
Construction log data entry
|
Details
|
|
|
12-27-2004
|
2.00
|
Finished adding expenses to KitLog
|
Details
|
|
|
12-26-2004
|
3.00
|
Worked on getting organized
|
Details
|
|
|
12-19-2004
|
2.00
|
Fixied loose fabric on left wing
|
Details
|
|
|
10-24-2004
|
4.00
|
Trailered fuselage and wings
|
Details
|
|
|
10-17-2004
|
1.00
|
Finished installing tiedowns in trailer
|
Details
|
|
|
10-09-2004
|
3.00
|
installed tie downs into new trailer
|
Details
|
|
|
10-02-2004
|
1.00
|
Dowloaded and installed Kitlog Pro
|
Details
|
|
|
09-29-2004
|
7.00
|
drove to DE and picked up new trailer
|
Details
|
|
|
04-04-2004
|
4.00
|
taped a tail piece, continued working on airleron
|
Details
|
|
|
03-28-2004
|
3.50
|
sanded firewall putty, worked on 2nd airleron fabr
|
Details
|
|
|
03-27-2004
|
2.00
|
started applying fabric on 2nd airleron, shrunk fi
|
Details
|
|
|
03-25-2004
|
0.75
|
started prepping 2nd airleron for fabric
|
Details
|
|
|
03-21-2004
|
1.50
|
temporarily installed venturri and cleaned interio
|
Details
|
|
|
03-20-2004
|
4.00
|
bonded firewall to fuselaghe, taped tail horizonta
|
Details
|
|
|
03-18-2004
|
1.00
|
carpeted firewall, reinstalled engine mount
|
Details
|
|
|
03-06-2004
|
2.50
|
installed 4 more cam locks in radiator cover, tigh
|
Details
|
|
|
02-29-2004
|
4.00
|
carpet, holes in firewall and fuselage, cam locks
|
Details
|
|
|
02-28-2004
|
2.00
|
cleaned interior and moved back ino the barn
|
Details
|
|
|
02-21-2004
|
8.00
|
puttied and sanded fuelage, fabricated & installed
|
Details
|
|
|
02-14-2004
|
8.00
|
puttied and sanded fuelage, trimmed radiator cover
|
Details
|
|
|
02-07-2004
|
6.00
|
puttied and sanded fuelage
|
Details
|
|
|
01-19-2004
|
4.00
|
flaperon cables, fuselage panels, misc stuff
|
Details
|
|
|
01-17-2004
|
2.00
|
drilled holes in door hindges, installed drivers s
|
Details
|
|
|
01-11-2004
|
2.50
|
fit & trimmed door openings, fit & trimmed bottoms
|
Details
|
|
|
01-04-2004
|
5.00
|
fiber glued the fuselage together
|
Details
|
|
|
01-03-2004
|
2.00
|
prepped and fiberglassed the side panels to the be
|
Details
|
|
|
12-28-2003
|
2.00
|
fuselage work on firewall and strut bracket holes
|
Details
|
|
|
12-07-2003
|
3.00
|
fiberglassed fuselage panels together in rear
|
Details
|
|
|
09-01-2003
|
3.00
|
rear windows and fuselage patches
|
Details
|
|
|
08-31-2003
|
1.00
|
worked on fitting fuselage panels
|
Details
|
|
|
08-28-2003
|
1.00
|
fitting of battery box and fuselage panels
|
Details
|
|
|
08-24-2003
|
3.00
|
AOA plumbing and wiring
|
Details
|
|
|
08-23-2003
|
0.50
|
ran battery wire from engine mount to breaker pane
|
Details
|
|
|
08-09-2003
|
3.00
|
nose gear wheel pant, pilot pal and pilot tube
|
Details
|
|
|
08-02-2003
|
3.00
|
50amp fuse, AOA gauge, wire holding pole, pilot tu
|
Details
|
|
|
07-20-2003
|
4.00
|
heater duct, tightened misc bolts, radiator and ra
|
Details
|
|
|
07-19-2003
|
2.00
|
worked heater vents
|
Details
|
|
|
07-12-2003
|
0.50
|
reattached landing gear for the last time, I hope
|
Details
|
|
|
07-05-2003
|
0.50
|
attached landing gear fairings to landing gear wit
|
Details
|
|
|
06-21-2003
|
2.50
|
moved fuselage to barn
|
Details
|
|
|
11-23-2002
|
4.00
|
wiring and luguage platforms
|
Details
|
|
|
11-17-2002
|
4.00
|
flaperon bracket, battery wire, luggauge racks, wi
|
Details
|
|
|
09-01-2002
|
4.50
|
cut, measured, drilled, and clecoed, luggage rack
|
Details
|
|
|
08-31-2002
|
2.50
|
documented wiring, took measurements for luggage p
|
Details
|
|
|
08-24-2002
|
6.00
|
installed reinforment bars for the longerons, this
|
Details
|
|
|
08-11-2002
|
2.00
|
ironed out wrinkles on tail pieces and right wing,
|
Details
|
|
|
08-10-2002
|
6.00
|
worked in tail pieces and cut holes in other wing
|
Details
|
|
|
08-04-2002
|
4.00
|
worked on covering tail pieces, installing elevato
|
Details
|
|
|
08-03-2002
|
2.00
|
continued taping airleron
|
Details
|
|
|
08-02-2002
|
4.00
|
cleaned up and prepped airleron, began taping aile
|
Details
|
|
|
08-01-2002
|
2.00
|
ironed out wrinkles on the edges of the tail piece
|
Details
|
|
|
07-29-2002
|
4.75
|
cut holes in fabric for strut and AOA probe added
|
Details
|
|
|
07-28-2002
|
5.00
|
applied pinked tape to perimeter of left wing
|
Details
|
|
|
07-27-2002
|
6.00
|
cleaned up fabric and applied lace tape, rivets an
|
Details
|
|
|
07-26-2002
|
7.50
|
finished applying and shrinking fabric on top of l
|
Details
|
|
|
07-25-2002
|
6.00
|
shrunk wingtip and began fabric application to top
|
Details
|
|
|
07-24-2002
|
8.00
|
prepped bottom of left wing for fabric
|
Details
|
|
|
07-22-2002
|
2.50
|
finished and shrunk bottom of left wing
|
Details
|
|
|
07-21-2002
|
6.00
|
beganapplying fabric to left wing
|
Details
|
|
|
07-20-2002
|
5.00
|
finsihed wing jig, prepped left wing for fabric
|
Details
|
|
|
07-19-2002
|
3.00
|
worked on building wing jigs
|
Details
|
|
|
07-18-2002
|
3.00
|
applied fabric tape to top of right wing
|
Details
|
|
|
07-17-2002
|
5.00
|
applied fabric tape to bottom of rt wing
|
Details
|
|
|
07-16-2002
|
4.00
|
rib laced and riveted th ebottom of right wing
|
Details
|
|
|
07-15-2002
|
5.00
|
shrunk fabric to top of right wing then applied ri
|
Details
|
|
|
07-01-2002
|
3.00
|
felted, taped and fabriced top of right wing
|
Details
|
|
|
06-20-2002
|
4.00
|
started working on the top of the right wing
|
Details
|
|
|
06-16-2002
|
2.00
|
finished fabric application to rt wing bottom
|
Details
|
|
|
06-09-2002
|
2.00
|
felted rib gussets applied more fabric to right wi
|
Details
|
|
|
06-08-2002
|
2.00
|
installed anti-chaif plate & started fabric applic
|
Details
|
|
|
06-02-2002
|
1.50
|
finished applying felts to wings
|
Details
|
|
|
06-01-2002
|
1.50
|
applied fabric to wingtips
|
Details
|
|
|
05-18-2002
|
1.50
|
applied felt to wing ribs and rough spots
|
Details
|
|
|
01-27-2002
|
3.00
|
holes in firewall, brake lines, wire bundles
|
Details
|
|
|
01-26-2002
|
1.00
|
installed wiring for landing lights and tested
|
Details
|
|
|
01-23-2002
|
2.00
|
traced & diagramed wiring
|
Details
|
|
|
01-13-2002
|
3.50
|
cut & fit aluminum filler panel for fuselage gap
|
Details
|
|
|
01-12-2002
|
2.50
|
finished fitting firewall to fuselage panels
|
Details
|
|
|
10-16-2001
|
3.00
|
fitted firewall into place
|
Details
|
|
|
10-14-2001
|
2.00
|
drilled holes and dry fitted firewall
|
Details
|
|
|
08-19-2001
|
3.00
|
fuselage panel work and wire wrap
|
Details
|
|
|
07-04-2001
|
1.00
|
painted insude fuselage, mounted xponder ground pl
|
Details
|
|
|
06-16-2001
|
2.50
|
primed wheel pants, radiator cover and door
|
Details
|
|
|
06-15-2001
|
2.50
|
prepped wheel pants for paint
|
Details
|
|
|
06-08-2001
|
3.00
|
wheel pants, belly pan, radiator cover, elevator
|
Details
|
|
|
05-28-2001
|
4.00
|
moved fuselage, worked on garage and hangar
|
Details
|
|
|
05-26-2001
|
4.00
|
wiring, cabin heat and radiator cover doors
|
Details
|
|
|
05-20-2001
|
4.00
|
heater door, eis wiring, antenna, heater ducts
|
Details
|
|
|
05-11-2001
|
2.00
|
Fitted radiator into place.
|
Details
|
|
|
05-05-2001
|
5.00
|
Misc interior parts
|
Details
|
|
|
05-04-2001
|
5.00
|
Misc interior components.
|
Details
|
|
|
04-18-2001
|
6.00
|
finished radiator door, antenna, wiring, paint
|
Details
|
|
|
04-16-2001
|
2.00
|
Continued work on the radiator cover door
|
Details
|
|
|
04-15-2001
|
5.00
|
More wiring
|
Details
|
|
|
04-14-2001
|
3.00
|
Figured out noise problem in intercomm
|
Details
|
|
|
04-13-2001
|
1.50
|
Began radiator cover door
|
Details
|
|
|
04-08-2001
|
4.00
|
Fuel pump wiring and intercom power
|
Details
|
|
|
04-07-2001
|
5.00
|
Electrical stuff
|
Details
|
|
|
04-01-2001
|
7.00
|
Wiring
|
Details
|
|
|
03-31-2001
|
7.50
|
Wiring
|
Details
|
|
|
03-25-2001
|
3.00
|
Wiring
|
Details
|
|
|
03-24-2001
|
2.50
|
Tubing
|
Details
|
|
|
03-18-2001
|
1.00
|
Installed wiring from encoder to transponder
|
Details
|
|
|
03-14-2001
|
2.00
|
Continued wiring transponder to altitude encoder
|
Details
|
|
|
03-11-2001
|
4.00
|
Plumbing
|
Details
|
|
|
03-11-2001
|
1.00
|
Installed LRI probe mounting on wing platform with
|
Details
|
|
|
03-05-2001
|
2.00
|
instrumenty plumbing, G5 wire testing, inventory
|
Details
|
|
|
03-04-2001
|
1.50
|
Replaced temp bolts mounting seat to seat brackets
|
Details
|
|
|
03-03-2001
|
3.00
|
cut holes & drilled holes in instrument panel
|
Details
|
|
|
02-13-2001
|
2.00
|
Wired transponder to altitude encoder
|
Details
|
|
|
02-12-2001
|
2.00
|
G5 rudder and head wiring instrument screws
|
Details
|
|
|
02-10-2001
|
6.00
|
Installed instrument panel, center console, thrott
|
Details
|
|
|
02-03-2001
|
5.00
|
Final coat of paint on interior pieces
|
Details
|
|
|
01-27-2001
|
8.00
|
Paint interior.
|
Details
|
|
|
01-13-2001
|
6.00
|
Prepped interior for paint
|
Details
|
|
|
11-11-2000
|
3.00
|
Applied and shrunk fabric to flying surfaces
|
Details
|
|
|
10-15-2000
|
1.00
|
wiring for elevtor trim
|
Details
|
|
|
10-14-2000
|
1.00
|
shrunk fabric on horz stab, rivet & taped rudder
|
Details
|
|
|
10-08-2000
|
4.00
|
fabric to horz stab, taped & riveted rudder
|
Details
|
|
|
10-07-2000
|
3.00
|
center console work and instrument panel work
|
Details
|
|
|
09-17-2000
|
4.50
|
Worked on bus bar and rudder skins
|
Details
|
|
|
09-10-2000
|
4.00
|
Glued fabric to one side of horizontal stabilizer
|
Details
|
|
|
09-09-2000
|
2.00
|
preped tail pieces for fabric
|
Details
|
|
|
09-02-2000
|
2.00
|
Repair instrument panel
|
Details
|
|
|
09-01-2000
|
0.50
|
EIS wiring
|
|
|
|
08-31-2000
|
0.10
|
Received EIS
|
Details
|
|
|
08-23-2000
|
4.00
|
Parts ordering
|
Details
|
|
|
08-19-2000
|
3.00
|
Landing light flasher and yoke
|
Details
|
|
|
08-13-2000
|
4.00
|
Tail work
|
Details
|
|
|
08-12-2000
|
3.00
|
Started covering rudder.
|
Details
|
|
|
08-08-2000
|
2.00
|
Wiring diagram
|
Details
|
|
|
08-07-2000
|
2.00
|
Wiring diagram
|
Details
|
|
|
07-16-2000
|
2.00
|
Internal panels
|
Details
|
|
|
07-15-2000
|
2.00
|
Aligned fuselage panels
|
Details
|
|
|
06-25-2000
|
2.00
|
Body trimming
|
Details
|
|
|
06-24-2000
|
2.00
|
Trimming body panels
|
Details
|
|
|
06-01-2000
|
1.00
|
Tail covering
|
Details
|
|
|
05-30-2000
|
4.00
|
Covering tail
|
Details
|
|
|
05-22-2000
|
1.50
|
Covering flying surfaces
|
Details
|
|
|
05-21-2000
|
2.00
|
Fabric on flying surfaces
|
Details
|
|
|
05-14-2000
|
1.00
|
Fabric qork
|
Details
|
|
|
05-07-2000
|
6.00
|
Left wimg
|
Details
|
|
|
05-06-2000
|
4.00
|
left wing
|
Details
|
|
|
05-05-2000
|
2.50
|
Seat fix and instrument panel flub
|
Details
|
|
|
05-02-2000
|
2.00
|
trim tab and coolant bottle
|
Details
|
|
|
04-30-2000
|
4.00
|
Trailer work
|
Details
|
|
|
04-29-2000
|
3.00
|
Work on enclosed trailer
|
Details
|
|
|
04-23-2000
|
6.00
|
Left wing work
|
Details
|
|
|
03-26-2000
|
6.00
|
Misc stuff
|
Details
|
|
|
03-25-2000
|
1.50
|
Misc paint
|
Details
|
|
|
03-19-2000
|
3.00
|
Misc stuff
|
Details
|
|
|
03-16-2000
|
4.00
|
Misc fiberglass work
|
Details
|
|
|
03-12-2000
|
5.00
|
Misc fiberglass work
|
Details
|
|
|
03-11-2000
|
6.00
|
Misc stuff
|
Details
|
|
|
03-09-2000
|
0.50
|
Paint inside of fiberglass pieces black
|
Details
|
|
|
03-08-2000
|
0.50
|
Landing gear pants
|
Details
|
|
|
03-07-2000
|
0.75
|
Throttle linkage
|
Details
|
|
|
03-06-2000
|
0.75
|
Belly pan, radiator
|
Details
|
|
|
03-05-2000
|
8.50
|
Battery box, ins. panel, seats, console
|
Details
|
|
|
03-04-2000
|
5.00
|
Belly pan and battery box
|
Details
|
|
|
02-20-2000
|
3.50
|
Painted fuselage frame again
|
Details
|
|
|
02-08-2000
|
0.10
|
Info on paint application
|
Details
|
|
|
02-06-2000
|
4.50
|
Painted fuselage frame
|
Details
|
|
|
01-23-2000
|
3.00
|
preped fuselage frame for paint
|
Details
|
|
|
01-09-2000
|
2.50
|
Paint and paint booth
|
Details
|
|
|
01-02-2000
|
3.00
|
Prep fuselage frame for paint
|
Details
|
|
|
12-27-1999
|
0.50
|
Landing gear
|
Details
|
|
|
12-26-1999
|
3.00
|
Belly pan and landing gear
|
Details
|
|
|
12-18-1999
|
2.00
|
Landing gear
|
Details
|
|
|
12-07-1999
|
1.00
|
Landing gear
|
Details
|
|
|
12-06-1999
|
1.50
|
Landing gear
|
Details
|
|
|
11-28-1999
|
5.00
|
Left wing
|
Details
|
|
|
11-27-1999
|
6.00
|
Left wing
|
Details
|
|
|
11-26-1999
|
6.00
|
Right wing
|
Details
|
|
|
11-13-1999
|
1.50
|
Finished root tube and work on elevator
|
Details
|
|
|
11-10-1999
|
0.50
|
Root tube
|
Details
|
|
|
11-08-1999
|
1.00
|
Root tube
|
Details
|
|
|
11-07-1999
|
3.00
|
Right wing leading edge
|
Details
|
|
|
11-07-1999
|
3.00
|
Reinforcing tube for root tube
|
Details
|
|
|
10-17-1999
|
2.50
|
Right wing leading edge
|
Details
|
|
|
10-03-1999
|
8.00
|
Right wing ribs
|
Details
|
|
|
09-19-1999
|
7.00
|
Right wing work
|
Details
|
|
|
09-07-1999
|
2.00
|
Right wing work
|
Details
|
|
|
09-06-1999
|
3.00
|
Fuselage frane
|
Details
|
|
|
09-05-1999
|
4.00
|
Right wing work
|
Details
|
|
|
09-04-1999
|
3.00
|
Fixed up trailer
|
Details
|
|
|
09-03-1999
|
11.50
|
Picked up trailer
|
Details
|
|
|
09-02-1999
|
6.50
|
Picked up trailer
|
Details
|
|
|
08-14-1999
|
2.00
|
Started working on wing ribs
|
Details
|
|
|
08-14-1999
|
5.00
|
Hangar cleanup and trailer hunting
|
Details
|
|
|
08-07-1999
|
1.00
|
Started work on wings
|
Details
|
|
|
08-07-1999
|
3.00
|
Picked up two more tables
|
Details
|
|
|
08-01-1999
|
5.00
|
Worked on hanagr, table, & inventory
|
Details
|
|
|
07-29-1999
|
1.50
|
Bought hose, worked on elevator
|
Details
|
|
|
07-28-1999
|
0.50
|
Messed with rivet gun
|
Details
|
|
|
07-27-1999
|
1.50
|
Cleaned and organized garage
|
Details
|
|
|
07-25-1999
|
4.00
|
Put together work table
|
Details
|
|
|
07-24-1999
|
0.75
|
Took box of fiberglass over to hangar
|
Details
|
|
|
07-18-1999
|
1.50
|
Continued cleaning hanger walls
|
Details
|
|
|
07-17-1999
|
1.50
|
Continued inventory.
|
Details
|
|
|
07-17-1999
|
3.00
|
Cleaned hangar walls and removed debris
|
Details
|
|
|
07-15-1999
|
2.00
|
Started inventory
|
Details
|
|
|
07-11-1999
|
4.00
|
Added more stone and vents to hanagar
|
Details
|
|
|
07-10-1999
|
3.00
|
Put more stone around hangar floor
|
Details
|
|
|
07-09-1999
|
0.50
|
Studied builders manual
|
Details
|
|
|
07-08-1999
|
0.10
|
My pneumatic rivet gun finally arrived.
|
Details
|
|
|
07-04-1999
|
4.00
|
Put rocks around hangar floor
|
Details
|
|
|
07-03-1999
|
2.00
|
Moved boxes to hangar
|
Details
|
|
|
06-30-1999
|
0.50
|
Studied Builder's Manual's.
|
Details
|
|
|
06-26-1999
|
1.00
|
Looked through boxes
|
Details
|
|
|
06-25-1999
|
7.00
|
Floor poored in hangar
|
Details
|
|
|
06-25-1999
|
0.25
|
Boxes arrived
|
Details
|
|