KitLog pro

Powered By Kitlog Pro v2.0

JAMES'S WEB SITE
Work Logs Found: 89
Category Work Time: 432 Hours
 Date
Hours
Work Log Summary

Details

 03-31-2007
6.00
Removal of leading edge from Model II
Details

 04-04-2006
4.00
Wing Detail
Details
       

 04-03-2006
3.00
Built angles and glued trailing edge
Details

 04-01-2006
3.00
Clean and start on Right wing
Details
       

 03-31-2006
5.00
Left wing tip
Details
       

 03-30-2006
4.00
Final coat and install flaperon
Details
       

 03-29-2006
4.00
Varnish Wing ribs
Details
       

 03-28-2006
4.00
Fab wing tip
Details
       

 03-27-2006
3.00
Sand ribs and fit leading edge
Details
       

 03-25-2006
4.00
Training edge and pitot tube
Details
       

 03-24-2006
6.00
Trailing edge Left wing
Details
       

 03-23-2006
4.00
Completion Flaperons and st trailing edg
Details
       

 03-20-2006
6.00
Detailed Floaperons
Details
       

 03-19-2006
3.00
Install wing on Right side
Details
       

 03-18-2006
5.00
Detail for the Right wing
Details
     

 03-17-2006
5.00
Fit up of left wing
Details

 03-16-2006
6.00
Detail Left Wing
Details

 03-15-2006
4.00
Jury Struts and Lift Strut bracket insta
Details
       

 03-14-2006
3.00
Jury struts and flaperons
Details
       

 03-13-2006
5.00
Fit and drill wing spar pins.
Details
     

 03-02-2006
8.00
Fit wings to fuselage
Details
       

 03-01-2006
6.00
Completed glue up and prep for wing inst
Details

 02-28-2006
4.00
Prep Right wing for glue up

 02-21-2006
5.00
Detail Left wing
Details
       

 02-20-2006
4.00
glue up ot left wing
Details
       

 02-19-2006
4.00
Assembly
Details
       

 02-18-2006
4.00
Epoxy Brackets
Details
       

 02-17-2006
4.00
Install flaporon supports, rub down Spar
Details

 02-11-2006
3.00
Flaperon supports

 02-11-2006
3.00
Fab flaperon support brackets
Details
       

 02-04-2006
6.00
Fabricate brackets
Details
       

 02-03-2006
6.00
Wing ribs and Brackets
Details

 02-02-2006
4.00
Rib Preperation
Details
       

 02-01-2006
3.00
material Preperation
Details

 01-31-2006
3.00
Build assembly Jig
       

 01-26-2006
5.00
Cowl Repair
Details
     

 01-25-2006
5.00
Cowl Repairs
Details
       

 01-24-2006
4.00
Cowl and wiring
Details
     

 01-23-2006
4.00
Cowl
Details
       

 01-21-2006
5.00
Cowl and Wiring
Details

 01-20-2006
4.00
Cowling and Wiring
Details
       

 01-19-2006
3.00
Cowling rework
Details

 01-18-2006
2.00
Cowl refit
Details

 05-08-2004
3.00
Install gauges
       

 03-13-2004
6.00
Electical and cowl fit up
Details
       

 03-11-2004
8.00
Elec tie in
Details
       

 03-10-2004
6.00
Electrical and muffler
Details
       

 03-09-2004
6.00
Elec and muffler
Details
     

 03-08-2004
6.00
Electrical system
Details
       

 03-07-2004
3.00
Fuel and Electrical systems
Details
       

 03-06-2004
7.00
Fuel system
Details
       

 03-05-2004
6.00
Fuel system
Details
       

 03-04-2004
7.00
Throttle and cable installation
Details
       

 03-03-2004
6.00
Throttle controls
Details
       

 03-02-2004
5.00
Panel layout
Details
       

 03-01-2004
7.00
Cooling System and Fuel System
Details
       

 02-28-2004
6.00
Fuel and cooling systems
Details
     

 02-27-2004
8.00
Mount equipment
Details
       

 02-26-2004
8.00
Mount cab heater and fit Eng oil res.
Details

 02-23-2004
4.00
Heater installlation and chase parts

 02-21-2004
4.00
Coolant hook up
Details
       

 02-20-2004
6.00
Engine and cooling system
Details
       

 02-19-2004
5.00
Hook up breaks and reinstall firewall
Details
       

 02-17-2004
8.00
Complete firewall and replace rudder
Details
       

 02-15-2004
4.00
fab lower firewall
Details

 02-14-2004
6.00
Fit of cowl
Details

 02-13-2004
8.00
Fit of cowl
Details
       

 02-12-2004
6.00
Fit and install fiberglass cowl
Details

 02-10-2004
6.00
Detail
Details

 02-09-2004
6.00
eng installation
Details
       

 02-07-2004
4.00
Catch up and finish a number of items
Details

 02-06-2004
8.00
Detail fuselage and landing gear
Details
       

 02-05-2004
8.00
Installation of landing gear
Details

 02-04-2004
7.00
completed flaperon linkage
Details

 02-03-2004
5.00
Installed the Empennage
Details
       

 02-02-2004
5.00
Control Linkage
     

 02-01-2004
4.00
Control linkage
       

 01-28-2004
4.00
Control linkags parts and assemblies

 01-03-2004
4.00
control system
Details
       

 01-01-2004
2.00
Controls
Details

 11-26-2003
3.50
Fabricate mounting brackets for control
Details

 11-24-2003
1.00
Inspection of questionable weld
Details

 11-22-2003
5.00
Drilled and prep Lift Strut Spar bracket
Details

 11-20-2003
3.00
Inspect welds and grind tabs
Details
       

 11-19-2003
7.00
Sandblast Fuselage
Details

 11-18-2003
6.00
Sandblast of small components
Details
       

 11-17-2003
2.00
Sandblast and inspect components
Details

 01-13-2000
2.00
Rec. All remaining kits

 04-01-1990
4.00
Recieved fuselage and wing kit
Details










Copyright © 2001-2024 Matronics. All Rights Reserved.